PLANNING
Project of Gas Processing Jambaran Tiung Biru
- Bojonegoro
Member’s name :
1. DEWI NAJIBAH K/07 (1-4)
2. IYZ HANIUDDIN/12 (5-8)
4MRK3
1
2
Gayam,
Bojonegoro
3
Why we get there? Because we want to complete this project until 100%.
4
2. Set objectives
Is this where we want to be?
Gas processing Jambaran Tiung Biru has an area ±200ha, will be
completed in 2021 at Rp. 3.771.905.000.000,00.
5. Prepare forecasts
Conventional method
Precast method
What is the best course for us to take?
Of the above 2 methods and also consideration of the rainy weather the
more effective method used is precast method.
What are the potential benefits?
• Precast method provides ease during installation
• Accelerate the job
• Good quality Guaranteed
• Spending on labor costs
7