PROJECT :
SUBTITLE :
INPUT DATA : L
f'c(kg/cm2) = 250
Cy
B
ft(kg/cm2) = 1600
Cx
PILE DIAMETER,Dp(mm) = 400 PILE PITCH ; CL (mm.) 1000
PILE PITCH
PILE CAPACITY, Ra(ton) = 90 CL
MOMENT@COLUMN FACE :
M(t.m) = 22.5
PUNCHING SHEAR
NOTE X , X' : DISTANCE BETWEEN CRITICAL SECTION AND THE CENTER OF PILE (SEE ACI 318-89: SECTION 15.5)
0.53 f'c : PERMISSIBLE SHEAR STRESS CARRIED BY CONCRETE (SEE ACI 318-89:SECTION 11.3)