HPVP, Vizag

SHEET 1 OF 2

SCOPE OF SUPPLY INCLUDED IN THE VENDOR SCOPE FOR LDO


PUMPING SKID FOR PANKI AUXILIARY BOILER PROJECT

Reference Documents

1. P&ID N.. 1-00-056-U8011, Rev.1


2. Valve Schedule No. FS/7851/Valve/001, Rev.01 -- Please provide this document
Not able to find in the given document set
3. Specification for LDO Screw Pumps, TOS 1800/Rev. 00
4. LDO pump motor data sheet, TOS 802/Rev.00
5. Technical specification for LT motors (Flame proof), Rev.0
6. LDO Pump set drawing no. B-0-42-010-00002,Rev.0
7. Frame for LDO pump set drawing no. B-1-42-010-00002, Rev.0
8. Pump frame drg.no.. B-2-42-010-00006,Rev.0
9. PMS of 11A
10. PMS of 21A
11. Standard vent, drain & pressure inst. Connection details , drg.no. 4-38101-02488, Rev.
01
12. Details of welding, inspection &testing for BOP piping, doc.no. GT 57124, Rev.03
13. Vendors list for critical items like Pumps, Motors, Pipes and valves.
Complete LDO pumping skid consisting of the following in assembled condition.
1. LDO PUMPS WITH MOTORS ALONG WITH BASE FRAME (2 SETS)---End
connections flanged Noted
2. LDO PUMP INLET PIPING OF SIZE 80 NB --- End connections flanged Noted
3. LDO PUMP OUTLET PIPING OF SIZE 40 NB--- End connections flanged Noted
4. LDO PUMP RETURN PIPING OF SIZE 40 NB--- End connections flanged Noted
5. INLET AND OUTLET PIPING OF STRAINERS, SIZE 80 NB --- End connections flanged ,
Understand from this document that strainers are not in our scope , Please Confirm
6. GATE VALVES WITH TAG NO. LO 02A/02B/03A/03B/05A/05B---For end connections,
refer valve schedule FS/7851/VALVE/001, Rev.01
7. NRV WITH TAG NO. LO 04A/04B-- For end connections, refer valve schedule
FS/7851/VALVE/001, Rev.01
8. GLOBE VALVES WITH TAG NO. LO 06A/06B/06C/06D/06E/06F; LO 07A/07B/07C; LO
08A/08B; LO 12A/12B AND LO13-- For end connections, refer valve schedule
FS/7851/VALVE/001, Rev.01 This standard not available , Please send to us.
9. Wherever the item is excluded from vendor scope, temporary spool pieces are to be provided
for easy replacement of spools with actual item. Noted
10. Pipe supports with clamps are to be provided wherever necessary. Noted
11. Vendor to provide counter flanges with gaskets and bolts&nuts at the skid battery limits. We
need to arrive this scope very clearly , Please give your inputs on this.

BHEL VENDOR
PREPD APPD DATE PREPD APPD DATE
Ch.Satish Kumar Y.Srinivasa Rao 20.09.19
HPVP, Vizag
SHEET 2 OF 2

12. For pipe thickness and other details, please refer PMS 11A & 21A enclosed.
13. For vents, drains and pressure instrument connections details, please refer Drg. No. 4-38101-
02488, Rev.01
14. For Welding, Inspection &Testing of piping, please refer Doc. No. GT 57124, Rev.03
15. Hydro test shall be conducted for pumps and piping & valves at a pressure of 1.5 times of the
design pressure.
16. Painting :
a) Surface preparation to SSPC-SP3/Power tool cleaning
b) Primer: 1 coat of Red Oxide Zinc Phosphate Primer(Alkyd base) to IS 12744, DFT: 30
microns
c) Finish coat: 2 coats of synthetic enamel paint(Long oil Alkyd) to IS 2932, DFT : 20
microns/coat
d) Total DFT : 70 microns (Minimum)

The following items are excluded from the vendor scope.

1. All PIs, PTs, DPTs shown in the P&ID.


2. Control valve with Tag no. LO 11 (LOPCV).
3. Pump inlet strainers with Tag no. L001A/B ( Supplier GA
enclosed). Noted and We don't consider any instruments in
our scope.
4. 1. CAF gaskets are not accepted. Spiral wound gaskets are to be provided.
Notes:

BHEL VENDOR
PREPD APPD DATE PREPD APPD DATE
Ch.Satish Kumar Y.Srinivasa Rao 20.09.19