Name Of Work : Rehabilitation & Up-gradation of Wardha - Arvi from km 0+000 ( Wardha) to km 53+708 (Arvi) of NH-647 to

Two Lane with paved shoulders in the state of Maharastra on Engineering, Procurement & Construction ( EPC ) Contract Basis.

Client : Public Works Department National Highway Division Nagpur


Authority Engineer : TPF Engineering Pvt Ltd in Joint Venture with TPF Gentisa Eurostudios S.L. In association with Nascence
Consultant Private Limited
Contractor : M/s. RPP Infra Projects Limited - P & C Projects( P ) Ltd.(JV)
A. Widening and Strengthining of existing road
2.Granular Subbase

Chainage
Sl.No Unit Side Length RFI No. RFI Date Month IPC No.
From To
1 18+980 19+260 M LHS 280 ARS/009/HW/328 6/26/2019 Jun-19 IPC 2
June 280
2 18+600 18+780 M LHS 180 ARS/009/HW/357 7/6/2019 Jul-19 IPC 2
3 18+500 18+600 M LHS 100 ARS/009/HW/364 7/8/2019 Jul-19 IPC 2
4 17+600 17+800 M LHS 200 ARS/009/HW/382 7/12/2019 Jul-19 IPC 2
5 17+800 18+000 M LHS 200 ARS/009/HW/396 7/15/2019 Jul-19 IPC 2
6 17+500 17+600 M LHS 100 ARS/009/HW/409 7/16/2019 Jul-19 IPC 2
7 17+250 17+500 M LHS 250 ARS/009/HW/423 7/19/2019 Jul-19 IPC 2
8 17+100 17+250 M LHS 150 ARS/009/HW/428 7/20/2019 Jul-19 IPC 2
9 16+800 17+100 M LHS 300 ARS/009/HW/434A 7/22/2019 Jul-19 IPC 2
10 16+700 16+800 M LHS 100 ARS/009/HW/447 7/24/2019 Jul-19 IPC 2
July 1580
11 39+900 40+120 M LHS 220 ARS/009/HW/467 A 8/1/2019 Aug-19 IPC 2
12 19+260 19+500 M LHS 240 ARS/009/HW/471 8/2/2019 Aug-19 IPC 2
13 19+500 19+850 M LHS 350 ARS/009/HW/476 8/3/2019 Aug-19 IPC 2
14 14+900 15+200 M LHS 300 ARS/009/HW/484 8/10/2019 Aug-19 IPC 2
15 15+300 15+700 M LHS 400 ARS/009/HW/487 8/11/2019 Aug-19 IPC 2
16 15+800 16+000 M LHS 200 ARS/009/HW/489 8/12/2019 Aug-19 IPC 2
17 16+000 16+200 M LHS 200 ARS/009/HW/492 8/13/2019 Aug-19 IPC 2
18 41+200 41+500 M LHS 300 ARS/009/HW/495 A 8/14/2019 Aug-19 IPC 2
19 8+800 9+000 M RHS 200 ARS/009/HW/496 8/14/2019 Aug-19 IPC 2
20 9+000 9+260 M RHS 260 ARS/009/HW/500 8/16/2019 Aug-19 IPC 2
21 41+500 41+820 M LHS 320 ARS/009/HW/501 8/16/2019 Aug-19 IPC 2
22 9+200 9+500 M LHS 300 ARS/009/HW/502 A 8/16/2019 Aug-19 IPC 2
23 10+100 10+400 M LHS 300 ARS/009/HW/517 A 8/19/2019 Aug-19 IPC 2
24 9+800 10+100 M LHS 300 ARS/009/HW/519 8/20/2019 Aug-19 IPC 2
25 14+800 14+900 M LHS 100 ARS/009/HW/534 8/21/2019 Aug-19 IPC 2
26 9+260 9+500 M RHS 240 ARS/009/HW/540 8/22/2019 Aug-19 IPC 2
27 8+540 8+800 M RHS 260 ARS/009/HW/546 8/23/2019 Aug-19 IPC 2
28 40+300 40+600 M LHS 300 ARS/009/HW/547 8/23/2019 Aug-19 IPC 2
29 20+000 20+400 M LHS 400 ARS/009/HW/568 8/25/2019 Aug-19 IPC 2
30 6+900 7+200 M LHS 300 ARS/009/HW/594 8/28/2019 Aug-19 IPC 2
31 9+500 9+750 M RHS 250 ARS/009/HW/576 8/26/2019 Aug-19 IPC 2
August 5740
Chainage
Sl.No Unit Side Length RFI No. RFI Date Month IPC No.
From To
32 19+850 20+000 M LHS 150 ARS/009/HW/614 9/2/2019 Sep-19 IPC 3
33 15+200 15+300 M LHS 100 ARS/009/HW/625 9/12/2019 Sep-19 IPC 3
34 9+500 9+800 M LHS 300 ARS/009/HW/630 9/15/2019 Sep-19 IPC 4
35 9+120 9+200 M LHS 80 ARS/009/HW/643 9/22/2019 Sep-19 IPC 4
September 630
36 13+000 13+200 M RHS 200 ARS/009/HW/696 10/6/2019 Oct-19 IPC 3
37 13+200 13+600 M RHS 400 ARS/009/HW/698 10/7/2019 Oct-19 IPC 3
38 10+400 10+500 M LHS 100 ARS/009/HW/715 10/14/2019 Oct-19 IPC 3
39 5+950 6+130 M RHS 180 ARS/009/HW/720 10/15/2019 Oct-19 IPC 3
40 10+580 10+720 M LHS 140 ARS/009/HW/722 10/16/2019 Oct-19 IPC 3
41 13+600 14+000 M RHS 400 ARS/009/HW/727 10/17/2019 Oct-19 IPC 3
42 10+720 11+000 M LHS 280 ARS/009/HW/732 10/17/2019 Oct-19 IPC 3
43 11+000 11+200 M LHS 200 ARS/009/HW/734 10/18/2019 Oct-19 IPC 3
44 11+200 11+400 M LHS 200 ARS/009/HW/753 10/20/2019 Oct-19 IPC 3
45 14+000 14+400 M RHS 400 ARS/009/HW/760 10/20/2019 Oct-19 IPC 3
46 11+400 11+580 M LHS 180 ARS/009/HW/763 10/22/2019 Oct-19 IPC 3
47 14+400 14+700 M RHS 300 ARS/009/HW/766 10/22/2019 Oct-19 IPC 3
48 14+700 15+000 M RHS 300 ARS/009/HW/773 10/23/2019 Oct-19 IPC 3
49 15+000 15+300 M RHS 300 ARS/009/HW/780 10/24/2019 Oct-19 IPC 3
50 8+800 9+120 M LHS 320 ARS/009/HW/782 10/24/2019 Oct-19 IPC 3
51 8+500 8+800 M LHS 300 ARS/009/HW/784 10/24/2019 Oct-19 IPC 3
52 15+300 15+600 M RHS 300 ARS/009/HW/787 10/26/2019 Oct-19 IPC 3
53 42+550 42+700 M LHS 150 ARS/009/HW/789 10/29/2019 Oct-19 IPC 3
54 15+600 15+900 M RHS 300 ARS/009/HW/792 10/30/2019 Oct-19 IPC 3
55 15+900 16+200 M RHS 300 ARS/009/HW/795 10/31/2019 Oct-19 IPC 3
October 5250
56 40600 40950 M LHS 350 ARS/009/HW/837 11/12/2019 Nov-19 IPC4
57 40120 40200 M LHS 80 ARS/009/HW/845 11/13/2019 Nov-19 IPC4
58 20300 20600 M RHS 300 ARS/009/HW/902 11/23/2019 Nov-19 IPC4
59 16700 17300 M RHS 600 ARS/009/HW/920 11/26/2019 Nov-19 IPC4
60 17300 17500 M RHS 200 ARS/009/HW/927 11/27/2019 Nov-19 IPC4
61 17500 17700 M RHS 200 ARS/009/HW/938 11/28/2019 Nov-19 IPC4
62 17700 17800 M RHS 100 ARS/009/HW/945 11/29/2019 Nov-19 IPC4
63 19800 20000 M RHS 200 ARS/009/HW/946 11/29/2019 Nov-19 IPC4
64 17800 18000 M RHS 200 ARS/009/HW/957 11/30/2019 Nov-19 IPC4
65 20000 20300 M RHS 300 ARS/009/HW/961 11/30/2019 Nov-19 IPC4
November 2530
66 18400 18800 M RHS 400 ARS/009/HW/977 12/2/2019 Dec-19 IPC4
67 40880 41260 M LHS 380 ARS/009/HW/982 12/2/2019 Dec-19 IPC4
68 19700 19800 M RHS 100 ARS/009/HW/988 12/3/2019 Dec-19 IPC4
69 18900 19300 M RHS 400 ARS/009/HW/992 12/3/2019 Dec-19 IPC4
70 5980 6130 M LHS 150 ARS/009/HW/1012 12/6/2019 Dec-19 IPC4
71 6130 6580 M LHS 450 ARS/009/HW/1017 12/7/2019 Dec-19 IPC4
72 42340 42550 M LHS 210 ARS/009/HW/1019 12/7/2019 Dec-19 IPC4
Chainage
Sl.No Unit Side Length RFI No. RFI Date Month IPC No.
From To
73 6580 6900 M LHS 320 ARS/009/HW/1020 12/8/2019 Dec-19 IPC4
December 2410
Total One Side 18.42
Total Both Side 9.21

A Total Scope as per Contract Agreement 47.542 Km


B Work done upto date 9.210 Km
C Work done in previous month ( SPC) 6.550 Km
D Work done upto this Month 2.660 Km
E Balance work 38.332 Km
dha - Arvi from km 0+000 ( Wardha) to km 53+708 (Arvi) of NH-647 to
ra on Engineering, Procurement & Construction ( EPC ) Contract Basis.

nture with TPF Gentisa Eurostudios S.L. In association with Nascence

Strengthining of existing road


Granular Subbase

Remarks
Remarks
Remarks
Name Of Work : Rehabilitation & Up-gradation of Wardha - Arvi from km 0+000 ( Wardha) to km 53+708 (Arvi) of NH-647 to
Two Lane with paved shoulders in the state of Maharastra on Engineering, Procurement & Construction ( EPC ) Contract Basis

Client : Public Works Department National Highway Division Nagpur

Authority Engineer : TPF Engineering Pvt Ltd in Joint Venture with TPF Gentisa Eurostudios S.L. In association with Nascence
Consultant Private Limited

Contractor : M/s. RPP Infra Projects Limited - P & C Projects( P ) Ltd.(JV)

A. Widening and Strengthining of existing road


3.Dry Lean Concrete

Chainage
Sl.No Unit Side Length RFI No. RFI Date Month IPC No.
From To
1 19+060 19+260 M LHS 200 ARS/009/HW/346 7/2/2019 Jul-19 IPC 3
2 18+985 19+060 M LHS 75 ARS/009/HW/351 7/4/2019 Jul-19 IPC 3
3 18+620 18+780 M LHS 160 ARS/009/HW/359 7/7/2019 Jul-19 IPC 3
4 18+505 18+620 M LHS 115 ARS/009/HW/383 7/12/2019 Jul-19 IPC 3
5 17+750 17+965 M LHS 215 ARS/009/HW/400 7/16/2019 Jul-19 IPC 3
6 17+550 17+750 M LHS 200 ARS/009/HW/410 7/17/2019 Jul-19 IPC 3
7 17+260 17+550 M LHS 290 ARS/009/HW/429 7/20/2019 Jul-19 IPC 3
8 17+030 17+260 M LHS 230 ARS/009/HW/437 7/23/2019 Jul-19 IPC 3
9 16+800 17+030 M LHS 230 ARS/009/HW/448 7/25/2019 Jul-19 IPC 3
JUL 1715
10 16+725 16+800 M LHS 75 ARS/009/HW/494 8/14/2019 Aug-19 IPC 3
11 8+810 8+925 M RHS 115 ARS/009/HW/505 8/16/2019 Aug-19 IPC 3
12 8+925 9+115 M RHS 190 ARS/009/HW/511 8/17/2019 Aug-19 IPC 3
13 9+115 9+310 M RHS 195 ARS/009/HW/547 8/23/2019 Aug-19 IPC 3
14 9+310 9+470 M RHS 160 ARS/009/HW/584 8/27/2019 Aug-19 IPC 3
15 9+470 9+643 M RHS 173 ARS/009/HW/592 8/28/2019 Aug-19 IPC 3
AUG 908
16 8+600 8+810 M RHS 210 ARS/009/HW/619 9/5/2019 Sep-19 IPC 3
17 6+980 7+200 M LHS 220 ARS/009/HW/621 9/7/2019 Sep-19 IPC4
18 9+850 10+040 M LHS 190 ARS/009/HW/637 9/20/2019 Sep-19 IPC 3
SEP 620
19 13+060 13+250 M RHS 190 ARS/009/HW/701 10/9/2019 Oct-19 IPC 3
20 13+250 13+580 M RHS 330 ARS/009/HW/703 10/9/2019 Oct-19 IPC 3
21 10+040 10+230 M LHS 190 ARS/009/HW/704 10/11/2019 Oct-19 IPC 3
22 10+230 10+380 M LHS 150 ARS/009/HW/706 10/12/2019 Oct-19 IPC 3
23 10+380 10+480 M LHS 100 ARS/009/HW/730 10/17/2019 Oct-19 IPC 3
24 10+600 10+750 M LHS 150 ARS/009/HW/731 10/17/2019 Oct-19 IPC 3
25 10+750 10+940 M LHS 190 ARS/009/HW/733 10/18/2019 Oct-19 IPC 3
26 10+940 11+090 M LHS 150 ARS/009/HW/752 10/19/2019 Oct-19 IPC 3
27 11+090 11+310 M LHS 220 ARS/009/HW/769 10/22/2019 Oct-19 IPC 3
28 11+310 11+530 M LHS 220 ARS/009/HW/771 10/23/2019 Oct-19 IPC 3
Chainage
Sl.No Unit Side Length RFI No. RFI Date Month IPC No.
From To
29 11+530 11+580 M LHS 50 ARS/009/HW/781 10/24/2019 Oct-19 IPC 3
30 8+920 9+120 M LHS 200 ARS/009/HW/785 10/26/2019 Oct-19 IPC4
31 8+560 8+920 M LHS 360 ARS/009/HW/786 10/26/2019 Oct-19 IPC 3
32 9+120 9+490 M LHS 370 ARS/009/HW/791 10/29/2019 Oct-19 IPC4
33 9+490 9+850 M LHS 360 ARS/009/HW/794 10/30/2019 Oct-19 IPC4
34 13+580 13+790 M RHS 210 ARS/009/HW/797 10/31/2019 Oct-19 IPC 3
OCT 3440
35 13+790 14+030 M RHS 240 ARS/009/HW/804 11/2/2019 Nov-19 IPC4
36 14+030 14+300 M RHS 270 ARS/009/HW/806 11/4/2019 Nov-19 IPC4
37 14+300 14+600 M RHS 300 ARS/009/HW/810 11/5/2019 Nov-19 IPC4
38 14+600 14+900 M RHS 300 ARS/009/HW/811 11/6/2019 Nov-19 IPC4
39 14+900 15+200 M RHS 300 ARS/009/HW/815 11/7/2019 Nov-19 IPC4
40 15+200 15+500 M RHS 300 ARS/009/HW/819 11/8/2019 Nov-19 IPC4
41 15+500 15+900 M RHS 400 ARS/009/HW/822 11/9/2019 Nov-19 IPC4
42 15+900 16+100 M RHS 200 ARS/009/HW/828 11/10/2019 Nov-19 IPC4
43 16730 16975 M RHS 245 ARS/009/HW/924 11/26/2019 Nov-19 IPC4
44 16975 17270 M RHS 295 ARS/009/HW/931 11/27/2019 Nov-19 IPC4
45 17270 17440 M RHS 170 ARS/009/HW/941 11/28/2019 Nov-19 IPC4
46 17440 17670 M RHS 230 ARS/009/HW/965 11/30/2019 Nov-19 IPC4
NOV 3250
47 17670 17980 M RHS 310 ARS/009/HW/978 12/2/2019 Dec-19 IPC4
48 18500 18775 M RHS 275 ARS/009/HW/990 12/3/2019 Dec-19 IPC4
49 18900 19300 M RHS 400 ARS/009/HW/1000 12/4/2019 Dec-19 IPC4
50 5980 6480 M LHS 500 ARS/009/HW/1027 12/8/2019 Dec-19 IPC4
51 6480 6980 M LHS 500 ARS/009/HW/1034 12/9/2019 Dec-19 IPC4
DEC 1985

Total One Side Err:511


Total Both Side 5.959

A Total Scope as per Contract Agreement 47.542 Km


B Work done upto date 5.959 Km
C Work done in previous month ( SPC) 2.767 Km
D Work done upto this Month 3.192 Km
E Balance work 41.583 Km
rdha - Arvi from km 0+000 ( Wardha) to km 53+708 (Arvi) of NH-647 to
tra on Engineering, Procurement & Construction ( EPC ) Contract Basis.

enture with TPF Gentisa Eurostudios S.L. In association with Nascence

d Strengthining of existing road


Dry Lean Concrete

Remarks
Remarks
Name Of Work : Rehabilitation & Up-gradation of Wardha - Arvi from km 0+000 ( Wardha) to km 53+708 (Arvi) of NH-647 to
Two Lane with paved shoulders in the state of Maharastra on Engineering, Procurement & Construction ( EPC ) Contract Basis

Client : Public Works Department National Highway Division Nagpur

Authority Engineer : TPF Engineering Pvt Ltd in Joint Venture with TPF Gentisa Eurostudios S.L. In association with Nascence
Consultant Private Limited

Contractor : M/s. RPP Infra Projects Limited - P & C Projects( P ) Ltd.(JV)

A. Widening and Strengthining of existing road


4.Pavement Quality Concrete ( PQC)

Chainage
Sl.No Unit Side Length RFI No. RFI Date Month IPC No.
From To
1 17+890 17+960 M LHS 70 ARS/009/HW/525 8/20/2019 Aug-19 IPC 3
2 17+756 17+890 M LHS 134 ARS/009/HW/542 8/22/2019 Aug-19 IPC 3
3 17+665 17+756 M LHS 91 ARS/009/HW/581 8/27/2019 Aug-19 IPC 3
4 17+500 17+665 M LHS 165 ARS/009/HW/588 8/28/2019 Aug-19 IPC 3
5 17+241 17+280 M LHS ARS/009/HW/595 8/29/2019 Aug-19 IPC 3
6 17+280 17+321 M LHS 41 ARS/009/HW/595 8/29/2019 Aug-19 IPC 3
7 17+321 17+366 M LHS ARS/009/HW/595 8/29/2019 Aug-19 IPC 3
8 17+366 17+500 M LHS 134 ARS/009/HW/595 8/29/2019 Aug-19 IPC 3
9 17+136 17+200 M LHS 64 ARS/009/HW/603 8/30/2019 Aug-19 IPC 3
10 17+200 17+241 M LHS ARS/009/HW/603 8/30/2019 Aug-19 IPC 3
AUG 699
11 16+926 17+136 M LHS 210 ARS/009/HW/615 9/3/2019 Sep-19 IPC 3
12 16+856 16+926 M LHS 70 ARS/009/HW/617 9/4/2019 Sep-19 IPC 3
13 16+760 16+856 M LHS 96 ARS/009/HW/620 9/7/2019 Sep-19 IPC 3
14 18+580 18+770 M LHS 190 ARS/009/HW/629 9/14/2019 Sep-19 IPC 3
15 18+520 18+580 M LHS 60 ARS/009/HW/631 9/16/2019 Sep-19 IPC 3
16 19+145 19+245 M LHS 100 ARS/009/HW/633 9/19/2019 Sep-19 IPC 3
17 19+053 19+145 M LHS 92 ARS/009/HW/641 9/21/2019 Sep-19 IPC 3
18 18+990 19+053 M LHS 63 ARS/009/HW/647 9/23/2019 Sep-19 IPC 3
SEP 881
19 8+614 8+770 M RHS 156 ARS/009/HW/671 10/1/2019 Oct-19 IPC 3
20 8+770 8+950 M RHS 180 ARS/009/HW/673 10/2/2019 Oct-19 IPC 3
21 8+950 9+117 M RHS 167 ARS/009/HW/676 10/3/2019 Oct-19 IPC 3
22 9+117 9+260 M RHS 143 ARS/009/HW/700 10/7/2019 Oct-19 IPC 3
23 9+260 9+440 M RHS 180 ARS/009/HW/702 A 10/9/2019 Oct-19 IPC 3
24 9+440 9+620 M RHS 180 ARS/009/HW/705 10/11/2019 Oct-19 IPC 3
25 9+860 10+060 M LHS 200 ARS/009/HW/743 10/19/2019 Oct-19 IPC 3
26 10+060 10+280 M LHS 220 ARS/009/HW/767 10/22/2019 Oct-19 IPC 3
27 10+280 10+460 M LHS 180 ARS/009/HW/770 10/23/2019 Oct-19 IPC 3
28 10+610 10+710 M LHS 100 ARS/009/HW/778 10/24/2019 Oct-19 IPC 3
29 13+070 13+300 M RHS 230 ARS/009/HW/790 10/29/2019 Oct-19 IPC 3
Chainage
Sl.No Unit Side Length RFI No. RFI Date Month IPC No.
From To
30 13+300 13+570 M RHS 270 ARS/009/HW/793 10/30/2019 Oct-19 IPC 3
31 10+710 10+850 M LHS 140 ARS/009/HW/796 10/31/2019 Oct-19 IPC 3
OCT 2346
32 10+850 11+020 M LHS 170 ARS/009/HW/798 11/1/2019 Nov-19 IPC 3
33 11+020 11+210 M LHS 190 ARS/009/HW/803 11/2/2019 Nov-19 IPC 3
34 11+210 11+410 M LHS 200 ARS/009/HW/805 11/4/2019 Nov-19 IPC 3
35 11+410 11+570 M LHS 160 ARS/009/HW/809 11/5/2019 Nov-19 IPC 3
36 8+610 8+900 M LHS 290 ARS/009/HW/813 11/7/2019 Nov-19 IPC 3
37 8+900 9+200 M LHS 300 ARS/009/HW/820 11/8/2019 Nov-19 IPC4
38 9+200 9+500 M LHS 300 ARS/009/HW/823 11/9/2019 Nov-19 IPC4
39 9+500 9+860 M LHS 360 ARS/009/HW/827 11/10/2019 Nov-19 IPC4
40 13570 13800 M RHS 230 ARS/009/HW/895 11/22/2019 Nov-19 IPC4
41 13800 14140 M RHS 340 ARS/009/HW/905 11/23/2019 Nov-19 IPC4
42 14140 14420 M RHS 280 ARS/009/HW/912 11/25/2019 Nov-19 IPC4
43 14420 14630 M RHS 210 ARS/009/HW/923 11/26/2019 Nov-19 IPC4
44 14630 14970 M RHS 340 ARS/009/HW/930 11/27/2019 Nov-19 IPC4
45 14970 15310 M RHS 340 ARS/009/HW/940 11/28/2019 Nov-19 IPC4
46 15310 15640 M RHS 330 ARS/009/HW/951 11/29/2019 Nov-19 IPC4
47 15640 15890 M RHS 250 ARS/009/HW/964 11/30/2019 Nov-19 IPC4
NOV 4290
48 15890 16100 M RHS 210 ARS/009/HW/979 12/2/2019 Dec-19 IPC4
49 16770 17120 M RHS 350 ARS/009/HW/989 12/3/2019 Dec-19 IPC4
50 17120 17945 M RHS 825 ARS/009/HW/1011 12/6/2019 Dec-19 IPC4
51 18530 18760 M RHS 230 ARS/009/HW/1033 12/9/2019 Dec-19 IPC4
52 18900 19200 M RHS 300 ARS/009/HW/1035 12/10/2019 Dec-19 IPC4
DEC 1915
Total One Side 10.131
Total Both Side 5.066

A Total Scope as per Contract Agreement 47.542 Km


B Work done upto date 5.066 Km
C Work done in previous month ( SPC) 2.468 Km
D Work done upto this Month 2.598 Km
E Balance work 42.477 Km
rdha - Arvi from km 0+000 ( Wardha) to km 53+708 (Arvi) of NH-647 to
tra on Engineering, Procurement & Construction ( EPC ) Contract Basis.

enture with TPF Gentisa Eurostudios S.L. In association with Nascence

d Strengthining of existing road


t Quality Concrete ( PQC)

Remarks
Remarks
Name Of Work : Rehabilitation & Up-gradation of Wardha - Arvi from km 0+000 ( Wardha) to km 53+708 (Arvi) of NH-647 to T
Lane with paved shoulders in the state of Maharastra on Engineering, Procurement & Construction ( EPC ) Contract Basis.

Client : Public Works Department National Highway Division Nagpur

Authority Engineer : TPF Engineering Pvt Ltd in Joint Venture with TPF Gentisa Eurostudios S.L. In association with Nascence
Consultant Private Limited

Contractor : M/s. RPP Infra Projects Limited - P & C Projects( P ) Ltd.(JV)

A. Widening and Strengthining of existing road


1.Earth work upto top of Sub grade

Chainage
a Unit Side Length RFI No. RFI Date Month IPC No.
From To
1 10+300 10+500 M LHS 200 ARS009/HW/038 13/Mar/19 Mar-19 IPC 1
2 10+500 10+750 M LHS 250 ARS009/HW/039 13/Mar/19 Mar-19 IPC 1
3 10+750 11+000 M LHS 250 ARS009/HW/040 13/Mar/19 Mar-19 IPC 1
4 11+000 11+250 M LHS 250 ARS009/HW/041 13/Mar/19 Mar-19 IPC 1
5 9+500 9+750 M LHS 250 ARS009/HW/075 25/Mar/19 Mar-19 IPC 1
6 9+750 10+000 M LHS 250 ARS009/HW/076 25/Mar/19 Mar-19 IPC 1
7 10+000 10+300 M LHS 300 ARS009/HW/077 25/Mar/19 Mar-19 IPC 1
8 13+500 13+750 M LHS 250 ARS009/HW/078 25/Mar/19 Mar-19 IPC 1
9 13+750 14+000 M LHS 250 ARS009/HW/085 27/Mar/19 Mar-19 IPC 1
10 14+000 14+250 M LHS 250 ARS009/HW/086 27/Mar/19 Mar-19 IPC 1
11 14+250 14+500 M LHS 250 ARS009/HW/087 27/Mar/19 Mar-19 IPC 1
12 14+500 14+750 M LHS 250 ARS009/HW/088 27/Mar/19 Mar-19 IPC 1
13 11+250 11+500 M LHS 250 ARS009/HW/092 30/Mar/19 Mar-19 IPC 1
14 13+000 13+250 M LHS 250 ARS009/HW/093 30/Mar/19 Mar-19 IPC 1
15 13+250 13+500 M LHS 250 ARS009/HW/094 30/Mar/19 Mar-19 IPC 1
16 15+300 15+700 M LHS 400 ARS009/HW/095 30/Mar/19 Mar-19 IPC 1
March 4150
17 30+000 30+250 M LHS 250 ARS009/HW/167 18/Apr/19 Apr-19 IPC 1
18 30+250 30+500 M LHS 250 ARS009/HW/168 19/Apr/19 Apr-19 IPC 1
19 30+500 30+750 M LHS 250 ARS009/HW/169 19/Apr/19 Apr-19 IPC 1
20 30+750 30+977 M LHS 227 ARS009/HW/170 20/Apr/19 Apr-19 IPC 1
21 9+250 9+500 M LHS 250 ARS009/HW/171 20/Apr/19 Apr-19 IPC 1
22 14+800 15+050 M LHS 250 ARS009/HW/172 20/Apr/19 Apr-19 IPC 1
23 15+050 15+300 M LHS 250 ARS009/HW/173 21/Apr/19 Apr-19 IPC 1
24 15+800 16+000 M LHS 200 ARS009/HW/174 21/Apr/19 Apr-19 IPC 1
25 8+500 8+750 M LHS 250 ARS009/HW/175 21/Apr/19 Apr-19 IPC 1
26 8+750 9+000 M LHS 250 ARS009/HW/176 22/Apr/19 Apr-19 IPC 1
27 9+000 9+250 M LHS 250 ARS009/HW/177 22/Apr/19 Apr-19 IPC 1
28 16+000 16+200 M LHS 200 ARS009/HW/178 22/Apr/19 Apr-19 IPC 1
29 16+880 17+130 M LHS 250 ARS009/HW/179 25/Apr/19 Apr-19 IPC 1
Chainage
a Unit Side Length RFI No. RFI Date Month IPC No.
From To
30 17+300 17+600 M LHS 300 ARS009/HW/179 A 25/Apr/19 Apr-19 IPC 1
31 19+500 19+750 M LHS 250 ARS009/HW/180 25/Apr/19 Apr-19 IPC 1
32 19+750 19+950 M LHS 200 ARS009/HW/181 26/Apr/19 Apr-19 IPC 1
33 29+860 29+883 M LHS 23 ARS009/HW/182 26/Apr/19 Apr-19 IPC 1
34 17+130 17+300 M LHS 170 ARS009/HW/183 27/Apr/19 Apr-19 IPC 1
35 17+600 17+800 M LHS 200 ARS009/HW/184 27/Apr/19 Apr-19 IPC 1
36 17+800 18+000 M LHS 200 ARS/009/HW/185 27/Apr/19 Apr-19 IPC 1
37 19+250 19+500 M LHS 250 ARS/009/HW/186 27/Apr/19 Apr-19 IPC 1
April 4720
38 18+900 19+250 M LHS 350 ARS/009/HW/207 8/May/19 May-19 IPC 1
39 18+600 18+800 M LHS 200 ARS/009/HW/208 8/May/19 May-19 IPC 1
40 18+400 18+600 M LHS 200 ARS/009/HW/212 9/May/19 May-19 IPC 1
41 21+080 21+270 M LHS 190 ARS/009/HW/227 20/May/19 May-19 IPC 1
42 21+270 21+580 M LHS 310 ARS/009/HW/240 26/May/19 May-19 IPC 1
May 1250
43 16+700 16+880 M LHS 180 ARS/009/HW/280 11/Jun/19 Jun-19 IPC2
44 15+700 15+800 M LHS 100 ARS/009/HW/330a 26/Jun/19 Jun-19 IPC2
45 20+160 20+340 M LHS 180 ARS/009/HW/337 28/Jun/19 Jun-19 IPC2
46 7+320 7+600 M LHS 280 ARS/009/HW/337a 28/Jun/19 Jun-19 IPC2
47 19+950 20+160 M LHS 210 ARS/009/HW/338 28/Jun/19 Jun-19 IPC2
June 950
48 32+460 32+660 M LHS 200 ARS/009/HW/348 3/Jul/19 Jul-19 IPC2
49 40+120 40+350 M LHS 230 ARS/009/HW/348a 3/Jul/19 Jul-19 IPC2
50 32+750 33+010 M LHS 260 ARS/009/HW/360a 7/Jul/19 Jul-19 IPC2
51 4+000 4+270 M LHS 270 ARS/009/HW/367a 9/Jul/19 Jul-19 IPC2
52 3+500 3+660 M LHS 160 ARS/009/HW/414a 17/Jul/19 Jul-19 IPC2
53 33+060 33+300 M LHS 240 ARS/009/HW/419a 18/Jul/19 Jul-19 IPC2
54 2+720 3+160 M LHS 440 ARS/009/HW/422a 19/Jul/19 Jul-19 IPC2
55 3+160 3+350 M LHS 190 ARS/009/HW/432a 22/Jul/19 Jul-19 IPC2
56 5+140 5+340 M LHS 200 ARS/009/HW/450a 25/Jul/19 Jul-19 IPC2
57 8+600 8+900 M RHS 300 ARS/009/HW/457 26/Jul/19 Jul-19 IPC2
58 8+900 9+140 M RHS 240 ARS/009/HW/458 26/Jul/19 Jul-19 IPC2
59 9+140 9+260 M RHS 120 ARS/009/HW/456 26/Jul/19 Jul-19 IPC2
60 34+150 34+450 M LHS 300 ARS/009/HW/464 29/Jul/19 Jul-19 IPC2
61 39+900 40+120 M LHS 220 ARS/009/HW/466 31/Jul/19 Jul-19 IPC2
July 3370
62 4+780 5+060 M LHS 280 ARS/009/HW/467 1/Aug/19 Aug-19 IPC2
63 33+300 33+620 M LHS 320 ARS/009/HW/468 1/Aug/19 Aug-19 IPC2
64 33+670 34+060 M LHS 390 ARS/009/HW/469 1/Aug/19 Aug-19 IPC2
65 5+920 6+130 M LHS 210 ARS/009/HW/470 1/Aug/19 Aug-19 IPC2
66 9+500 9+750 M RHS 250 ARS/009/HW/470a 1/Aug/19 Aug-19 IPC2
67 15+300 15+500 M RHS 200 ARS/009/HW/474 3/Aug/19 Aug-19 IPC2
68 34+450 34+800 M LHS 350 ARS/009/HW/475 3/Aug/19 Aug-19 IPC2
69 37+200 37+400 M LHS 200 ARS/009/HW/477 3/Aug/19 Aug-19 IPC2
Chainage
a Unit Side Length RFI No. RFI Date Month IPC No.
From To
70 34+800 34+990 M LHS 190 ARS/009/HW/479 4/Aug/19 Aug-19 IPC2
71 14+750 14+800 M LHS 50 ARS/009/HW/481 5/Aug/19 Aug-19 IPC2
72 41+050 41+300 M LHS 250 ARS/009/HW/485 10/Aug/19 Aug-19 IPC2
73 41+300 41+600 M LHS 300 ARS/009/HW/486 11/Aug/19 Aug-19 IPC2
74 41+600 41+820 M LHS 220 ARS/009/HW/488 12/Aug/19 Aug-19 IPC2
75 35+070 35+390 M LHS 320 ARS/009/HW/507 17/Aug/19 Aug-19 IPC2
76 8+540 8+600 M RHS 60 ARS/009/HW/510 17/Aug/19 Aug-19 IPC2
77 6+130 6+400 M LHS 270 ARS/009/HW/520 20/Aug/19 Aug-19 IPC2
78 6+400 6+700 M LHS 300 ARS/009/HW/526 20/Aug/19 Aug-19 IPC2
79 9+260 9+500 M RHS 240 ARS/009/HW/530 21/Aug/19 Aug-19 IPC2
80 6+700 7+000 M LHS 300 ARS/009/HW/531 21/Aug/19 Aug-19 IPC2
81 7+000 7+200 M LHS 200 ARS/009/HW/533 21/Aug/19 Aug-19 IPC2
82 40+350 40+700 M LHS 350 ARS/009/HW/541 22/Aug/19 Aug-19 IPC2
83 36+300 36+460 M LHS 160 ARS/009/HW/543 22/Aug/19 Aug-19 IPC2
84 36+500 36+800 M LHS 300 ARS/009/HW/544 22/Aug/19 Aug-19 IPC2
85 36+800 37+000 M LHS 200 ARS/009/HW/555 24/Aug/19 Aug-19 IPC2
86 20+340 20+700 M LHS 360 ARS/009/HW/559 24/Aug/19 Aug-19 IPC2
87 37+000 37+200 M LHS 200 ARS/009/HW/561 24/Aug/19 Aug-19 IPC2
Chainage
a Unit Side Length RFI No. RFI Date Month IPC No.
From To
88 15+500 15+700 M RHS 200 ARS/009/HW/564 25/Aug/19 Aug-19 IPC2
89 14+000 14+250 M RHS 250 ARS/009/HW/565 25/Aug/19 Aug-19 IPC2
90 40+300 40+600 M RHS 300 ARS/009/HW/567 25/Aug/19 Aug-19 IPC2
91 40+700 40+990 M LHS 290 ARS/009/HW/570 25/Aug/19 Aug-19 IPC2
92 14+800 15+200 M RHS 400 ARS/009/HW/578 26/Aug/19 Aug-19 IPC2
93 7+830 8+040 M LHS 210 ARS/009/HW/582 27/Aug/19 Aug-19 IPC2
94 12+700 12+900 M LHS 200 ARS/009/HW/591 28/Aug/19 Aug-19 IPC2
95 41+200 41+500 M RHS 300 ARS/009/HW/602 29/Aug/19 Aug-19 IPC2
96 39+900 40+060 M RHS 160 ARS/009/HW/598 29/Aug/19 Aug-19 IPC2
97 41+500 41+750 M RHS 250 ARS/009/HW/604 30/Aug/19 Aug-19 IPC2
98 15+700 15+750 M RHS 50 ARS/009/HW/605 30/Aug/19 Aug-19 IPC2
99 36+460 36+500 M LHS 40 ARS/009/HW/609 31/Aug/19 Aug-19 IPC2
100 40+060 40+120 M RHS 60 ARS/009/HW/610 31/Aug/19 Aug-19 IPC2
August 9180
101 42+700 43+000 M LHS 300 ARS/009/HW/635 20/Sep/19 Sep-19 IPC3
102 13+500 13+700 M RHS 200 ARS/009/HW/640 21/Sep/19 Sep-19 IPC3
103 14+600 14+800 M RHS 200 ARS/009/HW/651 27/Sep/19 Sep-19 IPC3
104 14+250 14+600 M RHS 350 ARS/009/HW/653 28/Sep/19 Sep-19 IPC3
105 13+700 14+000 M RHS 300 ARS/009/HW/657 29/Sep/19 Sep-19 IPC3
106 13+000 13+200 M RHS 200 ARS/009/HW/663 30/Sep/19 Sep-19 IPC3
107 43+000 43+250 M LHS 250 ARS/009/HW/665 A 30/Sep/19 Sep-19 IPC3
September 1800
108 13+200 13+300 M RHS 100 ARS/009/HW/670 1/Oct/19 Oct-19 IPC3
109 4+780 4+940 M RHS 160 ARS/009/HW/675 2/Oct/19 Oct-19 IPC3
110 5+950 6+130 M RHS 180 ARS/009/HW/684 4/Oct/19 Oct-19 IPC3
111 13+300 13+500 M RHS 200 ARS/009/HW/686 5/Oct/19 Oct-19 IPC3
112 7+600 7+750 M LHS 150 ARS/009/HW/692 6/Oct/19 Oct-19 IPC3
113 42+540 42+700 M LHS 160 ARS/009/HW/721 16/Oct/19 Oct-19 IPC3
114 15+900 16+200 M RHS 300 ARS/009/HW/723 16/Oct/19 Oct-19 IPC3
115 15+200 15+300 M RHS 100 ARS/009/HW/725 17/Oct/19 Oct-19 IPC3
116 15+750 15+900 M RHS 150 ARS/009/HW/726 17/Oct/19 Oct-19 IPC3
117 11+500 11+580 M LHS 80 ARS/009/HW/761 20/Oct/19 Oct-19 IPC3
118 2+650 2+900 M RHS 250 ARS/009/HW/765 22/Oct/19 Oct-19 IPC3
119 2+900 3+200 M RHS 300 ARS/009/HW/768 22/Oct/19 Oct-19 IPC3
120 43+880 44+100 M LHS 220 ARS/009/HW/772 23/Oct/19 Oct-19 IPC3
121 44+100 44+400 M LHS 300 ARS/009/HW/783 24/Oct/19 Oct-19 IPC3
122 43+250 43+560 M LHS 310 ARS/009/HW/788 26/Oct/19 Oct-19 IPC3
123 43+560 43+630 M LHS 70 ARS/009/HW/788 26/Oct/19 Oct-19 IPC3
October 3030
124 20+300 20+600 M RHS 300 ARS/009/HW/893 21/Nov/19 Nov-19 IPC4
125 16+700 17+100 M RHS 400 ARS/009/HW/904 23/Nov/19 Nov-19 IPC4
126 17+100 17+300 M RHS 200 ARS/009/HW/911 24/Nov/19 Nov-19 IPC4
127 17+300 17+500 M RHS 200 ARS/009/HW/915 27/Nov/19 Nov-19 IPC4
128 17+500 17+700 M RHS 200 ARS/009/HW/928 28/Nov/19 Nov-19 IPC4
Chainage
a Unit Side Length RFI No. RFI Date Month IPC No.
From To
129 19+800 20+000 M RHS 200 ARS/009/HW/933 28/Nov/19 Nov-19 IPC4
130 20+000 20+300 M RHS 300 ARS/009/HW/935 28/Nov/19 Nov-19 IPC4
131 17+700 18+000 M RHS 300 ARS/009/HW/947 29/Nov/19 Nov-19 IPC4
132 18+400 18+800 M RHS 400 ARS/009/HW/956 30/Nov/19 Nov-19 IPC4
133 19+300 19+500 M RHS 200 ARS/009/HW/958 30/Nov/19 Nov-19 IPC4
November 2700
134 19500 19700 M RHS 200 ARS/009/HW/971 1/Dec/19 Dec-19 IPC4
135 19700 19800 M RHS 100 ARS/009/HW/972 1/Dec/19 Dec-19 IPC4
136 18900 19300 M RHS 400 ARS/009/HW/985 3/Dec/19 Dec-19 IPC4
137 10600 10850 M RHS 250 ARS/009/HW/986 3/Dec/19 Dec-19 IPC4
138 42180 42260 M LHS 80 ARS/009/HW/995 4/Dec/19 Dec-19 IPC4
139 10850 11050 M RHS 200 ARS/009/HW/997 4/Dec/19 Dec-19 IPC4
140 11050 11250 M RHS 200 ARS/009/HW/1003 5/Dec/19 Dec-19 IPC4
141 42340 42540 M LHS 200 ARS/009/HW/1005 6/Dec/19 Dec-19 IPC4
142 11250 11600 M RHS 350 ARS/009/HW/1010 6/Dec/19 Dec-19 IPC4
143 41880 42180 M LHS 300 ARS/009/HW/1016 7/Dec/19 Dec-19 IPC4
144 10100 10400 M RHS 300 ARS/009/HW/1018 7/Dec/19 Dec-19 IPC4
December 2580
Total One Side 33.73
Total Both Side 16.87

A Total Scope as per Contract Agreement 47.542 Km


B Work done upto date 16.865 Km
C Work done in previous month ( SPC) 14.225 Km
D Work done upto this Month 2.640 Km
E Balance work 30.677 Km
a - Arvi from km 0+000 ( Wardha) to km 53+708 (Arvi) of NH-647 to Two
ngineering, Procurement & Construction ( EPC ) Contract Basis.

ure with TPF Gentisa Eurostudios S.L. In association with Nascence

Strengthining of existing road


k upto top of Sub grade

Remarks
Remarks
Remarks
Remarks
Remarks