Вы находитесь на странице: 1из 7

Maintain Potential Facilities Offshore

Long Term Agreement


Contract No. 6600035841 (OOK) / 6600035823 (IK)

LTA 34: BERRI DEVELOPMENT - OFFSHORE


PLATFRORMS AND FLOW LINES
FORM-LTA2-QA-0013
(BI 10-09501)
Rev.0 Date: 5/9/2017
INSPECTION REPORT
Page 1

SAIPEM JOB SAIPEM PO. No:- ARAMCO DUMMY P.O.NO.:- INSPECTION. LOT IRID No: 07
No.: - 1278528 CFIK-310-01-A229-DA 107000156735 Date.: - 12th Dec,2019

SUPPLIER: - Al Qahtani Pipe Coating Industries SUB-SUPPLIER: - NA SUB-ORDER No.: - NA

Date of visit: - 2nd Dec,2019 From to: 11th Dec,2019

Codes and Rules: 01 SAMSS -05 (29 Apr 2018)


IR-175 012500

Specification and Drawings: AWWA C205(2012)


ASTM C- 136
ASTM C- 150
ASTM C- 142
ISO 8501

Vendor -Spec. - Dwgs - Proc. AQPCI-WP-363 Rev 8

ITP n°: Inspection & test ITP-CML-SFBV-SA-SAIPEM Rev-00


plan.

Type of Inspection (1): In Process & Final Inspection of CML

(1) Use (I)Stage, (F) Final, (S) Survey, (A) Audit) -PIM I&F

Materials Inspected
Item Sub item Qty. Unit Item Description Result (1)
For
15.2.6 - 198 Bare CS Spool Fittings DIA 4” S Test

PCS Test ITP item Result Doc


Final Inspection 0 All S/Yes/W P
Results use S: satisfactory; N : non conform; P : pending (2) For document attached use: Yes or No (3) Use witness(W) or test data review(TDR)
NCR Punch List
I N/A Nil

Contact/Interface for NCR/Punch List:


o Copy of material Certificate shipped with the material: (Yes)
Nil

Any expected visit within next 15 days NO x YES - Expected date: 14th Dec-2019.

Order Status
Item n° Brief Description Order Presented Accepted this Accepted to Appr. %

Inspector's signature
Fahad Ahmad
Maintain Potential Facilities Offshore
Long Term Agreement
Contract No. 6600035841 (OOK) / 6600035823 (IK)

LTA 34: BERRI DEVELOPMENT - OFFSHORE


PLATFRORMS AND FLOW LINES
FORM-LTA2-QA-0013
(BI 10-09501)
Rev.0 Date: 5/9/2017
INSPECTION REPORT
Page 2

Quantity M this visit M visit M date Complete


15.2.6 Bare CS Spool Fittings DIA 4” -- 198 0 0 -

Observations /Conclusion/Reservation

Visual Inspection of the CML found satisfactory and the final acceptance shall be based on the compressive
strength test as per the approved ITP and work procedure.

Following persons were present during the inspection :

Name Position Company Tel Email


Mr. Fahad Ahmad TPI Astron 0550398489 Fahad@astrongroup.com
Mr. Mohammad Adnan QA/QC Engg. AQPCI 0563254119 -
Mr. Ibrahim QA/QC Engg AQPCI 0502217273 -

ITP Point n° -
ITP Activities ITP Step Type
Visual - M
Dimensions - M
Cement Mill Certificate - R
Sand Gradation- Verification of Certificates - R
Sand Clay Lumps and friable- Verification of Certificates - R
Sand- Chloride, Sulphates & magnesium Soundness - R
Storage Condition of Cement & Sand - M
Water- Total Dissolved Solids - R
Cement Mortar Chloride Content - R
Visual Inspection surface to be lined - M
Surface preparation to Gr. ST2 - W
Surface temp. on the Item - W
Mix Ratio in the mixing Equip. - M
Lining Thickness by Depth Gauge - W
Visual Inspection of Applied Cement - W
Lining Temp. for 3 hrs after application - M
End Caps Verification - M
Water Injection after 24 hrs - M

Activity description :

Inspection visits were made as per the notification ( AQ-NOI-009 Rev-00/ & AQ-NOI-009 Rev-01Rev-01) at Al
Qahtani Pipe Coating Industries Site 1 to carry out the in-process and final Inspection of the spool fittings of
diameter 04” for Cement Lining as per client requirements for the PO: 1278528.

Inspector's signature
Fahad Ahmad
Maintain Potential Facilities Offshore
Long Term Agreement
Contract No. 6600035841 (OOK) / 6600035823 (IK)

LTA 34: BERRI DEVELOPMENT - OFFSHORE


PLATFRORMS AND FLOW LINES
FORM-LTA2-QA-0013
(BI 10-09501)
Rev.0 Date: 5/9/2017
INSPECTION REPORT
Page 3

The entire detail of each inspection activity is listed as mentioned:


Visual Inspection:
Visual Inspection of Raw Fittings has been randomly monitored at vendor shop and found free from the
damages. Found Satisfactory.

Document Check:
Test reports for Sand, Cement & water have been reviewed and found satisfactory. Copies of the same along
with the set of concerning documents shall be provided by the vendor after final Inspection.
 Cement was confirming the requirement ASTM C150 Type V as per the Test certificate of Cement and
Mortar, Chloride content was less than the 0.15% and found it acceptable.
 As per the test report of the Sand, Values of Acid Soluble Chloride & Acid Soluble Sulphate were
acceptable as per the approved Vendor Procedure.
 Water was Potable and contains the TDS value less than 500 ppm and found acceptable as per the test
report for chemical analysis of water.
 Storage of cement & sand was in dry condition which was acceptable.

Dimensional Inspection:
Randomly monitored the dimensional Check and found satisfactory as per the material description.

Surface Inspection:
Witnessed the surface preparation to Grade ST2 to be lined was free of contamination and found satisfactory.

Surface temperature:
Witnessed Surface temperature of the item and found less than 90° F. This was acceptable as per the work
procedure.

Mixing Ratio in the mixing Equipment:


Monitored the mixing Ratio of cement, Sand & water as per the ITP and found it acceptable.

Lining Thickness:
Witnessed the Lining thickness with depth gauge within 23 inches from the end at 3, 6, 9 & 12 O Clock
Positions in each sides of the presented spool fittings.

Visual Inspection of the Applied Cement:


Visual Inspection has been performed and found lined surface was smooth, uniform with even surface finish
which was found satisfactory.

Lining Temperature:
Lining Temperature for three hours after application was monitored and found less than 90° F as per the
approved work procedure.

Capping & Curing:


Monitored the lining were sealed within 30 minutes after CML application and after 24 hours water was
injected into the lined fittings through end caps.

Result of this Point: As per the ITP stage wise Inspection was satisfactory and final acceptance of the CML
shall be based on the satisfactory result of the Compressive strength test of the samples at 4500 psi after 28
days as per the approved ITP and work procedure.
Inspector's signature
Fahad Ahmad
Maintain Potential Facilities Offshore
Long Term Agreement
Contract No. 6600035841 (OOK) / 6600035823 (IK)

LTA 34: BERRI DEVELOPMENT - OFFSHORE


PLATFRORMS AND FLOW LINES
FORM-LTA2-QA-0013
(BI 10-09501)
Rev.0 Date: 5/9/2017
INSPECTION REPORT
Page 4

Used Test Instruments & Calibration Details:

Device Type Identification/Serial Calibration date Calibration Expiry


Mixer- Flow Meter AQ-FM-004 14-07-2019 13-07-2020
Temperature Guage 01-032 30-10-2019 30-04-2020
Blast Spot 47262 02-07-2019 01-01-2020

CONCLUSION:
Inspection of the spool fittings of diameter 04” for Cement Mortar Lining was carried out in accordance with
the approved ITP no ITP-CML-SFBV-SA-SAIPEM Rev-00 and work procedure (AQPCI-WP-363 Rev 08) and found
satisfactory results. Although, Final Acceptance of the CML shall be based on Successful acceptance of
Compression test results as well as the Final Visual Inspection of the CML surface.
Order Status (Intermediate): N/A

Item n° Brief Description Order Presented Accepted this Accepted Appr. %


Quantity this visit visit up to date Complete

Observations /Conclusion/Reservation/Findings:

SCOPE In-Process inspection of Cement Motor Lining.


RESULT Acceptable Acceptable Not Acceptable -
Number Action Required Action By Due Date
CONCERNS
00 NIL - -
Number Nil
NCR
Action Nil
Number AQ-NOI-009 Rev-00 & AQ-NOI-009 Rev-01
NOTIFICATION
Date 27th Nov 2019 & 05th Dec,2019

Reference Photos:

Inspector's signature
Fahad Ahmad
Maintain Potential Facilities Offshore
Long Term Agreement
Contract No. 6600035841 (OOK) / 6600035823 (IK)

LTA 34: BERRI DEVELOPMENT - OFFSHORE


PLATFRORMS AND FLOW LINES
FORM-LTA2-QA-0013
(BI 10-09501)
Rev.0 Date: 5/9/2017
INSPECTION REPORT
Page 5

Inspector's signature
Fahad Ahmad
Maintain Potential Facilities Offshore
Long Term Agreement
Contract No. 6600035841 (OOK) / 6600035823 (IK)

LTA 34: BERRI DEVELOPMENT - OFFSHORE


PLATFRORMS AND FLOW LINES
FORM-LTA2-QA-0013
(BI 10-09501)
Rev.0 Date: 5/9/2017
INSPECTION REPORT
Page 6

Inspector's signature
Fahad Ahmad
Maintain Potential Facilities Offshore
Long Term Agreement
Contract No. 6600035841 (OOK) / 6600035823 (IK)

LTA 34: BERRI DEVELOPMENT - OFFSHORE


PLATFRORMS AND FLOW LINES
FORM-LTA2-QA-0013
(BI 10-09501)
Rev.0 Date: 5/9/2017
INSPECTION REPORT
Page 7

***End of Report***

Inspector's signature
Fahad Ahmad