Вы находитесь на странице: 1из 1

SAUDIARAMCO.

385000

407500
392500

400000
NOTES:
1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE
DRAWING LIMIT
NOTED.

E
E

E
2. COORDINATE SYSTEM IS BASED ON AIN EL ABD 1970
DATUM, UTM ZONE 39N.

NE

NE

NE

NE

NE

NE

NE

NE

NE

NE
3. HMYM-04 IS NOT SHOWN IN THIS DRAWING FOR
D

8" FLOWLI

8" FLOWLI

8" FLOWLI

8" FLOWLI

8" FLOWLI

8" FLOWLI

8" FLOWLI

8" FLOWLI

8" FLOWLI

8" FLOWLI
M-03
HMY 2 D
CLARITY. REFER TO TD-572751-001 FOR HMYM-04.
202

OF
RH EAST - HMYM GCP-3 4. ALL DETAILS TO BE VERIFIED DURING DETAIL DESIGN
TRUE
PLANT PHASE OF THE PROJECT.
NORTH LP T/L EAST

CONSENT
NORTH 5. FOR OTHER LEGENDS AND DETAILS REFER TO
PI E. N.
OVERALL SITE PLAN TD-011101-001.
SPE 400195.41 2834218.43 6. FOR BURIED PIPELINES SEPARATION DISTANCES,
22 REFER TO TD-541702-001.
.5° PI.1E 400264.41 2833919.57
CONTRACTOR TO CONFIRM DURING DETAIL DESIGN.
8M 12M 8M 12M 8M 12M 8M 12M 8M PI.2E 399990.61 2833856.36

TTEN
7. WELL PAD LOCATIONS BASED ON JAFURAH
PI.3E 397035.35 2833479.22 DEVELOPMENT DATA PACKAGE (INCLUDING NEW 2.2

WRI
EPE 396496.94 2833256.21 BCFD TARGET).
SECTION - C (NTS)
FUTURE
FLOWLINES

THE
(TYP.) RH EAST - HMYM GCP-3

LI
PREVAI NG HP T/L EAST

THOUT
ND
WI PI E. N.
EXISTING OHTL
FUTURE SPE 400180.94 2834214.44
REMOTE HEADER

WI
PI.1E 400246.87 2833928.86
NORTH-EAST
PI.2E 399988.31 2833869.17

NG
DRAWI
PI.3E 397024.43 2833490.93 LEGEND
ACCESS ROAD
FUTURE
HMYM-3 HP T/L EPE 396491.90 2833270.35 GCP GAS COMPRESSION PLANT (FORMER FCF)
13.8 kV OHTL
NORTH-EAST HMYM HUMAYMAH BLOCK
APPROX. L=5.88KM JFGP JAFURAH GAS PLANT
EXISTING PIPELINE STS SCRAPER TRAP STATION

S
RH EAST - HMYM GCP-3

THI
FUTURE NTS NOT TO SCALE
FLOWLINES (TYP.) FUTURE TEST T/L EAST OHL OVERHEAD LINE
HMYM-3 TEST T/L OHTL OVERHEAD TRANSMISSION LINE

FROM
FUTURE NORTH-EAST PI E. N.
P/L PIPELINE
REMOTE HEADER APPROX. L=5.88KM D
SPE 400166.15 2834211.81 T/L TRUNKLINE
(NORTH-WEST) LP LOW PRESSURE
N 2837500
FUTURE PI.1E 400229.55 2833937.18 HP HIGH PRESSURE

NED
HMYM-3 LP T/L RH REMOTE HEADER
PI.2E 399986.20 2833881.00
NORTH-EAST OD OUTSIDE DIAMETER

OBTAI
FUTURE FUTURE APPROX. L=5.88KM PI-XXE/W POINT OF INTERSECTION EAST/WEST
PI.3E 397009.99 2833501.19
HMYM-3 LP T/L HMYM-3 HP T/L SPW START POINT WEST
NORTH-WEST NORTH-WEST EPE 396485.31 2833283.86 SPE START POINT EAST
APPROX. L=6.42KM APPROX. L=6.45KM EPW END POINT WEST
EPE END POINT EAST

BE
FLOWLINES (TYP.) 230 kV OHTL L LENGTH
FUTURE (HOLD-3) REFER TO

PART,SHALL
HMYM-3 TEST T/L TD-783401-001 FLOWLINES
NORTH-WEST TRUNKLINES
APPROX. L=6.42KM
FUTURE TRUNKLINS & FLOWLINES
REFER TO
START POINT TRANSMISSION P/L HMYM-03 GCP TO STS
(EAST)
TRUNKLINES AT BLOCK BOUNDARY
TD-013106-001
SCRAPER TRAPS ASPHALT ROAD
NEW ROADS
REFER TO
MAIN REMOTE EXISTING ROADS

N
MOV SPE TD-573702-001

I
HEADER (EAST)
PI.4W AREA NEW OVERHEAD POWERLINES

FULL,OR
MAIN HMYM-3 STS REFER TO EXISTING OVERHEAD POWERLINES
T

T
16" HP T/L
MI

MI
FLOWLINES (TYP.) TD-013121-001 EXISTING UNDERGROUND PIPELINE
EAST
LI

LI
MAIN HMYM-3 PI.3W MAIN HMYM-3 APPROX. REFER TO
30" LP T/L WEST 8" TEST T/L L=4.10KM REFERENCE DRAWINGS
NG

NG
TD-573702-001
APPROX. L=5.42KM PI.5W EAST
DRAWI

DRAWI
APPROX. OVERALL TRANSMISSION PIPELINES ROUTE TD-573701-001
SPW

N
I
L=4.09KM LATERAL TRANSMISSION P/L GCP's TO STS TD-573702-001
START POINT STS

ON
OVERALL SITE PLAN JFGP NORTH TD-011101-001

BE
TRUNKLINES AT

LOW
GRO
UN
D
AB
OV
EG
RO
UN
D

REPRODUCTI
SCRAPER TRAPS
ND
OU
OVEGR
AB
ND
GROU
OW

PI.2E
BEL

GCP PLOT PLAN HMYM GCP-3 TD-013102-001

A
11000

00
30
15000

REFER TO
REMOTE HEADER PLOT PLAN HMYM GCP-3 WEST TD-013105-001

B
TD-573703-001
EPW PI.1E

2
021
U-
-
769
MAIN HMYM-3
REMOTE HEADER PLOT PLAN HMYM GCP-3 EAST TD-013106-001
WIND
SOCK

PI.3E 30" LP T/L


EAST GAS BLOCK AREA SECTION AND DETAIL HMYM-3 GCP TD-013111-001
HMYM APPROX.
MAIN 230kV CABLES ROUTING NORTH BLKS TD-783401-001
MAIN HMYM-3 GCP 3 L=4.12KM
REMOTE HEADER
16" HP T/L WEST 13.8kV CABLES ROUTING NORTH BLKS TD-783411-001
RH WEST - HMYM GCP-3 (WEST) EPE
APPROX. L=5.42KM CABLE ROUTING OVERHEAD LINE HMYM BLK-3 TD-783411-001

SAUDIARAMCO.NO
LP T/L WEST
MAIN HMYM-3 TYP. APPROACH DRAWING - GCP SCRAPER AREA TD-573713-001
REFER TO
PI E. N. 8" TEST T/L WEST
(WEST) TYP. APPROACH DRAWING - GCP MOV AREA TD-573714-001
APPROX. L=5.36KM
SPW 392785.19 2832508.14 TD-013105-001 TYPICAL ROW FOR UPSTREAM PIPELINES TD-541702-001

PI.2W EXISTING
PI.1W 392818.43 2832364.14 5.47 X 3 KM REFER TO WELLPAD
TD-013101-001 (TYP.) THIS DRAWING
PI.2W 392993.90 2832404.65 FLOWLINES (TYP.)

PI.3W 395089.78 2833584.67


(HOLD-3) PI.1W

PI.4W 396529.69 2834181.10

NO
N
CO

OF
M
P
A
NY
E
C

X
T
PI.5W 396834.67 2833444.81

E
NT
FUTURE
EPW 396479.72 2833297.78 HMYM-3 HP T/L

PROPERTY
SOUTH-EAST
APPROX. L=5.91KM
N 2830000 FUTURE
HMYM-3 TEST T/L
SOUTH-EAST
APPROX. L=5.91KM
RH WEST - HMYM GCP-3

SOLE
HP T/L WEST FUTURE
KEY PLAN
HMYM-3 LP T/L
PI E. N. SOUTH-EAST
D1 10/04/19
APPROX. L=5.91KM

THE
SPW 392770.71 2832504.15 A2 05/22/19 NZ AS AA

HMYM-3 HP T/L
PI.1W 392806.74 2832348.10 A1 04/18/19 NZ AA AA
SOUTH-WEST ACCESS ROAD FUTURE

ARE
PI.2W 392998.64 2832392.40 APPROX. L=5.90KM REMOTE HEADER O1 10/19/18 A.S. A.A. A.A.

SOUTH-EAST AFW DATE BY CH'D APP PLG PRJ PRO HSE CIV INS ELE COM CON
PI.3W 395095.47 2833572.95

N
HEREI
PI.4W 396522.66 2834164.11 0 1000 2000 3000
HMYM-3 TEST T/L FUTURE FUTURE
PI.5W 396816.92 2833453.69 SOUTH-WEST FLOWLINES (TYP.)
REMOTE HEADER METERS
APPROX. L=5.90KM SOUTH-WEST
EPW 396474.68 2833311.93

NED
HMYM-3 LP T/L SCALE: 1:30000
EXISTING

CONTAI
SOUTH-WEST
APPROX. L=5.90KM OVERHEAD
POWERLINE
REVISION VALIDATION
EXISTING
RH WEST - HMYM GCP-3 ACCESS ROAD THIS REVISION NO. D IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:


TEST T/L WEST D

ON
34-15430-3002-001
PI E. N.

NFORMATI
FUTURE
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
FLOWLINES (TYP.)
SPW 392755.93 2832501.52 (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

WEST

WEST

10" COND.LATERAL
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

LATERAL
WEST

WEST
WEST

WEST
PI.1W 392794.82 2832333.03
TBA TBA

PI.2W 393003.02 2832381.10

T/L

T/L
REV.NO. DATE

I
T/L

T/L
T/L

T/L
D 10/04/19 ISSUED FOR PROPOSAL
PI.3W 395100.73 2833562.14

TRANS.PL

TRANS.PL

THE
8" TEST

8" TEST
JOB ORDER/EWO NO.

30" GAS
PI.4W 396516.16 2834148.43 THIS REVISION IS NOT TO BE USED FOR
30" LP

30" LP
34-15430-3002

16" HP

16" HP
CONSTRUCTION UNTIL CERTIFIED AND DATED
PI.5W 396800.10 2833462.96
SAUDI ARABIAN OIL COMPANY

AND
EPW 396468.09 2833325.44
DRAWING TYPE

D PIPELINE ROUTING MAP PPL

NG
13M 12M 12M 13M 15M 13.5M GATHERING SYSTEM FLOWLINES AND TRUNKLINES

DRAWI
CONSTRUCTION CAMP
NORTH
HMYM GCP-3
SECTION - A (NTS) SECTION - B (NTS)
JAFURAH SAUDI ARABIA

S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

THI
DRAWING LIMIT
751 L TD-572750 001 D
AFW DOC NO: 6702-8210-57-0256 CLASS: 1 REV: D1 DSN: 4961 Saudi Aramco 2615 ENG. (05/05)