13) Regrading terracing of mud phaska covered with tiles or brick, in cement
mortar by dismantling tiles or bricks, removing mud plaster, preparing the surface of
mud phaska to proper slope, relaying mud plaster gobri leaping and tiles or bricks,
grouted in cement mortar 1:3 (1 cement : 3 fine sand), including replacing
unserviceable tiles or bricks with new ones and disposal of unserviceable
material to the dumping ground (the cost of the new tiles or brick excluded), all
complete as per direction of Engineer-in-Charge.

Code Description Unit Quantit Rate Amount


y
Detail of cost for 10 sqm
(i) Dismantling tiles/bricks in
cement
mortar including removing mud
plaster
and cleaning the tiles/bricks
LABOUR
0155 Mason (average) day 0.54 392.00 211.68
0114 Beldar day 0.54 386.00 208.44
(ii) Preparing the surface, for mud

phuska to proper slope, relaying


mud
plaster gobri leeping.
0155 Mason (average) day 0.27 392.00 105.84
25mm thick mud plaster
including
gobri leaping
MATERIAL
Mud mortar
3.18 Rate as per Item Number 3.18 of

SH: Mortars cum 0.24 512.67 123.04


0308 Bhusa quintal 0.084 420.00 35.28
Gobri mortar
3.18 Rate as per Item Number 3.18 of

SH: Mortars cum 0.12 512.67 61.52


LABOUR
0114 Beldar day 0.25 386.00 96.50
(iii) relaying tiles/bricks including

Cement mortar 1:3 (1 Cement : 3


fine
sand) for grouting
3.3 Rate as per item No 3.3 of SH: cum
Mortars 0.061 3665.78 223.61
LABOUR
0155 Mason (average) day 1.20 392.00 470.40
0114 Beldar day 1.50 386.00 579.00
0101 Bhisti day 1.00 386.00 386.00
9999 Disposal of mulba L.S. 5.33 2.00 10.66
9999 Sundries L.S. 2.73 2.00 5.46
TOTAL 2517.43 W
Add 1.5 % Water charges on "W" 37.76
TOTAL 2555.20 X
Add GST on "X" (multiplying
factor 0.1336) 341.37
TOTAL 2896.57 Y
Add 10% CPOH on "Y" 289.66
TOTAL 3186.23 Z
Add Labour Cess @ 1% on "Z" 31.86
Cost of 10.00 sqm 3218.09
Cost of 1.00 sqm 321.81
Say 322
3038145
cum
3.18 Mud mortar
Code Description Unit Quantity Rate Amount
0811 Detail of cost for one cum
0114
0101
9999 1.08 125
0.63 386 135
0.315 386 243.18
6.45 2.00 121.59
12.90
MATERIAL 512.67
Mud (dry) LABOUR 512.67
Beldar Bhisti
Sundries
Cost of one cum Say day day
L.S.
135
243.18

121.59
12.9
512.67
3.3 Cement mortar 1:3 (1 cement : 3 fine sand).
Code Description Unit Quantity Rate Amount

Details of cost for 1 cum

MATERIAL

(0.357 cum. of cement


= 0.51 tonne) Cement
required for cement
mortar is 35.70%
0367 Portland Cement tonne 0.51 4940.00 2519.40
2209 Carriage of Cement tonne 0.51 0.00 0.00
0983 Fine sand (zone IV) cum 1.07 700.00 749.00
2261 Carriage of Fine sand
(1 part badarpur sand :
2 parts jamuna sand) cum 1.07 0.00 0.00
LABOUR
For measuring,
carrying, depositing and

mixing-
0114 Beldar da 0.75 386.00 289.50
0101 Bhisti y
da 0.07 386.00 27.02
9999 Hire and running y
charges of mechanical
mixer L.S 26.91 2.00 53.82
9999 Sundries .L.S 13.52 2.00 27.04
Cost of 1.00 cum . 3665.78
Say 3666
(NS)Providing new brick tiles at the site of work for laying over the roof slabs of
common burnt clay FPS (non Modular ) class designation 10 to entire satisfaction
of EIC
Code Description Unit Quantity Rate Amount
Details of cost for 10 sqm.
MATERIAL
1984 Common burnt clay F.P.S.
(non
modular) bricks tile class 1000 Nos
0.38 5000.00 1900.00
designation 10
2207 Carriage of Brick tiles 1000 Nos 0.38 150.00 57.00
LABOUR
0115 Coolie day 0.54 386.00 208.44
0101 Bhisti day 0.14 386.00 52.11
9999 Sundries L.S. 0.91 2.00 1.82
TOTAL 2219.37 W
Add 1.5 % Water charges on
33.29
"W"
TOTAL 2252.66 X
Add GST on "X"
(multiplying
factor 0.1336) 300.96
TOTAL 2553.62 Y
Add 10% CPOH on "Y" 255.36
TOTAL 2808.98 Z
Add Cess @ 1% on "Z" 28.09
Cost of 10.00 sqm. 2837.07
Cost of 1 Sqm. 283.71
Say 283.7
(REF 22.6) (NS) Providing and laying water proofing treatment on roofs of slabs
by applying cement slurry mixed with water proofing cement compound
consisting of applying:
(a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed
with water proofing cement compound @ 0.253 kg/sqm.
(b) laying second layer of Fibre glass cloth when the first layer is still green.
Overlaps of joints of fibre cloth should not be less than 10 cm.
(c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm
mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @
1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing
for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and
tucked into groove in parapet all around.
For the purpose of measurement the entire treated surface will be measured.

Code Description Unit Quantity Rate Amount

Details of cost for 10 sqm


MATERIAL
Cement 10x(1.289+0.488) =
17.77 kg
Sealing fillets @ 10% = 1.77 kg

Total = 19.54kg = 0.020 tonne

0367 Portland Cement (OPC-43 tonne


0.02 4940.00 98.80
grade)
2209 Carriage of Cement tonne 0.02 0.00 0.00
Bonding material 1.6 kgx30x2
= 96 kg
Bitumen (blown/residual type)

10x(0.253+0.67) = 9.23 kg
Wastage @ 5% = 0.46 kg
Total = 9.69 kg
8501 Polymer modified kilogra
9.69 150.00 1453.50
cementation coating m
Fibre Glass cloth = 10.00 sqm
Wastage @ 10 % = 1.00 sqm
Total = 11.00 sqm
8502 Fibre glass cloth sqm 11.00 44.00 484.00
LABOUR
0155 Mason (average) day 2.00 392.00 784.00
0114 Beldar day 1.00 386.00 386.00
0101 Bhisti day 0.25 386.00 96.50
9999 Sundries, brushes etc L.S. 23.40 2.00 46.80
TOTAL 3349.60 W
Add 1.5 % Water charges on
50.24
"W"
TOTAL 3399.84 X
Add GST on "X" (multiplying

factor 0.1336) 454.22


TOTAL 3854.06 Y
Add 10% CPOH on "Y" 385.41
TOTAL 4239.47 Z
Add Cess @ 1% on "Z" 42.39
Cost for 10 sqm 4281.86
Cost for 1 sqm 428.19
Say 428
(22.22A ) Providing and applying fibre reinforced elastomeric liquid water
proofing membrane with resilient acrylic polymers having Sun Reflectivity
Index (SRI) of 105 on top of roof in three coats @10.76 litre/ 10 sqm. One coat
of self-priming of elastomeric waterproofing liquid (dilution with water in
the ratio of 3:1) and two coats of undiluted elastomeric waterproofing liquid
(dry film thickness of complete application/system not less than 500 microns).
The operation shall be carried out after scrapping and properly cleaning the
surface to remove loose particles with wire brushes, complete in all respect as
per the direction of Engineer-in-Charge.

Code Description Un Quantit Rate Amount


Details of cost for 10 Sqm it y
MATERIAL
8511 Fibre reinforced elastomeric
liquid
water proofing membrane litre 11.30 190.00 2147.00
10.76 litre + 0.538 (Add
wastage 5%)
= 11.30 litre
9977 Carriage of materials L.S. 1.43 2.00 2.86
LABOUR
0115 Coolie day 0.67 386.00 258.62
0131 Painter day 0.67 392.00 262.64
9999 Wire brush brushes, rollers
L.S. 6.76 2.00 13.52
etc.
9999 Sundries L.S. 8.06 2.00 16.12
TOTAL 2700.76 W
Add 1.5 % Water charges on
40.51
"W"
TOTAL 2741.27 X
Add GST on "X"
(multiplying
factor 0.1336) 366.23
TOTAL 3107.51 Y
Add 10% CPOH on "Y" 310.75
TOTAL 3418.26 Z
Add Cess @ 1% on "Z" 34.18
Cost of 10 sqm 3452.44
Cost of 1 sqm 345.24
Say 345.2
773

518 400,637

49000
4554.581
5117571 3522650