INVESTMENT FREE
ENERGY MANAGEMENT CONTRACT
Contents
I. Introduction
II. Synergy One Stop Energy Saving Service
III. Current Electricity Situation in Indonesia
IV. Lighting Solutions & Project Experiences
V. Air Conditioning Solutions & Project Experiences
VI. Project CVs
I. Who We Are?
I. About Synergy
• Established since 2008.
• Leading Energy Management Contrac t (EMC) / performance
contract provider in Hong Kong/Singapore/Malaysia.
• Provide innovative energy-s aving lighting and air conditioning
cooling management technologies and solutions.
• Served over 200 clients since 2008.
• Further extend to Green Building Facade Lighting & renewable
energy solutions.
• Listed on Hong Kong Stock Exchange in 2015.
I. Energy Management Contract “EMC”
Before
After Implementation
Implementation
( Product life need to be very long i.e. Designed limited product life cycle
design Life 10 years, 100,000 Hrs. )
IV. Why Are We Different?
Tube Lighting Product Comparison Summary
Items (in 4 ft.) Synergy LED Market LED
Power (W) 10W 18W
Scope of Work: Over 1,900 light points has been replaced by Synergy High Bay Induction
Lamps and Induction Flood Lights.
Description: The lighting improvement works saved over 5,000,000 kWh per year.
IV. Project Experiences
World Trade Centre, Sri Lanka Colombo
Project: Lighting Retrofit Works for General Lighting.
Scope of Work: Over 10,000 light points has been replaced by Synergy Lightings.
Description: T8 and MR16 replacement saved over 2,280,000 kWh per year.
Projects Ongoing
Project: Matahari Department Store (75) Project: Hypermart (100)
Location: All Indonesia Location: All Indonesia
Annual fee : around Rp24 billion Annual fee : around Rp27 billion
VRV System
Chiller CRAC Unit
Filtration System
With Synergy Coologic ™
V. Air Conditioning Solutions
Synergy Coologic® - Complete Energy Management Platform
2015 / 05 / 20
V. Air Conditioning Solution – Shamelin Real Case
Condensing Tube Approach Cooling Tower Approach
Before
Before
After
Before – After –
Aug, 2014 Mar, 2015
Source : Paradigm_project
V. Air Conditioning Solution : Concordia Real Case
Client : : Commercial Building, HK
Project Start : Since early 2011
Electricity Bill in Jul, 2012 Saved 28.3%
Facility : York Air Cool Chiller (3,000 Tons)
Refrigerant : R22 Before Installation : In Jul, 2010 549,724 kWh
Saving % 27%
(1)(3)(6)
(4)
(1) NEC finds clients for Synergy for proposal (4) Synergy arranges installation of lighting products on
(2) NEC enters EMC with Clients and sign back to back EMC EMC Clients’ premises
with Synergy (5) EMC Clients pay NEC monthly
(3) NEC pays Synergy to share initial costs as deposit (6) NEC pays Synergy monthly, after deducting the paid
deposit that is evenly spread over the lease term
* for illustrative purpose only
SYNERGY+NEC AR FACTORING
MODEL
(4)
(3)
(1)(2)
(1) Synergy enters EMC with EMC Clients monthly energy (3) Upon installation completed, NEC purchases the
saving receivables of the EMC between Synergy and EMC
(2) Synergy arranges for installation of lighting products on Clients
EMC Clients’ premises (4) Since then, NEC will be in charge of receivable
collection from EMC Clients directly
* for illustrative purpose only
Financials
• Typical IRR ~ 27-30%
• 7 years contract
• Typical project size – 5,000 tubes – 10,000 tubes per site
• Typical contract value – US$500,000 – US$1m (pre split)
• Potential Market – 1,000 factories
– US$500m – US$1b