Вы находитесь на странице: 1из 2

Your BABOK “Phone number.

” List
CBAP® Exam Top Mnemonics number of your mnemonics by KA:
Watermark Learning _3_ _4__ 2_ -- _2_ _4_ _4_ _1_

Instructions: Use this as a handy reference for your “top” mnemonics to help study the BABOK®
Knowledge Areas. Space is available for you to add some of your own, so start thinking of them!
Mnemonic Stands For Used For Notes
General and Competencies Nbr of Mnemonics 3
PEACEUS Abbreviations of the Knowledge Quick way to remember the
Areas in the BABOK: BAPM, RE, KAs
RA, RMC, EA, UC, SAV
BSFNT Business, Stakeholder, Functional, 5 types of requirements in Alternative: “Bake Some Fun
Non-functional, and Transition the BABOK New Treats”
Requirements
PS, LES Physiological, Safety, Love & Maslow’s Hierarchy of
Belonging, Esteem, and Self- needs, part of his theory of
Actualization motivation

BAPM – Business Analysis Planning and Monitoring Nbr of Mnemonics 4


ASACMP Plan BA Approach; Conduct Tasks in Business Analysis
Stakeholder Analysis; Plan BA Planning and Monitoring
Activities; Plan BA Communication;
Plan Requirements Management
Process; Manage BA Performance
RACI Responsible, Accountable, A common role and RACI is an industry acronym,
Consult with, and Inform responsibility matrix not an invented mnemonic
CARA’S SOUPS Complexity, Absolute Reference, Requirements attributes.
Risks, Author, Source, Status, “Cara’s soups has many
Ownership, Urgency, Priority, good attributes.”
Stability.
MATA Mitigate, Accept, Transfer, Avoid Four risk responses. “MATA
Hari was a risky spy to deal
with.”

RE - Requirements Elicitation Nbr of Mnemonics 2


PC/DC Prepare for Elicitation, Conduct Tasks in Requirements
Elicitation Activity, Elicitation. “Elicitation is
Document Elicitation Results, Politically Correct in
Confirm Elicitation Results Washington, DC”
DIP OF RIBS Document Analysis, Interviews, Techniques for Elicitation.
Prototyping, Observation, Focus “Make your elicitation
Groups, Reqs Workshops, appetizing”
Interface Analysis, Brainstorming,
Survey/Questionnaire

RMC - Requirements Management and Communication Nbr of Mnemonics 2


STRPC Manage Solution Scope & Reqs, Requirements Mgmt and Note the BABOK lists Scope as
Manage Reqs Traceability, Communication tasks. “If the first task, but it could be in
Maintain Reqs for Re-Use, your PC manages data and any order.
Prepare Reqs Package, communicates well, it’s a
Communicate Requirements “Star PC”

© 2009-2011, Watermark Learning, Inc. | Modified copies allowed, as long as copyright is intact. Page 1
Mnemonic Stands For Used For Notes
POI BARS Purpose of the deliverable, Items to include in a Note; the order of items is
Objectives of the review, requirements review. “I saw different in the BABOK, but
Introductions, Background, a presentation on the latest that should not be a big issue.
Agreement, Review, Status craze in Hawaii: POI BARS.”

EA - Enterprise Analysis Nbr of Mnemonics 4


NGASC Define business Need, Determine Enterprise Analysis tasks. Alternative: “No GAS for
Gap in capabilities, Determine “Think of a “National Gas Cooking”
solution Approach, Define solution Company” that spans the
Scope, Develop business Case. whole country
(Enterprise”).
SMART Specific, Measurable, Achievable, Characteristics of properly SMART is an industry
Relevant, Time-bounded constructed goals and acronym, not an invented
objectives mnemonic
POLDAT Process, Organization, Location, An enterprise architecture POLDAT is an industry
Data, Applications, Technology framework acronym, not an invented
mnemonic
BC RAMP Benefit identification, Cost Elements of defining a
identification, Risk Assessment Business Case. “Business
for solution, Measurement Case Ramp (up).”
Process for Benefits & Costs

RA - Requirements Analysis Nbr of Mnemonics 4


POMA V V Prioritize Reqs, Organize Reqs, Tasks in Requirements
Specify and Model Reqs, Define Analysis. “POMA apples
Assumptions & Constraints, Verify have Verified Valid
Reqs, Validate Requirements requirements.”
PUREE Processes, User Classes/Profiles/ Modeling concepts for
Roles, Rules, Entities and analysis. “Models PUREE
Relationships, Events your requirements “
CCCC MUFT Cohesive Modifiable Characteristics of
Complete Unambiguous requirements quality.”Let’s
Consistent Feasible all cheer for quality
Correct Testable requirements!”
PERM COST Performance Efficiency Non-Functional
Reliability, Maintainability, Requirements. “There is a
Compatibility, Operability, PERManent COST to non-
Security, Transferability functional requirements.”

SAV - Solution Assessment & Validation Nbr of Mnemonics 1


PART VP Assess Proposed Solution, Tasks in Solution Alternative: “Proposals
Allocate Reqs, Assess Org. Assessment and Validation. Allocate Ready Transitions to
Readiness, Define Transition “What part does a BA play Valid Performance.”
Reqs, Validate Solution, Evaluate in Solution Assessment and
Solution Performance Validation?”

© 2009-2011, Watermark Learning, Inc. | Modified copies allowed, as long as copyright is intact. Page 2

Вам также может понравиться