GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT a HIGHWAYS
(S&R(P&B) Section)
Transport Bhawan, 01, Parliament Street, New Delhi-110 001
Dated the 18th December, 2019
OFFICE MEMORANDUM
In connection with review of report of Prime Minister's Infrastructure projects,
the target in respect of the following is required for the current year 2019-20 as well as
for the year 2020-21 :
1 NSV Survey Length of NHs for condition survey using Network Survey Vehicle
(NSV)- accounting length of projects where appointed date
declared/ PCC or CC issued/likely to be issued, projects under
O&M stage etc.
2 Road safety Length of NHs for road safety audit as per provisions of contract
Audit agreement/lRC-SP 88:2019.
3 Removal of Action has to be taken for removal of black spots (recently a list
Black Spots of 322 7 Black Spots for 17 states has been sent to all ROs).
2. The above matter has been discussed during the review meeting chaired by DG
(RD) & 55 with all Regional Officers of MoRTH through video conference on 16.12.2019.
Therefore, it is requested that target in respect of the above may be prepared in the
enclosed format (Annexure-1) for the current year 2019-20 as well as for the year 2020-
21 and the same may be submitted within one week urgently. Q -~
~~\t\
(Puneet Garg)
Assistant Executive Engineer -QCC (S&R)
for Director General (Road Development) & SS
To,
All CE- ROs / SE-ROs/ ELOs of the Ministry of Road Transport & Highways