Vodafone SA Prevention Maintenance Report

Customer Name Frequency:


UBR Product Channel width:
Name
Wipro TT number Type of service:ILL/PRI/MPLS/NPLC
Location Region
Master UBR details Slave UBR details
S.No Parameters to be checked status(ye Remarks status(ye Remarks
s/no) s/no)
1 pole/mask&ODU mounted are
properly tightened.
2 Pole/Mask
If pole/mastHeight.
height is>4m,check for
3 the provision to climb the pole and
Boot cap fixed
stay wire with
support gasket and
provided.
4 weatherproofing done
Shielded RJ-45 connector on to
boot
be cap.
used
5
and properly crimmped.
is no chance for any obstacle in front
6 1
ofM extra Cat
anteena 5e cable
at least for futher
for another 3
7 operation purpose(Both end
8 Cat 5e Cables properly laid with cable
ODU/POE).
tie &routed Properlyatupto
Earthing connected ODUPOE.
and
9 Pole/Mast.
10 Signal details(RSSI &LINK Quality).
11 Cable length from ODU to POE
AGL(Anteena Height from Ground
12 Level)
Factory made cable used between
13 POE
Properto Converter/Router/Switch
lebeling to be available at
14
cable for LAN/WAN
Proper lebeling to beport at POEatend.
available POE
15 Power supply.
POE to be placed at proper cooling
16 area to avoid excessive
POE fixed/placed heat.
properly by using
17 No stress to be on Power cable,Cat 5e
tie.
18 Cable & RJ45 connectors (Both end
Power
ODU/IDU).reading details by measuring 5-
19 10 mins.
Earthing Voltage proper (Less than 3
20
Volt).

Other Observations if any:

Field Engineer Name Customer Acknowledgement


Date:
Signature:
No of Radio mounted at BTS End(vodafone +other vodafone other vedner total
vedner)
No of Radio mounted at BTS End(vodafone +other vodafone other vedner total
vedner)
Frequency:
hannel width:
vice:ILL/PRI/MPLS/NPLC

ve UBR details

nowledgement

total
total