The constructional work in connection with 3rd line between

Bainchi(Exl) to Palsit(Incl.) in Howrah division at Eastern Railway, the


overhead equipment work is awarded to M/S Shyam Takniki Udyog ,
Post Box No.-31, Bhuli Road Dhanbad-826001. Jharkhand.
Vide LOA NO. EL/HWH/CON/04/TRD-2016(OPEN)/Tender/Vol.II Dated
02.12.2016
Necessary Instruction from the end of SSE/TRD/CON/HWH to all staff of M/S
Shyam Takniki Udyog Post Box No.-31, Bhuli Road Dhanbad-826001.
Jharkhand. Who are involved in day and night work, should strictly followed the
Instruction given below during the on-going project work.

 Do not adopt any short-cut methods while


working on new line as well as running line.
 Before working put discharge rod and
banner flag on either end of working zone.
 No trolley movement should be allowed
without the intimation of railway person.
 NO FOUR WHEELAR MOVEMENTS SHOULD BE
ALLOWED WITHOUT THE INTIMATION OF RAILWAY
PERSON.
 All erection materials should be looked
after by your concern and do it properly.
 If any un-usual incident occurs, for violating
the safety, your company will be
responsible.
 Switching station manning staff should be
alert round the clock for manual operation.
 Each and every staff should have proper
Identity card while on duty.
SSE/TR-D/CON/HWH