The constructional work in connection with 3rd line between
Bainchi(Exl) to Palsit(Incl.) in Howrah division at Eastern Railway, the
overhead equipment work is awarded to M/S Shyam Takniki Udyog , Post Box No.-31, Bhuli Road Dhanbad-826001. Jharkhand. Vide LOA NO. EL/HWH/CON/04/TRD-2016(OPEN)/Tender/Vol.II Dated 02.12.2016 Necessary Instruction from the end of SSE/TRD/CON/HWH to all staff of M/S Shyam Takniki Udyog Post Box No.-31, Bhuli Road Dhanbad-826001. Jharkhand. Who are involved in day and night work, should strictly followed the Instruction given below during the on-going project work.
Do not adopt any short-cut methods while
working on new line as well as running line. Before working put discharge rod and banner flag on either end of working zone. No trolley movement should be allowed without the intimation of railway person. NO FOUR WHEELAR MOVEMENTS SHOULD BE ALLOWED WITHOUT THE INTIMATION OF RAILWAY PERSON. All erection materials should be looked after by your concern and do it properly. If any un-usual incident occurs, for violating the safety, your company will be responsible. Switching station manning staff should be alert round the clock for manual operation. Each and every staff should have proper Identity card while on duty. SSE/TR-D/CON/HWH