2 X 660 MW KHARGONE SUPER THERMAL

POWER PROJECT

Owner:
NTPC LIMITED
(A GOVERNMENT OF INDIA ENTERPRISE)

EPC Contractor:

LARSEN & TOUBRO LIMITED

Architect Engineer:

L&T – SARGENT & LUNDY LIMITED

L&T – S&L Job No.: LD16005000 L&T Project No.: KHARGONE

WRITE-UP FOR STEAM BLOWING SCHEME


Title:
(Boiler & Pipe Lines)

Doc./Drg. No.: LD16005-DS00-00-ZEN-130001 Rev No.: 05 Total No. of Pages : 82

NTPC Doc./Drg. No.: 9578-001-102-PVM-K-004 Unit Designation: 1 & 2


Stamp:

Digitally signed by
DEBABRATA KUNDU
PROJECT ENGINEERING
MANAGER KHARGONE
Date: 2018.12.27 17:52:49
+05'30'

REVISION STATUS
Prepared Reviewed Approved
Rev
Name
No. Name Date Date Name Date
Mech Elec Civil C&I SES
00 BDJ 30.DEC.2016 KT -- -- -- -- 30.DEC.2016 DK 30.DEC.2016
01 PNS 16.MAR.2018 RKB -- -- -- -- 16.MAR.2018 DK 16.MAR.2018
02 PNS 11.JUL.2018 RKB -- -- -- -- 11.JUL.2018 DK 11.JUL.2018
03 PNS 13.NOV.2018 RKB -- -- -- -- 13.NOV.2018 DK 13.NOV.2018
04 PNS 07.DEC.2018 RKB -- -- -- -- 07.DEC.2018 DK 07.DEC.2018
05 PNS 25.DEC.2018 RKB -- -- -- -- 25.DEC.2018 DK 25.DEC.2018
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

REVISION SUMMARY SHEET

Rev
Details / Description Date
No.
00 DESIGN ISSUE 30.DEC.2016

01 Issued for approval 16.MAR.2018

02 Issued for approval 11.JUL.2018

03 Issued for approval 13.NOV.2018

04 Issued for approval 07.DEC.2018

05 Issued for approval 25.DEC.2018

Page 2 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

TABLE OF CONTENTS
1  INTRODUCTION......................................................................................................... 5 
2  OBJECTIVE ................................................................................................................ 5 
3  STEAM BLOWING METHODOLOGY ........................................................................ 5 
4  LIST OF EQUIPMENTS FOR STEAM BLOWING ...................................................... 7 
5  PREPARATION FOR STEAM BLOWING .................................................................. 9
6  STATE OF THE PLANT ............................................................................................ 12 
7  SAFETY ARRANGEMENTS ..................................................................................... 12 
8  ACCEPTANCE CRITERIA AND TARGET PLATE SIZE .......................................... 14 
9  ARRANGEMENT FOR MOUNTING TARGET PLATES FOR STEAM BLOWING ... 14 
10  INITIAL HEATING OF THE STEAM LINES BEFORE STEAM BLOWING ............... 15 
11  PROCESS FOR STEAM BLOWING......................................................................... 15 
12  LIMITS OF STEAM BLOWING: ................................................................................ 16 
13  STEAM BLOWING STAGES AND DESCRIPTION .................................................. 16 
14  CHECK LIST ............................................................................................................. 38 
15  ANNEXURE: LOG SHEET........................................................................................ 39 
16  STEAM BLOWING DATA SHEET ............................................................................ 42 
17  REFERENCE ............................................................................................................ 44 

Page 3 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

ATTACHMENTS

Attachment – 1 Blow out kit drawing for MSV, RSV, CRH NRV and Ext. # 6 NRV

Attachment – 2 HP-Bypass Blow through kit and LP-Bypass Blowout kit Drawings

Attachment – 3 Typical operation procedure for steam generator

Attachment – 4 BFPT Steam Blowing criteria

Attachment – 5 Steam Blowing P&ID

Attachment – 6 Steam blowing schemes

Attachment – 7 Target Plate Assembly drawing

Attachment – 8 Cut out locations

Page 4 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

1 INTRODUCTION
This document is meant to form a design basis of Steam Blowing Procedure for 2X660 MW
Khargone Super Thermal Power Project.

2 OBJECTIVE
The purpose of steam blowing of high pressure steam pipe lines is to ensure that the steam pipe
lines to the equipment are free from foreign objects like slag from welds, rust, scales, loose
debris etc. before allowing steam into the turbine.
Steam blowing is carried out for the entire main steam, auxiliary steam and re-heater circuits
and steam inlet piping up to the equipment by subjecting the piping system to successive
heating, blowing steam (with higher steam, momentum) and cooling cycles in sufficient
numbers and duration.

3 STEAM BLOWING METHODOLOGY


To ensure that sufficient cleaning forces are applied to the piping system, the steam
momentum during steam blowing must be kept higher than the steam momentum at
maximum continuous operating load condition. This would ensure that any potentially
damaging particles are dislodged and removed out of the piping prior to the turbine
operation. Cleaning Force Ratio (E) (known as Disturbing Factor in earlier times) is
expressed as ratio of steam momentum during blowout to that during normal MCR
(Maximum Continuous Rating) operating condition. It determines effectiveness of steam
blowing.

The Cleaning Force Ratio (E) is given as:

E = [M b / M a] 2 x [V b / V a]

Where,

E = Cleaning Force ratio (CFR)

Ma = Mass Flow during MCR operating condition, kg/s

Mb = Mass Flow during Steam blowout, kg/s

Va = Specific Vol. of steam during MCR operating condition, m3/kg

Vb = Specific Vol. of steam during steam blow-out, m3/kg.

05 The cleaning force ratio (CFR) should be 1.4 with steel plate (Two times successive) &
CFR should be greater than 1.0 with brass plate (Three times successive), for main lines.

Page 5 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

05 Cleaning force ratio should be 1.2 with Aluminum as target plate material (Two times
adjacent) for BFPT lines.

Steam cleanliness is determined by the number of indentation on the polished target plates
that are mounted in the temporary pipe after the terminal blowing point of the permanent
piping during steam blowing. The acceptance criteria for numbers and sizes of indentation
on target plate are given by turbine OEM.

Water separator pressure shall be maintained at approx. 50-56 kg/cm2 (Please refer data
sheet for stage wise water separator pressure). The martyr valve will be opened to release
steam to atmosphere. Total number of blows will vary as per the cleanliness requirement of
the installed piping and the target plate acceptance criterion of the turbine OEM.

Non critical line including the auxiliary steam lines as well as turbine gland seal steam lines
will be cleaned by continuous blow method. During cleaning of these lines target plate
assembly will not be installed. Completion of steam blowing will be judged based on visual
inspection of the exhaust steam quality.

Thermal cycles are provided to the piping system during steam blowing to assist in
dislodging the mill scales, weld slag and debris. This is to be achieved by providing cool
down intervals as per recommendation of boiler OEM. Overnight cooling is also adopted at
times. It is recommended to provide one overnight cooling to each stage having Target
Blow.

This procedure is a suggested method of steam blowing and does not attempt to address all
aspects of the blowing operation that will be required. The commissioning-in-charge has
the ultimate responsibility for the implementation at the Project Site after due approval of
KHARGONE Project officials at site.

Steam lines for which blowing is not carried out, such as downstream piping of
MSCV/RSV, upstream of CRH NRV, overload lines etc. shall be cleaned erected or
manually cleaned.

Page 6 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

4 LIST OF EQUIPMENTS FOR STEAM BLOWING

System Tag Number Scope of Supply Remarks

Main Steam & Reheat Steam line

1 HP Turbine MSV (Main Steam Stop 01MAA02AA081 Blow out kit


Valve) LMTG
01MAA02AA082

2 IP Turbine Steam Stop Valve (RSV- 01MAB02AA081 Blow out Kit


Reheat Stop Valve) LMTG
01MAB02AA082

3 HP bypass pressure control valve 01MAN10AA081 Blow through kit


IMI CCI
01MAN20AA081

4 LP bypass pressure control valves 01MAP10AA081 Blow out kit


IMI CCI
01MAP20AA081

5 Cold reheat NRV (Non Return Valve) 01LBC10AA201 Blow out kit
LMTG
01LBC20AA201

CRH Line

6 CRH to Deaerator control valve Erect after steam


01LBQ60AA081 KSB MILL
blowing

7 CRH to Gland sealing control valve Erect after steam


01LBD11AA081 LMTG
blowing

8 CRH to Aux. control valve Erect after steam


01LBC30AA081 KSB MILL
blowing

MS line

9 MS to Aux. control valve Erect after steam


01LBA30AA081 IMI CCI
blowing

Auxiliary steam line

10 Auxiliary line Desuperheater Temporary spool


01LBG10AZ001 IMI CCI
piece

11 Aux header to gland steam line CV Temporary spool


01MAW01AA081 LMTG
piece

Page 7 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

System Tag Number Scope of Supply Remarks

12 Aux header to Deaerator 01LBG13AA081 Temporary spool


piece
01LBG13AA003 -
01LBG13AA002

Extraction line

13 Extraction-6 QCNRV 01LBD60AA051 LMTG Blow out kit

Flow elements

14 Upstream of HP Bypass 01MAN10CF001 Temporary spool


- piece
01MAN20CF001

15 MS to Aux header Temporary spool


01LBA30CF001 -
piece

16 CRH to Aux header Temporary spool


01LBC30CF001 -
piece

17 Ext-6 to Deaerator Temporary spool


05LBD60CF001 -
piece

18 EXT-6 to BFPT 01LBD61CF001 Temporary spool


- piece
01LBD62CF001

Other Equipment’s

20 Target Plate - - As per requirement

21 Target plate holder - - 03 Nos.

22 Spectacle Blanks - - As per scheme.

23 Temporary MOV (Martyr valve) Temp.MOV-


- -
02 Nos.

24 Spool piece As per


- -
Requirement.

25 Temporary Drain Valve To suit pipe


- -
layout.

Page 8 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

5 PREPARATION FOR STEAM BLOWING


a) Ensure proper anchoring support for the temporary blowing outlet pipe at the exhaust to
prevent lateral movement and allow axial movement.
b) Ensure the drain lines connections in the main steam line are also thoroughly cleaned during
blowing operation by opening the isolation valves.
c) Ensure the readiness of the boiler & accessories in all respects for including identified
protection & interlocks for boiler operation.
d) Ensure readiness of all BOP facilities and control systems.
e) Spectacle Blind assembly shall be provided in the system (in line with the procedure) to
ensure that each stage is positively isolated from other stage.
f) MSV (Main Steam Stop Valve) / RSV (Reheat Stop Valve) Blow out device to be installed
to prevent steam ingress to turbine and other blanks are to be installed as per scheme.
g) All NRV (Non Return Valve) internals to be removed/ locked, controls valves and flow
nozzles /orifice plates in the blow circuit are to be removed and blow through kit/ temporary
spool pieces to be installed.
h) Drain lines are to be installed in temporary pipes low points and upstream of blank (if
required).
i) Drains beyond the valves being blanked for steam blowing operation are to be kept open
during steam blowing to detect and drain any condensate /steam passing through the
blanking device.
j) Ensure proper drain connection for Temporary blowing pipe. Temporary blowing pipe
should be well supported to withstand reaction forces during blowing and proper thermal
expansion provision has to be given. Mark permanent and temporary piping at all sliding
support so that piping expansion can be checked when piping is warmed up. Exhaust lines
outlet should be such that personnel and equipment are not endangered.
k) The pipe lines including temporary pipes which are to be blown with steam must be
insulated where personnel protection is required.
l) Ensure smooth operation of the martyr valves (temporary MOV-1 & 2) for full open and
close position.
m) All permanent hangers for various lines are to be erected and set for proper values as per
schedule. All locks and restraints are to be removed from pipelines.
n) Open / Close limit switches are to be provided for all temporary MOVs in blowing
circuit.

Page 9 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

o) Target plate surface (blow face) is to be made in line with turbine OEM recommendations.
The condition of target plate shall be jointly inspected before insertion.
p) Provision should be made for hot tightening of flanges to arrest/prevent leaks during blowing
operations.
q) Spare gaskets for flanges are to be kept ready (metallic gaskets).
r) In addition to usual instruments required for boiler light up, provision may be made for
monitoring / recording pressure & temperature at outlet of boiler and before temporary pipe
exhaust (optional). Also quantity of water fed to boiler is to be monitored.
s) Effective communication and lighting system should be ensured at operating areas.
t) Strainer elements are removed before the steam blowing operation.
u) Following facilities should be checked before steam blowing operation for sustained
availability,

- Water Treatment System

- Condensate Transfer Pump

- Condenser & Condensate Pump along with CPU. 05

- Vacuum system.

- Motor Driven Feed Water Pump

- Feed water system and Feed Water Control System

- HP/LP Bypass System

- Boiler Start –Up system and Drain Transfer Pumps

- Gas Air preheater and its Soot Blower System

- Steam Coil Air Heater

- Oil Burners and Flame Scanning System

- FD fan ,ID fan ,PA fan ,Scanner Coiling Air Fan

- All necessary Auxiliaries systems (Cooling water, compressed air, etc.)

- Fire Fighting System

- Controlled Air System

- CCTV

- Fuel Oil Supply System


Page 10 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Auxiliary Steam System

- Instrument air system

- Cooling water systems (CW / ACW / DMCW)

- All Boiler and MDBFP Protection and Interlocks Checked

- All structural steel work

- Steam piping erection along with supports.


v) All rotating machines should be supervised by commissioning group.
w) Before blowing, the pipeline should be adequately warmed.
x) MS, HRH and CRH drain connections to condenser and drain connected to boiler flash tank
will be temporarily routed to safe area.
y) Oil firing shall be done in the boiler during steam blowing .Boiler operation should be as
per OEM instruction.
z) The feed water temperature at economizer inlet should be maintained around 100 0C during
steam blowing operation by deaerator pegging. Variation from this temperature will have an
impact on the firing rate requiring generation of the targeted steam flow.
aa) Motor driven BFP shall be continuously running on the recirculation mode during steam
blowing operation.
bb) Boiler light up is carried out in the normal manner satisfying all the recommended start up
and running procedure viz. firing equipment, draft system, drains and vents, instruments and
protection. Flue gas temperature at furnace exit should be limited to 560 0C or recommended
by OEM to prevent overheating of re-heater and super-heater sections.
cc) The power supply for the temporary blowing valve should be cut off when removing and
installing the target plate. Also stop the power supply when the pipe blowing is concluded
for each day.
dd) Boiler water quality to be maintained as per OEMs recommendation by dosing of requisite
chemicals.As per turbine supplier’s recommendation steam flushing for seal steam line is
done through auxiliary steam. Hence ensure readiness of auxiliary steam system prior to
steam blowing.
ee) To protect the turbine (due to possible steam leakage) into turbine, the turning gear must be
in operation when steam blowing is being carried out and condenser shall be under vacuum
condition.
ff) Lube oil system of turbine needs to be in operation before start up turning gear.

Page 11 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

6 STATE OF THE PLANT


a) All temporary piping along with valves for steam blowing should be completed as per
schematic diagram (Refer section - 12) prior to commencement of steam blowing.
b) Temporary piping should be adequately supported. RT/DPT of joints in temporary pipes to
be done as per FQP.
c) Hydraulic test of permanent steam blowing lines should be completed before steam blowing.
d) Hangers should be released to withstand reaction forces.
e) For all MSV, RSV, HP bypass valve dismantling, reassembling and protective works shall
be performed during steam blowing as per valve manufacturer’s recommendation. The check
valve for CRH line should be removed and protected with adopter before steam blowing.
f) Drain lines will be installed for clearing out accumulated fluid at low points, where the
condensate accumulation will be maximum, as per schematic diagram. (Refer section - 12).
g) All drains at the upstream of the valves being blanked should be kept open to avoid
accumulation of condensation and possibility of the line hammering.
h) Pressure gauge, temperature gauge and target plate should be kept at the free end of the blow
out pipe. All other gauge, instrument connection, control valves, NRV internals (as per
requirement), flow nozzles/orifice etc. should be removed and spool pieces, blow through
kits/blanking device are to be installed, wherever necessary, as per steam blowing stages.
i) Smooth operation (opening/closing) from control room should be ensured for the motorized
blow valve before steam blowing operation.
j) Power supply to motorized blow valves should be extended from emergency section of the
switchgear. NTPC to provide power supply source from emergency bus.
k) Blow valve should be quick acting type with minimum opening time.
l) Sufficient storage of DM water, (approx. 1100 ~ 1300 Tonnes per day for 20 nos. of blow in
a day) should be ensured.
m) Sufficient storage of LDO (approx. 300 ~ 350 Tonnes per day for 20 nos. of blow) should be
ensured (NTPC scope).

7 SAFETY ARRANGEMENTS
a) The area around the exhaust point should be cordoned off. Caution boards are to be
displayed at vulnerable points.
b) The area around the temporary exhaust pipe should be barricaded and no one should be
allowed inside the barricaded area when the blowing is in progress.

Page 12 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

c) Prior to every blow, a warning should be sounded by means of a siren and announcement
should also be made from the public address system.
d) Personnel working near the blow area to be provided with ear muffs.
e) After completion of trials and few initial blowouts check all hangers, guides & supports for
healthiness.
f) Before changing the target plate, work permit to be taken.
g) Hot target plates shall be handled only using gloves to prevent injuries. Be careful not to
scratch the surface of the target plate during removal.
h) Flanged Safety valve will not be installed during steam blowing and corresponding stubs
shall be blanked if required. Welded safety valve can be installed.
i) Before opening the Temporary MOV for blowing, make sure that no construction personnel
are working on the pipeline and the personnel installing/replacing of the target plate have
moved to a safe location.
j) Required personnel and responsibilities:
- Commissioning in-charge has overall responsibility for ensuring that the commissioning
activities are performed in accordance with this procedure.
- Commissioning Manager is responsible for scheduling, controlling and coordinating the
commissioning activity with other disciplines. He is also responsible for ensuring the
implementation of the lockout and tagging procedure during the commissioning activities
on live systems, circuits, equipment and piping system.
- Commissioning Engineer is responsible for the preparation, coordination with other
disciplines and execution of the commissioning activity.
- Commissioning Supervisor is responsible for the supervision of the safe start-up,
operation and shutdown of the equipment/system and shall take instructions from the
Commissioning Engineer.
- Local Operators are responsible for the operation and monitoring of all equipment in
service.
- Safety Engineer shall be responsible for monitoring that all activities are carried out in a
safe manner and in accordance with the established procedure.

Page 13 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

8 ACCEPTANCE CRITERIA AND TARGET PLATE SIZE

8.1 Target Plate Size


Target plate size, material, thickness and surface finish shall be as per the turbine OEM’s
recommendations (Attachment 4 & Reference 17.2).

8.2 Evaluation of Target Plate


For initial blowouts no target plates will be installed. Only after steam coming out of piping
is considered clean based on visual inspection, target plates shall be used. Fresh target plate
should be used for each blowing. The number of blows will depend upon cleanliness of the
installed piping and the steam blowing completion declaration shall depend upon the number
of indentations and the total percentage area of indentations on the target plate which is
noted after each blow.

8.3 Acceptance Criteria


After completion of steam blowing operations, target plate is removed for inspection of the
number and sizes of the indentations in accordance with turbine manufacturer’s
recommendations. Declaration of completion of steam blowing of piping to steam turbine
based on the steam turbine supplier/owner representative clearing the target plate based on
the acceptance criterion of the turbine manufacturer. For HP bypass piping, no of steam
blows shall be 7-10 of 15 min duration.

Non critical line including the auxiliary steam lines as well as turbine gland seal steam lines
will be cleaned by continuous blow method. During cleaning of these lines target plate
assembly will not be installed. Completion of steam blowing will be judged based on visual
inspection of the exhaust steam quality. For blowing to be declared complete for a non-
critical line (Service blow), atleast 03 nos. continuous blows of 5-10 min is to be given or
till the exhaust steam is visibly clear, whichever is later.

9 ARRANGEMENT FOR MOUNTING TARGET PLATES FOR STEAM BLOWING


Arrangements must be made for mounting the test target plates. The test pieces are to be
inserted in the slot provided in the holder, which is to be suitably fabricated according to the
pipe size and holder mounting should be exactly at pipe centre.
Target Plate assembly shall be installed after Temporary MOV wherever applicable. Attempt
shall be made to keep target plate assembly as close to MOV as possible.

Page 14 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

10 INITIAL HEATING OF THE STEAM LINES BEFORE STEAM BLOWING


Boiler light up is carried out as per boiler start up and shutdown procedure in the normal
manner satisfying all the recommended start up and running procedure viz. firing equipment,
draft system, drains and vents, instruments and protection.
Target plate should be fixed / exchanged before warming operation. Warming of temporary
pipes shall be done and drain lines shall be kept open.
Checking for expansion of pipes should be done after warming. Further fastening of flanges
and supporting bolts of temporary piping will be performed after completion of warming.
During shutdown or replacement of target plate, the supporting bolt should be loosened.

11 PROCESS FOR STEAM BLOWING

11.1 Prevent the introduction of wet steam or de-superheater spray water into the SH or RH
assemblies. Poor distribution of the water particles into the superheater or reheater
assemblies causes excessive temperature differentials resulting in blowing or overstressing
damage in attachments or supports. Therefore, the steam entering any SH or RH section
must be superheated at all times.

11.2 The process of steam line blowing imposes abnormal and severe conditions upon the unit
and steam piping. Large, rapid temperature changes occur during each blowing cycle, which
is far more severe than is incurred in normal operation. Thermal stresses may be high in the
thick walled portions of the unit. It is prudent to consider this fact when performing this
procedure and to limit the number of blowing cycles to the minimum consistent with
cleaning the system.

11.3 The temperature of steam entering sections that are downstream of de-superheating points,
and subject to injection of water should be monitored ; a minimum of 14 °C (57 °F) above
the saturation temperature existing at that point should be maintained at all times.
Temperature monitoring and control will be as per normal operating procedure of Boiler and
will be controlled through DCS.

11.4 The operator must continuously monitor pressure in the temporary and permanent piping and
be ready to take action to prevent over pressure, since the temporary piping may be designed
for a lower pressure than the steam generator’s normal operating pressure. The maximum
pressure to be attained during blowing of each stage is indicated in table (see clause No. 15.
STEAM BLOWING DATA SHEET) Care must be taken to prevent over – pressurization
during the entire steam blow operation.

11.5 During cold start up, drains in piping system inclusive of temporary piping should be
carefully operated to prevent steam/water hammering phenomenon.

Page 15 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

11.6 The initial blow of each phase should be done at reduced pressure in ordered to check the
temporary piping anchors and supports.

11.7 Steam blowing operation is the first occasion when the boiler unit is fired at a significant
rate. Therefore, special attention must be paid to the boiler start up and operation at all times.
The unit must be started at a slow rate so that all equipment is checked for initial expansion
movement.

12 LIMITS OF STEAM BLOWING:


Steam parameters during steam blowing shall be maintained as below:

SH outlet: 45 - 57 KG/CM2

SH outlet: 320 – 370 °C

The degree of superheat shall be maintained as 70 – 80 °C.

13 STEAM BLOWING STAGES AND DESCRIPTION


Stage- 1_MS & CRH PRDS Blow Path from Auxiliary Boiler (Service blow)

Auxiliary  Aux.  Line to MS &  Temporary  Atmosphere


Boiler Steam CRH PRDS Pipe
Header

Blowing Description:
- Continuous method shall be used for steam blowing without target plate.
- Keep all the drains connections going to Flash Tank / Drain Manifold closed during
steam blowing. Drains should be closed only after the lines are drained and warmed up
properly.
- Keep 00LBG01-AA106 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep 02LBG15-AA 101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 00LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG15-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep MOV-01LBG15-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG10-AA001 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG11-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG13-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep MOV-01LBG12-AA002 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG14-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA111 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.

Page 16 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Keep 01LBC30-AA112 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.


- Keep 01LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Either lock or remove internals of 00LBG01-AA201 (Refer 9578-001-102-PVM-L-027
SHT 2 OF 2), 01LBG05-AA201 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2), and
01LBG01-AA201 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2).
- Remove PCV-01LBC30-AA081 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2),
PCV-01LBA30-AA081 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) and install
temporary piping as per isometric.
- Keep all temporary spectacle blinds position according to respective stage of P&ID.

Stage- 2_Deaerator blow Path from Auxiliary Boiler (Service Blow)

Auxiliary  Aux. Steam  Line to  Temporary  Atmosphere


Boiler Header Deaerator Pipe

Blowing Description:
- Continuous method shall be used for steam blowing without Target plate.
- Keep all the drains connections going to Flash Tank / Drain Manifold closed during
steam blowing. Drains should be closed only after the lines are drained and warmed up
properly.
- Keep 00LBG01-AA106 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep 02LBG15-AA 101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 00LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG15-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep MOV-01LBG15-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG10-AA001 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG11-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG13-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG12-AA002 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG14-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA111 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA112 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBQ60-AA101 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) closed.
- Keep MOV-01LBG13-AA001 (Refer 9578-001-110-PVM-F-030 SHT 5 OF 7) open.
- Keep 01LBG13-AA102 (Refer 9578-001-110-PVM-F-030 SHT 5 OF 7) open.

Page 17 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Either lock or remove internals of 00LBG01-AA201 (Refer 9578-001-102-PVM-L-027


SHT 2 OF 2), 01LBG05-AA201 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2),
01LBG01-AA201 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2), 01LBG13-AA201
(Refer 9578-001-110-PVM-F-030 SHT 4 OF 7), 01LBD65-AA201 (Refer 9578-001-
110-PVM-F-030 SHT 4 OF 7) 01LBD65-AA202 (Refer 9578-001-110-PVM-F-030
SHT 4 OF 7).
- Temporary spool piece shall be used in place of Control Valve PCV-01LBG13-AA081,
MOV-01LBG13-AA003 (Refer 9578-001-110-PVM-F-030 SHT 5 OF 7), MOV-
01LBG13-AA002 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7).
- Keep all temporary spectacle blinds position according to respective stage of P&ID.

Stage – 3_GSC Blow path from Auxiliary line (Service Blow)

Auxiliary  Aux. Steam  Line to  Temporary  Atmosphere


Boiler Header GSC Pipe

Blowing Description:
- Continuous method shall be used for steam blowing without Target plate.
- Keep all the drains connections going to Flash Tank / Drain Manifold closed during
steam blowing. Drains should be closed only after the lines are drained and warmed up
properly.
- Keep 00LBG01-AA106 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep 02LBG15-AA 101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 00LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG15-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep MOV-01LBG15-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG10AA001 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG11-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG13-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep MOV-01LBG12-AA002 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG12-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep 01MAW01-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW01-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA101, 01MAW03-AA102 (Refer 9578-001-110-PVM-L-005 SHT
5 OF 5) closed.
- Keep 01LBD11-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
Page 18 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Keep 01LBD11-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.


- Keep 01LBG14-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA111 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA112 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Either lock or remove internals of 00LBG01-AA201 (Refer 9578-001-102-PVM-L-027
SHT 2 OF 2), 01LBG05-AA201 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2),
01LBG01-AA201 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) 01MAW01AA221
(Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) 01LBD01AA221 (Refer 9578-001-
110-PVM-L-005 SHT 5 OF 5).
- Temporary spool piece shall be used in place of Control Valve 01MAW01AA081
(Refer 9578-001-110-PVM-L-005 SHT 5 OF 5).
- Temporary spool shall be used in place of FE2 (Refer 9578-001-110-PVM-L-005 SHT
3 OF 5), FE3 (Refer 9578-001-110-PVM-L-005 SHT 4 OF 5) and FE5 (Refer 9578-
001-110-PVM-L-005 SHT 5 OF 5).
- Remove all internals/use temporary spool piece for de-superheater 01MAW01AC201
and drain separator 01MAW20KT101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5).
- Keep all temporary spectacle blinds position according to respective stage of P&ID.
- Remove strainer and install temporary piping as per isometric.

Stage - 4_BFPT Line Blow Path from Auxiliary boiler (Target Blow)

Aux.  Aux. Steam  BFPT A & B  Temporary  Atmosphere


boiler header line

Blowing Description:
- Continuous method shall be used for steam blowing with Target plate.
- Keep all the drains connections going to Flash Tank / Drain Manifold closed during
steam blowing. Drains should be closed only after the lines are drained and warmed up
properly.
- Keep 00LBG01-AA106 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep 02LBG15-AA 101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 00LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG15-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep MOV-01LBG15-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG10-AA001 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
Page 19 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Keep 01LBG11-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.


- Keep 01LBG13-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep MOV-01LBG12-AA002 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG14-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep 01LBC30-AA111 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA112 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep MOV-01LBQ81-AA001 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) closed.
- Keep MOV-01LBQ81-AA002 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) open.
- Keep MOV-01LBQ82-AA001 (Refer 9578-001-110-PVM-F-032 SHT 2 OF 2) closed.
- Keep MOV-01LBQ82-AA002 (Refer 9578-001-110-PVM-F-032 SHT 2 OF 2) open.
- Keep MOV-01LBD61-AA001 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) closed.
- Keep MOV-01LBD62-AA001 (Refer 9578-001-110-PVM-F-032 SHT 2 OF 2) closed.
- Keep 01LBQ81-AA101 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) open.
- Keep 01LBQ82-AA101 (Refer 9578-001-110-PVM-F-032 SHT 2 OF 2) open.
- Temporary spool piece shall be used in place of Control Valve PCV-01LBQ81-AA081
(Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) & PCV-01LBQ82-AA081 (Refer
9578-001-110-PVM-F-032 SHT 2 OF 2).
- Either lock or remove internals of 00LBG01-AA201 (Refer 9578-001-102-PVM-L-027
SHT 2 OF 2), 01LBG05-AA201 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2),
01LBG01-AA201 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) 01LBQ81-AA201
(Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) 01LBQ81-AA202 (Refer 9578-001-
110-PVM-F-032 SHT 1 OF 2) 01LBQ82-AA201 (Refer 9578-001-110-PVM-F-032
SHT 2 OF 2) 01LBQ82-AA202 (Refer 9578-001-110-PVM-F-032 SHT 2 OF 2)
01LBD61-AA201 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) and 01LBD62-
AA201 (Refer 9578-001-110-PVM-F-032 SHT 2 OF 2).
- Temporary spool piece shall be used in place of flow element 01LBQ61-CF001 (Refer
9578-001-110-PVM-F-032 SHT 1 OF 2), 01LBQ62-CF001 (Refer 9578-001-110-
PVM-F-032 SHT 2 OF 2).
- Keep all temporary spectacle blinds position according to respective stage of P&ID.

Page 20 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

Stage –5_MS & CRH Line Blow Path (Target Blow)

Superheater  Main  Main steam stop  Temporary  Temporary


steam line valve(MSV) before line MOVs
HP steam turbine

 Atmosphere  Temporary  CRH line  CRH  Temporary


line NRVs line

Blowing Description:
- Puffing method shall be used for steam blowing with target plate.
- Keep stop valve MOV-01LBA01-AA001 & MOV-01LBA01-AA002 (Refer 9578-001-
102-PVM-L-011 SHT 1 OF 6) open.
- Blow out kit should be used for Main steam stop valves 01MAA02-AA081 &
01MAA02-AA082 (Refer 9578-001-110-PVM-L-005 SHT 2 OF 5) near HP Turbine.
- Keep HP Bypass valve PCV-01MAN10-AA0081 & PCV-01MAN20-AA081 (Refer
9578-001-102-PVM-L-011 SHT 2 OF 6) closed.
- Blow out kit should be used for CRH NRVs 01LBC10-AA201 & 01LBC20-AA201
(Refer 9578-001-102-PVM-L-011 SHT 3 OF 6).
- Keep MOV-01LBA30-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep MOV-01LBC30-AA010 & MOV-01LBC30-AA011 (Refer 9578-001-102-PVM-
L-027 SHT 1 OF 2) closed.
- Keep MOV-01LBQ60-AA001 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) closed.
- Keep MOV-01LBQ80-AA001 & MOV-01LBQ80-AA002 (Refer 9578-001-110-PVM-
F-030 SHT 2 OF 7) closed.
- Keep 01LBQ80-AA101 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) closed.
- Keep 01HCB01-AA150 & 01HCB01-AA153 (Refer 9578-001-102-PVM-L-025 SHT
1 OF 1) closed.
- Keep MOV-01LBC35-AA001 (Refer 9578-001-102-PVM-L-011 SHT 3 OF 6) closed.
- Keep 01LBD11-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
- Temporary spool piece shall be used in place of Flow element 01MAN10CF001 (Refer
9578-001-102-PVM-L-011 SHT 1 OF 6), 01MAN20CF001 (Refer 9578-001-102-
PVM-L-011 SHT 1 OF 6), 01LBA30CF001 (Refer 9578-001-102-PVM-L-027 SHT 1
OF 2), 01LBC30CF001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2)
- Either lock or remove internals of 01LBQ80-AA051 (Refer 9578-001-110-PVM-F-030
SHT 2 OF 7).
- Isolate HP bypass attemperator line by closing valve 01LAE10-AA101 and 01LAE20-
AA101 (Refer 9578-001-102-PVM-L-011 SHT 2 OF 6).
Page 21 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Keep martyr valve 01TMP01-AA001 and 01TMP01-AA002 open.


- All temporary spectacle blinds position should be according to respective stage P&ID.
- Auxiliary steam shall be continuously supplied to turbine gland sealing from
auxiliary boiler.
- Keep 00LBG01-AA106 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep 02LBG15-AA 101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 00LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG15-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep MOV-01LBG15-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG10-AA001 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG11-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG13-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG12-AA002 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG12-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep 01MAW01-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01LBD11-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
- Keep 01LBD11-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
- Keep 01MAW01-AA081 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW01-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA081 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep MOV-01LBS45-AA001 (Refer 9578-001-110-PVM-F-030 SHT 7 OF 7) closed.
- Keep 01LBG14-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA111 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA112 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Auxiliary steam shall be continuously supplied to deaerator for pegging from
auxiliary boiler.
- Keep MOV-01LBG13-AA001 (Refer 9578-001-110-PVM-F-030 SHT 5 OF 7), PCV-
01LBG13-AA081 (Refer 9578-001-110-PVM-F-030 SHT 5 OF 7), 01LBG13-AA102
(Refer 9578-001-110-PVM-F-030 SHT 5 OF 7) and MOV-01LBG13-AA003 (Refer
9578-001-110-PVM-F-030 SHT 5 OF 7) open.
- Keep MOV-01LBG13-AA002 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) open.
Page 22 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Keep 01LBQ60-AA101 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) closed.

Stage - 6_CRH to BFPT (Target Blow) & Deaerator Line Blow Path (Service Blow)

Superheater  Main steam line  Main steam stop  Temporary 


valve(MSV) before line
HP steam turbine
 CRH line  CRH NRVs  Temporary line  Temporary 
MOVs
 Deaerator Line  Temporary line  Atmosphere

Superheater  Main steam line  Main steam stop  Temporary 


valve(MSV) before line
HP steam turbine
 CRH line  CRH NRVs  Temporary line  Temporary 
MOVs
 BFPT Line  Temporary line  Atmosphere

Blowing Description:
- Puffing method shall be used for steam blowing with target plate for BFPT and
without target plate for Deaerator.
- There will be only service blow & cleanliness will be ensured through visual inspection
for deaerator line, however cleanliness of BFPT will be ensured through target plate.
- Keep stop valve MOV-01LBA01-AA001 & MOV-01LBA01-AA002 (Refer 9578-001-
102-PVM-L-011 SHT 1 OF 6) open.
- Blow out kit should be used for Main steam stop valves 01MAA02-AA081 &
01MAA02-AA082 (Refer 9578-001-110-PVM-L-005 SHT 2 OF 5) near HP Turbine.
- Keep HP Bypass valve PCV-01MAN10-AA0081 & PCV-01MAN20-AA081 (Refer
9578-001-102-PVM-L-011 SHT 2 OF 6) closed.
- Blow out kit should be used for CRH NRVs 01LBC10-AA201 & 01LBC20-AA201
(Refer 9578-001-102-PVM-L-011 SHT 3 OF 6).
- Keep MOV-01LBA30-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep MOV-01LBC30-AA010 &MOV 01LBC30-AA011 (Refer 9578-001-102-PVM-
L-027 SHT 1 OF 2) closed.
- Keep MOV-01LBQ60-AA001 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) open.
- Keep MOV-01LBQ80-AA001 & MOV-01LBQ80-AA002 (Refer 9578-001-110-PVM-
F-030 SHT 2 OF 7) closed.
- Keep 01LBQ80-AA101 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) open.
Page 23 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Keep MOV-01LBQ81-AA001 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) open.


- Keep MOV-01LBQ82-AA001 (Refer 9578-001-110-PVM-F-032 SHT 2 OF 2) open.
- Keep 01HCB01-AA150 & 01HCB01-AA153 (Refer 9578-001-102-PVM-L-025 SHT
1 OF 1) closed.
- Keep LBC35-AA001 (Refer 9578-001-102-PVM-L-011 SHT 2 OF 6) closed.
- Keep LBD11-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
- Keep MOV-01LBQ81-AA002 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) closed.
- Keep MOV-01LBQ82-AA002 (Refer 9578-001-110-PVM-F-032 SHT 2 OF 2) closed.
- Keep MOV-01LBD61-AA001 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) closed.
- Keep MOV-01LBD62-AA001 (Refer 9578-001-110-PVM-F-032 SHT 2 OF 2) closed.
- Temporary spool piece shall be used in place of Flow element 01MAN10CF001 (Refer
9578-001-102-PVM-L-011 SHT 1 OF 6), 01MAN20CF001 (Refer 9578-001-102-
PVM-L-011 SHT 1 OF 6), 01LBA30CF001 (Refer 9578-001-102-PVM-L-027 SHT 1
OF 2), 01LBC30CF001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2),
01LBD61CF001 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2), 01LBD62CF001
(Refer 9578-001-110-PVM-F-032 SHT 2 OF 2).
- Temporary spool piece shall be install in place of control valve PCV-01LBQ81-AA081
(Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) and PCV-01LBQ82-AA081 (Refer
9578-001-110-PVM-F-032 SHT 1 OF 2).
- Either lock or remove internals of 01LBQ80-AA051 (Refer 9578-001-110-PVM-F-030
SHT 2 OF 7), 01LBQ81-AA201 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2),
01LBQ81-AA202 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2), 01LBQ82-AA201
(Refer 9578-001-110-PVM-F-032 SHT 2 OF 2), 01LBQ82-AA202 (Refer 9578-001-
110-PVM-F-032 SHT 2 OF 2).
- Keep Martyr valve 01TMP01-AA001 & 01TMP01-AA002 open.
- Isolate HP bypass attemperator line by closing valve 01LAE10-AA101 and 01LAE20-
AA101 (Refer 9578-001-102-PVM-L-011 SHT 2 OF 6).
- All temporary spectacle blinds position should be according to respective stage P&ID.
- Auxiliary steam shall be continuously supplied to turbine gland sealing from
auxiliary boiler.
- Keep 00LBG01-AA106 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep 02LBG15-AA 101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 00LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG15-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
Page 24 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Keep MOV-01LBG15-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.


- Keep MOV-01LBG10-AA001 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG11-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG13-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG12-AA002 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG12-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep 01MAW01AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01LBD11-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
- Keep 01LBD11-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
- Keep 01MAW01-AA081 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW01-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA081 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep MOV-01LBS45-AA001 (Refer 9578-001-110-PVM-F-030 SHT 7 OF 7) closed.
- Keep 01LBG14-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA111 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA112 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Auxiliary steam shall be continuously supplied to deaerator for pegging from
auxiliary boiler.
- Keep MOV-01LBG13-AA001 (Refer 9578-001-110-PVM-F-030 SHT 5 OF 7), PCV-
01LBG13-AA081 (Refer 9578-001-110-PVM-F-030 SHT 5 OF 7), 01LBG13-AA102
(Refer 9578-001-110-PVM-F-030 SHT 5 OF 7) and MOV-01LBG13-AA003 (Refer
9578-001-110-PVM-F-030 SHT 5 OF 7) open.
- Keep MOV-01LBG13-AA002 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) open.
- Keep 01LBQ60-AA101 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) closed.

Page 25 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

Stage - 7_CRH to GSC and MS & CRH to AUX Line up to PRDS Blow Path (Service
Blow)

Superheater  Main steam line  Main steam stop  Temporary 


valve(MSV) before line
HP steam turbine
 CRH line  CRH NRVs  Temporary line  Temporary 
MOVs
 GSC Line  Temporary line  Atmosphere

Superheater  Main steam line  Auxiliary Line  Temporary 


line

Atmosphere 

Superheater  Main steam line  Main steam stop  Temporary 


valve(MSV) before line
HP steam turbine
 CRH line  CRH NRVs  Temporary line  Temporary 
MOVs
 Auxiliary Line  Temporary line  Atmosphere

Blowing Description:
- Continuous method shall be used for steam blowing without target plate.
- Keep stop valve MOV-01LBA01-AA001 & MOV-01LBA01-AA002 (Refer 9578-001-
102-PVM-L-011 SHT 1 OF 6) open.
- Blow out kit should be used for Main steam stop valves 01MAA02-AA081 &
01MAA02-AA082 (Refer 9578-001-110-PVM-L-005 SHT 2 OF 5) near HP Turbine.
- Keep HP Bypass valve PCV-01MAN10-AA0081 & PCV-01MAN20-AA081 (Refer
9578-001-102-PVM-L-011 SHT 2 OF 6) closed.
- Blow out kit should be used for CRH NRVs 01LBC10-AA201 & 01LBC20-AA201
(Refer 9578-001-102-PVM-L-011 SHT 3 OF 6).
- Keep MOV-01LBA30-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBC30-AA010 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV 01LBC30-AA011 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep MOV-01LBQ60-AA001 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) closed.
- Keep MOV-01LBQ80-AA001 & MOV-01LBQ80-AA002 (Refer 9578-001-110-PVM-
F-030 SHT 2 OF 7) closed.
- Keep 01LBQ80-AA101 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) closed.
Page 26 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Keep 01HCB01-AA150 & 01HCB01-AA153 (Refer 9578-001-102-PVM-L-025 SHT


1 OF 1) closed.
- Keep 01LBC35-AA001 (Refer 9578-001-102-PVM-L-011 SHT 2 OF 6) open.
- Keep 01LBD11-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) & 01LBD11-
AA-102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
- Temporary spool piece shall be used in place of Flow element 01MAN10CF001 (Refer
9578-001-102-PVM-L-011 SHT 1 OF 6), 01MAN20CF001 (Refer 9578-001-102-
PVM-L-011 SHT 1 OF 6), 01LBA30CF001 (Refer 9578-001-102-PVM-L-027 SHT 1
OF 2), 01LBC30CF001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2).
- Remove control valve PCV-01LBA30-AA081 (Refer 9578-001-102-PVM-L-027 SHT
1 OF 2), PCV-01LBC30-AA081 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2),
01LBD11-AA081 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) and install
temporary piping as per isometric.
- Either lock or remove internals of 01LBQ80-AA051 (Refer 9578-001-110-PVM-F-030
SHT 2 OF 7).
- Keep Martyr valve 01TMP01-AA001 & 01TMP01-AA002 open.
- Isolate HP bypass attemperator line by closing valve 01LAE10-AA101 and 01LAE20-
AA101 (Refer 9578-001-102-PVM-L-011 SHT 2 OF 6).
- All temporary spectacle blinds position should be according to respective stage P&ID.
- Auxiliary steam shall be continuously supplied to turbine gland sealing from
auxiliary boiler.
- Keep 00LBG01-AA106 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep 02LBG15-AA 101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 00LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG15-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep MOV-01LBG15-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG10-AA001 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG11-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG13-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG12-AA002 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG12-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep 01MAW01AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01LBD11-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
- Keep 01LBD11-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
Page 27 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Keep 01MAW01-AA081 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.


- Keep 01MAW01-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA081 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep MOV-01LBS45-AA001 (Refer 9578-001-110-PVM-F-030 SHT 7 OF 7) closed.
- Keep 01LBG14-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA111 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA112 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Auxiliary steam shall be continuously supplied to deaerator for pegging from
auxiliary boiler.
- Keep MOV-01LBG13-AA001 (Refer 9578-001-110-PVM-F-030 SHT 5 OF 7), PCV-
01LBG13-AA081 (Refer 9578-001-110-PVM-F-030 SHT 5 OF 7), 01LBG13-AA102
(Refer 9578-001-110-PVM-F-030 SHT 5 OF 7) and MOV-01LBG13-AA003 (Refer
9578-001-110-PVM-F-030 SHT 5 OF 7) open.
- Keep MOV-01LBG13-AA002 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) open.
- Keep 01LBQ60-AA101 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) closed.

Stage - 8_Extraction#6 to BFPT (Target Blow) & Deaerator Line Blow Path (Service
Blow)

Superheater  Main steam line  Temporary pipe  Temporary 


MOVs
BFPT Header  Ext#6 Header  Ext#6 QCNRV  Temporary 
Line pipe
BFPT-A,B  Temporary Pipe  Atmosphere
individual line
Superheater  Main steam line  Temporary pipe  Temporary 
MOVs
Deaerator  Ext#6 Header  Ext#6 QCNRV  Temporary 
pipe
Temporary  Atmosphere
Pipe

Blowing Description:
- Puffing method shall be used for steam blowing without target plate for Deaerator
& with target plate for BFPT.

Page 28 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Keep stop valve MOV-01LBA01-AA001 & MOV-01LBA01-AA002 (Refer 9578-001-


102-PVM-L-011 SHT 1 OF 6) open.
- Blow out kit should be used for Main steam stop valves 01MAA02-AA081 &
01MAA02-AA082 (Refer 9578-001-110-PVM-L-005 SHT 2 OF 5) near HP Turbine.
- Keep HP Bypass valve PCV-01MAN10-AA0081 & PCV-01MAN20-AA081 (Refer
9578-001-102-PVM-L-011 SHT 2 OF 6) closed.
- Blow out kit shall be used for IP Ext QCNRV 01LBD60-AA051 (Refer 9578-001-110-
PVM-F-030 SHT 4 OF 7).
- Keep MOV-01LBD60-AA001 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) open.
- Keep MOV-01LBD61-AA001 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) open.
- Keep MOV-01LBD62-AA001 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) open.
- Keep MOV-01LBA30-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Temporary spool piece shall be used in place of Flow element 01MAN10CF001 (Refer
9578-001-102-PVM-L-011 SHT 1 OF 6), 01MAN20CF001 (Refer 9578-001-102-
PVM-L-011 SHT 1 OF 6), 01LBD61CF001 (Refer 9578-001-110-PVM-F-032 SHT 1
OF 2), 01LBD62CF001 (Refer 9578-001-110-PVM-F-032 SHT 2 OF 2),
01LBD60CF001 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7), 01LBA30CF001
(Refer 9578-001-102-PVM-L-027 SHT 1 OF 2).
- Either lock or remove internals of 01LBD60-AA052 (Refer 9578-001-110-PVM-F-030
SHT 4 OF 7), 01LBD61-AA201 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) and
01LBD62-AA201 (Refer 9578-001-110-PVM-F-032 SHT 2 OF 2).
- Keep Martyr valve 01TMP01-AA001 & 01TMP01-AA002 open.
- Isolate HP bypass attemperator line by closing valve 01LAE10-AA101 and 01LAE20-
AA101 (Refer 9578-001-102-PVM-L-011 SHT 2 OF 6).
- All temporary spectacle blinds position should be according to respective stage P&ID.
- Auxiliary steam shall be continuously supplied to turbine gland sealing from
auxiliary boiler.
- Keep 00LBG01-AA106 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep 02LBG15-AA 101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 00LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG15-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep MOV-01LBG15-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG10-AA001 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG11-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
Page 29 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Keep 01LBG13-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.


- Keep MOV-01LBG12-AA002 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG12-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep 01MAW01AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01LBD11-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
- Keep 01LBD11-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
- Keep 01MAW01-AA081 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW01-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA081 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep MOV-01LBS45-AA001 (Refer 9578-001-110-PVM-F-030 SHT 7 OF 7) closed.
- Keep 01LBG14-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA111 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA112 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Auxiliary steam shall be continuously supplied to deaerator for pegging from
auxiliary boiler.
- Keep MOV-01LBG13-AA001 (Refer 9578-001-110-PVM-F-030 SHT 5 OF 7), PCV-
01LBG13-AA081 (Refer 9578-001-110-PVM-F-030 SHT 5 OF 7), 01LBG13-AA102
(Refer 9578-001-110-PVM-F-030 SHT 5 OF 7) and MOV-01LBG13-AA003 (Refer
9578-001-110-PVM-F-030 SHT 5 OF 7) open.
- Keep MOV-01LBG13-AA002 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) open.
- Keep 01LBQ60-AA101 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) closed.

Stage - 9_HP Bypass Line Blow Path (Service Blow) 05

Superheater  Main steam line  HP Bypass Valve  CRH line 


Blow through Kit

 Temporary pipe  Reheat Stop Valve  HRH line  Reheater 


 Temporary MOVs  Atmosphere

Blowing Description:
- Continuous method shall be used for steam blowing without target plate.
- There will be only service blow & cleanliness will be ensured through visual
inspection.

Page 30 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Keep stop valve MOV-01LBA01-AA001 & MOV-01LBA01-AA002 (Refer 9578-001-


102-PVM-L-011 SHT 1 OF 6) open.
- Blow out kit should be used for Main steam stop valves 01MAA02-AA081 &
01MAA02-AA082 (Refer 9578-001-110-PVM-L-005 SHT 2 OF 5) near HP Turbine.
- Blow through kit should be used for HP Bypass valve PCV-01MAN10-AA0081 &
PCV-01MAN20-AA081 (Refer 9578-001-102-PVM-L-011 SHT 2 OF 6).
- Blow out kit should be used for CRH NRVs 01LBC10-AA201 & 01LBC20-AA201
(Refer 9578-001-102-PVM-L-011 SHT 3 OF 6).
- Keep MOV-01LBA30-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep MOV-01LBC30-AA010 &MOV 01LBC30-AA011 (Refer 9578-001-102-PVM-
L-027 SHT 1 OF 2) closed.
- Keep MOV-01LBQ60-AA001 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) closed.
- Keep MOV-01LBQ80-AA001 & MOV-01LBQ80-AA002 (Refer 9578-001-110-PVM-
F-030 SHT 2 OF 7) closed.
- Keep 01LBC35-AA001 (Refer 9578-001-102-PVM-L-011 SHT 2 OF 6) closed.
- Keep 01LBD11-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
- Keep 01LBQ80-AA101 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) closed.
- Keep 01HCB01-AA150 & 01HCB01-AA153 (Refer 9578-001-102-PVM-L-025 SHT
1 OF 1) closed.
- Isolate HP bypass attemperator line by closing valve 01LAE10-AA101 and 01LAE20-
AA101 (Refer 9578-001-102-PVM-L-011 SHT 2 OF 6).
- Keep Martyr valve 01TMP01-AA001 & 01TMP01-AA002 closed.
- Temporary spool piece shall be used in place of Flow element 01MAN10CF001 (Refer
9578-001-102-PVM-L-011 SHT 1 OF 6), 01MAN20CF001 (Refer 9578-001-102-
PVM-L-011 SHT 1 OF 6), 01LBA30CF001 (Refer 9578-001-102-PVM-L-027 SHT 1
OF 2), 01LBC30CF001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2)
- Either lock or remove internals of 01LBQ80-AA051 (Refer 9578-001-110-PVM-F-030
SHT 2 OF 7).
- All temporary spectacle blinds position should be according to respective stage P&ID.
- Auxiliary steam shall be continuously supplied to turbine gland sealing from
auxiliary boiler.
- Keep 00LBG01-AA106 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep 02LBG15-AA 101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 00LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
Page 31 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Keep 01LBG15-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.


- Keep MOV-01LBG15-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG10-AA001 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG11-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG13-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG12-AA002 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG12-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep 01MAW01-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01LBD11-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
- Keep 01LBD11-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
- Keep 01MAW01-AA081 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW01-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA081 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep MOV-01LBS45-AA001 (Refer 9578-001-110-PVM-F-030 SHT 7 OF 7) closed.
- Keep 01LBG14-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA111 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA112 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Auxiliary steam shall be continuously supplied to deaerator for pegging from
auxiliary boiler.
- Keep MOV-01LBG13-AA001 (Refer 9578-001-110-PVM-F-030 SHT 5 OF 7), PCV-
01LBG13-AA081 (Refer 9578-001-110-PVM-F-030 SHT 5 OF 7), 01LBG13-AA102
(Refer 9578-001-110-PVM-F-030 SHT 5 OF 7) and MOV-01LBG13-AA003 (Refer
9578-001-110-PVM-F-030 SHT 5 OF 7) open.
- Keep MOV-01LBG13-AA002 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) open.
- Keep 01LBQ60-AA101 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) closed.

Page 32 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

Stage - 10_MS, CRH & HRH Line Blow Path (Target Blow)

Superheater Outlet  Main Steam stop  Temporary pipe  CRH NRVs 


Valve Before HP
Turbine
 Reheat Stop Valve  HRH Line  Reheater  CRH Line 
 Temporary pipe  Temporary MOVs  Atmosphere

Blowing Description:
- Puffing method shall be used for steam blowing with target plate.
- Keep stop valve MOV-01LBA01-AA001 & MOV-01LBA01-AA002 (Refer 9578-001-
102-PVM-L-011 SHT 1 OF 6) open.
- Blow out kit should be used for Main steam stop valves 01MAA02-AA081 &
01MAA02-AA082 (Refer 9578-001-110-PVM-L-005 SHT 2 OF 5) near HP Turbine.
- Keep HP Bypass valve PCV-01MAN10-AA0081 & PCV-01MAN20-AA081 (Refer
9578-001-102-PVM-L-011 SHT 2 OF 6) closed.
- Blow out kit should be used for CRH NRVs 01LBC10-AA201 & 01LBC20-AA201
(Refer 9578-001-102-PVM-L-011 SHT 3 OF 6).
- Keep MOV-01LBA30-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep MOV-01LBC30-AA010 & MOV 01LBC30-AA011 (Refer 9578-001-102-PVM-
L-027 SHT 1 OF 2) closed.
- Keep MOV-01LBQ60-AA001 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) closed.
- Keep MOV-01LBQ80-AA001 & MOV-01LBQ80-AA002 (Refer 9578-001-110-PVM-
F-030 SHT 2 OF 7) closed.
- Keep 01LBQ80-AA101 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) closed.
- Keep 01HCB01-AA150 & 01HCB01-AA153 (Refer 9578-001-102-PVM-L-025 SHT
1 OF 1) closed.
- CRH pipe shall be reconnected to re-heater.
- Blow out kit should be used for Reheat stop valve 01MAB02-AA081 & 01MAB02-
AA082 (Refer 9578-001-110-PVM-L-005 SHT 2 OF 5).
- Keep LP bypass valve PCV-01MAP10-AA081 & PCV-01MAP20-AA081 Refer 9578-
001-102-PVM-L-011 SHT 6 OF 6) closed.
- Temporary spool piece shall be used in place of Flow element 01MAN10CF001 (Refer
9578-001-102-PVM-L-011 SHT 1 OF 6), 01MAN20CF001 (Refer 9578-001-102-
PVM-L-011 SHT 1 OF 6), 01LBA30CF001 (Refer 9578-001-102-PVM-L-027 SHT 1
OF 2), 01LBC30CF001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2)

Page 33 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Either lock or remove internals of 01LBQ80-AA051 (Refer 9578-001-110-PVM-F-030


SHT 2 OF 7).
- Keep Martyr valve 01TMP01-AA001 & 01TMP01-AA002 open.
- Isolate HP bypass attemperator line by closing valve 01LAE10-AA101 and 01LAE20-
AA101 (Refer 9578-001-102-PVM-L-011 SHT 2 OF 6).
- Removable temporary spool piece including martyr valve, instruments and target plate
assembly should be installed after RSV as indicated in P&ID.
- All temporary spectacle blinds position should be according to respective stage P&ID.
- Auxiliary steam shall be continuously supplied to turbine gland sealing from
auxiliary boiler.
- Keep 00LBG01-AA106 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep 02LBG15-AA 101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 00LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG15-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep MOV-01LBG15-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG10-AA001 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG11-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG13-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG12-AA002 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG12-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep 01MAW01AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01LBD11-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
- Keep 01LBD11-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
- Keep 01MAW01-AA081 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW01-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA081 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep MOV-01LBS45-AA001 (Refer 9578-001-110-PVM-F-030 SHT 7 OF 7) closed.
- Keep 01LBG14-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA111 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA112 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.

Page 34 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Auxiliary steam shall be continuously supplied to deaerator for pegging from


auxiliary boiler.
- Keep MOV-01LBG13-AA001 (Refer 9578-001-110-PVM-F-030 SHT 5 OF 7), PCV-
01LBG13-AA081 (Refer 9578-001-110-PVM-F-030 SHT 5 OF 7), 01LBG13-AA102
(Refer 9578-001-110-PVM-F-030 SHT 5 OF 7) and MOV-01LBG13-AA003 (Refer
9578-001-110-PVM-F-030 SHT 5 OF 7) open.
- Keep MOV-01LBG13-AA002 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) open.
- Keep 01LBQ60-AA101 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) closed.

Stage - 11_LP Bypass Line Blow Path (Service blow)

Superheater  Main Steam stop  Temporary  CRH  CRH 


Outlet Valve Before pipe NRVs Line
HP Turbine
 LP Bypass  LP Bypass line  HRH  HRH  Reheater 
valve Blow Equalizing Line
through Kit line
 Temporary  Temporary  Atmosphere
Pipe MOVs

Blowing Description:
- Continuous method shall be used for steam blowing without target plate.
- Keep stop valve MOV-01LBA01-AA001 & MOV-01LBA01-AA002 (Refer 9578-001-
102-PVM-L-011 SHT 1 OF 6) open.
- Blow out kit should be used for Main steam stop valves 01MAA02-AA081 &
01MAA02-AA082 (Refer 9578-001-110-PVM-L-005 SHT 2 OF 5) near HP Turbine.
- Keep HP Bypass valve PCV-01MAN10-AA0081 & PCV-01MAN20-AA081 (Refer
9578-001-102-PVM-L-011 SHT 2 OF 6) closed.
- Blow out kit should be used for CRH NRVs 01LBC10-AA201 & 01LBC20-AA201
(Refer 9578-001-102-PVM-L-011 SHT 3 OF 6).
- Keep MOV-01LBA30-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep MOV-01LBC30-AA010 &MOV 01LBC30-AA011 (Refer 9578-001-102-PVM-
L-027 SHT 1 OF 2) closed.
- Keep MOV-01LBQ60-AA001 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) closed.
- Keep MOV-01LBQ80-AA001 & MOV-01LBQ80-AA002 (Refer 9578-001-110-PVM-
F-030 SHT 2 OF 7) closed.
- Keep 01LBQ80-AA101 (Refer 9578-001-110-PVM-F-032 SHT 1 OF 2) closed.

Page 35 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Keep 01HCB01-AA150 & 01HCB01-AA153 (Refer 9578-001-102-PVM-L-025 SHT


1 OF 1) closed.
- CRH pipe shall be reconnected to re-heater.
- Blow out kit should be used for Reheat stop valve 01MAB02-AA081 & 01MAB02-
AA082 (Refer 9578-001-110-PVM-L-005 SHT 2 OF 5).
- Blow out kit should be used for LP bypass valve PCV-01MAP10-AA081 & PCV-
01MAP20-AA081 Refer 9578-001-102-PVM-L-011 SHT 6 OF 6).
- Temporary spool piece shall be used in place of Flow element 01MAN10CF001 (Refer
9578-001-102-PVM-L-011 SHT 1 OF 6), 01MAN20CF001 (Refer 9578-001-102-
PVM-L-011 SHT 1 OF 6), 01LBA30CF001 (Refer 9578-001-102-PVM-L-027 SHT 1
OF 2), 01LBC30CF001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2)
- Either lock or remove internals of 01LBQ80-AA051 (Refer 9578-001-110-PVM-F-030
SHT 2 OF 7).
- Keep Martyr valve 01TMP01-AA001 & 01TMP01-AA002 open.
- Isolate HP bypass attemperator line by closing valve 01LAE10-AA101 and 01LAE20-
AA101 (Refer 9578-001-102-PVM-L-011 SHT 2 OF 6).
- Removable temporary spool piece including martyr valve, instruments and target plate
assembly should be installed after RSV as indicated in P&ID.
- All temporary spectacle blinds position should be according to respective stage P&ID.
- Auxiliary steam shall be continuously supplied to turbine gland sealing from
auxiliary boiler.
- Keep 00LBG01-AA106 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep 02LBG15-AA 101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 00LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG15-AA101 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) open.
- Keep MOV-01LBG15-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG10-AA001 (Refer 9578-001-102-PVM-L-027 SHT 2 OF 2) closed.
- Keep 01LBG11-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG13-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG12-AA002 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep MOV-01LBG12-AA001 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) open.
- Keep 01MAW01AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01LBD11-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
- Keep 01LBD11-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) closed.
Page 36 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

- Keep 01MAW01-AA081 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.


- Keep 01MAW01-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA101 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA102 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep 01MAW03-AA081 (Refer 9578-001-110-PVM-L-005 SHT 5 OF 5) open.
- Keep MOV-01LBS45-AA001 (Refer 9578-001-110-PVM-F-030 SHT 7 OF 7) closed.
- Keep 01LBG14-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA111 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBC30-AA112 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Keep 01LBG01-AA101 (Refer 9578-001-102-PVM-L-027 SHT 1 OF 2) closed.
- Auxiliary steam shall be continuously supplied to deaerator for pegging from
auxiliary boiler.
- Keep MOV-01LBG13-AA001 (Refer 9578-001-110-PVM-F-030 SHT 5 OF 7), PCV-
01LBG13-AA081 (Refer 9578-001-110-PVM-F-030 SHT 5 OF 7), 01LBG13-AA102
(Refer 9578-001-110-PVM-F-030 SHT 5 OF 7) and MOV-01LBG13-AA003 (Refer
9578-001-110-PVM-F-030 SHT 5 OF 7) open.
- Keep MOV-01LBG13-AA002 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) open.
- Keep 01LBQ60-AA101 (Refer 9578-001-110-PVM-F-030 SHT 4 OF 7) closed.

Page 37 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
LARSEN & TOUBRO LIMITED Date: 25.DEC.2018

14 CHECK LIST

Sl. ACTIVITY OK / NOT


No. OK

1 All spring-loaded hangers of Steam pipes released after hydraulic test.

2 Check hanger & support positions for temporary steam lines

3 General cleanliness around support and status of the sliding faces.

4 Temporary pipe spools installed in place of all flow nozzles & flow
measurement devices.

5 Temporary spool pipes provided/temporary blowout pipes provided as the case


may be in place of control valves.

6 Terminal point of permanent piping being steam blown connected to temporary


exhaust pipe.

7 Boiler steam outlet MOVs (MSV) erected & commissioned.

8 Temporary MOV (martyr valve) in blowout lines erected & commissioned

9 Pressure transmitter and thermocouple in the temporary exhaust piping are


installed as per the P&ID.

10 Target plate holder assembly fitted in temporary exhaust pipe section of blow
out lines.

11 All permanent instrument tapping points isolated (if required).

12 Temporary pressure gauge provided in the steam blowout line before blow out
valve.

13 Insulation shall be provided on the steam lines as well as temporary piping for
personnel protection

Page 38 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


LARSEN & TOUBRO LIMITED
NTPC Doc. No.: 9578-001-102-PVM-K-004
WRITE-UP FOR STEAM BLOWING SCHEME (Boiler & Pipe Lines)
Rev. No.: 05
Date: 25.DEC.2018

15 ANNEXURE: LOG SHEET

Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Date

Start
Time (sec.)
Finish

Holding Time (sec.)

Blow Valve Position (%)

Start

Finish
WS O/L Pressure [kg/cm2 (g)]
Full open position

Start

Finish
WS O/L Temperature (°C)
Full open position

Start

Finish
SH O/L Pressure
[kg/cm2 (g)] Full open position

Start
SH O/L Temperature (°C)
Finish

Full open position

Start
HP Turbine I/L Pressure
Finish
[kg/cm2 (g)]
Full open position

Start
HP Turbine I/L Temperature
Finish
(°C)
Full open position

Page 39 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


LARSEN & TOUBRO LIMITED
NTPC Doc. No.: 9578-001-102-PVM-K-004
WRITE-UP FOR STEAM BLOWING SCHEME (Boiler & Pipe Lines)
Rev. No.: 05
Date: 25.DEC.2018

Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Start
HP Turbine O/L Pressure
Finish
[kg/cm2 (g)]
Full open position

Start
HP Turbine O/L
Finish
Temperature (°C)
Full open position

Start
RH I/L Pressure
Finish
[kg/cm2 (g)]
Full open position

Start

RH I/L Temperature (°C) Finish

Full open position

Start
RH O/L Pressure
Finish
[kg/cm2 (g)]
Full open position

Start

RH O/L Temperature (°C) Finish

Full open position

Start
IP Turbine I/L Pressure
Finish
[kg/cm2 (g)]
Full open position

Start
IP Turbine I/L Temperature
Finish
(°C)
Full open position

Page 40 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


LARSEN & TOUBRO LIMITED
NTPC Doc. No.: 9578-001-102-PVM-K-004
WRITE-UP FOR STEAM BLOWING SCHEME (Boiler & Pipe Lines)
Rev. No.: 05
Date: 25.DEC.2018

Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Temporary Line Pressure Start


2
[kg/cm (g)]
Finish

Full open position

Start
Temporary Line
Finish
Temperature (°C)
Full open position

Page 41 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


LARSEN & TOUBRO LIMITED
NTPC Doc. No.: 9578-001-102-PVM-K-004
WRITE-UP FOR STEAM BLOWING SCHEME (Boiler & Pipe Lines)
Rev. No.: 05
Date: 25.DEC.2018

16 STEAM BLOWING DATA SHEET

Estimated Estimated Cleaning Flow


Auxiliary Main
Water Water Main Boiler
Temperature
Boiler TP
Boiler separator separator TP Pressure kg/s TPH Exit Pressure Exit Flow CFR
Stage Description Pressure (at SH outlet) CFR (Final) Remarks
Pressure pressure pressure (Final) (Initial)
(Initial) kg/cm2 (a) TPH
(Initial) (Final) °C
kg/cm2 (a) kg/cm2 (a)
kg/cm2 (a) kg/cm2 (a) kg/cm2 (a)

AUX BOILER- AUX BOILER TO MS & CONTINUOUS METHOD


1 CRH PRDS LINE-TEMPORARY LINE- 8 - - - - 240 16.7 60 - - - - (SERVICE BLOW)
ATMOSPHERE

AUX BOILER-DEAERATOR PEGGING CONTINUOUS METHOD


2 10 - - - - 250 19.4 70 - - - - (SERVICE BLOW)
LINE-TEMP. LINES- ATMOSPHERE

AUX BOILER-GLAND SEALING LINE- CONTINUOUS METHOD


3 6 - - - - 230 6.7 24 - - - - (SERVICE BLOW)
TEMPORARY PIPE- ATMOSPHERE

CONTINUOUS METHOD
(TARGET PLATE BLOW)
4 AUX BOILER-BFPT LINE-TEMPORARY 10 - - - - 250 19.4 70 - - 1.2 - (CFR ≥ 1.2 WITH ALUMINUM PLATE -
PIPE- ATMOSPHERE
SHOW TWO TIMES)
05

PUFFING METHOD
(TARGET PLATE BLOW)
MAIN STEAM UPTO MSV -TEMP.
5 LINES-CRH LINE-TEMPORARY LINE- - 52 40 36.10 27.74 340 253.4 912.2 4.02 456.1 1.42 1.09 (CFR ≥ 1.4 WITH STEEL PLATE - SHOW 05
ATMOSPHERE TWO TIMES)

MAIN STEAM-TEMP. LINES-CRH LINE-


PUFFING
DEAERATOR LINE-TEMPORARY LINE- 05
ATMOSPHERE (TARGET PLATE BLOW FOR BFPT)
(CFR ≥ 1.2 WITH ALUMINUM PLATE -
6 AND - 30 25 21.72 18.1 300 143.24 515.6 - - 1.2 1.05
SHOW TWO TIMES)
MAIN STEAM-TEMP. LINES-CRH LINE-
BFPT LINE-TEMPORARY LINE-
ATMOSPHERE

Page 42 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008

L&T-Sargent & Lundy Ltd.


LARSEN & TOUBRO LIMITED
NTPC Doc. No.: 9578-001-102-PVM-K-004
WRITE-UP FOR STEAM BLOWING SCHEME (Boiler & Pipe Lines)
Rev. No.: 05
Date: 25.DEC.2018

Estimated Estimated Cleaning Flow


Auxiliary Main
Water Water Main Boiler
Temperature
Boiler TP
Boiler separator separator TP Pressure kg/s TPH Exit Pressure Exit Flow CFR
Stage Description Pressure (at SH outlet) CFR (Final) Remarks
Pressure pressure pressure (Final) (Initial)
(Initial) kg/cm2 (a) TPH
(Initial) (Final) °C
kg/cm2 (a) kg/cm2 (a)
kg/cm2 (a) kg/cm2 (a) kg/cm2 (a)

MAIN STEAM-AUX HEADER-


TEMPORARY LINE-ATMOSPHERE
AND

MAIN STEAM-TEMP. LINES-CRHLINE-


-ATMOSPHERE
AND
7 - 30 - 25.65 - 300 109.7 395 - - - - CONTINUOUS BLOW
MAIN STEAM - TEMP LINE- CRH LINE- (SERVICE BLOW)
GLAND SEALING-TEMP. LINES-
ATMOSPHERE

AND

MAIN STEAM-TEMP. LINES-CRHLINE-


AUX HEADER-TEMPORARY LINE-
ATMOSPHERE
MAIN STEAM-TEMP. LINES-EXT#6
NRV-EXT HEADER-BFPT LINE- PUFFING METHOD
TEMPORARY LINE-ATMOSPHERE (TARGET PLATE BLOW 05
FOR BFPT)
8 AND - 42 32 36.22 27.6 340 146.1 526 - - 1.21 1.07
(CFR ≥ 1.2 WITH ALUMINUM PLATE -
MAIN STEAM-TEMP. LINES-EXT#6 SHOW TWO TIMES)
NRV-EXT HEADER-DEAERATOR LINE-
TEMPORARY LINE-ATMOSPHERE

MAIN STEAM - HP BYPASS LINE – CONTINUOUS BLOW


9 CRH –RH - HRH-TEMP LINE- - - - 15 - 300 160.27 577 - - - - (SERVICE BLOW)
ATMOSPHERE

PUFFING METHOD 05
MAIN STEAM UPTO MSV- TEMP LINE-
10 - 56 45 40.99 31.8 360 276.7 996 4.6 498 1.44 1.11 (TARGET PLATE BLOW)
CRH-RH-HRH-TEMP LINE-
ATMOSPHERE (CFR ≥ 1.0 WITH BRASS PLATE - SHOW
THREE TIMES)

MAIN STEAM UPTO MSV- TEMP LINE-


CONTINUOUS BLOW
11 CRH-RH-HRH -LP BYPASS- - - - 15 - 300 95.8 345 - - - -
TEMP.LINES-TEMPORARY LINE- (SERVICE BLOW)
ATMOSPHERE

NOTE:

(1) ESTIMATED WATER SEPERATOR PRESSURE (INITIAL) INDICATES THE PRESSURE DURING BOXING UP OF THE STEAM GENERATOR WHEN MARTYR VALVE IS IN CLOSE POSITION.

(2) MAIN BOILER TP PRESSURE INDICATES THE PRESSURE AT SUPERHEATER OUTLET DURING BLOWING WHEN MARTYR VALVE IS IN FULL OPEN POSITION.

(3) PRESSURE DROP ACROSS SUPERHEATER CIRCUIT = 18.8 KG/CM2 & REHEATER CIRCUIT = 1.9 KG/CM2 AT 100% BMCR CONDITION TO BE CONSIDERD FOR CFR CALCULATION.

* COMPLETION OF STAGE-5, MAIN STEAM TO BE FINALISED BY MUTUAL AGREEMENT OF ALL STAKE HOLDERS DURING STEAM BLOWING.

Page 43 of 44
NTPC Ref. No.:COS-COMM-KG-Commg-PRO/008
L&T-Sargent & Lundy Ltd.
WRITE-UP FOR STEAM BLOWING NTPC Doc. No.: 9578-001-102-PVM-K-004
SCHEME(Boiler & Pipe Lines) Rev. No.: 05
Date: 25.DEC.2018
LARSEN & TOUBRO LIMITED

17 REFERENCE

17.1 Predicted performance for indigeneous best coal, design coal & worst coal and variable pressure

operation for 50, 60, 80 & 100 % TMCR and 60% BMCR & 100% BMCR load and HP heaters out

condition (9578-001-102-PVM-W-011).

17.2 Steam blowing out criteria (NTPC Doc. /Drg No.:9578-001-110-PVM-X-026).

17.3 O&M Manual for BFP Drive Turbine (NTPC Doc. /Drg No.: 9578-001-110- PVM-W-143).

Page 44 of 44
ATTACHMENT - 1
MHPS
MHPS
ATTACHMENT - 2

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION WITH ALL


RIGHTS AND TITLES RESERVED AND MAY NOT BE REPRODUCED IN SolidWorks REV NO. DESCRIPTION DATE APPROVED
WHOLE OR IN PART WITHOUT WRITTEN CONSENT OF
CONTROL COMPONENTS Inc. Generated Dwg. 00 FIRST ISSUE 07-June-2017 VS

Note:
All parts which are not mentioned in the parts list
are available in the main valve Assembly Engineering Data
12 x M39 Design Code EN12516-2
A/F= 60/24 Design Pressure 65bar
See Table Design Temperature 400°C
3x M24
005 006 001 A/F=36
for FSORT
& FSOHT 002 004 003 Bolt Material FSORT (KN) FSOHT(KN)
Water Flange
21CrMoV5-7 365 200
X22CrMoV12-1 400 225
A193 B16 310 170
ASTM B446Gr.1 370 205
"x"

Tightening of Packing Flange Nuts (3xM24):


1.Hand tighten gland flange- Nuts
2.Measure dimension "x"
(Target value approx 72.3)
3.Torque nuts to compress packing:
4X M30 compression shall be 8% (1 x12.5mm x 0.08=1mm)
A/F=22 (Target value of dimension "x" after compression71.3mm)
Mt=600Nm

PARTS LIST
Pos.No Material Description Quantity/Valve
001 A105 Blind Plug 1 Pcs
002 A182.F22.Cl.3 Blow Through Tool 1 Pcs
003 A182.F22.Cl.3 Blind Flange 1 Pcs
004 Graphite Gasket 1 Pcs
005 Graphite Gasket 1 Pcs
006 Graphite Gasket 1 Pcs
DO NOT SCALE DRAWINGS 1St ANGLE PROJECTION
GEOMETRIC SYMBOLS PER ANSI Y14.5
MACHINED SURFACES 3.2 PER ANSI B46.1
Ra
WELDING SYMBOLS PER ANSI Y32.3 OR AWS A2.0
UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN mm Blow Through Device For 50 N12
25 N11
GENERAL TOLERANCES PER ISO 2768-mK HP Turbine Bypass Valve 12.5 N10
6.3 N9
PREP RG 02-June-17 Khargone 3.2 N8
CHK RJB 05-June-17 DRE 125C
Assembly Drawing 1.6 N7
0.8 N6
DSGN RG 02-June-17 0.4 N5
SIZE DRAWING NUMBER
0.2 N4
APVD VS 07-June-17 A17200IN-01-BLOW 0.1 N3
A3 SCALE 1:5 SHEET 1 OF 1 REV-00
0.05 N2
0.025 N1
THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION WITH ALL RIGHTS
AND TITLES RESERVED AND MAY NOT BE REPRODUCED IN WHOLE OR PART SolidWorks REV NO. DESCRIPTION DATE APPROVED
WITHOUT WRITTEN CONSENT OF CONTROL COMPONENTS INC. Generated Dwg. 0 FIRST ISSUE 18-May-2017 VS
A O-RING MATERIAL CHANGED 01-Aug-2017 VS

ALL PARTS WHICH ARE NOT MENTIONED IN PARTS LIST ARE AVAILABLE IN THE PLANT

X 001
002 X(1:1)
003
+1

~787
397 0
004 0
357 -0.5 20
005

R5
2 ±0.8

006

°
20° ±2.5
2
009 007

010 008

011 PARTS LIST


Pos Component Material Quantity
001 Blow out Nozzle A105 1
002 Gasket Graphite 1
003 Guide Bush A105 1
004 Hexagon Nut 25CrMoV4 2
005 Bar 1.0035 1
006 Stud 21CrMoV57 1
007 Seat Protector A105 1
008 O-ring FFKM A 1
009 Guide Bush A105 1
010 Gasket Graphite 1
011 Closure A105 1

ENGINEERING DATA
Design Code EN12516-2
Design Pressure /Temperature 60 Bar /400°C
DO NOT SCALE DRAWINGS Ist ANGLE PROJECTION
GEOMETRIC SYMBOLS PER ANSI Y14.5
MACHINED SURFACES 3.2 PER ANSI B46.1
WELDING SYMBOLS PER ANSI Y32.3 OR AWS A2.0 Ra
UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN mm
General Tolerances per ISO 2768-mK Blow Out Tool 50 N12
25 N11
12.5 N10
6.3 N9
PREP RMP 16-May-2017
Khargone Assembly drawing 3.2 N8
CHK RJB 17-May-2017 1.6 N7
0.8 N6
DAE360/DCE380
DSGN RMP 16-May-2017 SIZE DRAWING NUMBER 0.4 N5
0.2 N4
APVD VS 18-May-2017
A2 A17200IN-04-BLOW 0.1 N3
0.05 N2
SCALE 1:10 SHEET 1 OF 1 REV-A 0.025 N1
THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION WITH ALL RIGHTS
AND TITLES RESERVED AND MAY NOT BE REPRODUCED IN WHOLE OR PART SolidWorks REV NO. DESCRIPTION DATE APPROVED
WITHOUT WRITTEN CONSENT OF CONTROL COMPONENTS INC. Generated Dwg. 0 FIRST ISSUE 18-May-2017 VS

ALL PARTS WHICH ARE NOT MENTIONED IN PARTS LIST ARE AVAILABLE IN THE PLANT

Parts list
Pos. Name Material Qty
001 Supporting ring A105 1
002 Gasket Graphite 1
003 Stem A105 1
004 Cover A105 1
005 O-ring NBR 2
006 Packing ring Graphite 4
007 Packing cord Graphite 0.3 m
DO NOT SCALE DRAWINGS Ist ANGLE PROJECTION
GEOMETRIC SYMBOLS PER ANSI Y14.5
MACHINED SURFACES 3.2 PER ANSI B46.1
WELDING SYMBOLS PER ANSI Y32.3 OR AWS A2.0 Ra
UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN mm
General Tolerances per ISO 2768-mK
Hydro test device 50 N12
25 N11
12.5 N10

Assembly drawing
PREP 6.3 N9
RMP 16-May-2017
Khargone 3.2 N8
CHK RJB 17-May-2017 1.6 N7
0.8 N6
RMP DAE360
DSGN 16-May-2017 SIZE DRAWING NUMBER 0.4 N5
0.2 N4
APVD VS 18-May-2017
A2 A17200IN-04-HYDRO 0.1 N3
0.05 N2
SCALE NTS SHEET 1 OF 1 REV-0 0.025 N1
Attachment - -33
ATTACHMENT

Typical Operation Procedure during blowing Out

*Operation procedure shall be changed


according to the actual operating condition.

BCP in-service
"Manual" close "Auto"
BCP and BR Valve "Auto"
BR Valve
"Manual" open
Fully Closed

25% ECR Constant


Feed Water Flow
Feed Water Flow M-BFP S/S "Auto"
(M-BFP)

One Pair Burner in-service

Burner Operation

Main Steam Drain


Valves 20~30% open

Fully Closed
WDC valve "Auto" WDC valve "Auto"

Water Separator Water separator level


Level WDC valve "Manual"

30S~40S
*Keeping time shall be
Temporary Stop decided according to the
press. drop behavior.
Valve
Blow finish
Blow start

W/S level stable


5 min. before

1 min. before

Pressure recover

Page 49 of 102
ATTACHMENT - 4

使用说明书 蒸汽管路的吹扫 3-0350-01-02


Operating Instructions Purging Steam Piping

蒸汽管路的吹扫 Purging Steam Piping


蒸汽管路的吹扫是保证汽轮机安全的一 The purge of the steam piping is an
important measure for ensuring the
项重要措施。 turbine safety, it should be carried out
after the tightness test has been passed.
蒸汽管路吹扫应在管路系统严密性试验

合格后进行。 During manufacturing, welding and


installing the steam piping, not only the
蒸汽管路在制作、焊接及安装过程中, dirt will enter into the piping but also the
不仅有脏物进入管道,而且管道内壁会附有 oxide and welding spatter will be
attached on the inner wall of the piping.
金属氧化物、焊渣等杂质,尽管汽轮机速关 Therefore, the solid impurities with the
size less than the hole of the strainer will
阀中装有蒸汽滤网,但汽轮机投入运行后,
enter into the steam path at high speed
尺寸小于滤网孔隙的固体杂质仍可通过滤网 through the strainer, colliding with and
damaging the blade and gland bush. In
高速进入通流部分,撞击、打毛叶片,损坯 order to eliminate this hidden risk, the
叶片、汽封,为消除这种事故隐患,汽轮机 steam inlet piping should be purged with
steam prior to first commissioning after
安装后第一次起动之前,进汽管路必须进行 turbine installed.
蒸汽吹扫。
To purge the steam inlet piping with
采用蒸汽吹扫方法清洗汽轮机进汽管路 steam, the emergency stop valve must be
removed in advance, mount the “Purging
时,事先须拆出速关阀,并装好随机提供的 tool”(2-8535-xxxx-xx) supplied with the

(2-8535-XXXX-XX)以封堵蒸汽 turbine for blocking the passage through


“冲管工具”
which the steam enters into the steam
进入通流部分的通路。 path.
蒸汽吹扫需装接临时排汽管道,排汽管
A temporary exhaust pipe is required for
内径宜等于或大于被吹扫管道的内径;长度 purging, the inner diameter of the exhaust
pipe should be equal to or larger than that
应尽量短捷,以减少排汽阻力;排汽管管口 of the purged piping with a length as
应朝上倾斜(约 30℃)排空;排汽管应具有 short as possible for reducing the exhaust
resistance. The outlet of the exhaust pipe
牢固的支承,以承受排汽的反作用力。为降 should be tilted up (by approx. 30°) to
低排汽产生的噪声,可在临时排汽管上加装 the air. The exhaust pipe should be fixed
by the firm support to bearing the
消音器,但必须考虑到,消音器会增大排汽 reaction force of the exhaust. In order to
reduce the noise level produced by
阻力。
exhaust, a muffler may be mounted in the
为保证吹扫的有效性,吹扫时蒸汽对管 temporary exhaust pipe. But the muffler
mounted will increase the exhaust
壁的冲刷力应大于额定工况下蒸汽对管壁的 resistance.
冲刷力。为此,用动量系数 K 来确定、控制
To get the efficient purging, the scouring
吹扫蒸汽参数,动量系数是吹洗工况下蒸汽 force against the piping wall during

杭州汽轮机股份有限公司 第 1 页 共 3 页
Hangzhou Steam Turbine Company Limited Page 1 of 3
使用说明书 蒸汽管路的吹扫 3-0350-01-02
Operating Instructions Purging Steam Piping

purging should be larger than that during


动量 m1c1 ,与额定工况下蒸汽动量 mo vo 的比
normal operation. Therefore, the
值,即: purging-steam parameters is determined
m ⋅v
2
m1c1 and controlled by a momentum
K= = 12 1 K 值 coefficient K, which is the ratio of the
mo c o m o ⋅ v o
应≥1.2~1.5 steam momentum m1c1 under purging
condition to the steam momentum m0v0
m1 —— 吹扫蒸汽流量 under rated condition, i.e.:
m1 ⋅ v1
2
mo —— 额定工况蒸汽流量 m1c1
K= = K should
mo c o m o 2 ⋅ v o
v1 —— 吹扫蒸汽比容
be ≥1.2~1.5
v o —— 额定工况蒸汽比容 Where:
m1—Purging-seam flow
m0—Steam flow under rated
condition
v1—Special volume of
purging-steam
v0—Special volume of steam under
rated condition
冲管前应先进行暖管,在所有法兰的连 Before purging, the piping should be
接螺栓热紧后再进行管路吹扫。吹扫分多次 warmed up and all of the joint bolts for
flanges should be tightened under hot
进行,次数视管路清洁状况而定,每次吹扫 state. The purging is carried out in several
times, which is based on the clean
持续时间约 10 分钟,两次吹扫间隔的时间根
condition of the piping. Each time of
据管道温度降至低于 100℃所需时间而定,管 purging will last for 10 minutes. The
interval time between two purges is
壁温度降至 100℃以下可使粘结在管壁上的 determined by the time required for the
杂质因管壁冷却而脱落,以利再次吹扫时被 piping temperature to drop below 100℃.
When the temperature of the piping wall
吹除。 dropped below 100 ℃ , the impurities
deposited on the wall will fall down and
be blown off in the next purging.

为了检查和判断吹扫效果是否良好,可 In order to examine and evaluate the


在临时排汽管内装入检测板(图 1,也可在临
purging result, a checkerboard may be
fitted in the exhaust pipe (Fig.1) or at the
时排汽管出口装设检测板(图 2),检测板由 outlet of the exhaust pipe (Fig.2). It
consists of a support and target plate
靶板和支架等构成,靶板用厚度大于 1mm,宽
made of new aluminum plate with
度约 30mm 未使用过的铝板制成,长度依排汽 thickness of 1mm and width of 30mm,
the length of the checkerboard is decided
管直径而定。每次吹扫后换下靶板进行检查, by the diameter of the exhaust pipe. the
在保证蒸汽冲刷力的前提下,连续两次把板
target plate should be replaced and
examined after each purging. On the
premise that the scouring force of the

杭州汽轮机股份有限公司 第 2 页 共 3 页
Hangzhou Steam Turbine Company Limited Page 2 of 3
使用说明书 蒸汽管路的吹扫 3-0350-01-02
Operating Instructions Purging Steam Piping

steam does not decrease, when the


上杂物冲击斑痕的粒度≤0.8mm,且斑痕不多
impacting blemishes on the target plate in
于 8 点即认为吹扫合格。 two adjacent purges has been ≤ 0.8mm
and number of the blemishes is less than
8, the purging is considered to be
qualified.
吹扫合格,管路冷却到接近室温后拆除Following the purging, remove the
临时排汽管,仔细清理速关阀阀壳,拆出冲 temporary exhaust pipe when the piping
temperature dropped to room
管工具,确认进汽腔室无杂质后装入速关阀。 temperature. Carefully clean the
emergency stop valve housing and
remove the purging tool. Make sure that
there is no impurity in the steam inlet
compartment and mount the emergency
stop valve.

1. 汽流方向
2. 法兰盖
3. 靶板
4. 托架

图1 内装检测板

图2 外装检测板示意图

杭州汽轮机股份有限公司 第 3 页 共 3 页
Hangzhou Steam Turbine Company Limited Page 3 of 3
ATTACHMENT - 5
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

NOTES:

1. DOCUMENT NUMBER IN THE CONTINUATION ARROW SHALL BE READ PREFIXING WITH

UNIT#2
01TMP01-BR003-0602-DN500
PROJECT CODE (9578-) AS PROJECT CODE WILL REMAIN SAME FOR ALL DOCUMENTS
01MAA02-AA081

01TMP01-BR036-0602-DN500
M 02LBG15-BR001-0305-DN450 FOR KHARGONE STPP. M
450X500

01TMP01-BR012-0602-DN500
02LBG15-AA101 2. FOR INDEX, LEGENDS & SYMBOLS, REFER DWG. NO. 9578-001-110-PVM-F-026.

01TMP01-BR037-0602-DN250
01LBA10-BR004-4537-ID318 3. ---- DENOTES TEMPORARY PIPING.

SUPERHEATER
TO ATMOSPHERE
01MAN10-BR001-4537-ID220 MSV 02LBG15-BR001-0305-DN450
MOV-01LBA01-AA002 4. FLOW NOZZLES WILL BE INSTALLED AFTER STEAM BLOW OUT. TEMPORARY SPOOL WILL
FE
01MAN10-BR002-0935-DN600 BE INSTALLED AT FLOW NOZZLE LOCATION BEFORE STEAM BLOW OUT.
01MAN10 00LBG01-BR001-0305-DN450
AUX STEAM
CF001 AUX 5. ALL INTERNALS OF CONTROL VALVES IN THE BLOW CIRCUIT SHALL BE REMOVED AND

01TMP01-AA002
00LBG01-BR004-0305-DN350 BLOW OUT KIT/TEMPORARY SPOOL PIECES TO BE INSTALLED.
A
PCV-01MAN10-AA081
PT DCS
BOILER
K8 6. STEAM BLOW OUT WILL NOT INCLUDE FOLLOWING PIPING:
HP TURBINE 01TMP01

00LBG01-BR441-0305-DN250
PCV-01MAN20-AA081 BOP 00LBG01-AA106 01LBG15-AA101 FOLLOWING LINES SHALL BE MECHANICALLY CLEANED.
CP102

00LBG01-AA101
C&I
- STEAM PIPING FROM TURBINE NOZZLE UPTO POWER ACTUATED NON RETURN VALVES.

TO ATMOSPHERE
L FE L
00LBG01-AA201
01MAN20 01MAN20-BR002-0935-DN600 - DOWNSTREAM PIPING FROM LP BYPASS TO CONDENSER.
CF001 01MAA02-AA082
TE TT - DOWNSTREAM PIPING FROM MSV/RSV TO HP/IP TURBINE.
01MAN20-BR001-4537-ID220 01TMP01 01TMP01
MSV 01LBG15-BR001-0305-DN450 - ADMISSION STEAM PIPING FOR BFPT.
CT002 CT102
01LBA20-BR004-4537-ID318 7. STEAM CONNECTION SHALL BE RESTORED AFTER STEAM PIPING BLOW OUT.

01TMP01-BR102-0602-DN50 8. BLOW OUT/THROUGH KIT CRITERIA :

J4
MOV-01LBA01-AA001
- BLOW THROUGH KIT WILL BE USED FOR HP BYPASS VALVE DURING STEAM BLOW OUT.
PT 01TMP01-AA102 01TMP01-BR038-0602-DN500
DCS

01TMP01-BR004-0602-DN500
01TMP01-BR017-0602-DN500

01TMP01-AA001
01TMP01-BR011-0602-DN500
- BLOW OUT KIT SHALL BE USED FOR MAIN STEAM STOP VALVE, COLD REHEAT NRV,
01TMP01

B
01TMP01-BR001-0602-DN500
CP101 BOP 01TMP01-BR039-0602-DN200 HOT REHEAT STOP VALVE, EXTRACTION-6 QCNRV AND LP BYPASS VALVE.

01LBC10-BR001-0925-DN800
C&I

01LBC20-BR001-0925-DN800

01LBG15-BR001-0305-DN450
K TO ATMOSPHERE K

550X500
01LBG30-BR102-0335-DN550

01MAN30-BR001-0935-DN800

TO ST HDR
TE TT 01TMP01-BR018-0602-DN500 FE

01TMP01-BR101-0602-DN50

01TMP01-BR002-0602-DN500
01LBA30

TO BFPT
TO ATMOSPHERE

01TMP01 01TMP01

TO GSC
CF001

TO DEA
CT001 CT101

BLOWER
01LBC20-AA201
G
01LBC50-BR003-0608-DN800 A LEGENDS:

01TMP01-AA101
F14

TO ATMOSPHERE
L15

AUX
01TMP01-BR005-0602-DN600
TARGET PLATE ASSEMBLY

E11
G14
01LBA30-BR101-4537-DN200

G7

K5
SOOT

MOV-01LBG15-AA001
TO

01LBG14-AA101
PCV-01LBA30-AA081
PCV-01LBC30-AA081

01LBG11-AA101
01TMP01-SF009

01HCB01-AA150

01HCB01-AA153

01LBG13-AA101
PERMANENT LINES

01LBG01-AA101
01LBG01-AA201

TO

E
N

B
Q
I9

01LBC30-AA111
J I J

TEMPORARY LINES

TO SOOT BLOWER

C
01TMP01-BR040-0602-DN250
VALVE OPEN

01LBC10-AA201
TO ATMOSPHERE
M
F14
VALVE CLOSED
01TMP01-BR041-0602-DN250
REHEATER

MOV-01LBC30-AA010 SPECTACLE BLIND OPEN


C
I J12 250X150 I

01LBC30-AA112
01LBB30-BR001-0937-ID620

01LBG10-BR001-0305-DN550 SPECTACLE BLIND CLOSED


01LBG05-AA201
01LBC30-BR001-0925-DN1050 MOV-01LBC30-AA011
FE
01LBC30 MOV-01LBC30-AA012 01LBG05-BR001-0305-DN250
CF001 STEAM BLOW PATH (FOR ELECTRONIC COPY ONLY)
F
01LBQ80-BR001-0608-DN500

D10 01TMP01-SF014 01LBG10-AZ001


TO DEA 01LBC30-BR103-0608-DN150 OPERATIONAL PATH (FOR ELECTRONIC COPY ONLY)
01LBC35-BR001-0608-DN250 01LBG20-BR001-0305-DN300
N
P
E6 01LBG20-AA101
MOV-01LBC35-AA001 01TMP01-SF015
01TMP01-BR028-0602-DN200 O
TO HTR#8
SPECTACLE BLIND SCHEDULE:
F7

TO ATMOSPHERE
H TO HPT GS TO MILL INERTING H
01LBD11-AA101 250X200
TO BFPT

01LBG10-AA201 LOCATION A B C D E F G H I J K L M N O P Q
01TMP01-SF010 TO IPT GS
H

J 01MAW03-AA101

01TMP01-BR029-0602-DN200

01TMP01-BR031-0602-DN250
MOV-01LBG10-AA001

01TMP01-BR042-0602-DN250
TO SCAPH

01TMP01-BR030-0602-DN250
01MAW03-AA081 I BLIND POSITION - - C C C C C C C C - - C C C - -
TO GLAND STEAM
01LBD11-AA081 01LBG10-BR018-0305-DN300
SPILL OVER C: CLOSED
01TMP01-BR006-0602-DN600
C6
ATMOSPHERE

01LBC35-BR002-0608-DN250
01LBS45-AA101 O: OPEN
01LBC40-BR003-0608-DN800 01LBD11-AA102 01LBD01-AA221 TO CONDENSER

MOV-01LBG12-AA001
MOV-01LBQ81-AA002 SPECIAL NOTE:
01MAW03-AA102 Q
MOV-01LBG12-AA002 01LBG14-BR001-0305-DN200 01LBQ81-AA202 1. FOR UNIT#2 P&ID, TAG NUMBER SHALL BE CHANGED FROM 01 TO 02.
01MAW01-AA101 J6
MOV-01LBS45-AA001
TO

N TO LPT GS
01LBG12-BR003-0305-DN150
J5
J PCV-01LBQ81-AA081
01MAW01-AA081

01LBQ81-AA101
01LBB10-BR004-0937-ID620

01LBB20-BR004-0937-ID620

MOV-01LBQ80-AA001
B7
01TMP01-SF007
01MAW01-AA102 01LBQ80-AA101
01MAW01-AA221
500X300
300X250

01TMP01-BR018-0602-DN500
01LBG12-BR002-0305-DN150
H K HOLD LIST:
01TMP01-BR020-0602-DN250

G G
H13 C12
K9
MOV-01LBQ81-AA001
01MAP20-BR001-0937-ID620

01LBG13-BR002-0305-DN200
01TMP01-BR017-0602-DN500
F F
01LBQ81-AA201 01LBQ81-BR003-0615-DN300
H
M
J11 01LBD61-BR002-0315-DN300
01TMP01-BR020-0602-DN250

01TMP01-SF008 MOV-01LBG13-AA002

MOV-01LBG13-AA003 01LBQ80-BR002-0608-DN250
01TMP01-BR019-0602-DN250

01TMP01-BR032-0602-DN200
TO HTR#8A
01LBG13-BR002-0305-DN200
PCV-01LBG13-AA081
TO DEAERATOR
RSV
P
01LBG13-BR001-0305-DN400 01LBG13-AA102
TO ATMOSPHERE H12
01LBG13-AA201

01MAB02-AA082 E 01LBQ80-AA051
E J5 E
WRITING.

IP TURBINE MOV-01LBG13-AA001 01LBG13-BR002-0305-DN200 01LBQ80-BR003-0608-DN250


TO HTR#8B
01LBD65-AA202 REFERENCE DRAWINGS:
01MAB02-AA081

MOV-01LBQ60-AA001 PCV-01LBQ60-AA081 MOV-01LBQ80-AA002 DRAWING NO. DRAWING TITLE


IN

01TMP01-BR033-0602-DN500 9578-001-110-PVM-F-026 LEGEND FOR P&IDS


PERMISSION

01LBD60-BR001-0315-DN700 01LBQ60-AA101
RSV
01TMP01-BR013-0602-DN500

01TMP01-SF003
PCV-01MAP20-AA081

01LBD60-AA052 900X500
F TO DEAERATOR
C TO ATMOSPHERE
500X450

I12
THEIR

01LBD65-AA201 01LBD65-BR001-0315-DN900
D 01LBQ60-BR001-0608-DN450
01MAP10-BR001-0937-ID620
WITHOUT

D D

01TMP01-BR035-0602-DN500 TO ATMOSPHERE
01TMP01-SF004

01TMP01-SF013

01LBD60-AA051 MOV-01LBD60-AA001
E TO DEAERATOR 550X500
LENT

01LBD60-BR005-0315-DN550 TO ATMOSPHERE
OR

01TMP01-SF005
COPIED

01TMP01-BR034-0602-DN500
PCV-01MAP10-AA081

01TMP01-BR021-0602-DN250

FE
600X400
400X250

MOV-01LBD61-AA001 01LBD60
CF001
01TMP01-BR014-0602-DN500
BE

M 300X250
01LBD61-AA201 MOV-01LBQ82-AA002
NOT

01LBD61-BR001-0315-DN300 02 13-NOV-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK
01TMP01-BR022-0602-DN250

I 01LBQ82-AA202
BFPT#A
MUST

C H7 01 16-MAR-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK C


K
00 28-DEC-16 ISSUED FOR APPROVAL BDJ KT --- --- DJR --- DK
AND

F5
FE
01LBD61
LIMITED

01LBD61-BR002-0315-DN300 REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD.
F
CF001
PCV-01LBQ82-AA081
PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
01LBQ82-AA101
LUNDY

01LBD62-AA201
NTPC LIMITED
01TMP01-SF006
&

01LBD62-BR001-0315-DN300 OWNER:
(A GOVERNMENT OF INDIA ENTERPRISE)
SARGENT

MOV-01LBD62-AA001 300X250 BFPT#B J D


G7 B13
D EPC
B B4 FE LARSEN & TOUBRO LIMITED B
-

01LBD62 CONTRACTOR:
L&T

CF001 MOV-01LBQ82-AA001
01LBD62-BR002-0315-DN300 L&T's
01LBQ82-BR003-0615-DN300 L & T - SARGENT & LUNDY LTD.
OF

01LBQ82-AA201 CONSULTANT:
01TMP01-BR022-0602-DN250
PROPERTY

01LBD62-BR002-0315-DN300
NTPC
9578-001-102-PVM-K-004 REV. 03
DRG. NO.:
THE

DATE NAME SIGN. TITLE:

P&ID FOR
IS

PREPARED 28-DEC-16 BDJ


DESIGN

600X500 600X500 CHECKED 28-DEC-16 KT AUX BOILER TO


01TMP01-BR007-0602-DN600 01TMP01-BR026-0602-DN500 01TMP01-BR008-0602-DN600 TO ATMOSPHERE

841mm)
A A
600X500 APPROVED 28-DEC-16 DK
AND

MS & CRH PRDS STEAM BLOWING


01TMP01-BR009-0602-DN600 01TMP01-BR027-0602-DN500 01TMP01-BR010-0602-DN600 TO ATMOSPHERE
DEPARTMENT MECHANICAL
DRAWING

x
600X500 STAGE-1

(1189mm
L&T-S&L JOB NO.: LD16005000
THIS

SCALE: NA DRG. NO.: LD16005-XG02-00-LBU-110001 SHT: 01 OF 12 REV. 02

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME: LD16005-XG02-00-LBU-110001-01.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

NOTES:

1. DOCUMENT NUMBER IN THE CONTINUATION ARROW SHALL BE READ PREFIXING WITH

UNIT#2
01TMP01-BR003-0602-DN500
PROJECT CODE (9578-) AS PROJECT CODE WILL REMAIN SAME FOR ALL DOCUMENTS
01MAA02-AA081

01TMP01-BR036-0602-DN500
M 02LBG15-BR001-0305-DN450 FOR KHARGONE STPP. M
450X500

01TMP01-BR012-0602-DN500
02LBG15-AA101 2. FOR INDEX, LEGENDS & SYMBOLS, REFER DWG. NO. 9578-001-110-PVM-F-026.

01TMP01-BR037-0602-DN250
01LBA10-BR004-4537-ID318 3. ---- DENOTES TEMPORARY PIPING.

SUPERHEATER
TO ATMOSPHERE
01MAN10-BR001-4537-ID220 MSV 02LBG15-BR001-0305-DN450
MOV-01LBA01-AA002 4. FLOW NOZZLES WILL BE INSTALLED AFTER STEAM BLOW OUT. TEMPORARY SPOOL WILL
FE
01MAN10-BR002-0935-DN600 BE INSTALLED AT FLOW NOZZLE LOCATION BEFORE STEAM BLOW OUT.
01MAN10 00LBG01-BR001-0305-DN450
AUX STEAM
CF001 AUX 5. ALL INTERNALS OF CONTROL VALVES IN THE BLOW CIRCUIT SHALL BE REMOVED AND

01TMP01-AA002
00LBG01-BR004-0305-DN350 BLOW OUT KIT/TEMPORARY SPOOL PIECES TO BE INSTALLED.
A
PCV-01MAN10-AA081
PT DCS
BOILER
K8 6. STEAM BLOW OUT WILL NOT INCLUDE FOLLOWING PIPING:
HP TURBINE 01TMP01

00LBG01-BR441-0305-DN250
PCV-01MAN20-AA081 BOP 00LBG01-AA106 01LBG15-AA101 FOLLOWING LINES SHALL BE MECHANICALLY CLEANED.
CP102

00LBG01-AA101
C&I
- STEAM PIPING FROM TURBINE NOZZLE UPTO POWER ACTUATED NON RETURN VALVES.

ATMOSPHERE
L FE L
00LBG01-AA201
01MAN20 01MAN20-BR002-0935-DN600 - DOWNSTREAM PIPING FROM LP BYPASS TO CONDENSER.
CF001 01MAA02-AA082
TE TT - DOWNSTREAM PIPING FROM MSV/RSV TO HP/IP TURBINE.
01MAN20-BR001-4537-ID220 01TMP01 01TMP01
MSV 01LBG15-BR001-0305-DN450 - ADMISSION STEAM PIPING FOR BFPT.
CT002 CT102
01LBA20-BR004-4537-ID318 7. STEAM CONNECTION SHALL BE RESTORED AFTER STEAM PIPING BLOW OUT.

TO
01TMP01-BR102-0602-DN50 8. BLOW OUT/THROUGH KIT CRITERIA :

J4
MOV-01LBA01-AA001
- BLOW THROUGH KIT WILL BE USED FOR HP BYPASS VALVE DURING STEAM BLOW OUT.
PT 01TMP01-AA102 01TMP01-BR038-0602-DN500
DCS

01TMP01-BR004-0602-DN500
01TMP01-BR017-0602-DN500

01TMP01-AA001
01TMP01-BR011-0602-DN500
- BLOW OUT KIT SHALL BE USED FOR MAIN STEAM STOP VALVE, COLD REHEAT NRV,
01TMP01

B
01TMP01-BR001-0602-DN500
CP101 BOP 01TMP01-BR039-0602-DN200 HOT REHEAT STOP VALVE, EXTRACTION-6 QCNRV AND LP BYPASS VALVE.

01LBC10-BR001-0925-DN800
C&I

01LBC20-BR001-0925-DN800

01LBG15-BR001-0305-DN450
K TO ATMOSPHERE K

550X500
01LBG30-BR102-0335-DN550

01MAN30-BR001-0935-DN800

TO ST HDR
TE TT 01TMP01-BR018-0602-DN500 FE

01TMP01-BR101-0602-DN50

01TMP01-BR002-0602-DN500
01LBA30

TO BFPT
TO ATMOSPHERE

01TMP01 01TMP01

TO GSC
CF001

TO DEA
CT001 CT101

BLOWER
01LBC20-AA201
G
01LBC50-BR003-0608-DN800 A LEGENDS:

01TMP01-AA101
F14

TO ATMOSPHERE
L15

TO AUX
01TMP01-BR005-0602-DN600
TARGET PLATE ASSEMBLY

E11
G14
01LBA30-BR101-4537-DN200

G7

K5
SOOT

MOV-01LBG15-AA001
01LBG14-AA101
PCV-01LBA30-AA081
PCV-01LBC30-AA081

01LBG11-AA101
01TMP01-SF009

01HCB01-AA150

01HCB01-AA153

01LBG13-AA101
PERMANENT LINES

01LBG01-AA101
01LBG01-AA201

TO

E
N

B
Q
I9

01LBC30-AA111
J I J

TEMPORARY LINES

TO SOOT BLOWER

C
01TMP01-BR040-0602-DN250
VALVE OPEN

01LBC10-AA201
TO ATMOSPHERE
M
F14
VALVE CLOSED
01TMP01-BR041-0602-DN250
REHEATER

MOV-01LBC30-AA010 SPECTACLE BLIND OPEN


C
I J12 250X150 I

01LBC30-AA112
01LBB30-BR001-0937-ID620

01LBG10-BR001-0305-DN550 SPECTACLE BLIND CLOSED


01LBG05-AA201
01LBC30-BR001-0925-DN1050 MOV-01LBC30-AA011
FE
01LBC30 MOV-01LBC30-AA012 01LBG05-BR001-0305-DN250
CF001 STEAM BLOW PATH (FOR ELECTRONIC COPY ONLY)
F
01LBQ80-BR001-0608-DN500

D10 01TMP01-SF014 01LBG10-AZ001


TO DEA 01LBC30-BR103-0608-DN150 OPERATIONAL PATH (FOR ELECTRONIC COPY ONLY)
01LBC35-BR001-0608-DN250 01LBG20-BR001-0305-DN300
N
P
E6 01LBG20-AA101
MOV-01LBC35-AA001
01TMP01-BR028-0602-DN200 O
TO HTR#8
SPECTACLE BLIND SCHEDULE:
F7

TO ATMOSPHERE
H TO HPT GS TO MILL INERTING H
01LBD11-AA101 250X200
BFPT

01LBG10-AA201 LOCATION A B C D E F G H I J K L M N O P Q
01TMP01-SF010 TO IPT GS
H

J 01MAW03-AA101

01TMP01-BR029-0602-DN200

01TMP01-BR031-0602-DN250
MOV-01LBG10-AA001

01TMP01-BR042-0602-DN250
TO SCAPH

01TMP01-BR030-0602-DN250
01MAW03-AA081 I BLIND POSITION - - C C C C C C C C - - C C C - -
TO

TO GLAND STEAM
01LBD11-AA081 01LBG10-BR018-0305-DN300
SPILL OVER C: CLOSED
01TMP01-BR006-0602-DN600
C6
TO ATMOSPHERE

01LBC35-BR002-0608-DN250
01LBS45-AA101 O: OPEN
01LBC40-BR003-0608-DN800 01LBD11-AA102 01LBD01-AA221 TO CONDENSER

MOV-01LBG12-AA001
MOV-01LBQ81-AA002 SPECIAL NOTE:
01MAW03-AA102 Q
MOV-01LBG12-AA002 01LBG14-BR001-0305-DN200 01LBQ81-AA202 1. FOR UNIT#2 P&ID, TAG NUMBER SHALL BE CHANGED FROM 01 TO 02.
01MAW01-AA101 J6
MOV-01LBS45-AA001

N TO LPT GS
01LBG12-BR003-0305-DN150
J5
J PCV-01LBQ81-AA081
01MAW01-AA081

01LBQ81-AA101
01LBB10-BR004-0937-ID620

01LBB20-BR004-0937-ID620

MOV-01LBQ80-AA001
B7
01TMP01-SF007
01MAW01-AA102 01LBQ80-AA101
01MAW01-AA221
500X300
300X250

01TMP01-BR018-0602-DN500
01LBG12-BR002-0305-DN150
H K HOLD LIST:
01TMP01-BR020-0602-DN250

G G
H13 C12
K9
MOV-01LBQ81-AA001
01MAP20-BR001-0937-ID620

01LBG13-BR002-0305-DN200
01TMP01-BR017-0602-DN500
F F
01LBQ81-AA201 01LBQ81-BR003-0615-DN300
H
M
J11 01LBD61-BR002-0315-DN300
01TMP01-BR020-0602-DN250

01TMP01-SF008 MOV-01LBG13-AA002

MOV-01LBG13-AA003 01LBQ80-BR002-0608-DN250
01TMP01-BR019-0602-DN250

01TMP01-BR032-0602-DN200
TO HTR#8A
01LBG13-BR002-0305-DN200
PCV-01LBG13-AA081
TO DEAERATOR
RSV
P
01LBG13-BR001-0305-DN400 01LBG13-AA102
TO ATMOSPHERE H12
01LBG13-AA201

01MAB02-AA082 E 01LBQ80-AA051
E J5 E
WRITING.

IP TURBINE MOV-01LBG13-AA001 01LBG13-BR002-0305-DN200 01LBQ80-BR003-0608-DN250


TO HTR#8B
01LBD65-AA202 REFERENCE DRAWINGS:
01MAB02-AA081

MOV-01LBQ60-AA001 PCV-01LBQ60-AA081 MOV-01LBQ80-AA002 DRAWING NO. DRAWING TITLE


IN

01TMP01-BR033-0602-DN500 9578-001-110-PVM-F-026 LEGEND FOR P&IDS


OR LENT WITHOUT THEIR PERMISSION

01LBD60-BR001-0315-DN700 01LBQ60-AA101
RSV
01TMP01-BR013-0602-DN500

01TMP01-SF003
PCV-01MAP20-AA081

01LBD60-AA052 900X500
F TO DEAERATOR
C TO ATMOSPHERE
500X450

I12

01LBD65-AA201 01LBD65-BR001-0315-DN900
D 01LBQ60-BR001-0608-DN450
01MAP10-BR001-0937-ID620

D D

01TMP01-BR035-0602-DN500 TO ATMOSPHERE
01TMP01-SF004

01TMP01-SF013

01LBD60-AA051 MOV-01LBD60-AA001
E TO DEAERATOR 550X500
01LBD60-BR005-0315-DN550 TO ATMOSPHERE
01TMP01-SF005
MUST NOT BE COPIED

01TMP01-BR034-0602-DN500
PCV-01MAP10-AA081

01TMP01-BR021-0602-DN250

FE
600X400
400X250

MOV-01LBD61-AA001 01LBD60
CF001
01TMP01-BR014-0602-DN500

M 300X250
01LBD61-AA201 MOV-01LBQ82-AA002
01LBD61-BR001-0315-DN300 02 13-NOV-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK
01TMP01-BR022-0602-DN250

I 01LBQ82-AA202
C BFPT#A H7 01 16-MAR-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK C
K
00 28-DEC-16 ISSUED FOR APPROVAL BDJ KT --- --- DJR --- DK
AND

F5
FE
01LBD61
SARGENT & LUNDY LIMITED

01LBD61-BR002-0315-DN300 REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD.
F
CF001
PCV-01LBQ82-AA081
PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
01LBQ82-AA101

01LBD62-AA201
NTPC LIMITED
01TMP01-SF006

01LBD62-BR001-0315-DN300 OWNER:
(A GOVERNMENT OF INDIA ENTERPRISE)
MOV-01LBD62-AA001 300X250 BFPT#B J D
G7 B13
D EPC
B B4 FE LARSEN & TOUBRO LIMITED B
OF L&T -

01LBD62 CONTRACTOR:
CF001 MOV-01LBQ82-AA001
01LBD62-BR002-0315-DN300 L&T's
01LBQ82-AA201
01LBQ82-BR003-0615-DN300
CONSULTANT:
L & T - SARGENT & LUNDY LTD.
01TMP01-BR022-0602-DN250
IS THE PROPERTY

01LBD62-BR002-0315-DN300
NTPC
9578-001-102-PVM-K-004 REV. 03
DRG. NO.:

DATE NAME SIGN. TITLE:

PREPARED 28-DEC-16 BDJ P&ID FOR


THIS DRAWING AND DESIGN

600X500
600X500
CHECKED 28-DEC-16 KT AUX BOILER TO
01TMP01-BR007-0602-DN600 01TMP01-BR026-0602-DN500 01TMP01-BR008-0602-DN600 TO ATMOSPHERE

841mm)
A A
APPROVED 28-DEC-16 DK
DEAERATOR STEAM BLOWING
01TMP01-BR009-0602-DN600 01TMP01-BR027-0602-DN500 01TMP01-BR010-0602-DN600 TO ATMOSPHERE
DEPARTMENT MECHANICAL

(1189mm x
600X500 600X500 STAGE-2
L&T-S&L JOB NO.: LD16005000

SCALE: NA DRG. NO.: LD16005-XG02-00-LBU-110001 SHT: 02 OF 12 REV. 02

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME: LD16005-XG02-00-LBU-110001-01.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

NOTES:

1. DOCUMENT NUMBER IN THE CONTINUATION ARROW SHALL BE READ PREFIXING WITH

UNIT#2
01TMP01-BR003-0602-DN500
PROJECT CODE (9578-) AS PROJECT CODE WILL REMAIN SAME FOR ALL DOCUMENTS
01MAA02-AA081

01TMP01-BR036-0602-DN500
M 02LBG15-BR001-0305-DN450 FOR KHARGONE STPP. M
450X500

01TMP01-BR012-0602-DN500
02LBG15-AA101 2. FOR INDEX, LEGENDS & SYMBOLS, REFER DWG. NO. 9578-001-110-PVM-F-026.

01TMP01-BR037-0602-DN250
01LBA10-BR004-4537-ID318 3. ---- DENOTES TEMPORARY PIPING.

SUPERHEATER
TO ATMOSPHERE
01MAN10-BR001-4537-ID220 MSV 02LBG15-BR001-0305-DN450
MOV-01LBA01-AA002 4. FLOW NOZZLES WILL BE INSTALLED AFTER STEAM BLOW OUT. TEMPORARY SPOOL WILL
FE
01MAN10-BR002-0935-DN600 BE INSTALLED AT FLOW NOZZLE LOCATION BEFORE STEAM BLOW OUT.
01MAN10 00LBG01-BR001-0305-DN450
AUX STEAM
CF001 AUX 5. ALL INTERNALS OF CONTROL VALVES IN THE BLOW CIRCUIT SHALL BE REMOVED AND

01TMP01-AA002
00LBG01-BR004-0305-DN350 BLOW OUT KIT/TEMPORARY SPOOL PIECES TO BE INSTALLED.
A
PCV-01MAN10-AA081
PT DCS
BOILER
K8 6. STEAM BLOW OUT WILL NOT INCLUDE FOLLOWING PIPING:
HP TURBINE 01TMP01

00LBG01-BR441-0305-DN250
PCV-01MAN20-AA081 BOP 00LBG01-AA106 01LBG15-AA101 FOLLOWING LINES SHALL BE MECHANICALLY CLEANED.
CP102

00LBG01-AA101
C&I
- STEAM PIPING FROM TURBINE NOZZLE UPTO POWER ACTUATED NON RETURN VALVES.

ATMOSPHERE
L FE L
00LBG01-AA201
01MAN20 01MAN20-BR002-0935-DN600 - DOWNSTREAM PIPING FROM LP BYPASS TO CONDENSER.
CF001 01MAA02-AA082
TE TT - DOWNSTREAM PIPING FROM MSV/RSV TO HP/IP TURBINE.
01MAN20-BR001-4537-ID220 01TMP01 01TMP01
MSV 01LBG15-BR001-0305-DN450 - ADMISSION STEAM PIPING FOR BFPT.
CT002 CT102
01LBA20-BR004-4537-ID318 7. STEAM CONNECTION SHALL BE RESTORED AFTER STEAM PIPING BLOW OUT.

TO
01TMP01-BR102-0602-DN50 8. BLOW OUT/THROUGH KIT CRITERIA :

J4
MOV-01LBA01-AA001
- BLOW THROUGH KIT WILL BE USED FOR HP BYPASS VALVE DURING STEAM BLOW OUT.
PT 01TMP01-AA102 01TMP01-BR038-0602-DN500
DCS

01TMP01-BR004-0602-DN500
01TMP01-BR017-0602-DN500

01TMP01-AA001
01TMP01-BR011-0602-DN500
- BLOW OUT KIT SHALL BE USED FOR MAIN STEAM STOP VALVE, COLD REHEAT NRV,
01TMP01

B
01TMP01-BR001-0602-DN500
CP101 BOP 01TMP01-BR039-0602-DN200 HOT REHEAT STOP VALVE, EXTRACTION-6 QCNRV AND LP BYPASS VALVE.

01LBC10-BR001-0925-DN800
C&I

01LBC20-BR001-0925-DN800

01LBG15-BR001-0305-DN450
K TO ATMOSPHERE K

550X500
01LBG30-BR102-0335-DN550

01MAN30-BR001-0935-DN800

HDR
TE TT 01TMP01-BR018-0602-DN500 FE

01TMP01-BR101-0602-DN50

01TMP01-BR002-0602-DN500
01LBA30

TO BFPT
TO ATMOSPHERE

01TMP01 01TMP01

GSC
CF001

DEA
CT001 CT101

ST
BLOWER
01LBC20-AA201
G
01LBC50-BR003-0608-DN800 LEGENDS:

TO
A

01TMP01-AA101

TO
F14

TO
TO ATMOSPHERE
L15

AUX
01TMP01-BR005-0602-DN600
TARGET PLATE ASSEMBLY

E11
G14
01LBA30-BR101-4537-DN200

G7

K5
SOOT

MOV-01LBG15-AA001
TO

01LBG14-AA101
PCV-01LBA30-AA081
PCV-01LBC30-AA081

01LBG11-AA101
01TMP01-SF009

01HCB01-AA150

01HCB01-AA153

01LBG13-AA101
PERMANENT LINES

01LBG01-AA101
01LBG01-AA201

TO

E
N

B
Q
I9

01LBC30-AA111
J I J

TEMPORARY LINES

TO SOOT BLOWER

C
01TMP01-BR040-0602-DN250
VALVE OPEN

01LBC10-AA201
TO ATMOSPHERE
M
F14
VALVE CLOSED
01TMP01-BR041-0602-DN250
REHEATER

MOV-01LBC30-AA010 SPECTACLE BLIND OPEN


C
I J12 250X150 I

01LBC30-AA112
01LBB30-BR001-0937-ID620

01LBG10-BR001-0305-DN550 SPECTACLE BLIND CLOSED


01LBG05-AA201
01LBC30-BR001-0925-DN1050 MOV-01LBC30-AA011
FE
01LBC30 MOV-01LBC30-AA012 01LBG05-BR001-0305-DN250
CF001 STEAM BLOW PATH (FOR ELECTRONIC COPY ONLY)
F
01LBQ80-BR001-0608-DN500

D10 01TMP01-SF014 01LBG10-AZ001


TO DEA 01LBC30-BR103-0608-DN150 OPERATIONAL PATH (FOR ELECTRONIC COPY ONLY)
01LBC35-BR001-0608-DN250 01LBG20-BR001-0305-DN300
N
P
E6 01LBG20-AA101
MOV-01LBC35-AA001
01TMP01-BR028-0602-DN200 O
TO HTR#8
SPECTACLE BLIND SCHEDULE:
F7

TO ATMOSPHERE
H TO HPT GS TO MILL INERTING H
01LBD11-AA101 250X200
TO BFPT

01LBG10-AA201 LOCATION A B C D E F G H I J K L M N O P Q
01TMP01-SF010 TO IPT GS
H

J 01MAW03-AA101

01TMP01-BR029-0602-DN200

01TMP01-BR031-0602-DN250
MOV-01LBG10-AA001

01TMP01-BR042-0602-DN250
TO SCAPH

01TMP01-BR030-0602-DN250
01MAW03-AA081 I BLIND POSITION - - C C C C C C C C - - C C O - -
TO GLAND STEAM
01LBD11-AA081 01LBG10-BR018-0305-DN300
SPILL OVER C: CLOSED
01TMP01-BR006-0602-DN600
C6
ATMOSPHERE

01LBC35-BR002-0608-DN250
01LBS45-AA101 O: OPEN
01LBC40-BR003-0608-DN800 01LBD11-AA102 01LBD01-AA221 TO CONDENSER

MOV-01LBG12-AA001
MOV-01LBQ81-AA002 SPECIAL NOTE:
01MAW03-AA102 Q
MOV-01LBG12-AA002 01LBG14-BR001-0305-DN200 01LBQ81-AA202 1. FOR UNIT#2 P&ID, TAG NUMBER SHALL BE CHANGED FROM 01 TO 02.
01MAW01-AA101 J6
MOV-01LBS45-AA001
TO

N TO LPT GS
01LBG12-BR003-0305-DN150
J5
J PCV-01LBQ81-AA081
01MAW01-AA081

01LBQ81-AA101
01LBB10-BR004-0937-ID620

01LBB20-BR004-0937-ID620

MOV-01LBQ80-AA001
B7
01TMP01-SF007
01MAW01-AA102 01LBQ80-AA101
01MAW01-AA221
500X300
300X250

01TMP01-BR018-0602-DN500
01LBG12-BR002-0305-DN150
H K HOLD LIST:
01TMP01-BR020-0602-DN250

G G
H13 C12
K9
MOV-01LBQ81-AA001
01MAP20-BR001-0937-ID620

01LBG13-BR002-0305-DN200
01TMP01-BR017-0602-DN500
F F
01LBQ81-AA201 01LBQ81-BR003-0615-DN300
H
M
J11 01LBD61-BR002-0315-DN300
01TMP01-BR020-0602-DN250

01TMP01-SF008 MOV-01LBG13-AA002

MOV-01LBG13-AA003 01LBQ80-BR002-0608-DN250
01TMP01-BR019-0602-DN250

01TMP01-BR032-0602-DN200
TO HTR#8A
01LBG13-BR002-0305-DN200
PCV-01LBG13-AA081
TO DEAERATOR
RSV
P
01LBG13-BR001-0305-DN400 01LBG13-AA102
TO ATMOSPHERE H12
01LBG13-AA201

01MAB02-AA082 E 01LBQ80-AA051
E J5 E
THIS DRAWING AND DESIGN IS THE PROPERTY OF L&T - SARGENT & LUNDY LIMITED AND MUST NOT BE COPIED OR LENT WITHOUT THEIR PERMISSION IN WRITING.

IP TURBINE MOV-01LBG13-AA001 01LBG13-BR002-0305-DN200 01LBQ80-BR003-0608-DN250


TO HTR#8B
01LBD65-AA202 REFERENCE DRAWINGS:
01MAB02-AA081

MOV-01LBQ60-AA001 PCV-01LBQ60-AA081 MOV-01LBQ80-AA002 DRAWING NO. DRAWING TITLE


01TMP01-BR033-0602-DN500 9578-001-110-PVM-F-026 LEGEND FOR P&IDS
01LBD60-BR001-0315-DN700 01LBQ60-AA101
RSV
01TMP01-BR013-0602-DN500

01TMP01-SF003
PCV-01MAP20-AA081

01LBD60-AA052 900X500
F TO DEAERATOR
C TO ATMOSPHERE
500X450

I12

01LBD65-AA201 01LBD65-BR001-0315-DN900
D 01LBQ60-BR001-0608-DN450
01MAP10-BR001-0937-ID620

D D

01TMP01-BR035-0602-DN500 TO ATMOSPHERE
01TMP01-SF004

01TMP01-SF013

01LBD60-AA051 MOV-01LBD60-AA001
E TO DEAERATOR 550X500
01LBD60-BR005-0315-DN550 TO ATMOSPHERE
01TMP01-SF005

01TMP01-BR034-0602-DN500
PCV-01MAP10-AA081

01TMP01-BR021-0602-DN250

FE
600X400
400X250

MOV-01LBD61-AA001 01LBD60
CF001
01TMP01-BR014-0602-DN500

M 300X250
01LBD61-AA201 MOV-01LBQ82-AA002
01LBD61-BR001-0315-DN300 02 13-NOV-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK
01TMP01-BR022-0602-DN250

I 01LBQ82-AA202
C BFPT#A H7 01 16-MAR-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK C
K
F5 00 28-DEC-16 ISSUED FOR APPROVAL BDJ KT --- --- DJR --- DK
FE
01LBD61
01LBD61-BR002-0315-DN300 REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD.
F
CF001
PCV-01LBQ82-AA081
PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
01LBQ82-AA101

01LBD62-AA201
NTPC LIMITED
01TMP01-SF006

01LBD62-BR001-0315-DN300 OWNER:
(A GOVERNMENT OF INDIA ENTERPRISE)
MOV-01LBD62-AA001 300X250 BFPT#B J D
G7 B13
D EPC
B B4 FE
CONTRACTOR:
LARSEN & TOUBRO LIMITED B
01LBD62
CF001 MOV-01LBQ82-AA001
01LBD62-BR002-0315-DN300 L&T's
01LBQ82-AA201
01LBQ82-BR003-0615-DN300
CONSULTANT:
L & T - SARGENT & LUNDY LTD.
01TMP01-BR022-0602-DN250
01LBD62-BR002-0315-DN300
NTPC
9578-001-102-PVM-K-004 REV. 03
DRG. NO.:

DATE NAME SIGN. TITLE:

PREPARED 28-DEC-16 BDJ P&ID FOR


600X500
600X500
CHECKED 28-DEC-16 KT AUX BOILER TO
01TMP01-BR007-0602-DN600 01TMP01-BR026-0602-DN500 01TMP01-BR008-0602-DN600 TO ATMOSPHERE

A0 (1189mm x 841mm)
A A
APPROVED 28-DEC-16 DK
GSC STEAM BLOWING
01TMP01-BR009-0602-DN600 01TMP01-BR027-0602-DN500 01TMP01-BR010-0602-DN600 TO ATMOSPHERE
DEPARTMENT MECHANICAL
600X500 600X500 STAGE-3
L&T-S&L JOB NO.: LD16005000

SCALE: NA DRG. NO.: LD16005-XG02-00-LBU-110001 SHT: 03 OF 12 REV. 02


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME: LD16005-XG02-00-LBU-110001-01.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

NOTES:

1. DOCUMENT NUMBER IN THE CONTINUATION ARROW SHALL BE READ PREFIXING WITH

UNIT#2
01TMP01-BR003-0602-DN500
PROJECT CODE (9578-) AS PROJECT CODE WILL REMAIN SAME FOR ALL DOCUMENTS
01MAA02-AA081

01TMP01-BR036-0602-DN500
M 02LBG15-BR001-0305-DN450 FOR KHARGONE STPP. M
450X500

01TMP01-BR012-0602-DN500
02LBG15-AA101 2. FOR INDEX, LEGENDS & SYMBOLS, REFER DWG. NO. 9578-001-110-PVM-F-026.

01TMP01-BR037-0602-DN250
01LBA10-BR004-4537-ID318 3. ---- DENOTES TEMPORARY PIPING.

SUPERHEATER
TO ATMOSPHERE
01MAN10-BR001-4537-ID220 MSV 02LBG15-BR001-0305-DN450
MOV-01LBA01-AA002 4. FLOW NOZZLES WILL BE INSTALLED AFTER STEAM BLOW OUT. TEMPORARY SPOOL WILL
FE
01MAN10-BR002-0935-DN600 BE INSTALLED AT FLOW NOZZLE LOCATION BEFORE STEAM BLOW OUT.
01MAN10 00LBG01-BR001-0305-DN450
AUX STEAM
CF001 AUX 5. ALL INTERNALS OF CONTROL VALVES IN THE BLOW CIRCUIT SHALL BE REMOVED AND

01TMP01-AA002
00LBG01-BR004-0305-DN350 BLOW OUT KIT/TEMPORARY SPOOL PIECES TO BE INSTALLED.
A
PCV-01MAN10-AA081
PT DCS
BOILER
K8 6. STEAM BLOW OUT WILL NOT INCLUDE FOLLOWING PIPING:
HP TURBINE 01TMP01

00LBG01-BR441-0305-DN250
PCV-01MAN20-AA081 BOP 00LBG01-AA106 01LBG15-AA101 FOLLOWING LINES SHALL BE MECHANICALLY CLEANED.
CP102

00LBG01-AA101
C&I
- STEAM PIPING FROM TURBINE NOZZLE UPTO POWER ACTUATED NON RETURN VALVES.

TO ATMOSPHERE
L FE L
00LBG01-AA201
01MAN20 01MAN20-BR002-0935-DN600 - DOWNSTREAM PIPING FROM LP BYPASS TO CONDENSER.
CF001 01MAA02-AA082
TE TT - DOWNSTREAM PIPING FROM MSV/RSV TO HP/IP TURBINE.
01MAN20-BR001-4537-ID220 01TMP01 01TMP01
MSV 01LBG15-BR001-0305-DN450 - ADMISSION STEAM PIPING FOR BFPT.
CT002 CT102
01LBA20-BR004-4537-ID318 7. STEAM CONNECTION SHALL BE RESTORED AFTER STEAM PIPING BLOW OUT.

01TMP01-BR102-0602-DN50 8. BLOW OUT/THROUGH KIT CRITERIA :

J4
MOV-01LBA01-AA001
- BLOW THROUGH KIT WILL BE USED FOR HP BYPASS VALVE DURING STEAM BLOW OUT.
PT 01TMP01-AA102 01TMP01-BR038-0602-DN500
DCS

01TMP01-BR004-0602-DN500
01TMP01-BR017-0602-DN500

01TMP01-AA001
01TMP01-BR011-0602-DN500
- BLOW OUT KIT SHALL BE USED FOR MAIN STEAM STOP VALVE, COLD REHEAT NRV,
01TMP01

B
01TMP01-BR001-0602-DN500
CP101 BOP 01TMP01-BR039-0602-DN200 HOT REHEAT STOP VALVE, EXTRACTION-6 QCNRV AND LP BYPASS VALVE.

01LBC10-BR001-0925-DN800
C&I

01LBC20-BR001-0925-DN800

01LBG15-BR001-0305-DN450
K TO ATMOSPHERE K

550X500
01LBG30-BR102-0335-DN550

01MAN30-BR001-0935-DN800

TO ST HDR
TE TT 01TMP01-BR018-0602-DN500 FE

01TMP01-BR101-0602-DN50

01TMP01-BR002-0602-DN500
01LBA30

TO BFPT
TO ATMOSPHERE

01TMP01 01TMP01

TO GSC
CF001

TO DEA
CT001 CT101

TO SOOT BLOWER
01LBC20-AA201
G
01LBC50-BR003-0608-DN800 A LEGENDS:

01TMP01-AA101
F14

TO ATMOSPHERE
L15

TO AUX
01TMP01-BR005-0602-DN600
TARGET PLATE ASSEMBLY

E11
G14
01LBA30-BR101-4537-DN200

G7

K5
MOV-01LBG15-AA001
01LBG14-AA101
PCV-01LBA30-AA081
PCV-01LBC30-AA081

01LBG11-AA101
01TMP01-SF009

01HCB01-AA150

01HCB01-AA153

01LBG13-AA101
PERMANENT LINES

01LBG01-AA101
01LBG01-AA201

E
N

B
Q
I9

01LBC30-AA111
J I J

TEMPORARY LINES

TO SOOT BLOWER

C
01TMP01-BR040-0602-DN250
VALVE OPEN

01LBC10-AA201
TO ATMOSPHERE
M
F14
VALVE CLOSED
01TMP01-BR041-0602-DN250
REHEATER

MOV-01LBC30-AA010 SPECTACLE BLIND OPEN


C
I J12 250X150 I

01LBC30-AA112
01LBB30-BR001-0937-ID620

01LBG10-BR001-0305-DN550 SPECTACLE BLIND CLOSED


01LBG05-AA201
01LBC30-BR001-0925-DN1050 MOV-01LBC30-AA011
FE
01LBC30 MOV-01LBC30-AA012 01LBG05-BR001-0305-DN250
CF001 STEAM BLOW PATH (FOR ELECTRONIC COPY ONLY)
F
01LBQ80-BR001-0608-DN500

D10 01TMP01-SF014 01LBG10-AZ001


TO DEA 01LBC30-BR103-0608-DN150 OPERATIONAL PATH (FOR ELECTRONIC COPY ONLY)
01LBC35-BR001-0608-DN250 01LBG20-BR001-0305-DN300
N
P
E6 01LBG20-AA101
MOV-01LBC35-AA001
01TMP01-BR028-0602-DN200 O
TO HTR#8
SPECTACLE BLIND SCHEDULE:
F7

TO ATMOSPHERE
H TO HPT GS TO MILL INERTING H
01LBD11-AA101 250X200
TO BFPT

01LBG10-AA201 LOCATION A B C D E F G H I J K L M N O P Q
01TMP01-SF010 TO IPT GS
H

J 01MAW03-AA101

01TMP01-BR029-0602-DN200

01TMP01-BR031-0602-DN250
MOV-01LBG10-AA001

01TMP01-BR042-0602-DN250
TO SCAPH

01TMP01-BR030-0602-DN250
01MAW03-AA081 I BLIND POSITION - - C C C C C C C C - - O C C - -
TO GLAND STEAM
01LBD11-AA081 01LBG10-BR018-0305-DN300
SPILL OVER C: CLOSED
01TMP01-BR006-0602-DN600
C6
TO ATMOSPHERE

01LBC35-BR002-0608-DN250
01LBS45-AA101 O: OPEN
01LBC40-BR003-0608-DN800 01LBD11-AA102 01LBD01-AA221 TO CONDENSER

MOV-01LBG12-AA001
MOV-01LBQ81-AA002 SPECIAL NOTE:
01MAW03-AA102 Q
MOV-01LBG12-AA002 01LBG14-BR001-0305-DN200 01LBQ81-AA202 1. FOR UNIT#2 P&ID, TAG NUMBER SHALL BE CHANGED FROM 01 TO 02.
01MAW01-AA101 J6
MOV-01LBS45-AA001

N TO LPT GS
01LBG12-BR003-0305-DN150
J5
J PCV-01LBQ81-AA081
01MAW01-AA081

01LBQ81-AA101
01LBB10-BR004-0937-ID620

01LBB20-BR004-0937-ID620

MOV-01LBQ80-AA001
B7
01TMP01-SF007
01MAW01-AA102 01LBQ80-AA101
01MAW01-AA221
500X300
300X250

01TMP01-BR018-0602-DN500
01LBG12-BR002-0305-DN150
H K HOLD LIST:
01TMP01-BR020-0602-DN250

G G
H13 C12
K9
MOV-01LBQ81-AA001
01MAP20-BR001-0937-ID620

01LBG13-BR002-0305-DN200
01TMP01-BR017-0602-DN500
F F
01LBQ81-AA201 01LBQ81-BR003-0615-DN300
H
M
J11 01LBD61-BR002-0315-DN300
01TMP01-BR020-0602-DN250

01TMP01-SF008 MOV-01LBG13-AA002

MOV-01LBG13-AA003 01LBQ80-BR002-0608-DN250
01TMP01-BR019-0602-DN250

01TMP01-BR032-0602-DN200
TO HTR#8A
01LBG13-BR002-0305-DN200
PCV-01LBG13-AA081
TO DEAERATOR
RSV
P
01LBG13-BR001-0305-DN400 01LBG13-AA102
TO ATMOSPHERE H12
01LBG13-AA201

01MAB02-AA082 E 01LBQ80-AA051
E J5 E
WRITING.

IP TURBINE MOV-01LBG13-AA001 01LBG13-BR002-0305-DN200 01LBQ80-BR003-0608-DN250


TO HTR#8B
01LBD65-AA202 REFERENCE DRAWINGS:
01MAB02-AA081

MOV-01LBQ60-AA001 PCV-01LBQ60-AA081 MOV-01LBQ80-AA002 DRAWING NO. DRAWING TITLE


IN

01TMP01-BR033-0602-DN500 9578-001-110-PVM-F-026 LEGEND FOR P&IDS


PERMISSION

01LBD60-BR001-0315-DN700 01LBQ60-AA101
RSV
01TMP01-BR013-0602-DN500

01TMP01-SF003
PCV-01MAP20-AA081

01LBD60-AA052 900X500
F TO DEAERATOR
C TO ATMOSPHERE
500X450

I12
THEIR

01LBD65-AA201 01LBD65-BR001-0315-DN900
D 01LBQ60-BR001-0608-DN450
01MAP10-BR001-0937-ID620
WITHOUT

D D

01TMP01-BR035-0602-DN500 TO ATMOSPHERE
01TMP01-SF004

01TMP01-SF013

01LBD60-AA051 MOV-01LBD60-AA001
E TO DEAERATOR 550X500
LENT

01LBD60-BR005-0315-DN550 TO ATMOSPHERE
OR

01TMP01-SF005
COPIED

01TMP01-BR034-0602-DN500
PCV-01MAP10-AA081

01TMP01-BR021-0602-DN250

FE
600X400
400X250

MOV-01LBD61-AA001 01LBD60
CF001
01TMP01-BR014-0602-DN500
BE

M 300X250
01LBD61-AA201 MOV-01LBQ82-AA002
NOT

01LBD61-BR001-0315-DN300 02 13-NOV-18 ISSUED FOR APPROVAL PNS KT --- ---


01TMP01-BR022-0602-DN250

I 01LBQ82-AA202
BFPT#A
MUST

C H7 01 16-MAR-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK C


K
00 28-DEC-16 ISSUED FOR APPROVAL BDJ KT --- --- DJR --- DK
AND

F5
FE
01LBD61
LIMITED

01LBD61-BR002-0315-DN300 REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD.
F
CF001
PCV-01LBQ82-AA081
PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
01LBQ82-AA101
LUNDY

01LBD62-AA201
NTPC LIMITED
01TMP01-SF006
&

01LBD62-BR001-0315-DN300 OWNER:
(A GOVERNMENT OF INDIA ENTERPRISE)
SARGENT

MOV-01LBD62-AA001 300X250 BFPT#B J D


G7 B13
D EPC
B B4 FE LARSEN & TOUBRO LIMITED B
-

01LBD62 CONTRACTOR:
L&T

CF001 MOV-01LBQ82-AA001
01LBD62-BR002-0315-DN300 L&T's
01LBQ82-BR003-0615-DN300 L & T - SARGENT & LUNDY LTD.
OF

01LBQ82-AA201 CONSULTANT:
01TMP01-BR022-0602-DN250
PROPERTY

01LBD62-BR002-0315-DN300
NTPC
9578-001-102-PVM-K-004 REV. 03
DRG. NO.:
THE

DATE NAME SIGN. TITLE:

P&ID FOR
IS

PREPARED 28-DEC-16 BDJ


DESIGN

600X500
600X500
CHECKED 28-DEC-16 KT AUX BOILER TO
01TMP01-BR007-0602-DN600 01TMP01-BR026-0602-DN500 01TMP01-BR008-0602-DN600 TO ATMOSPHERE

841mm)
A A
APPROVED 28-DEC-16 DK
AND

BFPT STEAM BLOWING


01TMP01-BR009-0602-DN600 01TMP01-BR027-0602-DN500 01TMP01-BR010-0602-DN600 TO ATMOSPHERE
DEPARTMENT MECHANICAL
DRAWING

x
600X500 600X500 STAGE-4

(1189mm
L&T-S&L JOB NO.: LD16005000
THIS

SCALE: NA DRG. NO.: LD16005-XG02-00-LBU-110001 SHT: 04 OF 12 REV. 02

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME: LD16005-XG02-00-LBU-110001-01.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

NOTES:

1. DOCUMENT NUMBER IN THE CONTINUATION ARROW SHALL BE READ PREFIXING WITH

UNIT#2
01TMP01-BR003-0602-DN500
PROJECT CODE (9578-) AS PROJECT CODE WILL REMAIN SAME FOR ALL DOCUMENTS
01MAA02-AA081

01TMP01-BR036-0602-DN500
M 02LBG15-BR001-0305-DN450 FOR KHARGONE STPP. M
450X500

01TMP01-BR012-0602-DN500
02LBG15-AA101 2. FOR INDEX, LEGENDS & SYMBOLS, REFER DWG. NO. 9578-001-110-PVM-F-026.

01TMP01-BR037-0602-DN250
01LBA10-BR004-4537-ID318 3. ---- DENOTES TEMPORARY PIPING.

SUPERHEATER
TO ATMOSPHERE
01MAN10-BR001-4537-ID220 MSV 02LBG15-BR001-0305-DN450
MOV-01LBA01-AA002 4. FLOW NOZZLES WILL BE INSTALLED AFTER STEAM BLOW OUT. TEMPORARY SPOOL WILL
FE
01MAN10-BR002-0935-DN600 BE INSTALLED AT FLOW NOZZLE LOCATION BEFORE STEAM BLOW OUT.
01MAN10 00LBG01-BR001-0305-DN450
AUX STEAM
CF001 AUX 5. ALL INTERNALS OF CONTROL VALVES IN THE BLOW CIRCUIT SHALL BE REMOVED AND

01TMP01-AA002
00LBG01-BR004-0305-DN350 BLOW OUT KIT/TEMPORARY SPOOL PIECES TO BE INSTALLED.
A
PCV-01MAN10-AA081
PT DCS
BOILER
K8 6. STEAM BLOW OUT WILL NOT INCLUDE FOLLOWING PIPING:
HP TURBINE 01TMP01

00LBG01-BR441-0305-DN250
PCV-01MAN20-AA081 BOP 00LBG01-AA106 01LBG15-AA101 FOLLOWING LINES SHALL BE MECHANICALLY CLEANED.
CP102

00LBG01-AA101
C&I
- STEAM PIPING FROM TURBINE NOZZLE UPTO POWER ACTUATED NON RETURN VALVES.

ATMOSPHERE
L FE L
00LBG01-AA201
01MAN20 01MAN20-BR002-0935-DN600 - DOWNSTREAM PIPING FROM LP BYPASS TO CONDENSER.
CF001 01MAA02-AA082
TE TT - DOWNSTREAM PIPING FROM MSV/RSV TO HP/IP TURBINE.
01MAN20-BR001-4537-ID220 01TMP01 01TMP01
MSV 01LBG15-BR001-0305-DN450 - ADMISSION STEAM PIPING FOR BFPT.
CT002 CT102
01LBA20-BR004-4537-ID318 7. STEAM CONNECTION SHALL BE RESTORED AFTER STEAM PIPING BLOW OUT.

TO
01TMP01-BR102-0602-DN50 8. BLOW OUT/THROUGH KIT CRITERIA :

J4
MOV-01LBA01-AA001
- BLOW THROUGH KIT WILL BE USED FOR HP BYPASS VALVE DURING STEAM BLOW OUT.
PT 01TMP01-AA102 01TMP01-BR038-0602-DN500
DCS

01TMP01-BR004-0602-DN500
01TMP01-BR017-0602-DN500

01TMP01-AA001
01TMP01-BR011-0602-DN500
- BLOW OUT KIT SHALL BE USED FOR MAIN STEAM STOP VALVE, COLD REHEAT NRV,
01TMP01

B
01TMP01-BR001-0602-DN500
CP101 BOP 01TMP01-BR039-0602-DN200 HOT REHEAT STOP VALVE, EXTRACTION-6 QCNRV AND LP BYPASS VALVE.

01LBC10-BR001-0925-DN800
C&I

01LBC20-BR001-0925-DN800

01LBG15-BR001-0305-DN450
K TO ATMOSPHERE K

550X500
01LBG30-BR102-0335-DN550

01MAN30-BR001-0935-DN800

HDR
TE TT 01TMP01-BR018-0602-DN500 FE

01TMP01-BR101-0602-DN50

01TMP01-BR002-0602-DN500
01LBA30

BFPT
ATMOSPHERE

01TMP01 01TMP01

GSC
CF001

DEA
CT001 CT101

ST
BLOWER
01LBC20-AA201
G
01LBC50-BR003-0608-DN800 LEGENDS:

TO

TO
A

01TMP01-AA101

TO
F14

TO
ATMOSPHERE
L15

AUX
01TMP01-BR005-0602-DN600
TARGET PLATE ASSEMBLY

E11
G14
01LBA30-BR101-4537-DN200

G7

K5
SOOT

MOV-01LBG15-AA001
TO

01LBG14-AA101
TO

PCV-01LBA30-AA081
PCV-01LBC30-AA081

01LBG11-AA101
01TMP01-SF009

01HCB01-AA150

01HCB01-AA153

01LBG13-AA101
PERMANENT LINES

01LBG01-AA101
01LBG01-AA201

TO

E
N

B
Q
I9

01LBC30-AA111
J I J

TO
TEMPORARY LINES

BLOWER

C
01TMP01-BR040-0602-DN250
VALVE OPEN

01LBC10-AA201
TO ATMOSPHERE
M

SOOT
F14
VALVE CLOSED
TO 01TMP01-BR041-0602-DN250
REHEATER

MOV-01LBC30-AA010 SPECTACLE BLIND OPEN


C
I J12 250X150 I

01LBC30-AA112
01LBB30-BR001-0937-ID620

01LBG10-BR001-0305-DN550 SPECTACLE BLIND CLOSED


01LBG05-AA201
01LBC30-BR001-0925-DN1050 MOV-01LBC30-AA011
FE
01LBC30 MOV-01LBC30-AA012 01LBG05-BR001-0305-DN250
CF001 STEAM BLOW PATH (FOR ELECTRONIC COPY ONLY)
F
01LBQ80-BR001-0608-DN500

D10 01TMP01-SF014 01LBG10-AZ001


TO DEA 01LBC30-BR103-0608-DN150 OPERATIONAL PATH (FOR ELECTRONIC COPY ONLY)
01LBC35-BR001-0608-DN250 01LBG20-BR001-0305-DN300
N
P
E6 01LBG20-AA101
MOV-01LBC35-AA001
01TMP01-BR028-0602-DN200 O
TO HTR#8
SPECTACLE BLIND SCHEDULE:
F7

TO ATMOSPHERE
H TO HPT GS TO MILL INERTING H
01LBD11-AA101 250X200
BFPT

01LBG10-AA201 LOCATION A B C D E F G H I J K L M N O P Q
01TMP01-SF010 TO IPT GS
H

J 01MAW03-AA101

01TMP01-BR029-0602-DN200

01TMP01-BR031-0602-DN250
MOV-01LBG10-AA001

01TMP01-BR042-0602-DN250
TO SCAPH

01TMP01-BR030-0602-DN250
01MAW03-AA081 I BLIND POSITION - - C C C C C C O O - - C C C - -
TO

TO GLAND STEAM
01LBD11-AA081 01LBG10-BR018-0305-DN300
SPILL OVER C: CLOSED
01TMP01-BR006-0602-DN600
C6
ATMOSPHERE

01LBC35-BR002-0608-DN250
01LBS45-AA101 O: OPEN
01LBC40-BR003-0608-DN800 01LBD11-AA102 01LBD01-AA221 TO CONDENSER

MOV-01LBG12-AA001
MOV-01LBQ81-AA002 SPECIAL NOTE:
01MAW03-AA102 Q
MOV-01LBG12-AA002 01LBG14-BR001-0305-DN200 01LBQ81-AA202 1. FOR UNIT#2 P&ID, TAG NUMBER SHALL BE CHANGED FROM 01 TO 02.
01MAW01-AA101 J6
MOV-01LBS45-AA001
TO

N TO LPT GS
01LBG12-BR003-0305-DN150
J5
J PCV-01LBQ81-AA081
01MAW01-AA081

01LBQ81-AA101
01LBB10-BR004-0937-ID620

01LBB20-BR004-0937-ID620

MOV-01LBQ80-AA001
B7
01TMP01-SF007
01MAW01-AA102 01LBQ80-AA101
01MAW01-AA221
500X300
300X250

01TMP01-BR018-0602-DN500
01LBG12-BR002-0305-DN150
H K HOLD LIST:
01TMP01-BR020-0602-DN250

G G
H13 C12
K9
MOV-01LBQ81-AA001
01MAP20-BR001-0937-ID620

01LBG13-BR002-0305-DN200
01TMP01-BR017-0602-DN500
F F
01LBQ81-AA201 01LBQ81-BR003-0615-DN300
H
M
J11 01LBD61-BR002-0315-DN300
01TMP01-BR020-0602-DN250

01TMP01-SF008 MOV-01LBG13-AA002

MOV-01LBG13-AA003 01LBQ80-BR002-0608-DN250
01TMP01-BR019-0602-DN250

01TMP01-BR032-0602-DN200
TO HTR#8A
01LBG13-BR002-0305-DN200
PCV-01LBG13-AA081
TO DEAERATOR
RSV
P
01LBG13-BR001-0305-DN400 01LBG13-AA102
TO ATMOSPHERE H12
01LBG13-AA201

01MAB02-AA082 E 01LBQ80-AA051
E J5 E
WRITING.

IP TURBINE MOV-01LBG13-AA001 01LBG13-BR002-0305-DN200 01LBQ80-BR003-0608-DN250


TO HTR#8B
01LBD65-AA202 REFERENCE DRAWINGS:
01MAB02-AA081

MOV-01LBQ60-AA001 PCV-01LBQ60-AA081 MOV-01LBQ80-AA002 DRAWING NO. DRAWING TITLE


IN

01TMP01-BR033-0602-DN500 9578-001-110-PVM-F-026 LEGEND FOR P&IDS


PERMISSION

01LBD60-BR001-0315-DN700 01LBQ60-AA101
RSV
01TMP01-BR013-0602-DN500

01TMP01-SF003
PCV-01MAP20-AA081

01LBD60-AA052 900X500
F TO DEAERATOR
C TO ATMOSPHERE
500X450

I12
THEIR

01LBD65-AA201 01LBD65-BR001-0315-DN900
D 01LBQ60-BR001-0608-DN450
01MAP10-BR001-0937-ID620
WITHOUT

D D

01TMP01-BR035-0602-DN500 TO ATMOSPHERE
01TMP01-SF004

01TMP01-SF013

01LBD60-AA051 MOV-01LBD60-AA001
E TO DEAERATOR 550X500
LENT

01LBD60-BR005-0315-DN550 TO ATMOSPHERE
OR

01TMP01-SF005
COPIED

01TMP01-BR034-0602-DN500
PCV-01MAP10-AA081

01TMP01-BR021-0602-DN250

FE
600X400
400X250

MOV-01LBD61-AA001 01LBD60
CF001
01TMP01-BR014-0602-DN500
BE

M 300X250
01LBD61-AA201 MOV-01LBQ82-AA002
NOT

01LBD61-BR001-0315-DN300 02 13-NOV-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK
01TMP01-BR022-0602-DN250

I 01LBQ82-AA202
BFPT#A
MUST

C H7 01 16-MAR-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK C


K
00 28-DEC-16 ISSUED FOR APPROVAL BDJ KT --- --- DJR --- DK
AND

F5
FE
01LBD61
LIMITED

01LBD61-BR002-0315-DN300 REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD.
F
CF001
PCV-01LBQ82-AA081
PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
01LBQ82-AA101
LUNDY

01LBD62-AA201
NTPC LIMITED
01TMP01-SF006
&

01LBD62-BR001-0315-DN300 OWNER:
(A GOVERNMENT OF INDIA ENTERPRISE)
SARGENT

MOV-01LBD62-AA001 300X250 BFPT#B J D


G7 B13
D EPC
B B4 FE LARSEN & TOUBRO LIMITED B
-

01LBD62 CONTRACTOR:
L&T

CF001 MOV-01LBQ82-AA001
01LBD62-BR002-0315-DN300 L&T's
01LBQ82-BR003-0615-DN300 L & T - SARGENT & LUNDY LTD.
OF

01LBQ82-AA201 CONSULTANT:
01TMP01-BR022-0602-DN250
PROPERTY

01LBD62-BR002-0315-DN300
NTPC
9578-001-102-PVM-K-004 REV. 03
DRG. NO.:
THE

DATE NAME SIGN. TITLE:

P&ID
IS

PREPARED 28-DEC-16 BDJ


DESIGN

600X500
600X500
CHECKED 28-DEC-16 KT FOR
01TMP01-BR007-0602-DN600 01TMP01-BR026-0602-DN500 01TMP01-BR008-0602-DN600 TO ATMOSPHERE

841mm)
A A
APPROVED 28-DEC-16 DK
AND

MS CRH STEAM BLOWING


01TMP01-BR009-0602-DN600 01TMP01-BR027-0602-DN500 01TMP01-BR010-0602-DN600 TO ATMOSPHERE
DEPARTMENT MECHANICAL
DRAWING

x
600X500 600X500 STAGE-5

(1189mm
L&T-S&L JOB NO.: LD16005000
THIS

SCALE: NA DRG. NO.: LD16005-XG02-00-LBU-110001 SHT: 06 OF 12 REV. 02

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME: LD16005-XG02-00-LBU-110001-01.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

NOTES:

1. DOCUMENT NUMBER IN THE CONTINUATION ARROW SHALL BE READ PREFIXING WITH

UNIT#2
01TMP01-BR003-0602-DN500
PROJECT CODE (9578-) AS PROJECT CODE WILL REMAIN SAME FOR ALL DOCUMENTS
01MAA02-AA081

01TMP01-BR036-0602-DN500
M 02LBG15-BR001-0305-DN450 FOR KHARGONE STPP. M
450X500

01TMP01-BR012-0602-DN500
02LBG15-AA101 2. FOR INDEX, LEGENDS & SYMBOLS, REFER DWG. NO. 9578-001-110-PVM-F-026.

01TMP01-BR037-0602-DN250
01LBA10-BR004-4537-ID318 3. ---- DENOTES TEMPORARY PIPING.

SUPERHEATER
TO ATMOSPHERE
01MAN10-BR001-4537-ID220 MSV 02LBG15-BR001-0305-DN450
MOV-01LBA01-AA002 4. FLOW NOZZLES WILL BE INSTALLED AFTER STEAM BLOW OUT. TEMPORARY SPOOL WILL
FE
01MAN10-BR002-0935-DN600 BE INSTALLED AT FLOW NOZZLE LOCATION BEFORE STEAM BLOW OUT.
01MAN10 00LBG01-BR001-0305-DN450
AUX STEAM
CF001 AUX 5. ALL INTERNALS OF CONTROL VALVES IN THE BLOW CIRCUIT SHALL BE REMOVED AND

01TMP01-AA002
00LBG01-BR004-0305-DN350 BLOW OUT KIT/TEMPORARY SPOOL PIECES TO BE INSTALLED.
A
PCV-01MAN10-AA081
PT DCS
BOILER
K8 6. STEAM BLOW OUT WILL NOT INCLUDE FOLLOWING PIPING:
HP TURBINE 01TMP01

00LBG01-BR441-0305-DN250
PCV-01MAN20-AA081 BOP 00LBG01-AA106 01LBG15-AA101 FOLLOWING LINES SHALL BE MECHANICALLY CLEANED.
CP102

00LBG01-AA101
C&I
- STEAM PIPING FROM TURBINE NOZZLE UPTO POWER ACTUATED NON RETURN VALVES.

ATMOSPHERE
L FE L
00LBG01-AA201
01MAN20 01MAN20-BR002-0935-DN600 - DOWNSTREAM PIPING FROM LP BYPASS TO CONDENSER.
CF001 01MAA02-AA082
TE TT - DOWNSTREAM PIPING FROM MSV/RSV TO HP/IP TURBINE.
01MAN20-BR001-4537-ID220 01TMP01 01TMP01
MSV 01LBG15-BR001-0305-DN450 - ADMISSION STEAM PIPING FOR BFPT.
CT002 CT102
01LBA20-BR004-4537-ID318 7. STEAM CONNECTION SHALL BE RESTORED AFTER STEAM PIPING BLOW OUT.

TO
01TMP01-BR102-0602-DN50 8. BLOW OUT/THROUGH KIT CRITERIA :

J4
MOV-01LBA01-AA001
- BLOW THROUGH KIT WILL BE USED FOR HP BYPASS VALVE DURING STEAM BLOW OUT.
PT 01TMP01-AA102 01TMP01-BR038-0602-DN500
DCS

01TMP01-BR004-0602-DN500
01TMP01-BR017-0602-DN500

01TMP01-AA001
01TMP01-BR011-0602-DN500
- BLOW OUT KIT SHALL BE USED FOR MAIN STEAM STOP VALVE, COLD REHEAT NRV,
01TMP01

B
01TMP01-BR001-0602-DN500
CP101 BOP 01TMP01-BR039-0602-DN200 HOT REHEAT STOP VALVE, EXTRACTION-6 QCNRV AND LP BYPASS VALVE.

01LBC10-BR001-0925-DN800
C&I

01LBC20-BR001-0925-DN800

01LBG15-BR001-0305-DN450
K TO ATMOSPHERE K

550X500
01LBG30-BR102-0335-DN550

01MAN30-BR001-0935-DN800

TO ST HDR
TE TT 01TMP01-BR018-0602-DN500 FE

01TMP01-BR101-0602-DN50

01TMP01-BR002-0602-DN500
01LBA30

TO BFPT
TO ATMOSPHERE

01TMP01 01TMP01

TO GSC
CF001

TO DEA
CT001 CT101

TO SOOT BLOWER
01LBC20-AA201
G
01LBC50-BR003-0608-DN800 A LEGENDS:

01TMP01-AA101
F14

ATMOSPHERE
L15

AUX
01TMP01-BR005-0602-DN600
TARGET PLATE ASSEMBLY

E11
G14
01LBA30-BR101-4537-DN200

G7

K5
MOV-01LBG15-AA001
TO

01LBG14-AA101
PCV-01LBA30-AA081
PCV-01LBC30-AA081

01LBG11-AA101
01TMP01-SF009

01HCB01-AA150

01HCB01-AA153

01LBG13-AA101
PERMANENT LINES

01LBG01-AA101
01LBG01-AA201

E
N

B
Q
I9

01LBC30-AA111
J I J

TO
TEMPORARY LINES

TO SOOT BLOWER

C
01TMP01-BR040-0602-DN250
VALVE OPEN

01LBC10-AA201
TO ATMOSPHERE
M
F14
VALVE CLOSED
01TMP01-BR041-0602-DN250
REHEATER

MOV-01LBC30-AA010 SPECTACLE BLIND OPEN


C
I J12 250X150 I

01LBC30-AA112
01LBB30-BR001-0937-ID620

01LBG10-BR001-0305-DN550 SPECTACLE BLIND CLOSED


01LBG05-AA201
01LBC30-BR001-0925-DN1050 MOV-01LBC30-AA011
FE
01LBC30 MOV-01LBC30-AA012 01LBG05-BR001-0305-DN250
CF001 STEAM BLOW PATH (FOR ELECTRONIC COPY ONLY)
F
01LBQ80-BR001-0608-DN500

D10 01TMP01-SF014 01LBG10-AZ001


TO DEA 01LBC30-BR103-0608-DN150 OPERATIONAL PATH (FOR ELECTRONIC COPY ONLY)
01LBC35-BR001-0608-DN250 01LBG20-BR001-0305-DN300
N
P
E6 01LBG20-AA101
MOV-01LBC35-AA001
01TMP01-BR028-0602-DN200 O
TO HTR#8
SPECTACLE BLIND SCHEDULE:
F7

TO ATMOSPHERE
H TO HPT GS TO MILL INERTING H
01LBD11-AA101 250X200
BFPT

01LBG10-AA201 LOCATION A B C D E F G H I J K L M N O P Q
01TMP01-SF010 TO IPT GS
H

J 01MAW03-AA101

01TMP01-BR029-0602-DN200

01TMP01-BR031-0602-DN250
MOV-01LBG10-AA001

01TMP01-BR042-0602-DN250
TO SCAPH

01TMP01-BR030-0602-DN250
01MAW03-AA081 I BLIND POSITION - - C C C C C C C C - - O C C - -
TO

TO GLAND STEAM
01LBD11-AA081 01LBG10-BR018-0305-DN300
SPILL OVER C: CLOSED
01TMP01-BR006-0602-DN600
C6
TO ATMOSPHERE

01LBC35-BR002-0608-DN250
01LBS45-AA101 O: OPEN
01LBC40-BR003-0608-DN800 01LBD11-AA102 01LBD01-AA221 TO CONDENSER

MOV-01LBG12-AA001
MOV-01LBQ81-AA002 SPECIAL NOTE:
01MAW03-AA102 Q
MOV-01LBG12-AA002 01LBG14-BR001-0305-DN200 01LBQ81-AA202 1. FOR UNIT#2 P&ID, TAG NUMBER SHALL BE CHANGED FROM 01 TO 02.
01MAW01-AA101 J6
MOV-01LBS45-AA001

N TO LPT GS
01LBG12-BR003-0305-DN150
J5
J PCV-01LBQ81-AA081
01MAW01-AA081

01LBQ81-AA101
01LBB10-BR004-0937-ID620

01LBB20-BR004-0937-ID620

MOV-01LBQ80-AA001
B7
01TMP01-SF007
01MAW01-AA102 01LBQ80-AA101
01MAW01-AA221
500X300
300X250

01TMP01-BR018-0602-DN500
01LBG12-BR002-0305-DN150
H K HOLD LIST:
01TMP01-BR020-0602-DN250

G G
H13 C12
K9
MOV-01LBQ81-AA001
01MAP20-BR001-0937-ID620

01LBG13-BR002-0305-DN200
01TMP01-BR017-0602-DN500
F F
01LBQ81-AA201 01LBQ81-BR003-0615-DN300
H
M
J11 01LBD61-BR002-0315-DN300
01TMP01-BR020-0602-DN250

01TMP01-SF008 MOV-01LBG13-AA002

MOV-01LBG13-AA003 01LBQ80-BR002-0608-DN250
01TMP01-BR019-0602-DN250

01TMP01-BR032-0602-DN200
TO HTR#8A
01LBG13-BR002-0305-DN200
PCV-01LBG13-AA081
TO DEAERATOR
RSV
P
01LBG13-BR001-0305-DN400 01LBG13-AA102
TO ATMOSPHERE H12
01LBG13-AA201

01MAB02-AA082 E 01LBQ80-AA051
E J5 E
WRITING.

IP TURBINE MOV-01LBG13-AA001 01LBG13-BR002-0305-DN200 01LBQ80-BR003-0608-DN250


TO HTR#8B
01LBD65-AA202 REFERENCE DRAWINGS:
01MAB02-AA081

MOV-01LBQ60-AA001 PCV-01LBQ60-AA081 MOV-01LBQ80-AA002 DRAWING NO. DRAWING TITLE


IN

01TMP01-BR033-0602-DN500 9578-001-110-PVM-F-026 LEGEND FOR P&IDS


WITHOUT THEIR PERMISSION

01LBD60-BR001-0315-DN700 01LBQ60-AA101
RSV
01TMP01-BR013-0602-DN500

01TMP01-SF003
PCV-01MAP20-AA081

01LBD60-AA052 900X500
F TO DEAERATOR
C TO ATMOSPHERE
500X450

I12

01LBD65-AA201 01LBD65-BR001-0315-DN900
D 01LBQ60-BR001-0608-DN450
01MAP10-BR001-0937-ID620

D D

01TMP01-BR035-0602-DN500 TO ATMOSPHERE
01TMP01-SF004

01TMP01-SF013

01LBD60-AA051 MOV-01LBD60-AA001
E TO DEAERATOR 550X500
OR LENT

01LBD60-BR005-0315-DN550 TO ATMOSPHERE
01TMP01-SF005
MUST NOT BE COPIED

01TMP01-BR034-0602-DN500
PCV-01MAP10-AA081

01TMP01-BR021-0602-DN250

FE
600X400
400X250

MOV-01LBD61-AA001 01LBD60
CF001
01TMP01-BR014-0602-DN500

M 300X250
01LBD61-AA201 MOV-01LBQ82-AA002
01LBD61-BR001-0315-DN300 02 13-NOV-18 PNS KT --- DJR DK
01TMP01-BR022-0602-DN250

I 01LBQ82-AA202
C BFPT#A H7 01 16-MAR-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK C
K
00 28-DEC-16 ISSUED FOR APPROVAL BDJ KT --- --- DJR --- DK
AND

F5
FE
01LBD61
SARGENT & LUNDY LIMITED

01LBD61-BR002-0315-DN300 REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD.
F
CF001
PCV-01LBQ82-AA081
PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
01LBQ82-AA101

01LBD62-AA201
NTPC LIMITED
01TMP01-SF006

01LBD62-BR001-0315-DN300 OWNER:
(A GOVERNMENT OF INDIA ENTERPRISE)
MOV-01LBD62-AA001 300X250 BFPT#B J D
G7 B13
D EPC
B B4 FE LARSEN & TOUBRO LIMITED B
OF L&T -

01LBD62 CONTRACTOR:
CF001 MOV-01LBQ82-AA001
01LBD62-BR002-0315-DN300 L&T's
01LBQ82-AA201
01LBQ82-BR003-0615-DN300
CONSULTANT:
L & T - SARGENT & LUNDY LTD.
01TMP01-BR022-0602-DN250
THIS DRAWING AND DESIGN IS THE PROPERTY

01LBD62-BR002-0315-DN300
NTPC
9578-001-102-PVM-K-004 REV. 03
DRG. NO.:

DATE NAME SIGN. TITLE:

PREPARED 28-DEC-16 BDJ P&ID FOR


600X500
600X500
CHECKED 28-DEC-16 KT CRH TO BFPT &
01TMP01-BR007-0602-DN600 01TMP01-BR026-0602-DN500 01TMP01-BR008-0602-DN600 TO ATMOSPHERE

(1189mm x 841mm)
A A
APPROVED 28-DEC-16 DK
DEAERATOR STEAM BLOWING
01TMP01-BR009-0602-DN600 01TMP01-BR027-0602-DN500 01TMP01-BR010-0602-DN600 TO ATMOSPHERE
DEPARTMENT MECHANICAL
600X500 600X500 STAGE-6
L&T-S&L JOB NO.: LD16005000

SCALE: NA DRG. NO.: LD16005-XG02-00-LBU-110001 SHT: 08 OF 12 REV. 02

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME: LD16005-XG02-00-LBU-110001-01.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

NOTES:

1. DOCUMENT NUMBER IN THE CONTINUATION ARROW SHALL BE READ PREFIXING WITH

UNIT#2
01TMP01-BR003-0602-DN500
PROJECT CODE (9578-) AS PROJECT CODE WILL REMAIN SAME FOR ALL DOCUMENTS
01MAA02-AA081

01TMP01-BR036-0602-DN500
M 02LBG15-BR001-0305-DN450 FOR KHARGONE STPP. M
450X500

01TMP01-BR012-0602-DN500
02LBG15-AA101 2. FOR INDEX, LEGENDS & SYMBOLS, REFER DWG. NO. 9578-001-110-PVM-F-026.

01TMP01-BR037-0602-DN250
01LBA10-BR004-4537-ID318 3. ---- DENOTES TEMPORARY PIPING.

SUPERHEATER
TO ATMOSPHERE
01MAN10-BR001-4537-ID220 MSV 02LBG15-BR001-0305-DN450
MOV-01LBA01-AA002 4. FLOW NOZZLES WILL BE INSTALLED AFTER STEAM BLOW OUT. TEMPORARY SPOOL WILL
FE
01MAN10-BR002-0935-DN600 BE INSTALLED AT FLOW NOZZLE LOCATION BEFORE STEAM BLOW OUT.
01MAN10 00LBG01-BR001-0305-DN450
AUX STEAM
CF001 AUX 5. ALL INTERNALS OF CONTROL VALVES IN THE BLOW CIRCUIT SHALL BE REMOVED AND

01TMP01-AA002
00LBG01-BR004-0305-DN350 BLOW OUT KIT/TEMPORARY SPOOL PIECES TO BE INSTALLED.
A
PCV-01MAN10-AA081
PT DCS
BOILER
K8 6. STEAM BLOW OUT WILL NOT INCLUDE FOLLOWING PIPING:
HP TURBINE 01TMP01

00LBG01-BR441-0305-DN250
PCV-01MAN20-AA081 BOP 00LBG01-AA106 01LBG15-AA101 FOLLOWING LINES SHALL BE MECHANICALLY CLEANED.
CP102

00LBG01-AA101
C&I
- STEAM PIPING FROM TURBINE NOZZLE UPTO POWER ACTUATED NON RETURN VALVES.

TO ATMOSPHERE
L FE L
00LBG01-AA201
01MAN20 01MAN20-BR002-0935-DN600 - DOWNSTREAM PIPING FROM LP BYPASS TO CONDENSER.
CF001 01MAA02-AA082
TE TT - DOWNSTREAM PIPING FROM MSV/RSV TO HP/IP TURBINE.
01MAN20-BR001-4537-ID220 01TMP01 01TMP01
MSV 01LBG15-BR001-0305-DN450 - ADMISSION STEAM PIPING FOR BFPT.
CT002 CT102
01LBA20-BR004-4537-ID318 7. STEAM CONNECTION SHALL BE RESTORED AFTER STEAM PIPING BLOW OUT.

01TMP01-BR102-0602-DN50 8. BLOW OUT/THROUGH KIT CRITERIA :

J4
MOV-01LBA01-AA001
- BLOW THROUGH KIT WILL BE USED FOR HP BYPASS VALVE DURING STEAM BLOW OUT.
PT 01TMP01-AA102 01TMP01-BR038-0602-DN500
DCS

01TMP01-BR004-0602-DN500
01TMP01-BR017-0602-DN500

01TMP01-AA001
01TMP01-BR011-0602-DN500
- BLOW OUT KIT SHALL BE USED FOR MAIN STEAM STOP VALVE, COLD REHEAT NRV,
01TMP01

B
01TMP01-BR001-0602-DN500
CP101 BOP 01TMP01-BR039-0602-DN200 HOT REHEAT STOP VALVE, EXTRACTION-6 QCNRV AND LP BYPASS VALVE.

01LBC10-BR001-0925-DN800
C&I

01LBC20-BR001-0925-DN800

01LBG15-BR001-0305-DN450
K TO ATMOSPHERE K

550X500
01LBG30-BR102-0335-DN550

01MAN30-BR001-0935-DN800

HDR
TE TT 01TMP01-BR018-0602-DN500 FE

01TMP01-BR101-0602-DN50

01TMP01-BR002-0602-DN500
01LBA30

TO BFPT
TO ATMOSPHERE

01TMP01 01TMP01

TO GSC
CF001

TO DEA
CT001 CT101

ST
BLOWER
01LBC20-AA201
G
01LBC50-BR003-0608-DN800 A LEGENDS:

01TMP01-AA101

TO
F14

TO ATMOSPHERE
L15

TO AUX
01TMP01-BR005-0602-DN600
TARGET PLATE ASSEMBLY

E11
G14
01LBA30-BR101-4537-DN200

G7

K5
SOOT

MOV-01LBG15-AA001
01LBG14-AA101
PCV-01LBA30-AA081
PCV-01LBC30-AA081

01LBG11-AA101
01TMP01-SF009

01HCB01-AA150

01HCB01-AA153

01LBG13-AA101
PERMANENT LINES

01LBG01-AA101
01LBG01-AA201

TO

E
N

B
Q
I9

01LBC30-AA111
J I J

TEMPORARY LINES

TO SOOT BLOWER

C
01TMP01-BR040-0602-DN250
VALVE OPEN

01LBC10-AA201
TO ATMOSPHERE
M
F14
VALVE CLOSED
01TMP01-BR041-0602-DN250
REHEATER

MOV-01LBC30-AA010 SPECTACLE BLIND OPEN


C
I J12 250X150 I

01LBC30-AA112
01LBB30-BR001-0937-ID620

01LBG10-BR001-0305-DN550 SPECTACLE BLIND CLOSED


01LBG05-AA201
01LBC30-BR001-0925-DN1050 MOV-01LBC30-AA011
FE
01LBC30 MOV-01LBC30-AA012 01LBG05-BR001-0305-DN250
CF001 STEAM BLOW PATH (FOR ELECTRONIC COPY ONLY)
F
01LBQ80-BR001-0608-DN500

D10 01TMP01-SF014 01LBG10-AZ001


TO DEA 01LBC30-BR103-0608-DN150 OPERATIONAL PATH (FOR ELECTRONIC COPY ONLY)
01LBC35-BR001-0608-DN250 01LBG20-BR001-0305-DN300
N
P
E6 01LBG20-AA101
MOV-01LBC35-AA001
01TMP01-BR028-0602-DN200 O
TO HTR#8
SPECTACLE BLIND SCHEDULE:
F7

TO ATMOSPHERE
H TO HPT GS TO MILL INERTING H
01LBD11-AA101 250X200
BFPT

01LBG10-AA201 LOCATION A B C D E F G H I J K L M N O P Q
01TMP01-SF010 TO IPT GS
H

J 01MAW03-AA101

01TMP01-BR029-0602-DN200

01TMP01-BR031-0602-DN250
MOV-01LBG10-AA001

01TMP01-BR042-0602-DN250
TO SCAPH

01TMP01-BR030-0602-DN250
01MAW03-AA081 I BLIND POSITION - - C C C C C C C C - - C O C - -
TO

TO GLAND STEAM
01LBD11-AA081 01LBG10-BR018-0305-DN300
SPILL OVER C: CLOSED
01TMP01-BR006-0602-DN600
C6
TO ATMOSPHERE

01LBC35-BR002-0608-DN250
01LBS45-AA101 O: OPEN
01LBC40-BR003-0608-DN800 01LBD11-AA102 01LBD01-AA221 TO CONDENSER

MOV-01LBG12-AA001
MOV-01LBQ81-AA002 SPECIAL NOTE:
01MAW03-AA102 Q
MOV-01LBG12-AA002 01LBG14-BR001-0305-DN200 01LBQ81-AA202 1. FOR UNIT#2 P&ID, TAG NUMBER SHALL BE CHANGED FROM 01 TO 02.
01MAW01-AA101 J6
MOV-01LBS45-AA001

N TO LPT GS
01LBG12-BR003-0305-DN150
J5
J PCV-01LBQ81-AA081
01MAW01-AA081

01LBQ81-AA101
01LBB10-BR004-0937-ID620

01LBB20-BR004-0937-ID620

MOV-01LBQ80-AA001
B7
01TMP01-SF007
01MAW01-AA102 01LBQ80-AA101
01MAW01-AA221
500X300
300X250

01TMP01-BR018-0602-DN500
01LBG12-BR002-0305-DN150
H K HOLD LIST:
01TMP01-BR020-0602-DN250

G G
H13 C12
K9
MOV-01LBQ81-AA001
01MAP20-BR001-0937-ID620

01LBG13-BR002-0305-DN200
01TMP01-BR017-0602-DN500
F F
01LBQ81-AA201 01LBQ81-BR003-0615-DN300
H
M
J11 01LBD61-BR002-0315-DN300
01TMP01-BR020-0602-DN250

01TMP01-SF008 MOV-01LBG13-AA002

MOV-01LBG13-AA003 01LBQ80-BR002-0608-DN250
01TMP01-BR019-0602-DN250

01TMP01-BR032-0602-DN200
TO HTR#8A
01LBG13-BR002-0305-DN200
PCV-01LBG13-AA081
TO DEAERATOR
RSV
P
01LBG13-BR001-0305-DN400 01LBG13-AA102
TO ATMOSPHERE H12
01LBG13-AA201

01MAB02-AA082 E 01LBQ80-AA051
E J5 E
THIS DRAWING AND DESIGN IS THE PROPERTY OF L&T - SARGENT & LUNDY LIMITED AND MUST NOT BE COPIED OR LENT WITHOUT THEIR PERMISSION IN WRITING.

IP TURBINE MOV-01LBG13-AA001 01LBG13-BR002-0305-DN200 01LBQ80-BR003-0608-DN250


TO HTR#8B
01LBD65-AA202 REFERENCE DRAWINGS:
01MAB02-AA081

MOV-01LBQ60-AA001 PCV-01LBQ60-AA081 MOV-01LBQ80-AA002 DRAWING NO. DRAWING TITLE


01TMP01-BR033-0602-DN500 9578-001-110-PVM-F-026 LEGEND FOR P&IDS
01LBD60-BR001-0315-DN700 01LBQ60-AA101
RSV
01TMP01-BR013-0602-DN500

01TMP01-SF003
PCV-01MAP20-AA081

01LBD60-AA052 900X500
F TO DEAERATOR
C TO ATMOSPHERE
500X450

I12

01LBD65-AA201 01LBD65-BR001-0315-DN900
D 01LBQ60-BR001-0608-DN450
01MAP10-BR001-0937-ID620

D D

01TMP01-BR035-0602-DN500 TO ATMOSPHERE
01TMP01-SF004

01TMP01-SF013

01LBD60-AA051 MOV-01LBD60-AA001
E TO DEAERATOR 550X500
01LBD60-BR005-0315-DN550 TO ATMOSPHERE
01TMP01-SF005

01TMP01-BR034-0602-DN500
PCV-01MAP10-AA081

01TMP01-BR021-0602-DN250

FE
600X400
400X250

MOV-01LBD61-AA001 01LBD60
CF001
01TMP01-BR014-0602-DN500

M 300X250
01LBD61-AA201 MOV-01LBQ82-AA002
01LBD61-BR001-0315-DN300 02 13-NOV-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK
01TMP01-BR022-0602-DN250

I 01LBQ82-AA202
C BFPT#A H7 01 16-MAR-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK C
K
F5 00 28-DEC-16 ISSUED FOR APPROVAL BDJ KT --- --- DJR --- DK
FE
01LBD61
01LBD61-BR002-0315-DN300 REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD.
F
CF001
PCV-01LBQ82-AA081
PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
01LBQ82-AA101

01LBD62-AA201
NTPC LIMITED
01TMP01-SF006

01LBD62-BR001-0315-DN300 OWNER:
(A GOVERNMENT OF INDIA ENTERPRISE)
MOV-01LBD62-AA001 300X250 BFPT#B J D
G7 B13
D EPC
B B4 FE
CONTRACTOR:
LARSEN & TOUBRO LIMITED B
01LBD62
CF001 MOV-01LBQ82-AA001
01LBD62-BR002-0315-DN300 L&T's
01LBQ82-AA201
01LBQ82-BR003-0615-DN300
CONSULTANT:
L & T - SARGENT & LUNDY LTD.
01TMP01-BR022-0602-DN250
01LBD62-BR002-0315-DN300
NTPC
9578-001-102-PVM-K-004 REV. 03
DRG. NO.:

DATE NAME SIGN. TITLE:

PREPARED 28-DEC-16 BDJ P&ID FOR


600X500
600X500
CHECKED 28-DEC-16 KT CRH TO GSC,
01TMP01-BR007-0602-DN600 01TMP01-BR026-0602-DN500 01TMP01-BR008-0602-DN600 TO ATMOSPHERE

A0 (1189mm x 841mm)
A A
APPROVED 28-DEC-16 DK
MS & CRH PRDS STEAM BLOWING
01TMP01-BR009-0602-DN600 01TMP01-BR027-0602-DN500 01TMP01-BR010-0602-DN600 TO ATMOSPHERE
DEPARTMENT MECHANICAL
600X500 600X500 STAGE-7
L&T-S&L JOB NO.: LD16005000

SCALE: NA DRG. NO.: LD16005-XG02-00-LBU-110001 SHT: 09 OF 12 REV. 02


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME: LD16005-XG02-00-LBU-110001-01.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

NOTES:

1. DOCUMENT NUMBER IN THE CONTINUATION ARROW SHALL BE READ PREFIXING WITH

UNIT#2
01TMP01-BR003-0602-DN500
PROJECT CODE (9578-) AS PROJECT CODE WILL REMAIN SAME FOR ALL DOCUMENTS
01MAA02-AA081

01TMP01-BR036-0602-DN500
M 02LBG15-BR001-0305-DN450 FOR KHARGONE STPP. M
450X500

01TMP01-BR012-0602-DN500
02LBG15-AA101 2. FOR INDEX, LEGENDS & SYMBOLS, REFER DWG. NO. 9578-001-110-PVM-F-026.

01TMP01-BR037-0602-DN250
01LBA10-BR004-4537-ID318 3. ---- DENOTES TEMPORARY PIPING.

SUPERHEATER
TO ATMOSPHERE
01MAN10-BR001-4537-ID220 MSV 02LBG15-BR001-0305-DN450
MOV-01LBA01-AA002 4. FLOW NOZZLES WILL BE INSTALLED AFTER STEAM BLOW OUT. TEMPORARY SPOOL WILL
FE
01MAN10-BR002-0935-DN600 BE INSTALLED AT FLOW NOZZLE LOCATION BEFORE STEAM BLOW OUT.
01MAN10 00LBG01-BR001-0305-DN450
AUX STEAM
CF001 AUX 5. ALL INTERNALS OF CONTROL VALVES IN THE BLOW CIRCUIT SHALL BE REMOVED AND

01TMP01-AA002
00LBG01-BR004-0305-DN350 BLOW OUT KIT/TEMPORARY SPOOL PIECES TO BE INSTALLED.
A
PCV-01MAN10-AA081
PT DCS
BOILER
K8 6. STEAM BLOW OUT WILL NOT INCLUDE FOLLOWING PIPING:
HP TURBINE 01TMP01

00LBG01-BR441-0305-DN250
PCV-01MAN20-AA081 BOP 00LBG01-AA106 01LBG15-AA101 FOLLOWING LINES SHALL BE MECHANICALLY CLEANED.
CP102

00LBG01-AA101
C&I
- STEAM PIPING FROM TURBINE NOZZLE UPTO POWER ACTUATED NON RETURN VALVES.

TO ATMOSPHERE
L FE L
00LBG01-AA201
01MAN20 01MAN20-BR002-0935-DN600 - DOWNSTREAM PIPING FROM LP BYPASS TO CONDENSER.
CF001 01MAA02-AA082
TE TT - DOWNSTREAM PIPING FROM MSV/RSV TO HP/IP TURBINE.
01MAN20-BR001-4537-ID220 01TMP01 01TMP01
MSV 01LBG15-BR001-0305-DN450 - ADMISSION STEAM PIPING FOR BFPT.
CT002 CT102
01LBA20-BR004-4537-ID318 7. STEAM CONNECTION SHALL BE RESTORED AFTER STEAM PIPING BLOW OUT.

01TMP01-BR102-0602-DN50 8. BLOW OUT/THROUGH KIT CRITERIA :

J4
MOV-01LBA01-AA001
- BLOW THROUGH KIT WILL BE USED FOR HP BYPASS VALVE DURING STEAM BLOW OUT.
PT 01TMP01-AA102 01TMP01-BR038-0602-DN500
DCS

01TMP01-BR004-0602-DN500
01TMP01-BR017-0602-DN500

01TMP01-AA001
01TMP01-BR011-0602-DN500
- BLOW OUT KIT SHALL BE USED FOR MAIN STEAM STOP VALVE, COLD REHEAT NRV,
01TMP01

B
01TMP01-BR001-0602-DN500
CP101 BOP 01TMP01-BR039-0602-DN200 HOT REHEAT STOP VALVE, EXTRACTION-6 QCNRV AND LP BYPASS VALVE.

01LBC10-BR001-0925-DN800
C&I

01LBC20-BR001-0925-DN800

01LBG15-BR001-0305-DN450
K TO ATMOSPHERE K

550X500
01LBG30-BR102-0335-DN550

01MAN30-BR001-0935-DN800

TO ST HDR
TE TT 01TMP01-BR018-0602-DN500 FE

01TMP01-BR101-0602-DN50

01TMP01-BR002-0602-DN500
01LBA30

TO BFPT
TO ATMOSPHERE

01TMP01 01TMP01

TO GSC
CF001

TO DEA
CT001 CT101

TO SOOT BLOWER
01LBC20-AA201
G
01LBC50-BR003-0608-DN800 A LEGENDS:

01TMP01-AA101
F14

TO ATMOSPHERE
L15

TO AUX
01TMP01-BR005-0602-DN600
TARGET PLATE ASSEMBLY

E11
G14
01LBA30-BR101-4537-DN200

G7

K5
MOV-01LBG15-AA001
01LBG14-AA101
PCV-01LBA30-AA081
PCV-01LBC30-AA081

01LBG11-AA101
01TMP01-SF009

01HCB01-AA150

01HCB01-AA153

01LBG13-AA101
PERMANENT LINES

01LBG01-AA101
01LBG01-AA201

E
N

B
Q
I9

01LBC30-AA111
J I J

TEMPORARY LINES

TO SOOT BLOWER

C
01TMP01-BR040-0602-DN250
VALVE OPEN

01LBC10-AA201
TO ATMOSPHERE
M
F14
VALVE CLOSED
01TMP01-BR041-0602-DN250
REHEATER

MOV-01LBC30-AA010 SPECTACLE BLIND OPEN


C
I J12 250X150 I

01LBC30-AA112
01LBB30-BR001-0937-ID620

01LBG10-BR001-0305-DN550 SPECTACLE BLIND CLOSED


01LBG05-AA201
01LBC30-BR001-0925-DN1050 MOV-01LBC30-AA011
FE
01LBC30 MOV-01LBC30-AA012 01LBG05-BR001-0305-DN250
CF001 STEAM BLOW PATH (FOR ELECTRONIC COPY ONLY)
F
01LBQ80-BR001-0608-DN500

D10 01TMP01-SF014 01LBG10-AZ001


TO DEA 01LBC30-BR103-0608-DN150 OPERATIONAL PATH (FOR ELECTRONIC COPY ONLY)
01LBC35-BR001-0608-DN250 01LBG20-BR001-0305-DN300
N
P
E6 01LBG20-AA101
MOV-01LBC35-AA001
01TMP01-BR028-0602-DN200 O
TO HTR#8
SPECTACLE BLIND SCHEDULE:
F7

TO ATMOSPHERE
H TO HPT GS TO MILL INERTING H
01LBD11-AA101 250X200
TO BFPT

01LBG10-AA201 LOCATION A B C D E F G H I J K L M N O P Q
01TMP01-SF010 TO IPT GS
H

J 01MAW03-AA101

01TMP01-BR029-0602-DN200

01TMP01-BR031-0602-DN250
MOV-01LBG10-AA001

01TMP01-BR042-0602-DN250
TO SCAPH

01TMP01-BR030-0602-DN250
01MAW03-AA081 I BLIND POSITION - - C C C C O O C C - - O C C - -
TO GLAND STEAM
01LBD11-AA081 01LBG10-BR018-0305-DN300
SPILL OVER C: CLOSED
01TMP01-BR006-0602-DN600
C6
TO ATMOSPHERE

01LBC35-BR002-0608-DN250
01LBS45-AA101 O: OPEN
01LBC40-BR003-0608-DN800 01LBD11-AA102 01LBD01-AA221 TO CONDENSER

MOV-01LBG12-AA001
MOV-01LBQ81-AA002 SPECIAL NOTE:
01MAW03-AA102 Q
MOV-01LBG12-AA002 01LBG14-BR001-0305-DN200 01LBQ81-AA202 1. FOR UNIT#2 P&ID, TAG NUMBER SHALL BE CHANGED FROM 01 TO 02.
01MAW01-AA101 J6
MOV-01LBS45-AA001

N TO LPT GS
01LBG12-BR003-0305-DN150
J5
J PCV-01LBQ81-AA081
01MAW01-AA081

01LBQ81-AA101
01LBB10-BR004-0937-ID620

01LBB20-BR004-0937-ID620

MOV-01LBQ80-AA001
B7
01TMP01-SF007
01MAW01-AA102 01LBQ80-AA101
01MAW01-AA221
500X300
300X250

01TMP01-BR018-0602-DN500
01LBG12-BR002-0305-DN150
H K HOLD LIST:
01TMP01-BR020-0602-DN250

G G
H13 C12
K9
MOV-01LBQ81-AA001
01MAP20-BR001-0937-ID620

01LBG13-BR002-0305-DN200
01TMP01-BR017-0602-DN500
F F
01LBQ81-AA201 01LBQ81-BR003-0615-DN300
H
M
J11 01LBD61-BR002-0315-DN300
01TMP01-BR020-0602-DN250

01TMP01-SF008 MOV-01LBG13-AA002

MOV-01LBG13-AA003 01LBQ80-BR002-0608-DN250
01TMP01-BR019-0602-DN250

01TMP01-BR032-0602-DN200
TO HTR#8A
01LBG13-BR002-0305-DN200
PCV-01LBG13-AA081
TO DEAERATOR
RSV
P
01LBG13-BR001-0305-DN400 01LBG13-AA102
TO ATMOSPHERE H12
01LBG13-AA201

01MAB02-AA082 E 01LBQ80-AA051
E J5 E
WRITING.

IP TURBINE MOV-01LBG13-AA001 01LBG13-BR002-0305-DN200 01LBQ80-BR003-0608-DN250


TO HTR#8B
01LBD65-AA202 REFERENCE DRAWINGS:
01MAB02-AA081

MOV-01LBQ60-AA001 PCV-01LBQ60-AA081 MOV-01LBQ80-AA002 DRAWING NO. DRAWING TITLE


IN

01TMP01-BR033-0602-DN500 9578-001-110-PVM-F-026 LEGEND FOR P&IDS


PERMISSION

01LBD60-BR001-0315-DN700 01LBQ60-AA101
RSV
01TMP01-BR013-0602-DN500

01TMP01-SF003
PCV-01MAP20-AA081

01LBD60-AA052 900X500
F TO DEAERATOR
C TO ATMOSPHERE
500X450

I12
THEIR

01LBD65-AA201 01LBD65-BR001-0315-DN900
D 01LBQ60-BR001-0608-DN450
01MAP10-BR001-0937-ID620
WITHOUT

D D

01TMP01-BR035-0602-DN500 TO ATMOSPHERE
01TMP01-SF004

01TMP01-SF013

01LBD60-AA051 MOV-01LBD60-AA001
E TO DEAERATOR 550X500
LENT

01LBD60-BR005-0315-DN550 TO ATMOSPHERE
OR

01TMP01-SF005
COPIED

01TMP01-BR034-0602-DN500
PCV-01MAP10-AA081

01TMP01-BR021-0602-DN250

FE
600X400
400X250

MOV-01LBD61-AA001 01LBD60
CF001
01TMP01-BR014-0602-DN500
BE

M 300X250
01LBD61-AA201 MOV-01LBQ82-AA002
NOT

01LBD61-BR001-0315-DN300 02 13-NOV-18 ISSUED FOR APPROVAL PNS KT --- --- DK


01TMP01-BR022-0602-DN250

I 01LBQ82-AA202
BFPT#A
MUST

C H7 01 16-MAR-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK C


K
00 28-DEC-16 ISSUED FOR APPROVAL BDJ KT --- --- DJR --- DK
AND

F5
FE
01LBD61
LIMITED

01LBD61-BR002-0315-DN300 REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD.
F
CF001
PCV-01LBQ82-AA081
PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
01LBQ82-AA101
LUNDY

01LBD62-AA201
NTPC LIMITED
01TMP01-SF006
&

01LBD62-BR001-0315-DN300 OWNER:
(A GOVERNMENT OF INDIA ENTERPRISE)
SARGENT

MOV-01LBD62-AA001 300X250 BFPT#B J D


G7 B13
D EPC
B B4 FE LARSEN & TOUBRO LIMITED B
-

01LBD62 CONTRACTOR:
L&T

CF001 MOV-01LBQ82-AA001
01LBD62-BR002-0315-DN300 L&T's
01LBQ82-BR003-0615-DN300 L & T - SARGENT & LUNDY LTD.
OF

01LBQ82-AA201 CONSULTANT:
01TMP01-BR022-0602-DN250
PROPERTY

01LBD62-BR002-0315-DN300
NTPC
9578-001-102-PVM-K-004 REV. 03
DRG. NO.:
THE

DATE NAME SIGN. TITLE:

P&ID FOR
IS

PREPARED 28-DEC-16 BDJ


DESIGN

600X500
600X500
CHECKED 28-DEC-16 KT EXTRACTION#6 TO BFPT
01TMP01-BR007-0602-DN600 01TMP01-BR026-0602-DN500 01TMP01-BR008-0602-DN600 TO ATMOSPHERE

841mm)
A A
APPROVED 28-DEC-16 DK
AND

& DEAERATOR STEAM BLOWING


01TMP01-BR009-0602-DN600 01TMP01-BR027-0602-DN500 01TMP01-BR010-0602-DN600 TO ATMOSPHERE
DEPARTMENT MECHANICAL
DRAWING

x
600X500 600X500 STAGE-08

(1189mm
L&T-S&L JOB NO.: LD16005000
THIS

SCALE: NA DRG. NO.: LD16005-XG02-00-LBU-110001 SHT: 10 OF 12 REV. 02

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME: LD16005-XG02-00-LBU-110001-01.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

NOTES:

1. DOCUMENT NUMBER IN THE CONTINUATION ARROW SHALL BE READ PREFIXING WITH

UNIT#2
01TMP01-BR003-0602-DN500
PROJECT CODE (9578-) AS PROJECT CODE WILL REMAIN SAME FOR ALL DOCUMENTS
01MAA02-AA081

01TMP01-BR036-0602-DN500
M 02LBG15-BR001-0305-DN450 FOR KHARGONE STPP. M
450X500

01TMP01-BR012-0602-DN500
02LBG15-AA101 2. FOR INDEX, LEGENDS & SYMBOLS, REFER DWG. NO. 9578-001-110-PVM-F-026.

01TMP01-BR037-0602-DN250
01LBA10-BR004-4537-ID318 3. ---- DENOTES TEMPORARY PIPING.

SUPERHEATER
TO ATMOSPHERE
01MAN10-BR001-4537-ID220 MSV 02LBG15-BR001-0305-DN450
MOV-01LBA01-AA002 4. FLOW NOZZLES WILL BE INSTALLED AFTER STEAM BLOW OUT. TEMPORARY SPOOL WILL
FE
01MAN10-BR002-0935-DN600 BE INSTALLED AT FLOW NOZZLE LOCATION BEFORE STEAM BLOW OUT.
01MAN10 00LBG01-BR001-0305-DN450
AUX STEAM
CF001 AUX 5. ALL INTERNALS OF CONTROL VALVES IN THE BLOW CIRCUIT SHALL BE REMOVED AND

01TMP01-AA002
00LBG01-BR004-0305-DN350 BLOW OUT KIT/TEMPORARY SPOOL PIECES TO BE INSTALLED.
A
PCV-01MAN10-AA081
PT DCS
BOILER
K8 6. STEAM BLOW OUT WILL NOT INCLUDE FOLLOWING PIPING:
HP TURBINE 01TMP01

00LBG01-BR441-0305-DN250
PCV-01MAN20-AA081 BOP 00LBG01-AA106 01LBG15-AA101 FOLLOWING LINES SHALL BE MECHANICALLY CLEANED.
CP102

00LBG01-AA101
C&I
- STEAM PIPING FROM TURBINE NOZZLE UPTO POWER ACTUATED NON RETURN VALVES.

ATMOSPHERE
L FE L
00LBG01-AA201
01MAN20 01MAN20-BR002-0935-DN600 - DOWNSTREAM PIPING FROM LP BYPASS TO CONDENSER.
CF001 01MAA02-AA082
TE TT - DOWNSTREAM PIPING FROM MSV/RSV TO HP/IP TURBINE.
01MAN20-BR001-4537-ID220 01TMP01 01TMP01
MSV 01LBG15-BR001-0305-DN450 - ADMISSION STEAM PIPING FOR BFPT.
CT002 CT102
01LBA20-BR004-4537-ID318 7. STEAM CONNECTION SHALL BE RESTORED AFTER STEAM PIPING BLOW OUT.

TO
01TMP01-BR102-0602-DN50 8. BLOW OUT/THROUGH KIT CRITERIA :

J4
MOV-01LBA01-AA001
- BLOW THROUGH KIT WILL BE USED FOR HP BYPASS VALVE DURING STEAM BLOW OUT.
PT 01TMP01-AA102 01TMP01-BR038-0602-DN500
DCS

01TMP01-BR004-0602-DN500
01TMP01-BR017-0602-DN500

01TMP01-AA001
01TMP01-BR011-0602-DN500
- BLOW OUT KIT SHALL BE USED FOR MAIN STEAM STOP VALVE, COLD REHEAT NRV,
01TMP01

B
01TMP01-BR001-0602-DN500
CP101 BOP 01TMP01-BR039-0602-DN200 HOT REHEAT STOP VALVE, EXTRACTION-6 QCNRV AND LP BYPASS VALVE.

01LBC10-BR001-0925-DN800
C&I

01LBC20-BR001-0925-DN800
9. PAIR OF VALVES WILL BE SHIFTED FROM TEMPORARY CONNECTION MS-CRH TO

01LBG15-BR001-0305-DN450
K TO ATMOSPHERE K

550X500
TEMPORARY CONNECTION D/S OF HRH PIPING.
01LBG30-BR102-0335-DN550

01MAN30-BR001-0935-DN800

HDR
TE TT 01TMP01-BR018-0602-DN500 FE

01TMP01-BR101-0602-DN50

01TMP01-BR002-0602-DN500
01LBA30

BFPT
01TMP01 01TMP01

GSC
CF001

DEA
CT001 CT101

ST
BLOWER
01LBC20-AA201
G
01LBC50-BR003-0608-DN800 LEGENDS:

TO

TO
A

01TMP01-AA101

TO
F14

TO
ATMOSPHERE
L15

AUX
TARGET PLATE ASSEMBLY

E11
G14
01LBA30-BR101-4537-DN200

G7

K5
SOOT

MOV-01LBG15-AA001
TO

01LBG14-AA101
PCV-01LBA30-AA081
PCV-01LBC30-AA081

01LBG11-AA101
01HCB01-AA150

01HCB01-AA153

01LBG13-AA101
PERMANENT LINES

01LBG01-AA101
01LBG01-AA201

TO

E
N

B
Q
I9

01LBC30-AA111
J J

TO
TEMPORARY LINES

BLOWER

C
01TMP01-BR040-0602-DN250
VALVE OPEN

01LBC10-AA201
TO ATMOSPHERE
M

SOOT
F14
VALVE CLOSED
TO 01TMP01-BR041-0602-DN250
REHEATER

MOV-01LBC30-AA010 SPECTACLE BLIND OPEN


C
I J12 250X150 I

01LBC30-AA112
01LBB30-BR001-0937-ID620

01LBG10-BR001-0305-DN550 SPECTACLE BLIND CLOSED


01LBG05-AA201
01LBC30-BR001-0925-DN1050 MOV-01LBC30-AA011
FE
01LBC30 MOV-01LBC30-AA012 01LBG05-BR001-0305-DN250
CF001 STEAM BLOW PATH (FOR ELECTRONIC COPY ONLY)
F
01LBQ80-BR001-0608-DN500

D10 01TMP01-SF014 01LBG10-AZ001


TO DEA 01LBC30-BR103-0608-DN150 OPERATIONAL PATH (FOR ELECTRONIC COPY ONLY)
01LBC35-BR001-0608-DN250 01LBG20-BR001-0305-DN300
N
P
E6 01LBG20-AA101
MOV-01LBC35-AA001
01TMP01-BR028-0602-DN200 O
TO HTR#8
SPECTACLE BLIND SCHEDULE:
F7

TO ATMOSPHERE
H TO HPT GS TO MILL INERTING H
01LBD11-AA101 250X200
BFPT

01LBG10-AA201 LOCATION A B C D E F G H I J K L M N O P Q
TO IPT GS
H

01MAW03-AA101

01TMP01-BR029-0602-DN200

01TMP01-BR031-0602-DN250
MOV-01LBG10-AA001

01TMP01-BR042-0602-DN250
TO SCAPH

01TMP01-BR030-0602-DN250
01MAW03-AA081 I BLIND POSITION - - O O C C C C - - - - C C C - -
TO

TO GLAND STEAM
01LBD11-AA081 01LBG10-BR018-0305-DN300
SPILL OVER C: CLOSED
C6
01LBC35-BR002-0608-DN250
01LBS45-AA101 O: OPEN
01LBC40-BR003-0608-DN800 01LBD11-AA102 01LBD01-AA221 TO CONDENSER

MOV-01LBG12-AA001
MOV-01LBQ81-AA002 SPECIAL NOTE:
01MAW03-AA102 Q
MOV-01LBG12-AA002 01LBG14-BR001-0305-DN200 01LBQ81-AA202 1. FOR UNIT#2 P&ID, TAG NUMBER SHALL BE CHANGED FROM 01 TO 02.
01MAW01-AA101 J6
MOV-01LBS45-AA001

N TO LPT GS
01LBG12-BR003-0305-DN150
J5
J PCV-01LBQ81-AA081
01MAW01-AA081

01LBQ81-AA101
01LBB10-BR004-0937-ID620

01LBB20-BR004-0937-ID620

MOV-01LBQ80-AA001
B7
01TMP01-SF007
01MAW01-AA102 01LBQ80-AA101
01MAW01-AA221
500X300
300X250

01TMP01-BR018-0602-DN500
01LBG12-BR002-0305-DN150
H K HOLD LIST:
01TMP01-BR020-0602-DN250

G G
H13 C12
K9
MOV-01LBQ81-AA001
01MAP20-BR001-0937-ID620

01LBG13-BR002-0305-DN200
01TMP01-BR017-0602-DN500
F F
01LBQ81-AA201 01LBQ81-BR003-0615-DN300
H
M
J11 01LBD61-BR002-0315-DN300
01TMP01-BR020-0602-DN250

01TMP01-SF008 MOV-01LBG13-AA002

MOV-01LBG13-AA003 01LBQ80-BR002-0608-DN250
01TMP01-BR019-0602-DN250

01TMP01-BR032-0602-DN200
TO HTR#8A
01LBG13-BR002-0305-DN200
PCV-01LBG13-AA081
TO DEAERATOR
RSV
P
01LBG13-BR001-0305-DN400 01LBG13-AA102
TO ATMOSPHERE H12
01LBG13-AA201

01MAB02-AA082 E 01LBQ80-AA051
E J5 E
WRITING.

IP TURBINE MOV-01LBG13-AA001 01LBG13-BR002-0305-DN200 01LBQ80-BR003-0608-DN250


TO HTR#8B
01LBD65-AA202 REFERENCE DRAWINGS:
01MAB02-AA081

MOV-01LBQ60-AA001 PCV-01LBQ60-AA081 MOV-01LBQ80-AA002 DRAWING NO. DRAWING TITLE


IN

01TMP01-BR033-0602-DN500 9578-001-110-PVM-F-026 LEGEND FOR P&IDS


PERMISSION

01LBD60-BR001-0315-DN700 01LBQ60-AA101
RSV
01TMP01-BR013-0602-DN500

01TMP01-SF003
PCV-01MAP20-AA081

01LBD60-AA052 900X500
F TO DEAERATOR
C TO ATMOSPHERE
500X450

I12
THEIR

01LBD65-AA201 01LBD65-BR001-0315-DN900
D 01LBQ60-BR001-0608-DN450
01MAP10-BR001-0937-ID620
WITHOUT

D D

01TMP01-BR035-0602-DN500 TO ATMOSPHERE
01TMP01-SF004

01TMP01-SF013

01LBD60-AA051 MOV-01LBD60-AA001
E TO DEAERATOR 550X500
LENT

01LBD60-BR005-0315-DN550 TO ATMOSPHERE
OR

01TMP01-SF005
COPIED

01TMP01-BR034-0602-DN500
PCV-01MAP10-AA081

01TMP01-BR021-0602-DN250

FE
600X400
400X250

MOV-01LBD61-AA001 01LBD60
CF001
01TMP01-BR014-0602-DN500
BE

M 300X250
01LBD61-AA201 MOV-01LBQ82-AA002
NOT

01LBD61-BR001-0315-DN300 02 13-NOV-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK
01TMP01-BR022-0602-DN250

I 01LBQ82-AA202
BFPT#A
MUST

C H7 01 16-MAR-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK C


K
00 28-DEC-16 ISSUED FOR APPROVAL BDJ KT --- --- DJR --- DK
AND

F5
FE
01LBD61
LIMITED

01LBD61-BR002-0315-DN300 REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD.
F
CF001
PCV-01LBQ82-AA081
PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
01LBQ82-AA101
LUNDY

01LBD62-AA201
NTPC LIMITED
01TMP01-SF006
&

01LBD62-BR001-0315-DN300 OWNER:
(A GOVERNMENT OF INDIA ENTERPRISE)
SARGENT

MOV-01LBD62-AA001 300X250 BFPT#B J D


G7 B13
D EPC
B B4 FE LARSEN & TOUBRO LIMITED B
-

01LBD62 CONTRACTOR:
L&T

CF001 MOV-01LBQ82-AA001
01LBD62-BR002-0315-DN300 L&T's
01LBQ82-BR003-0615-DN300 L & T - SARGENT & LUNDY LTD.
OF

01LBQ82-AA201 CONSULTANT:
01TMP01-BR022-0602-DN250
PROPERTY

01LBD62-BR002-0315-DN300
NTPC
9578-001-102-PVM-K-004 REV. 03
01TMP01-AA102 (REFER NOTE-9) DRG. NO.:
THE

DATE NAME SIGN. TITLE:


01TMP01-AA002 (REFER NOTE-9)
P&ID
IS

PREPARED 28-DEC-16 BDJ


DESIGN

600X500
600X500 CHECKED 28-DEC-16 KT FOR
01TMP01-BR007-0602-DN600 01TMP01-BR026-0602-DN500 01TMP01-BR008-0602-DN600 TO ATMOSPHERE

841mm)
A A
APPROVED 28-DEC-16 DK
AND

HP BYPASS STEAM BLOWING


01TMP01-BR009-0602-DN600 01TMP01-BR027-0602-DN500 01TMP01-BR010-0602-DN600 TO ATMOSPHERE
DEPARTMENT MECHANICAL
DRAWING

600X500

x
600X500 STAGE-9

(1189mm
01TMP01-AA001 (REFER NOTE-9) L&T-S&L JOB NO.: LD16005000

01TMP01-AA101 (REFER NOTE-9)


THIS

SCALE: NA DRG. NO.: LD16005-XG02-00-LBU-110001 SHT: 07 OF 12 REV. 02

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME: LD16005-XG02-00-LBU-110001-01.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

NOTES:

1. DOCUMENT NUMBER IN THE CONTINUATION ARROW SHALL BE READ PREFIXING WITH

UNIT#2
01TMP01-BR003-0602-DN500
PROJECT CODE (9578-) AS PROJECT CODE WILL REMAIN SAME FOR ALL DOCUMENTS
01MAA02-AA081

01TMP01-BR036-0602-DN500
M PT DCS 02LBG15-BR001-0305-DN450 FOR KHARGONE STPP. M
01TMP01 450X500
CP102 BOP
02LBG15-AA101 2. FOR INDEX, LEGENDS & SYMBOLS, REFER DWG. NO. 9578-001-110-PVM-F-026.
C&I

01TMP01-BR037-0602-DN250
01LBA10-BR004-4537-ID318 3. ---- DENOTES TEMPORARY PIPING.

SUPERHEATER
TO ATMOSPHERE

01TMP01-BR027-0602-DN500
01MAN10-BR001-4537-ID220 MSV 02LBG15-BR001-0305-DN450
MOV-01LBA01-AA002 TE TT 4. FLOW NOZZLES WILL BE INSTALLED AFTER STEAM BLOW OUT. TEMPORARY SPOOL WILL
FE 01TMP01 01TMP01
01MAN10-BR002-0935-DN600 CT002 CT102 BE INSTALLED AT FLOW NOZZLE LOCATION BEFORE STEAM BLOW OUT.
01MAN10 00LBG01-BR001-0305-DN450
AUX STEAM
CF001 AUX 5. ALL INTERNALS OF CONTROL VALVES IN THE BLOW CIRCUIT SHALL BE REMOVED AND

00LBG01-BR004-0305-DN350 BLOW OUT KIT/TEMPORARY SPOOL PIECES TO BE INSTALLED.


A
PCV-01MAN10-AA081
BOILER
K8 6. STEAM BLOW OUT WILL NOT INCLUDE FOLLOWING PIPING:
HP TURBINE

00LBG01-BR441-0305-DN250
PCV-01MAN20-AA081 00LBG01-AA106 01LBG15-AA101 FOLLOWING LINES SHALL BE MECHANICALLY CLEANED.

00LBG01-AA101
- STEAM PIPING FROM TURBINE NOZZLE UPTO POWER ACTUATED NON RETURN VALVES.

TO ATMOSPHERE
L FE L
00LBG01-AA201

01TMP01-AA002

01TMP01-AA102
01MAN20 01MAN20-BR002-0935-DN600 - DOWNSTREAM PIPING FROM LP BYPASS TO CONDENSER.
CF001 01MAA02-AA082
- DOWNSTREAM PIPING FROM MSV/RSV TO HP/IP TURBINE.
01MAN20-BR001-4537-ID220
MSV 01LBG15-BR001-0305-DN450 - ADMISSION STEAM PIPING FOR BFPT.

01LBA20-BR004-4537-ID318 7. STEAM CONNECTION SHALL BE RESTORED AFTER STEAM PIPING BLOW OUT.

8. BLOW OUT/THROUGH KIT CRITERIA :

J4
MOV-01LBA01-AA001
- BLOW THROUGH KIT WILL BE USED FOR HP BYPASS VALVE DURING STEAM BLOW OUT.

01TMP01-BR017-0602-DN500

01TMP01-AA101

01TMP01-AA001
PT 01TMP01-BR038-0602-DN500

01TMP01-BR026-0602-DN500

01TMP01-BR004-0602-DN500
DCS - BLOW OUT KIT SHALL BE USED FOR MAIN STEAM STOP VALVE, COLD REHEAT NRV,
01TMP01

B
01TMP01-BR001-0602-DN500
CP101 BOP 01TMP01-BR039-0602-DN200 HOT REHEAT STOP VALVE, EXTRACTION-6 QCNRV AND LP BYPASS VALVE.

01LBC10-BR001-0925-DN800
01LBC20-BR001-0925-DN800
C&I
9. PAIR OF VALVES WILL BE SHIFTED FROM TEMPORARY CONNECTION MS-CRH TO

01LBG15-BR001-0305-DN450
K TO ATMOSPHERE K

550X500
TEMPORARY CONNECTION D/S OF HRH PIPING.
01LBG30-BR102-0335-DN550

01MAN30-BR001-0935-DN800

TO ST HDR
TE TT 01TMP01-BR018-0602-DN500 FE

01TMP01-BR002-0602-DN500
01LBA30

TO BFPT
01TMP01 01TMP01

TO GSC
CF001

TO DEA
CT001 CT101

TO SOOT BLOWER
01LBC20-AA201
G
01LBC50-BR003-0608-DN800
F14 A LEGENDS:

TO ATMOSPHERE
L15

TO AUX
TARGET PLATE ASSEMBLY

E11
G14
01LBA30-BR101-4537-DN200

G7

K5
MOV-01LBG15-AA001
01LBG14-AA101
PCV-01LBA30-AA081
PCV-01LBC30-AA081

01LBG11-AA101
01HCB01-AA150

01HCB01-AA153

01LBG13-AA101
PERMANENT LINES

01LBG01-AA101
01LBG01-AA201

E
N

B
Q
I9

01LBC30-AA111
J J

TEMPORARY LINES

TO SOOT BLOWER

C
01TMP01-BR040-0602-DN250
VALVE OPEN

01LBC10-AA201
TO ATMOSPHERE
M
F14
VALVE CLOSED
01TMP01-BR041-0602-DN250
REHEATER

MOV-01LBC30-AA010 SPECTACLE BLIND OPEN


C
I J12 250X150 I

01LBC30-AA112
01LBB30-BR001-0937-ID620

01LBG10-BR001-0305-DN550 SPECTACLE BLIND CLOSED


01LBG05-AA201
01LBC30-BR001-0925-DN1050 MOV-01LBC30-AA011
FE
01LBC30 MOV-01LBC30-AA012 01LBG05-BR001-0305-DN250
CF001 STEAM BLOW PATH (FOR ELECTRONIC COPY ONLY)
F
01LBQ80-BR001-0608-DN500

D10 01TMP01-SF014 01LBG10-AZ001


TO DEA 01LBC30-BR103-0608-DN150 OPERATIONAL PATH (FOR ELECTRONIC COPY ONLY)
01LBC35-BR001-0608-DN250 01LBG20-BR001-0305-DN300
N
P
E6 01LBG20-AA101
MOV-01LBC35-AA001
01TMP01-BR028-0602-DN200 O
TO HTR#8
SPECTACLE BLIND SCHEDULE:
F7

TO ATMOSPHERE
H TO HPT GS TO MILL INERTING H
01LBD11-AA101 250X200
TO BFPT

01LBG10-AA201 LOCATION A B C D E F G H I J K L M N O P Q
TO IPT GS
H

01MAW03-AA101

01TMP01-BR029-0602-DN200

01TMP01-BR031-0602-DN250
MOV-01LBG10-AA001

01TMP01-BR042-0602-DN250
TO SCAPH

01TMP01-BR030-0602-DN250
01MAW03-AA081 I BLIND POSITION - - O O C C C C - - - - C C C - -
TO GLAND STEAM
01LBD11-AA081 01LBG10-BR018-0305-DN300
SPILL OVER C: CLOSED
C6
01LBC35-BR002-0608-DN250
01LBS45-AA101 O: OPEN
01LBC40-BR003-0608-DN800 01LBD11-AA102 01LBD01-AA221 TO CONDENSER

MOV-01LBG12-AA001
MOV-01LBQ81-AA002 SPECIAL NOTE:
01MAW03-AA102 Q
MOV-01LBG12-AA002 01LBG14-BR001-0305-DN200 01LBQ81-AA202 1. FOR UNIT#2 P&ID, TAG NUMBER SHALL BE CHANGED FROM 01 TO 02.
01MAW01-AA101 J6
MOV-01LBS45-AA001

N TO LPT GS
01LBG12-BR003-0305-DN150
J5
J PCV-01LBQ81-AA081
01MAW01-AA081

01LBQ81-AA101
01LBB10-BR004-0937-ID620

01LBB20-BR004-0937-ID620

MOV-01LBQ80-AA001
B7
01TMP01-SF007
01MAW01-AA102 01LBQ80-AA101
01MAW01-AA221
500X300
300X250

01TMP01-BR018-0602-DN500
01LBG12-BR002-0305-DN150
H K HOLD LIST:
01TMP01-BR020-0602-DN250

G G
H13 C12
K9
MOV-01LBQ81-AA001
01MAP20-BR001-0937-ID620

01LBG13-BR002-0305-DN200
01TMP01-BR017-0602-DN500
F F
01LBQ81-AA201 01LBQ81-BR003-0615-DN300
H
M
J11 01LBD61-BR002-0315-DN300
01TMP01-BR020-0602-DN250

01TMP01-SF008 MOV-01LBG13-AA002

MOV-01LBG13-AA003 01LBQ80-BR002-0608-DN250
01TMP01-BR019-0602-DN250

01TMP01-BR032-0602-DN200
TO HTR#8A
01LBG13-BR002-0305-DN200
PCV-01LBG13-AA081
TO DEAERATOR
RSV
P
01LBG13-BR001-0305-DN400 01LBG13-AA102
TO ATMOSPHERE H12
01LBG13-AA201

01MAB02-AA082 E 01LBQ80-AA051
E J5 E
WRITING.

IP TURBINE MOV-01LBG13-AA001 01LBG13-BR002-0305-DN200 01LBQ80-BR003-0608-DN250


TO HTR#8B
01LBD65-AA202 REFERENCE DRAWINGS:
01MAB02-AA081

MOV-01LBQ60-AA001 PCV-01LBQ60-AA081 MOV-01LBQ80-AA002 DRAWING NO. DRAWING TITLE


IN

01TMP01-BR033-0602-DN500 9578-001-110-PVM-F-026 LEGEND FOR P&IDS


PERMISSION

01LBD60-BR001-0315-DN700 01LBQ60-AA101
RSV
01TMP01-BR013-0602-DN500

01TMP01-SF003
PCV-01MAP20-AA081

01LBD60-AA052 900X500
F TO DEAERATOR
C TO ATMOSPHERE
500X450

I12
THEIR

01LBD65-AA201 01LBD65-BR001-0315-DN900
D 01LBQ60-BR001-0608-DN450
01MAP10-BR001-0937-ID620
WITHOUT

D D

01TMP01-BR035-0602-DN500 TO ATMOSPHERE
01TMP01-SF004

01TMP01-SF013

01LBD60-AA051 MOV-01LBD60-AA001

01LBD62-BR002-0315-DN300
E TO DEAERATOR 550X500
LENT

01LBD60-BR005-0315-DN550 TO ATMOSPHERE
OR

01TMP01-SF005
COPIED

01TMP01-BR034-0602-DN500
PCV-01MAP10-AA081

FE
600X400
400X250

01LBQ82-AA201
MOV-01LBD61-AA001 01LBD60
01TMP01-BR021-0602-DN250

MOV-01LBQ82-AA001
CF001
01TMP01-BR014-0602-DN500
BE

M 300X250
01LBD61-AA201 MOV-01LBQ82-AA002
NOT

01LBD61-BR001-0315-DN300 02 13-NOV-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK
01TMP01-BR022-0602-DN250

I 01LBQ82-AA202
BFPT#A
MUST

C H7 01 16-MAR-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK C


01TMP01-BR011-0602-DN500

01TMP01-BR101-0602-DN50

01TMP01-BR010-0602-DN600
00 28-DEC-16 ISSUED FOR APPROVAL BDJ KT --- --- DJR --- DK
AND

F5
FE
01LBD61
LIMITED

01LBD61-BR002-0315-DN300 REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD.
F
CF001
PCV-01LBQ82-AA081
PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
01LBQ82-AA101
LUNDY

01LBD62-AA201
NTPC LIMITED
01TMP01-SF006
&

01LBD62-BR001-0315-DN300 OWNER:
(A GOVERNMENT OF INDIA ENTERPRISE)
SARGENT

MOV-01LBD62-AA001 300X250 BFPT#B J D


G7 B13
D EPC
B B4 FE LARSEN & TOUBRO LIMITED B
-

01LBD62 CONTRACTOR:
01TMP01-BR102-0602-DN50
L&T

CF001

TO ATM.
01LBD62-BR002-0315-DN300 01TMP01-BR008-0602-DN600 L&T's

(REFER NOTE-9)
01TMP01-AA102
L & T - SARGENT & LUNDY LTD.
TO ATM.
OF

CONSULTANT:
01TMP01-BR022-0602-DN250
PROPERTY

NTPC
(REFER NOTE-9) 9578-001-102-PVM-K-004 REV. 03
DRG. NO.:
01TMP01-AA101
THE

DATE NAME SIGN. TITLE:

P&ID
IS

PREPARED 28-DEC-16 BDJ


DESIGN

600X500
600X500
CHECKED 28-DEC-16 KT FOR
01TMP01-BR007-0602-DN600

841mm)
A A
(REFER NOTE-9) 01TMP01-AA001 600X500 APPROVED 28-DEC-16 DK
AND

MS, CRH & HRH STEAM BLOWING


01TMP01-BR009-0602-DN600
DEPARTMENT MECHANICAL
DRAWING

x
600X500 STAGE-10

(1189mm
(REFER NOTE-9) 01TMP01-AA002
L&T-S&L JOB NO.: LD16005000

01TMP01-BR012-0602-DN500
THIS

SCALE: NA DRG. NO.: LD16005-XG02-00-LBU-110001 SHT: 11 OF 12 REV. 02

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME: LD16005-XG02-00-LBU-110001-01.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

NOTES:

1. DOCUMENT NUMBER IN THE CONTINUATION ARROW SHALL BE READ PREFIXING WITH

UNIT#2
01TMP01-BR003-0602-DN500
PROJECT CODE (9578-) AS PROJECT CODE WILL REMAIN SAME FOR ALL DOCUMENTS
PT DCS
01MAA02-AA081

01TMP01-BR036-0602-DN500
M 01TMP01 02LBG15-BR001-0305-DN450 FOR KHARGONE STPP. M
CP102 BOP
450X500
C&I
02LBG15-AA101 2. FOR INDEX, LEGENDS & SYMBOLS, REFER DWG. NO. 9578-001-110-PVM-F-026.

01TMP01-BR037-0602-DN250
01LBA10-BR004-4537-ID318 3. ---- DENOTES TEMPORARY PIPING.

01TMP01-BR027-0602-DN500
SUPERHEATER
TO ATMOSPHERE
MSV TE TT 02LBG15-BR001-0305-DN450
01MAN10-BR001-4537-ID220
MOV-01LBA01-AA002 01TMP01 01TMP01 4. FLOW NOZZLES WILL BE INSTALLED AFTER STEAM BLOW OUT. TEMPORARY SPOOL WILL
FE CT002 CT102
01MAN10-BR002-0935-DN600 BE INSTALLED AT FLOW NOZZLE LOCATION BEFORE STEAM BLOW OUT.
01MAN10 00LBG01-BR001-0305-DN450
CF001 AUX 5. ALL INTERNALS OF CONTROL VALVES IN THE BLOW CIRCUIT SHALL BE REMOVED AND

01TMP01-AA102
01TMP01-AA002
AUX STEAM
00LBG01-BR004-0305-DN350 BLOW OUT KIT/TEMPORARY SPOOL PIECES TO BE INSTALLED.
A
PCV-01MAN10-AA081
BOILER
K8 6. STEAM BLOW OUT WILL NOT INCLUDE FOLLOWING PIPING:
HP TURBINE

00LBG01-BR441-0305-DN250
PCV-01MAN20-AA081 00LBG01-AA106 01LBG15-AA101 FOLLOWING LINES SHALL BE MECHANICALLY CLEANED.

00LBG01-AA101
- STEAM PIPING FROM TURBINE NOZZLE UPTO POWER ACTUATED NON RETURN VALVES.

TO ATMOSPHERE
L FE L
00LBG01-AA201
01MAN20 01MAN20-BR002-0935-DN600 - DOWNSTREAM PIPING FROM LP BYPASS TO CONDENSER.
CF001 01MAA02-AA082
- DOWNSTREAM PIPING FROM MSV/RSV TO HP/IP TURBINE.
01MAN20-BR001-4537-ID220
MSV 01LBG15-BR001-0305-DN450 - ADMISSION STEAM PIPING FOR BFPT.

01LBA20-BR004-4537-ID318 7. STEAM CONNECTION SHALL BE RESTORED AFTER STEAM PIPING BLOW OUT.

8. BLOW OUT/THROUGH KIT CRITERIA :

J4
MOV-01LBA01-AA001 PT DCS - BLOW THROUGH KIT WILL BE USED FOR HP BYPASS VALVE DURING STEAM BLOW OUT.

01TMP01-BR026-0602-DN500
01TMP01-AA101

01TMP01-AA001
01TMP01 01TMP01-BR038-0602-DN500

01TMP01-BR004-0602-DN500
01TMP01-BR017-0602-DN500
CP101 BOP - BLOW OUT KIT SHALL BE USED FOR MAIN STEAM STOP VALVE, COLD REHEAT NRV,

B
01TMP01-BR001-0602-DN500
C&I
01TMP01-BR039-0602-DN200 HOT REHEAT STOP VALVE, EXTRACTION-6 QCNRV AND LP BYPASS VALVE.

01LBC10-BR001-0925-DN800
01LBC20-BR001-0925-DN800
9. PAIR OF VALVES WILL BE SHIFTED FROM TEMPORARY CONNECTION MS-CRH TO

01LBG15-BR001-0305-DN450
K TO ATMOSPHERE K

550X500
TE TT TEMPORARY CONNECTION D/S OF HRH PIPING.
01LBG30-BR102-0335-DN550

01MAN30-BR001-0935-DN800

HDR
01TMP01 01TMP01 01TMP01-BR018-0602-DN500 FE

01TMP01-BR002-0602-DN500
01LBA30

TO BFPT
CT001 CT101

TO GSC
CF001

TO DEA

ST
BLOWER
01LBC20-AA201
G
01LBC50-BR003-0608-DN800 A LEGENDS:

TO
F14

TO ATMOSPHERE
L15

TO AUX
TARGET PLATE ASSEMBLY

E11
G14
01LBA30-BR101-4537-DN200

G7

K5
SOOT

MOV-01LBG15-AA001
01LBG14-AA101
PCV-01LBA30-AA081
PCV-01LBC30-AA081

01LBG11-AA101
01HCB01-AA150

01HCB01-AA153

01LBG13-AA101
PERMANENT LINES

01LBG01-AA101
01LBG01-AA201

TO

E
N

B
Q
I9

01LBC30-AA111
J J

TEMPORARY LINES

TO SOOT BLOWER

C
01TMP01-BR040-0602-DN250
VALVE OPEN

01LBC10-AA201
TO ATMOSPHERE
M
F14
VALVE CLOSED
01TMP01-BR041-0602-DN250
REHEATER

MOV-01LBC30-AA010 SPECTACLE BLIND OPEN


C
I J12 250X150 I

01LBC30-AA112
01LBB30-BR001-0937-ID620

01LBG10-BR001-0305-DN550 SPECTACLE BLIND CLOSED


01LBG05-AA201
01LBC30-BR001-0925-DN1050 MOV-01LBC30-AA011
FE
01LBC30 MOV-01LBC30-AA012 01LBG05-BR001-0305-DN250
CF001 STEAM BLOW PATH (FOR ELECTRONIC COPY ONLY)
F
01LBQ80-BR001-0608-DN500

D10 01TMP01-SF014 01LBG10-AZ001


TO DEA 01LBC30-BR103-0608-DN150 OPERATIONAL PATH (FOR ELECTRONIC COPY ONLY)
01LBC35-BR001-0608-DN250 01LBG20-BR001-0305-DN300
N
P
E6 01LBG20-AA101
MOV-01LBC35-AA001
01TMP01-BR028-0602-DN200 O
TO HTR#8
SPECTACLE BLIND SCHEDULE:
F7

TO ATMOSPHERE
H TO HPT GS TO MILL INERTING H
01LBD11-AA101 250X200
BFPT

01LBG10-AA201 LOCATION A B C D E F G H I J K L M N O P Q
TO IPT GS
H

01MAW03-AA101

01TMP01-BR029-0602-DN200

01TMP01-BR031-0602-DN250
MOV-01LBG10-AA001

01TMP01-BR042-0602-DN250
TO SCAPH

01TMP01-BR030-0602-DN250
01MAW03-AA081 I BLIND POSITION - - C C O O C C - - - - C C C - -
TO

TO GLAND STEAM
01LBD11-AA081 01LBG10-BR018-0305-DN300
SPILL OVER C: CLOSED
C6
01LBC35-BR002-0608-DN250
01LBS45-AA101 O: OPEN
01LBC40-BR003-0608-DN800 01LBD11-AA102 01LBD01-AA221 TO CONDENSER

MOV-01LBG12-AA001
MOV-01LBQ81-AA002 SPECIAL NOTE:
01MAW03-AA102 Q
MOV-01LBG12-AA002 01LBG14-BR001-0305-DN200 01LBQ81-AA202 1. FOR UNIT#2 P&ID, TAG NUMBER SHALL BE CHANGED FROM 01 TO 02.
01MAW01-AA101 J6
MOV-01LBS45-AA001

N TO LPT GS
01LBG12-BR003-0305-DN150
J5
J PCV-01LBQ81-AA081
01MAW01-AA081

01LBQ81-AA101
01LBB10-BR004-0937-ID620

01LBB20-BR004-0937-ID620

MOV-01LBQ80-AA001
B7
01TMP01-SF007
01MAW01-AA102 01LBQ80-AA101
01MAW01-AA221
500X300
300X250

01TMP01-BR018-0602-DN500
01LBG12-BR002-0305-DN150
H K HOLD LIST:
01TMP01-BR020-0602-DN250

G G
H13 C12
K9
MOV-01LBQ81-AA001
01MAP20-BR001-0937-ID620

01LBG13-BR002-0305-DN200
01TMP01-BR017-0602-DN500
F F
01LBQ81-AA201 01LBQ81-BR003-0615-DN300
H
M
J11 01LBD61-BR002-0315-DN300
01TMP01-BR020-0602-DN250

01TMP01-SF008 MOV-01LBG13-AA002

MOV-01LBG13-AA003 01LBQ80-BR002-0608-DN250
01TMP01-BR019-0602-DN250

01TMP01-BR032-0602-DN200
TO HTR#8A
01LBG13-BR002-0305-DN200
PCV-01LBG13-AA081
TO DEAERATOR
RSV
P
01LBG13-BR001-0305-DN400 01LBG13-AA102
TO ATMOSPHERE H12
01LBG13-AA201

01MAB02-AA082 E 01LBQ80-AA051
E J5 E
THIS DRAWING AND DESIGN IS THE PROPERTY OF L&T - SARGENT & LUNDY LIMITED AND MUST NOT BE COPIED OR LENT WITHOUT THEIR PERMISSION IN WRITING.

IP TURBINE MOV-01LBG13-AA001 01LBG13-BR002-0305-DN200 01LBQ80-BR003-0608-DN250


TO HTR#8B
01LBD65-AA202 REFERENCE DRAWINGS:
01MAB02-AA081

MOV-01LBQ60-AA001 PCV-01LBQ60-AA081 MOV-01LBQ80-AA002 DRAWING NO. DRAWING TITLE


01TMP01-BR033-0602-DN500 9578-001-110-PVM-F-026 LEGEND FOR P&IDS
01LBD60-BR001-0315-DN700 01LBQ60-AA101
RSV
01TMP01-BR013-0602-DN500

01TMP01-SF003
PCV-01MAP20-AA081

01LBD60-AA052 900X500
F TO DEAERATOR
C TO ATMOSPHERE
500X450

I12

01LBD65-AA201 01LBD65-BR001-0315-DN900
D 01LBQ60-BR001-0608-DN450
01MAP10-BR001-0937-ID620

D D

01TMP01-BR035-0602-DN500 TO ATMOSPHERE
01TMP01-SF004

01TMP01-SF013

01LBD60-AA051 MOV-01LBD60-AA001

01LBD62-BR002-0315-DN300
E TO DEAERATOR 550X500
01LBD60-BR005-0315-DN550 TO ATMOSPHERE
01TMP01-SF005

01TMP01-BR034-0602-DN500
PCV-01MAP10-AA081

FE
600X400
400X250

01LBQ82-AA201
MOV-01LBD61-AA001 01LBD60
01TMP01-BR021-0602-DN250

MOV-01LBQ82-AA001
CF001
01TMP01-BR014-0602-DN500

M 300X250
01LBD61-AA201 MOV-01LBQ82-AA002
01LBD61-BR001-0315-DN300 02 13-NOV-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK
01TMP01-BR022-0602-DN250

I 01LBQ82-AA202
C BFPT#A H7 01 16-MAR-18 ISSUED FOR APPROVAL PNS KT --- --- DJR --- DK C
01TMP01-BR011-0602-DN500

01TMP01-BR101-0602-DN50

01TMP01-BR010-0602-DN600
F5 00 28-DEC-16 ISSUED FOR APPROVAL BDJ KT --- --- DJR --- DK
FE
01LBD61
01LBD61-BR002-0315-DN300 REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD.
F
CF001
PCV-01LBQ82-AA081
PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
01LBQ82-AA101

01LBD62-AA201
NTPC LIMITED
01TMP01-SF006

01LBD62-BR001-0315-DN300 OWNER:
(A GOVERNMENT OF INDIA ENTERPRISE)
MOV-01LBD62-AA001 300X250 BFPT#B J D
G7 B13
D EPC
B B4 FE
CONTRACTOR:
LARSEN & TOUBRO LIMITED B
01LBD62 01TMP01-BR102-0602-DN50
CF001

TO ATM.
01LBD62-BR002-0315-DN300 01TMP01-BR008-0602-DN600

(REFER NOTE-9)
L&T's

01TMP01-AA102
L & T - SARGENT & LUNDY LTD.
TO ATM.

CONSULTANT:
01TMP01-BR022-0602-DN250

NTPC
(REFER NOTE-9) 9578-001-102-PVM-K-004 REV. 03
DRG. NO.:
01TMP01-AA101
DATE NAME SIGN. TITLE:

PREPARED 28-DEC-16 BDJ P&ID


600X500
600X500
CHECKED 28-DEC-16 KT FOR
01TMP01-BR007-0602-DN600

A0 (1189mm x 841mm)
A A
(REFER NOTE-9) 01TMP01-AA001 600X500 APPROVED 28-DEC-16 DK
LP BYPASS STEAM BLOWING
01TMP01-BR009-0602-DN600
DEPARTMENT MECHANICAL
(REFER NOTE-9) 01TMP01-AA002 600X500 STAGE-11
L&T-S&L JOB NO.: LD16005000

01TMP01-BR012-0602-DN500 SCALE: NA DRG. NO.: LD16005-XG02-00-LBU-110001 SHT: 12 OF 12 REV. 02


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME: LD16005-XG02-00-LBU-110001-01.DGN


ATTACHMENT - 6
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

01TMP01-BR003-0602-DN500

01MAA02-AA081
LEGENDS:
M M

01TMP01-BR012-0602-DN500
TARGET PLATE ASSEMBLY
01LBA10-BR004-4537-ID318

SUPERHEATER
01MAN10-BR001-4537-ID220 MSV
MOV-01LBA01-AA002
PERMANENT LINES
FE
01MAN10 01MAN10-BR002-0935-DN600
CF001 TEMPORARY LINES
AUX STEAM

01TMP01-AA002
PCV-01MAN10-AA081
A PT DCS
K8
PCV-01MAN20-AA081 HP TURBINE 01TMP01
CP102 BOP
VALVE OPEN

C&I
L FE L
VALVE CLOSED
01MAN20 01MAN20-BR002-0935-DN600
CF001 01MAA02-AA082
TE TT
01MAN20-BR001-4537-ID220 01TMP01 01TMP01
MSV SPECTACLE BLIND OPEN
CT002 CT102
01LBA20-BR004-4537-ID318

01TMP01-BR102-0602-DN50
MOV-01LBA01-AA001 SPECTACLE BLIND CLOSED

PT DCS 01TMP01-AA102

01TMP01-BR004-0602-DN500
01TMP01-AA001
01TMP01-BR011-0602-DN500
01TMP01
STEAM BLOW PATH (FOR ELECTRONIC COPY ONLY)

01TMP01-BR001-0602-DN500
CP101 BOP

01LBC10-BR001-0925-DN800
C&I

01LBC20-BR001-0925-DN800
K K

01MAN30-BR001-0935-DN800
TE TT

01TMP01-BR101-0602-DN50

01TMP01-BR002-0602-DN500
ATMOSPHERE

01TMP01 01TMP01
CT001 CT101

01LBC20-AA201
01LBC50-BR003-0608-DN800

01TMP01-AA101
01TMP01-BR005-0602-DN600
TO

01TMP01-SF009

J K J

01LBC10-AA201
REHEATER

I I
01LBB30-BR001-0937-ID620

01LBC30-BR001-0925-DN1050

H H

01TMP01-SF010
L

01TMP01-BR006-0602-DN600
ATMOSPHERE

01LBC40-BR003-0608-DN800
TO
01LBB10-BR004-0937-ID620

01LBB20-BR004-0937-ID620

HOLD LIST:
01MAP20-BR001-0937-ID620

F F

RSV

01MAB02-AA082
E E
WRITING.

IP TURBINE
REFERENCE DRAWINGS:
01MAB02-AA081
DRAWING NO. DRAWING TITLE
IN
PERMISSION

RSV
01TMP01-BR013-0602-DN500

01TMP01-SF003
PCV-01MAP20-AA081

C
THEIR

D
01MAP10-BR001-0937-ID620
WITHOUT

D D
01TMP01-SF004

E
LENT
OR

01TMP01-SF005
COPIED

PCV-01MAP10-AA081
01TMP01-BR014-0602-DN500
BE
NOT

02 29-NOV-18 ISSUED FOR APPROVAL PNS RKB --- --- DJR --- DK
MUST

C 01 13-NOV-18 ISSUED FOR APPROVAL PNS RKB --- --- DJR --- DK C

00 11-JUL-18 ISSUED FOR APPROVAL PNS RKB --- --- DJR --- DK
AND
LIMITED

REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD.


F

PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT


LUNDY

NTPC LIMITED
01TMP01-SF006
&

OWNER:
(A GOVERNMENT OF INDIA ENTERPRISE)
SARGENT

600X500
600X500 EPC
B LARSEN & TOUBRO LIMITED B
-

01TMP01-BR007-0602-DN600 01TMP01-BR026-0602-DN500 01TMP01-BR008-0602-DN600 TO ATMOSPHERE CONTRACTOR:


L&T

L&T's
01TMP01-BR009-0602-DN600 01TMP01-BR027-0602-DN500 01TMP01-BR010-0602-DN600 TO ATMOSPHERE
L & T - SARGENT & LUNDY LTD.
OF

CONSULTANT:
600X500 600X500
PROPERTY

NTPC
9578-001-102-PVM-K-004 REV. 04
DRG. NO.:
THE

DATE NAME SIGN. TITLE:


IS

PREPARED 28-DEC-16 BDJ


DESIGN

CHECKED 28-DEC-16 KT MS & CRH STEAM BLOWING

841mm)
A A
APPROVED 28-DEC-16 DK SCHEMATIC
AND

DEPARTMENT MECHANICAL
DRAWING

x
(1189mm
L&T-S&L JOB NO.: LD16005000
THIS

SCALE: NA DRG. NO.: LD16005-XG02-00-LBU-110001 SHT: 01 OF 04 REV. 02

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME: LD16005-XG02-00-LBU-110001-01.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

01TMP01-BR003-0602-DN500

M
01MAA02-AA081 LEGENDS: M

01TMP01-BR012-0602-DN500
TARGET PLATE ASSEMBLY
01LBA10-BR004-4537-ID318

SUPERHEATER
01MAN10-BR001-4537-ID220 MSV
MOV-01LBA01-AA002
FE PERMANENT LINES
01MAN10 01MAN10-BR002-0935-DN600
CF001
AUX STEAM TEMPORARY LINES

01TMP01-AA102
PCV-01MAN10-AA081
A PT DCS
K8
PCV-01MAN20-AA081 HP TURBINE 01TMP01
CP102 BOP
VALVE OPEN
C&I
L FE L

01MAN20 01MAN20-BR002-0935-DN600 VALVE CLOSED


CF001 01MAA02-AA082
TE TT
01MAN20-BR001-4537-ID220 01TMP01 01TMP01
MSV
CT002 CT102 SPECTACLE BLIND OPEN
01LBA20-BR004-4537-ID318

01TMP01-BR102-0602-DN50
MOV-01LBA01-AA001
SPECTACLE BLIND CLOSED
PT DCS 01TMP01-AA102

01TMP01-BR004-0602-DN500
01TMP01-AA101
01TMP01-BR011-0602-DN500
01TMP01

01TMP01-BR001-0602-DN500
CP101 BOP STEAM BLOW PATH (FOR ELECTRONIC COPY ONLY)

01LBC10-BR001-0925-DN800
C&I

01LBC20-BR001-0925-DN800
K K

01MAN30-BR001-0935-DN800
TE TT

01TMP01-BR101-0602-DN50

01TMP01-BR002-0602-DN500
01TMP01 01TMP01
CT001 CT101

01LBC20-AA201
01LBC50-BR003-0608-DN800

01TMP01-AA101
J J

01LBC10-AA201
REHEATER

I I
01LBB30-BR001-0937-ID620

01LBC30-BR001-0925-DN1050

H H

01LBC40-BR003-0608-DN800
01LBB10-BR004-0937-ID620

01LBB20-BR004-0937-ID620

HOLD LIST:
01MAP20-BR001-0937-ID620

F F

RSV

01MAB02-AA082
E E
WRITING.

IP TURBINE
REFERENCE DRAWINGS:
01MAB02-AA081
DRAWING NO. DRAWING TITLE
IN
PERMISSION

RSV
01TMP01-BR013-0602-DN500

01TMP01-SF003
PCV-01MAP20-AA081

C
THEIR

D
01MAP10-BR001-0937-ID620
WITHOUT

D D
01TMP01-SF004

E
LENT
OR

01TMP01-SF005
COPIED

PCV-01MAP10-AA081

01TMP01-AA102

01TMP01-AA002
01TMP01-BR014-0602-DN500
BE
NOT

02 29-NOV-18 ISSUED FOR APPROVAL PNS RKB --- --- DJR --- DK
MUST

C 01 13-NOV-18 ISSUED FOR APPROVAL PNS RKB --- --- DJR --- DK C

00 11-JUL-18 ISSUED FOR APPROVAL PNS RKB --- --- DJR --- DK
AND
LIMITED

REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD.


F

PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT


LUNDY

NTPC LIMITED
01TMP01-SF006
&

OWNER:
(A GOVERNMENT OF INDIA ENTERPRISE)
SARGENT

600X500 EPC
600X500
B LARSEN & TOUBRO LIMITED B
-

01TMP01-BR007-0602-DN600 01TMP01-BR026-0602-DN500 01TMP01-BR008-0602-DN600 TO ATMOSPHERE CONTRACTOR:


L&T

L&T's
01TMP01-BR009-0602-DN600 01TMP01-BR027-0602-DN500 01TMP01-BR010-0602-DN600 TO ATMOSPHERE
L & T - SARGENT & LUNDY LTD.
OF

600X500 CONSULTANT:
600X500
PROPERTY

NTPC
9578-001-102-PVM-K-004 REV. 04
DRG. NO.:
THE

DATE NAME SIGN. TITLE:


IS

01TMP01-AA102 PREPARED 28-DEC-16 BDJ


DESIGN

CHECKED 28-DEC-16 KT HP BYPASS STEAM BLOWING

841mm)
A A
APPROVED 28-DEC-16 DK
SCHEMATIC
AND

DEPARTMENT MECHANICAL
DRAWING

x
(1189mm
L&T-S&L JOB NO.: LD16005000
THIS

SCALE: NA DRG. NO.: LD16005-XG02-00-LBU-110001 SHT: 02 OF 04 REV. 02

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME: LD16005-XG02-00-LBU-110001-01.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

01TMP01-BR003-0602-DN500

M
01MAA02-AA081 PT DCS LEGENDS: M
01TMP01
CP102 BOP
C&I
01LBA10-BR004-4537-ID318 TARGET PLATE ASSEMBLY

SUPERHEATER

01TMP01-BR027-0602-DN500
01MAN10-BR001-4537-ID220 MSV
TE TT
MOV-01LBA01-AA002
01TMP01 01TMP01
FE PERMANENT LINES
CT002 CT102
01MAN10 01MAN10-BR002-0935-DN600
CF001
AUX STEAM
TEMPORARY LINES
PCV-01MAN10-AA081
A
K8
PCV-01MAN20-AA081 HP TURBINE VALVE OPEN

L FE L

01TMP01-AA102
01MAN20 01MAN20-BR002-0935-DN600 VALVE CLOSED
CF001 01MAA02-AA082
01MAN20-BR001-4537-ID220
MSV
SPECTACLE BLIND OPEN
01LBA20-BR004-4537-ID318

MOV-01LBA01-AA001 PT DCS
SPECTACLE BLIND CLOSED
01TMP01

01TMP01-BR004-0602-DN500
CP101 BOP

01TMP01-AA101
C&I

01TMP01-BR001-0602-DN500
STEAM BLOW PATH (FOR ELECTRONIC COPY ONLY)

01LBC10-BR001-0925-DN800
01LBC20-BR001-0925-DN800
01TMP01-BR026-0602-DN500
K K
TE TT
01TMP01 01TMP01

01MAN30-BR001-0935-DN800
CT001 CT101

01TMP01-BR002-0602-DN500

01LBC20-AA201
01LBC50-BR003-0608-DN800

01TMP01-AA001
J J

01LBC10-AA201
REHEATER

I I
01LBB30-BR001-0937-ID620

01LBC30-BR001-0925-DN1050

H H

01LBC40-BR003-0608-DN800
01LBB10-BR004-0937-ID620

01LBB20-BR004-0937-ID620

HOLD LIST:
01MAP20-BR001-0937-ID620

F F

RSV

01MAB02-AA082
E E
WRITING.

IP TURBINE
REFERENCE DRAWINGS:
01MAB02-AA081
DRAWING NO. DRAWING TITLE
IN
PERMISSION

RSV
01TMP01-BR013-0602-DN500

01TMP01-SF003
PCV-01MAP20-AA081

C
THEIR

D
01MAP10-BR001-0937-ID620

01TMP01-BR011-0602-DN500

01TMP01-BR101-0602-DN50

01TMP01-BR010-0602-DN600
WITHOUT

D D
01TMP01-SF004

E
LENT
OR

01TMP01-SF005
COPIED

PCV-01MAP10-AA081
01TMP01-BR014-0602-DN500
BE
NOT

02 29-NOV-18 ISSUED FOR APPROVAL PNS RKB --- --- DJR --- DK
MUST

C 01TMP01-BR102-0602-DN50 01 13-NOV-18 ISSUED FOR APPROVAL PNS RKB --- --- DJR --- DK C

ATM.
01TMP01-BR008-0602-DN600
01TMP01-AA102

00 11-JUL-18 ISSUED FOR APPROVAL PNS RKB --- --- DJR --- DK
AND

ATM.
LIMITED

REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD.


F TO
TO

01TMP01-AA101
PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
LUNDY

NTPC LIMITED
01TMP01-SF006
&

OWNER:
600X500 (A GOVERNMENT OF INDIA ENTERPRISE)
SARGENT

600X500

01TMP01-BR007-0602-DN600
01TMP01-AA001
EPC
B LARSEN & TOUBRO LIMITED B
-

01TMP01-BR009-0602-DN600
CONTRACTOR:
L&T

600X500 01TMP01-AA002 600X500 L&T's


L & T - SARGENT & LUNDY LTD.
OF

CONSULTANT:
PROPERTY

01TMP01-BR012-0602-DN500
NTPC
9578-001-102-PVM-K-004 REV. 04
DRG. NO.:
THE

DATE NAME SIGN. TITLE:


IS

PREPARED 28-DEC-16 BDJ


DESIGN

CHECKED 28-DEC-16 KT
MS, CRH & HRH STEAM BLOWING

841mm)
A A
APPROVED 28-DEC-16 DK
AND

DEPARTMENT MECHANICAL
SCHEMATIC
DRAWING

x
(1189mm
L&T-S&L JOB NO.: LD16005000
THIS

SCALE: NA DRG. NO.: LD16005-XG02-00-LBU-110001 SHT: 03 OF 04 REV. 02

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME: LD16005-XG02-00-LBU-110001-01.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

01TMP01-BR003-0602-DN500

M
01MAA02-AA081 PT DCS LEGENDS: M
01TMP01
CP102 BOP

01TMP01-AA002
C&I
01LBA10-BR004-4537-ID318 TARGET PLATE ASSEMBLY

SUPERHEATER

01TMP01-BR027-0602-DN500
01MAN10-BR001-4537-ID220 MSV
TE TT
MOV-01LBA01-AA002
01TMP01 01TMP01
FE PERMANENT LINES
CT002 CT102
01MAN10 01MAN10-BR002-0935-DN600
CF001
AUX STEAM
TEMPORARY LINES
PCV-01MAN10-AA081
A
K8
PCV-01MAN20-AA081 HP TURBINE VALVE OPEN

L FE L

01TMP01-AA102
01MAN20 01MAN20-BR002-0935-DN600 VALVE CLOSED
CF001 01MAA02-AA082
01MAN20-BR001-4537-ID220
MSV
SPECTACLE BLIND OPEN
01LBA20-BR004-4537-ID318

MOV-01LBA01-AA001 PT DCS
SPECTACLE BLIND CLOSED
01TMP01

01TMP01-BR004-0602-DN500
CP101 BOP

01TMP01-AA101
C&I

01TMP01-BR001-0602-DN500
STEAM BLOW PATH (FOR ELECTRONIC COPY ONLY)

01LBC10-BR001-0925-DN800
01LBC20-BR001-0925-DN800
01TMP01-BR026-0602-DN500
K K
TE TT
01TMP01 01TMP01

01MAN30-BR001-0935-DN800
CT001 CT101

01TMP01-BR002-0602-DN500

01LBC20-AA201
01LBC50-BR003-0608-DN800

01TMP01-AA001
J J

01LBC10-AA201
REHEATER

I I
01LBB30-BR001-0937-ID620

01LBC30-BR001-0925-DN1050

H H

01LBC40-BR003-0608-DN800
01LBB10-BR004-0937-ID620

01LBB20-BR004-0937-ID620

HOLD LIST:
01MAP20-BR001-0937-ID620

F F

RSV

01MAB02-AA082
E E
WRITING.

IP TURBINE
REFERENCE DRAWINGS:
01MAB02-AA081
DRAWING NO. DRAWING TITLE
IN
PERMISSION

RSV
01TMP01-BR013-0602-DN500

01TMP01-SF003
PCV-01MAP20-AA081

C
THEIR

D
01MAP10-BR001-0937-ID620

01TMP01-BR011-0602-DN500

01TMP01-BR101-0602-DN50

01TMP01-BR010-0602-DN600
WITHOUT

D D
01TMP01-SF004

E
LENT
OR

01TMP01-SF005
COPIED

PCV-01MAP10-AA081
01TMP01-BR014-0602-DN500
BE
NOT

02 29-NOV-18 ISSUED FOR APPROVAL PNS RKB --- --- DJR --- DK
MUST

C 01TMP01-BR102-0602-DN50 01 13-NOV-18 ISSUED FOR APPROVAL PNS RKB --- --- DJR --- DK C

ATM.
01TMP01-BR008-0602-DN600
01TMP01-AA102

00 11-JUL-18 ISSUED FOR APPROVAL PNS RKB --- --- DJR --- DK
AND

ATM.
LIMITED

REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD.


F TO
TO

01TMP01-AA101
PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
LUNDY

NTPC LIMITED
01TMP01-SF006
&

OWNER:
600X500 (A GOVERNMENT OF INDIA ENTERPRISE)
SARGENT

600X500

01TMP01-BR007-0602-DN600
01TMP01-AA001
EPC
B LARSEN & TOUBRO LIMITED B
-

01TMP01-BR009-0602-DN600
CONTRACTOR:
L&T

600X500 01TMP01-AA002 600X500 L&T's


L & T - SARGENT & LUNDY LTD.
OF

CONSULTANT:
PROPERTY

01TMP01-BR012-0602-DN500
NTPC
9578-001-102-PVM-K-004 REV. 04
DRG. NO.:
THE

DATE NAME SIGN. TITLE:


IS

PREPARED 28-DEC-16 BDJ


DESIGN

CHECKED 28-DEC-16 KT
LP BYPASS STEAM BLOWING

841mm)
A A
APPROVED 28-DEC-16 DK
AND

DEPARTMENT MECHANICAL
SCHEMATIC
DRAWING

x
(1189mm
L&T-S&L JOB NO.: LD16005000
THIS

SCALE: NA DRG. NO.: LD16005-XG02-00-LBU-110001 SHT: 04 OF 04 REV. 02

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME: LD16005-XG02-00-LBU-110001-01.DGN


ATTACHMENT - 7

80

AS PER OEM
RECOMMENDATION
STD

AS PER OEM
RECOMMENDATION
ATTACHMENT - 8

Temporary piping

Temporary piping

Temporary piping

3D VIEW

MHPS 699990
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

BILL OF MATERIALS
ITEM SIZE (MM) SCHEDULE/
QTY. DESCRIPTION
NO. (DN) RATING

1 17700 MM 800 27MM AWT PIPE, ASTM A106 GRADE C, ASME B36.10M
M N 2 1 800X650 27MM AWT X ECCENTRIC REDUCER (FOB), ASTM A234 GRADE WPC, ASME B16.9
M

34MM AWT

3 2 800X ID 150 27MM AWT X NOZZLE-FABRICATED BRANCH CONNECTION, ASTM A 105, REFER
55MM MWT. DETAIL : CR-P14 (DWG:9578-001-102-PVM-C-011 SHT-09)

4 1 800X50 27MM AWT X NOZZLE-FABRICATED BRANCH CONNECTION, ASTM A 105, REFER


SCH 80 DETAIL : CR-P10 (DWG:9578-001-102-PVM-C-011 SHT-09)

5 1 800 27MM AWT 45 DEG ELBOW, ASTM A234 GRADE WPC, ASME B16.9
CONT. ON
6 1 800 27MM AWT 90 DEG LR ELBOW, ASTM A234 GRADE WPC, ASME B16.9
DWG: 9578-001-102-PVM-C-011 SHT-05 MATL
7 1 650X500 34MM AWT ECCENTRIC REDUCER (FOB), ASTM A234 GRADE WPC, ASME B16.9
E 2375.150M KHG 0608
N 1441.324M MATL 8 6800 MM 800 55MM AWT PIPE, ASTM A106 GRADE C, ASME B36.10M
EL +54.834M KHG 0601
L L
54
0

29
0
REFER DETAIL-D 15
DWG: 9578-001-102-PVM-C-011 SHT-09 40

TP-01
PB-68 E 2375.150M
01LBC40-BQ005V N 1440.307M

3 EL +55.460M

K K

SPRING LOADED SRV


VENT LINE TO 92
5
SRV: 01LBC99AA402
DWG: 51006-20600-1021

83
4

01LBC40-BQ042R
35
12

J J

(VERTICAL) 8 82
8
01LBC40-BQ006S

01LBC40-BR002-0601-DN800
TP-01
PB-70 E 2375.150M
01LBC40-BQ043R
N 1436.805M
HOLD LIST:
EL +55.425M
3

MATL
I I
KHG 0601
SPRING LOADED SRV 22
88 MATL
VENT LINE TO
KHG 0608
SRV: 01LBC99AA403
DWG: 51006-20600-1021

22
REFER DETAIL-D 5
DWG: 9578-001-102-PVM-C-011 SHT-09

12
20

H H
01LBC40-BQ007V
LEGENDS:

AWT : AVERAGE WALL THICKNESS

(AXIAL)
47
70
01LBC40-BQ008X

16
44
9
NOTES:

01. FOR GENERAL NOTES AND LEGENDS REFER DRAWING :


9578-001-102-PVM-C-011 SHT-01.
01LBC40-BQ009V

66
70

01LBC40-BR003-0608-DN800

F F

01LBC40-BQ010V
925
(REF.) 5
44.6°
¢ SRV E 2375.150M
N 1420.363M
EL +54.625M

3044

43
05
E E

1
SAFETY VALVE
WRITING.

DISCHARGE PIPE
(BY LMB)
IN
PERMISSION

)
REF.

30
44
(
BY LM B

Ø 6 VENT
HOLE (TYP)
01LBC40-BQ011V
6
THEIR

SS POLISHED PLATE REFERENCE DRAWINGS:


90.0°
75X75X3 MM THK
BY LTP

50 E 2375.150M DRAWING NO. DRAWING TITLE


15
WITHOUT

D D
END PLATE SIZE "P" N 1417.320M
8 MATL, A 515 Gr 70 DRAIN LINE EL +51.580M
LINE: 01LBC40-BR402-0608-DN50
Ø 6 VENT
50
LENT

HOLE (TYP) 21
610 4
L"
OR

"

FOR PIPE SIZE & THK


REFER "S" 610
Temporary Piping.
COPIED

FOR PIPE SIZE & THK 1 E 2373.000M


Ø 6 VENT REFER "S" MATL, A 106 Gr C
N 1417.320M
HOLE (TYP) MATL, A 106 Gr C
35
30
Elbow to be erected 03 21-JUN-17 ISSUED FOR APPROVAL PSK MRB --- --- DJR --- DK
EL +51.051M
G after steam blowing 02 12-MAY-17 ISSUED FOR APPROVAL PSK MRB --- --- DJR --- DK
BE

0
53
01 21-JUL-16 ISSUED FOR APPROVAL PSK MRB --- --- DJR --- DK
NOT

TP-01
BOILER GRID REFER DETAIL-H
PB-74
00 11-MAR-16 ISSUED FOR APPROVAL PSK MRB --- --- DJR --- DK
DWG: 9578-001-102-PVM-C-011 SHT-09
MUST

2
C CONN. TO REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD. C
END PLATE SIZE "P" 84MM OFFSET
MATL, A 515 Gr 70 BOILER TP-01 (PB-74) 7
STAMP:
AND

1RY RH INLET HEADER (LHS) 76MM OFFSET 00


23 BOILER GRID
E 2371.250M
LIMITED

TYP TYP REFER DETAIL-E


N 1417.320M DWG: 9578-001-102-PVM-C-011 SHT-09 7B
L EL +51.420M
(TYP)
CRH PIPE
& LUNDY

TYPE A TYPE G
SARGENT

WELDED ATTACHMENT DETAILS PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
B B
-
L&T

TRUNNION PIPE LENGTH END PLATE OWNER:


NTPC LIMITED
SUPPORT TAG VIEW (A GOVERNMENT OF INDIA ENTERPRISE)
TYPE "S" "L" "P"
OF

NO. LOOKING
mm mm mm x mm x mm THK.
EPC
PROPERTY

CONTRACTOR: LARSEN & TOUBRO LIMITED


01LBC40-BQ008X NORTH A DN 450 X SCH 40 1275 500X500X16 THK

ARCHITECT
ENGINEER: L & T - SARGENT & LUNDY LTD.
01LBC40-BQ042R EAST G DN 450 X SCH 40 715 500X500X16 THK
THE

NTPC
DRG. NO.:
9578-001-102-PVM-C-011 REV. 03
01LBC40-BQ043R EAST G DN 450 X SCH 40 715 500X500X16 THK
IS

DATE NAME SIGN TITLE:


DESIGN

NOTE:
PREPARED 11-MAR-16 PSK
LB ISOMETRIC DRAWING
1) FOR TRUNNION & END PLATE BOM, PLEASE REFER ABOVE TABLE.

841mm)
CHECKED 11-MAR-16 MRB
A FOR A
2) Ø 6 MM VENT SHOULD BE LOCATED IN THE HIGHEST POSITION ON THE TRUNNION.
AND

APPROVED 11-MAR-16 DK
COLD REHEAT PIPING
DEPARTMENT MECHANICAL
DRAWING

(1189mm x
L&T-S&L JOB NO. :LD16005000 TURBINE TO RH INLET HEADER
SCALE :NONE
THIS

L&T-S&L DRG. NO.:LD16005-


XJ00-01-LBC-130001 SHT:06 OF 16 REV.03

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME: LD16005-XJ00-01-LBC-130001.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

BILL OF MATERIALS
ITEM SIZE (MM) SCHEDULE/
QTY. DESCRIPTION
NO. (DN) RATING

1 17740 MM 800 27MM AWT PIPE, ASTM A106 GRADE C, ASME B36.10M
M N 2 1 800X650 27MM AWT X ECCENTRIC REDUCER (FOB), ASTM A234 GRADE WPC, ASME B16.9
M

34MM AWT

3 2 800X ID 150 27MM AWT X NOZZLE-FABRICATED BRANCH CONNECTION, ASTM A 105, REFER
55MM MWT DETAIL : CR-P14 (DWG:9578-001-102-PVM-C-011 SHT-09)

4 1 800X50 27MM AWT X NOZZLE-FABRICATED BRANCH CONNECTION, ASTM A 105, REFER


SCH 80 DETAIL : CR-P10 (DWG:9578-001-102-PVM-C-011 SHT-09)

5 1 800 27MM AWT 45 DEG ELBOW, ASTM A234 GRADE WPC, ASME B16.9

6 1 800 27MM AWT 90 DEG LR ELBOW, ASTM A234 GRADE WPC, ASME B16.9

7 1 650X500 34MM AWT ECCENTRIC REDUCER (FOB), ASTM A234 GRADE WPC, ASME B 16.9

8 6800 MM 800 55MM AWT PIPE, ASTM A106 GRADE C, ASME B36.10M

L L

K K

CONT. ON
DWG: 9578-001-102-PVM-C-011 SHT-07
E 2337.350M MATL

N 1441.323M KHG 0608

EL +54.877M MATL
KHG 0601

26
5
J J
01LBC50-BQ016V
28
5 12
65 TP-01
PB-69
REFER DETAIL-D
DWG: 9578-001-102-PVM-C-011 SHT-09 E 2337.350M
N 1440.318M
EL +55.503M

3 HOLD LIST:
92
5
SPRING LOADED SRV
VENT LINE TO
SRV: 01LBC99AA400
I 83 I
DWG: 51006-20600-1021 01LBC50-BQ044R 4

35
12

(VERTICAL) 82
8
01LBC50-BQ017S

TP-01
PB-71
E 2337.350M
01LBC50-BR002-0601-DN800 N 1436.805M
8
EL +55.468M
H MATL H
01LBC50-BQ045R
3
KHG 0601 LEGENDS:
MATL
22 AWT : AVERAGE WALL THICKNESS
88 KHG 0608
SPRING LOADED SRV
VENT LINE TO
SRV: 01LBC99AA401
DWG: 51006-20600-1021
22
5

REFER DETAIL-D
DWG: 9578-001-102-PVM-C-011 SHT-09
12
20
NOTES:

01. FOR GENERAL NOTES AND LEGENDS REFER DRAWING :


01LBC50-BQ018V
9578-001-102-PVM-C-011 SHT-01.

47
70
(AXIAL)
01LBC50-BQ019X 16
40
5

01LBC50-BQ020V BOILER GRID


66
45
G
F F

01LBC50-BR003-0608-DN800
CONN. TO
610
TP-01 BOILER TP-01(PB-75)
PB-75 1RY RH INLET HEADER (RHS)
925 610
35 E 2341.250M
(REF.) 1 REFER DETAIL-H 30
DWG: 9578-001-102-PVM-C-011 SHT-09 N 1417.320M

¢ SRV EL +51.420M
01LBC50-BQ021V DRAIN LINE
LINE: 01LBC50-BR402-0608-DN50
5 REFER DETAIL-E
1
44.6° DWG: 9578-001-102-PVM-C-011 SHT-09
E E 2337.350M 4 E

3087

43
SAFETY VALVE N 1420.407M
WRITING.

66
DISCHARGE PIPE 0
EL +54.668M 53 76MM OFFSET
2

1
84MM OFFSET
E 2339.500M
IN

N 1417.320M
00
EL +51.051M 23
PERMISSION

)
REF.

30
87
50 50
21
(
BY LM B

15
01LBC50-BQ022V
6
90.0°
THEIR

SS POLISHED PLATE REFERENCE DRAWINGS:


75X75X3 MM THK E 2337.350M
BY LTP

10B DRAWING NO. DRAWING TITLE


N 1417.320M
WITHOUT

D D
END PLATE SIZE "P"
EL +51.580M BOILER GRID
8 MATL, A 515 Gr 70

Ø 6 VENT
LENT

HOLE (TYP)
L"
OR

"

FOR PIPE SIZE & THK


REFER "S"
COPIED

FOR PIPE SIZE & THK


Ø 6 VENT REFER "S" MATL, A 106 GR C Temporary Piping.
MATL, A 106 GR C 03 21-JUN-17 ISSUED FOR APPROVAL PSK MRB --- --- DJR --- DK
HOLE (TYP)
Elbow to be erected
02 12-MAY-17 ISSUED FOR APPROVAL PSK MRB --- --- DJR --- DK
BE

after steam blowing


01 21-JUL-16 ISSUED FOR APPROVAL PSK MRB --- --- DJR --- DK
NOT

00 11-MAR-16 ISSUED FOR APPROVAL PSK RKB --- --- DJR --- DK
MUST

C REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD. C


END PLATE SIZE "P"
MATL, A 515 Gr 70 STAMP:
AND
LIMITED

TYP TYP

L
(TYP) CRH PIPE
& LUNDY

TYPE A TYPE G
SARGENT

WELDED ATTACHMENT DETAILS PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
B B
-
L&T

TRUNNION PIPE LENGTH END PLATE OWNER:


NTPC LIMITED
SUPPORT TAG VIEW (A GOVERNMENT OF INDIA ENTERPRISE)
TYPE "S" "L" "P"
OF

NO. LOOKING
mm mm mm x mm x mm THK.
EPC
PROPERTY

CONTRACTOR: LARSEN & TOUBRO LIMITED


01LBC50-BQ019X NORTH A DN 450 X SCH 40 1275 500X500X16 THK

ARCHITECT
ENGINEER: L & T - SARGENT & LUNDY LTD.
01LBC40-BQ044R EAST G DN 450 X SCH 40 715 500X500X16 THK
THE

NTPC
DRG. NO.:
9578-001-102-PVM-C-011 REV. 03
01LBC40-BQ045R EAST G DN 450 X SCH 40 715 500X500X16 THK
IS

DATE NAME SIGN TITLE:


DESIGN

NOTE:
PREPARED 11-MAR-16 PSK
LB ISOMETRIC DRAWING
1) FOR TRUNNION & END PLATE BOM, PLEASE REFER ABOVE TABLE.

841mm)
CHECKED 11-MAR-16 RKB
A FOR A
2) Ø 6 MM VENT SHOULD BE LOCATED IN THE HIGHEST POSITION ON THE TRUNNION.
AND

APPROVED 11-MAR-16 DK
COLD REHEAT PIPING
DEPARTMENT MECHANICAL
DRAWING

(1189mm x
L&T-S&L JOB NO. :LD16005000 TURBINE TO RH INLET HEADER
SCALE :NONE
THIS

L&T-S&L DRG. NO.:LD16005-


XJ00-01-LBC-130001 SHT:08 OF 16 REV.03

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME: LD16005-XJ00-01-LBC-130001.DGN


16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

BILL OF MATERIALS
ITEM SCHEDULE/
QTY. SIZE (MM) DESCRIPTION
NO. RATING

1 8932 MM 900 STD PIPE, ASTM A691 GRADE 1 1/4 CR CLASS 22, ASME B36.10M
M N 3 2 1710 MM 900 31 MM AWT PIPE, ASTM A106 GRADE C, ASME B36.10M
M

8
3 3 14545 MM 450 60 PIPE, ASTM A106 GRADE C, ASME B36.10M

4 1 900X900 STD TEE, ASTM A234 GRADE WP11 CLASS 1W, ASME B16.9

5 1 900X600 31 MM AWT X CONCENTRIC REDUCER, ASTM A234 GRADE WPC, ASME B16.9
SCH 60
TYP TYP
8 6 2 900X25 CLASS 3000 SOCKOLET, ASTM A 182 GRADE F11 CLASS 1, MSS SP-97

7 1 900XID 32 STD X SPL THERMOWELL STUB, ASTM A 182 GRADE F11 CLASS 1,
PIPE SIZE & THK DETAIL : T
99
L REFER "S"
CONN. TO 34 C
PLATE SIZE "P" 8 1 900X25 CLASS 6000 SOCKOLET, ASTM A 105, MSS SP-97
MATL. A106, GR. C 43
L 01LAA10-AC001 77

6 VENT
6 VENT MATL. A515, GR.70

TYP.
9 1 900 STD 90 DEG LR ELBOW, ASTM A234 GRADE WP11 CLASS 1W, ASME B16.9

HOLE
HOLE NOZZLE : D2
L 10 1 600X500 60 CONCENTRIC REDUCER, ASTM A234 GRADE WPC, ASME B16.9 L
PLATE SIZE "P" PIPE SIZE & THK DEAERATOR
REFER "S" E 2362.751M 11 1 500X300 - CONCENTRIC REDUCER (VENDOR SCOPE),
MATL. A515, GRADE 70
MATL. ASTM A691 N 1470.127M 01LBD65-BR001-0315-DN900 12 1 450X300 60 CONCENTRIC REDUCER, ASTM A234 GRADE WPC, ASME B16.9
GR.1 14CR CLASS 22 EL +38.266M
3 13 3 450X25 CLASS 6000 SOCKOLET, ASTM A 105, MSS SP-97
TYPE B TYPE C "DETAIL-A" 1 9
90.0° 14 3 450 60 90 DEG LR ELBOW, ASTM A234 GRADE WPC, ASME B16.9

WELDED ATTACHMENT DETAILS 23 E 2362.751M 15 2 450 60 45 DEG ELBOW, ASTM A234 GRADE WPC, ASME B16.9
20
PI N 1467.807M
LENGTH END PLATE
SUPPORT TAG VIEW TRUNNION PIPE EL +38.265M
TYPE "L" "P" 01LBD65
NO. LOOKING "S"
(MM) (MM X MM X MM THK.) CP501

01LBQ60-BQ064G EAST B DN350 X SCH STD 650 400 X 400 X 8 THK.


01LBD65-BQ010V

K 01LBD65-BQ011X EAST C DN700 X SCH STD 1035 750 X 750 X 8 THK. 9 K


47
98
01LBD65-BQ011X 33
1772

NOTE: 1) FOR TRUNNION & END PLATE BOM, PLEASE REFER ABOVE TABLE. 6 6
2) O 6 MM VENT SHOULD BE LOCATED IN THE HIGHEST POSITION ON THE TRUNNION. E 2355.005M
N 1467.807M
EL +38.837M E 2360.979M
N 1467.316M Temporary Piping. TOTAL WEIGHT OF THE SYSTEM (APPROX.) = 20 TONNE
EL +38.283M Elbow to be erected
80
59 after steam blowing
9 1

J J

4 3 VENT LINE
LINE: 01LBD65-BR501-0315-DN25
E 2353.839M

61
1 11
91

01LBD65-BQ012V C
89 20
E 2352.319M 10 57
N 1467.807M
EL +38.871M CONT. ON
25
15 LINE: 01LBD65-BR002-0315-DN900
I I
01LBD65-AA201
3 DWG: 9578-110-PVM-P-211A SHT.02 HOLD LIST:
7
E 2353.839M
01LBQ60-BQ061V N 1467.807M
4 EL +37.686M
26
01LBQ60-BR003-0608-DN900
5
22 TE
8 01LBD65
PROCESS LINE CT001
LINE: 01LBQ60-BR002-0608-DN25 2083
5
52
1
MATL
KHG 0315

01LBQ60-BQ062V MATL
H E 2349.442M KHG 0608 H

0 N 1467.310M
20
EL +38.402M LEGENDS:
5
8 2
47
PCV-01LBQ60-AA081 11 2 AWT : - AVERAGE WALL THICKNESS

5 2082
98
12

609 NOTES:
10 01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.: 9578-001-110-PVM-P-201.
01LBQ60-BQ063R 508 01LBQ60-AA101
02. ALL DIMENSIONS ARE IN MM AND ELEVATIONS AND CO- ORDINATES ARE IN
DRAIN LINE 0 508 METER UNLESS NOTED OTHERWISE.
LINE: 01LBQ60-BR405-0608-DN25 50
03. ELEVATION (EL.) SHOWN ON THE DRAWING IS THE CENTER OF PIPE ELEVATION
UNLESS NOTED OTHERWISE.
1041 04. BILL OF MATERIAL SHOWN ON THE DRAWING IS FOR ESTABLISHING
13 APPROXIMATE PIPE LENGTHS AND PIPE FITTINGS / COMPONENTS.
02 381
13 10 NO ALLOWANCES ARE CONSIDERED IN BILL OF MATERIAL.(FOR L&T PURPOSE)
05. PIPING SYSTEMS SHALL BE FABRICATED AND ERECTED IN ACCORDANCE
01LBQ60-BR001-0608-DN450 WITH ASME B31.1. AND NTPC TECHNICAL SPECIFICATION.
06. NO COLD PULL IS PERMISSIBLE.
E 2342.129M 07. HANDLING LUGS FOR ERECTION REQUIREMENT OF ADEQUATE STRENGTH SHALL

E 2339.120M 3 35
0 N 1467.807M Temporary Piping. BE ADDED BY PIPING ERECTION CONTRACTOR. THE MATERIAL SHALL BE SAME

EL +38.145M AS MAIN PIPE & WELDING SHALL BE DONE IN ACCORDANCE WITH THE APPROVED
N 1467.539M
QUALITY ASSURANCE PLAN.
EL +38.377M
08. ALL HOLES SHALL BE DRILLED. FLAME CUTTING IS NOT ALLOWED.
0 E 2341.776M 09. DELETED
F 13 35 F
N 1467.539M 10. ALL WELDING SHALL BE DONE BY IBR CERTIFIED WELDER.
9 EL +38.409M 11.INSULATION THICKNESS SHALL BE SUITABLY APPLIED TO AVOID
61
CLASH WITH NEARBY STEEL STRUCTURE.
1092
14 12. ALL PIPING WILL BE SLOPED HAVING MINIMUM SLOPE 1:100 UNLESS
14 PROCESS LINE
89.3° OTHERWISE SPECIFIED.
12 LINE: 01LBQ60-BR002-0608-DN25
E 2338.026M
N 1467.807M 01LBQ60-BQ064G
EL +38.364M 3
MOV-01LBQ60-AA001
REFERENCE DRAWINGS:
94 DRAWING NO. DRAWING TITLE
10
9578-001-999-POC-F-001 GENERAL LAYOUT PLAN
PT
9578-001-110-PVM-F-049 TO 053 TG EQUIPMENT LAYOUT DRAWING
01LBQ60
9578-001-110-PVM-L-027 P&ID FOR AUXILIARY STEAM SYSTEM
CP101
E E
3

15 9578-001-110-PVM-F-030 P&ID FOR EXTRACTION STEAM SYSTEM


WRITING.

45.0° 9578-001-110-PVM-B-154 ESSENTIAL DATASHEET FOR POWER CYCLE PIPING


E 2338.026M 9578-001-110-PVI-W-024 TYPICAL INSTRUMENT STUB DETAILS
(PRESSURE AND TEMPERATURE)
N 1467.807M
EL +35.204M 9578-001-110-PVM-F-057 COMPOSITE PIPING LAYOUT PLAN ABOVE OPERATING
IN

FLOOR IN A-B & B-C BAY


PERMISSION

9578-001-102-PVM-F-025 AUX. STEAM PIPING LAYOUT BELOW 38.0M IN B-C BAY


INCLUDING EMBEDMENT DETAILS
21
1530

9578-001-110-PVM-B-040 GA DRAWING OF DEAERATOR WITH SUPPORT ARRANGEMENT


64

9578-001-110-PVM-B-043 THERMAL MOVEMENTS ALLOWABLE FORCES & MOMENTS


3

ON DEAERATOR NOZZLES
THEIR

9578-001-102-PVM-H-032 DESIGN MEMO FOR THERMAL INSULATION OF PIPING


9578-001-110-PVM-H-009 THERMAL INSULATION SCHEDULE FOR POWER CYCLE PIPING
WITHOUT

D 15 E 2338.026M 9578-001-110-PVM-B-078A OUTLINE OF LARGE BORE LOW PRESSURE VALVES D


30 BELOW 900# ON PCP / LPP SYSTEMS
N 1466.277M
15 EL +33.674M 9578-001-110-PVI-Y-021A DATA SHEET OF PNEUMATIC OPERATED CONTROL
45.0° VALVES FOR BALANCE TG SYSTEMS
Ø 74.00
LENT

9578-001-102-PVM-U-035 STRESS CALCULATION & HANGER SCHEDULE FOR


AUXILIARY STEAM SYSTEM
OR

9578-001-102-PVM-H-024 HANGER DATA SHEET FOR AUXILIARY STEAM SYSTEM


3
COPIED

14 25
.° 03 16-OCT-17 ISSUED FOR APPROVAL KHB MRB --- --- DJR --- DK
±
89.4°
.5° 02 26-SEP-17 ISSUED FOR APPROVAL KHB MRB --- --- DJR --- DK
BE

E 2338.026M 37 TAPER THREAD Rc 1 INCH

30
P.) 01 15-JUL-17 ISSUED FOR APPROVAL KHB MRB --- --- DJR --- DK
NOT

N 1466.277M 01LBQ60-BQ065R AS PER IS: 554


(TY

40
EL +32.226M 00 31-AUG-16 ISSUED FOR APPROVAL KHB RSM --- --- DJR --- DK
"NOTE#11"
MUST

C 3 16
26 REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD. C
53

STAMP:
9.

50
AND

10
27

°
CONT. ON 47 14
LIMITED

LINE: 01LBQ80-BR001-0608-DN500 90.0°


DWG: 9578-001-110-PVM-P-210 SHT.05 E 2338.026M
E 2331.754M N 1463.530M
2
& LUNDY

N 1463.530M EL +32.198M
40

91
Ø 914.

Ø 892.

EL +32.135M 3
2

73
3 62 TAPER 1:3 Ø 32
SARGENT

11B DETAIL "T" PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
B C B
-

3 WEP BY LTP WEP BY BGR NOTES:


L&T

2220
OWNER:
NTPC LIMITED
96 01. ALL DIMENSIONS IN THE ABOVE FIGURE ARE IN MM. (A GOVERNMENT OF INDIA ENTERPRISE)
39
OF

EPC
PROPERTY

CONTRACTOR: LARSEN & TOUBRO LIMITED


DETAIL A ARCHITECT
ENGINEER: L & T - SARGENT & LUNDY LTD.
WEP AS PER ASME B16.25 FIG.4
THE

NTPC
DRG. NO.:
9578-001-110-PVM-P-211 REV. 03
IS

DATE NAME SIGN TITLE:


DESIGN

PREPARED 31-AUG-16 KHB


ISOMETRIC FOR STEAM

841mm)
CHECKED 31-AUG-16 RSM
A PIPING TO DEAERATOR FROM A
AND

APPROVED 31-AUG-16 DK
DIFFERENT SOURCES
DEPARTMENT MECHANICAL
DRAWING

(1189mm x
L&T-S&L JOB NO. :LD16005000 (CRH TO DEAERATOR)
SCALE :NONE
THIS

L&T-S&L DRG. NO.:LD16005-


XJ00-01-LBD-130003 SHT:01 OF 04 REV.03

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME:LD16005-XJ00-01LBD-130003-01.DGN
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

BILL OF MATERIALS
ITEM SIZE (MM) SCHEDULE/
Temporary Piping. QTY. DESCRIPTION
NO. (DN) RATING
Elbow to be erected
1 38967 MM 550 STD PIPE, ASTM A691 GRADE 1 1/4 CR CLASS 22, ASME B36.10M
M N after steam blowing 4 M
2 4 550X25 CLASS 3000 SOCKOLET, ASTM A 182 GRADE F11 CLASS 1, MSS SP-97
90.0°
E 2361.662M 3 3 550XID 32
E 2362.750M STD X SPL THERMOWELL STUB, ASTM A 182 GRADE F11 CLASS 1,
N 1475.209M DETAIL : T
N 1475.522M
EL +38.299M
EL +38.288M 4 4 550 STD 90 DEG LR ELBOW, ASTM A234 GRADE WP11 CLASS 1W, ASME B16.9

5 2 550 STD 45 DEG ELBOW, ASTM A234 GRADE WP11 CLASS 1W, ASME B16.9
E 2362.750M
88 TE
10 N 1474.431M
01LBD60
EL +38.597M
CT002
E 2361.162M PI
E 2362.750M
N 1475.209M 01LBD60 0 1
25 N 1474.184M
CP502 3
EL +38.304M EL +38.594M
L 10 L
88

PT 0
25
01LBD60 PP 3
E 2362.750M
CP102 2
24 N 1473.937M
TW
7
EL +38.592M
01LBD60
CT402
6
69 E 2361.412M
50 2 N 1475.209M TI
36 3
EL +38.302M 01LBD60
CT502 24
1500 7
E 2362.750M
N 1473.670M
K 01LBD60-BR005-0315-DN550 K
2 EL +38.582M 8

2
01LBD60-BQ018V 26
7
44
B 27
1
62
12
VENT LINE
FE
LINE: 01LBD60-BR501-0315-DN25
01LBD60
00
CF001 35
0
30 35
0

9 "DETAIL-A"
54
J 11 J

01LBD60-BQ019X
CONN. TO

19 01LAA10-AC001
89
NOZZLE : D1

01LBD60-BQ020V DEAERATOR
E 2362.750M
N 1473.323M
EL +38.266M

4
89.4°
1
E 2344.463M
N 1475.522M
I I
EL +38.210M
01LBD60-BQ021V
4
89.4°
E 2349.569M HOLD LIST:
N 1475.522M
EL +32.225M

76
31
1
1

1092

57
838 13 31.0 M FLOOR
H OF TG BUILDING H
01LBD60-BQ022V

4 EL +30.302M 01LBD60-BQ023X
89.4°
E 2344.463M REFER LUG DETAIL-X
N 1475.522M
EL +32.281M MOV-01LBD60-AA001
STG BLDG.

LEGENDS:
OUTSIDE

PP- PRESSURE TEST POINT


STG BLDG.

NOTES:
DE

01. FOR NOTES & REFERENCES REFER DWG. NO. : 9578-110-PVM-P-211A SHT 01 & 02.
NSI
I

01LBD60-BR003-0315-DN550
1

F F

5
45.0°
55 E 2349.569M
36
N 1475.522M
1
EL +29.005M
2585

5
45.0°
E 2349.569M
E N 1478.107M E
WRITING.

EL +26.420M
25
85

REFERENCE DRAWINGS:
IN

DRAWING NO. DRAWING TITLE


PERMISSION

9578-001-110-PVM-B-040 GA DRAWING OF DEAERATOR WITH SUPPORT ARRANGEMENT

9578-001-110-PVM-B-043 THERMAL MOVEMENTS ALLOWABLE FORCES & MOMENTS


ON DEAERATOR NOZZLES

9578-001-110-PVI-Y-011B FLOW NOZZLE GA DRAWING AND DESIGN CALCULATION


THEIR

EL +23.642M 25
.° A A
01LBD60-BQ024X ±

.5°
REFER LUG DETAIL-X 37
WITHOUT

D 2 D

P
)
P.

Y
TY

5
( T

2
P

Y
30 T
°
LENT

120°
8
53

EL.
9.

TYP
OR

50
COPIED

8
°

P
35

Y
T 03 16-OCT-17 ISSUED FOR APPROVAL KHB MRB --- --- DJR --- DK
2 Nos. LUG PL.
2 50 X 25 X 8 THK 02 26-SEP-17 ISSUED FOR APPROVAL KHB MRB --- --- DJR --- DK
BE

80

74

TYP
Ø 558.

Ø 539.

MAT'L ASTM A 387


2

01 15-JUL-17 ISSUED FOR APPROVAL KHB MRB --- --- DJR --- DK
NOT

GR11 2
TAPER 1:3
00 31-AUG-16 ISSUED FOR APPROVAL KHB RSM --- --- DJR --- DK
MUST

C REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD. C

EL +15.780M STAMP:
AND

01LBD60-BQ025X
VIEW LOOKING SECTION A-A
LIMITED

REFER LUG DETAIL-X


WEP BY LTP WEP BY BGR
CONT. ON DETAIL-X
1

DWG: 9578-001-110-PVM-P-211 SHT.03


LUG PLATE DETAIL
& LUNDY

E 2349.569M
N 1478.107M
EL +15.180M
DETAIL A SUPPORT TAG VIEW
EL.
B NO. LOOKING
SARGENT

35
WEP AS PER ASME B16.25 FIG.4
7
01LBD60-BQ023X NORTH 30.282 M
19 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
18 PROJECT:
B B
-

01LBD60-BQ024X EAST 23.622 M


L&T

OWNER:
NTPC LIMITED
(A GOVERNMENT OF INDIA ENTERPRISE)
01LBD60-BQ025X NORTH 15.760 M
OF

EPC
PROPERTY

CONTRACTOR: LARSEN & TOUBRO LIMITED


10 ARCHITECT
ENGINEER: L & T - SARGENT & LUNDY LTD.
THE

NTPC
DRG. NO.:
9578-001-110-PVM-P-211 REV. 03
IS

DATE NAME SIGN TITLE:


DESIGN

PREPARED 31-AUG-16 KHB


ISOMETRIC FOR STEAM

841mm)
CHECKED 31-AUG-16 RSM
A PIPING TO DEAERATOR FROM A
AND

APPROVED 31-AUG-16 DK
AUXILIARY STEAM PIPING
DEPARTMENT MECHANICAL
DRAWING

(1189mm x
L&T-S&L JOB NO. :LD16005000

SCALE :NONE
THIS

L&T-S&L DRG. NO.:LD16005-


XJ00-01-LBD-130003 SHT:04 OF 04 REV.03

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME:LD16005-XJ00-01-LBD-130003-04.DGN
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

BILL OF MATERIALS
ITEM SIZE (MM) SCHEDULE/
QTY. DESCRIPTION
NO. (DN) RATING

1 6956 MM 300 STD PIPE, ASTM A 335 GRADE P11, ASME B36.10M
2
M N 2 1 350X300 STD CONCENTRIC REDUCER, ASTM A 234 GRADE WP11 CLASS 1, ASME B16.9
M

3 1 300X250 40 REDUCING TEE, ASTM A 234 GRADE WP11 CLASS 1, ASME B16.9

4 2 300X200 40 REDUCING TEE, ASTM A 234 GRADE WP11 CLASS 1, ASME B16.9

5 3 300 X ID 40 STD X SPL THERMOWELL STUB, ASTM A 182 GRADE F11 CLASS 1,
DETAIL : T (SEE DWG NO : 9578-001-110-PVM-P-210 SHT.01)

6 5 300X25 CLASS 3000 SOCKOLET, ASTM A 182 GRADE F11 CLASS 1, MSS SP-97

7 2 300 STD 45 DEG ELBOW, ASTM A 234 GRADE WP11 CLASS 1, ASME B16.9

8 2 300 STD 90 DEG LR ELBOW, ASTM A 234 GRADE WP11 CLASS 1, ASME B16.9

L L

K K

CONT. ON
LINE: 01LBD61-BR193-0315-DN200
DWG: DWG: 9578-001-110-PVM-P-249B
E 2371.784M
N 1475.295M
24 EL +6.260M
J 55 J
B

8
90.0°
E 2372.495M
N 1475.295M
EL +6.039M
24 34
55
8 55
B

CONT. ON
4 76
LINE: 01LBU61-BR001-0315-DN250 1 5
71
DWG: 9578-001-110-PVM-P-210 SHT.20
I E 2371.023M 1 I
73 15
N 1475.295M 47 5
1
EL +6.265M
1 E 2372.495M
3 76 HOLD LIST:
01LBD61-BQ041V 20 N 1474.332M
E 2370.569M 0
N 1475.491M
EL +6.243M Temporary Piping.
8 E 2372.300M
EL +6.019M
6
6
E 2372.495M
Elbow to be erected
N 1474.530M
EL +6.046M 20 N 1474.132M after steam blowing
0
24 4 EL +6.245M
55 6 45 5
B
E 2370.369M
N 1475.491M PP
CONT. ON 6 65
EL +6.017M TW 7
H LINE: 01LBD61-BR191-0315-DN200 0 H
20 PT 01LBD61
DWG: DWG: 9578-001-110-PVM-P-249B 01LBD61 CT401
6 8
E 2369.715M CP103 90.6°
N 1475.295M 1
0 E 2372.495M
EL +6.239M 65 20 PT
34 N 1473.473M
01LBD61
EL +6.057M
CP102

3 PT
4 TE

1
4
45 01LBD61 VENT LINE 01LBD61
CP101 LINE: 01LBD61-BR503-0315-DN25 CT002
E 2372.357M
N 1473.611M
FE
8 E 2370.169M EL +5.400M
01LBD61
1 1 N 1475.491M 2
CF001 47 5
EL +6.015M
NOTES:
ORIEN. DIR.= TE
01LBD61-BQ124X 01. FOR NOTES & REFERENCES REFER DWG. NO. : 9578-001-110-PVM-P-210 SHT 01.
WEST 45.0 NORTH 01LBD61

4 CT001
55 E 2372.357M
N 1473.611M
2440 EL +5.150M
2
ORIEN. DIR.=
01LBD61-BR001-0315-DN300 5
WEST 45.0 NORTH 7
45.0°
F E 2372.764M F
66
16 N 1473.473M
01LBD61-BQ051R
38
10 1 EL +4.490M
38 7
2
45.0°

269

E 2372.495M 9
26
1 N 1473.473M
EL +4.759M
2 7

1
E E
2
WRITING.

CONT. ON 2
42
DWG: 9578-001-110-PVM-P-210 SHT.03 77 86
B 49
IN

E 2362.994M
N 1475.295M
REFERENCE DRAWINGS:
PERMISSION

EL +5.943M DRAWING NO. DRAWING TITLE

CONN. TO
01LAC01-MT001
TP1001
THEIR

BOILER FEED PUMP#A DRIVE TURBINE


E 2372.764M
WITHOUT

D N 1473.473M D
EL +3.509M
LENT
OR
COPIED
BE

02 07-NOV-17 ISSUED FOR APPROVAL KHB MRB --- --- DJR --- DK
NOT

01 28-SEP-17 ISSUED FOR APPROVAL KHB MRB --- --- DJR --- DK
MUST

C REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD. C

STAMP:
AND

FPJ
LIMITED

PIPE SIZE & THK


REFER "S"
L
MATL. A335 GR.P11
& LUNDY

FPJ
SARGENT

PLATE SIZE "P"


MATL. A515 GR.70
HOLE PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
B 6Ø VENT B
-

TYPE A
L&T

OWNER:
NTPC LIMITED
(A GOVERNMENT OF INDIA ENTERPRISE)
OF

EPC
PROPERTY

CONTRACTOR: LARSEN & TOUBRO LIMITED


WELDED ATTACHMENT DETAILS
ARCHITECT
SUPPORT TAG VIEW TRUNNION PIPE
LENGTH END PLATE ENGINEER: L & T - SARGENT & LUNDY LTD.
TYPE "L" "P"
NO. LOOKING "S"
THE

(MM) (MM X MM X MM THK.) NTPC


DRG. NO.:
9578-001-110-PVM-P-210 REV. 02
IS

01LBD61-BQ041V NORTH A DN200 X SCH STD 400 250 X 250 X 8 THK.


DATE NAME SIGN TITLE:
DESIGN

PREPARED 28-SEP-17 KHB


ISOMETRIC DRAWING FOR

841mm)
NOTE: 1) FOR TRUNNION & END PLATE BOM, PLEASE REFER ABOVE TABLE. CHECKED 28-SEP-17 MRB
A STEAM PIPING TO BFP A
AND

2) O 6 MM VENT SHOULD BE LOCATED IN THE HIGHEST POSITION ON THE TRUNNION. APPROVED 28-SEP-17 DK
DRIVE TURBINE FROM
DEPARTMENT MECHANICAL
DRAWING

(1189mm x
L&T-S&L JOB NO. :LD16005000 DIFFERENT SOURCES
SCALE :NONE
THIS

L&T-S&L DRG. NO.:LD16005-


XJ00-01-LBD-130004 SHT:18 OF 21 REV.02

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME:LD16005-XJ00-01-LBD-130004-18.DGN
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

BILL OF MATERIALS
ITEM SIZE (MM) SCHEDULE/
QTY. DESCRIPTION
NO. (DN) RATING

1 6233 MM 300 STD PIPE, ASTM A 335 GRADE P11, ASME B36.10M
2
M N 2 1 350X300 STD CONCENTRIC REDUCER, ASTM A 234 GRADE WP11 CLASS 1, ASME B16.9
M

3 1 300X250 40 REDUCING TEE, ASTM A 234 GRADE WP11 CLASS 1, ASME B16.9

4 2 300X200 40 REDUCING TEE, ASTM A 234 GRADE WP11 CLASS 1, ASME B16.9

5 3 300 X ID 40 STD X SPL THERMOWELL STUB, ASTM A 182 GRADE F11 CLASS 1,
DETAIL : T (SEE DWG NO : 9578-001-110-PVM-P-210 SHT.01)

6 5 300X25 CLASS 3000 SOCKOLET, ASTM A 182 GRADE F11 CLASS 1, MSS SP-97

7 2 300 STD 45 DEG ELBOW, ASTM A 234 GRADE WP11 CLASS 1, ASME B16.9

8 2 300 STD 90 DEG LR ELBOW, ASTM A 234 GRADE WP11 CLASS 1, ASME B16.9

L L

K K

CONT. ON
LINE: 01LBD62-BR193-0315-DN200
DWG: 9578-001-110-PVM-P-249B
E 2356.532M
N 1476.010M
17
40 EL +6.238M

J B J

8
90.0°
E 2357.243M PT
N 1476.011M 01LBD62
EL +6.016M CP101

82 1
17 71 67
5
PT
01LBD62
CP103
4
1
8
I 70 30
I
0
17
40 6 E 2357.048M
16 N 1475.035M
E 2357.048M 5 HOLD LIST:
B EL +6.026M
N 1475.335M
9
1 EL +6.023M PT 25
01LBD62 4
CONT. ON
CP102
LINE: 01LBU62-BR001-0315-DN250
74 6
10 DWG: 9578-001-110-PVM-P-210 25
E 2355.824M E 2357.048M 0

N 1476.010M 01LBD62-BQ123V N 1474.781M


EL +6.244M EL +6.029M
E 2357.243M
H 6 20 H
4 N 1474.330M
9 2440
5 EL +6.228M
40 3 E 2357.048M Temporary Piping.
N 1474.531M E 2357.243M
N 1474.129M
Elbow to be erected
EL +6.031M 6 20
9 0
EL +6.230M after steam blowing
1 5

17 9 PP
39 23 32 FE 65
32 TW 6 7
51 01LBD62
B 14 CF001
01LBD62
CT401 8
90.6°
CONT. ON
1 E 2357.243M
LINE: 01LBD62-BR191-0315-DN200
N 1473.470M
DWG: 9578-001-110-PVM-P-249B
EL +6.042M
E 2351.527M 01LBD62-BQ131X
NOTES:
N 1476.011M
N 1474.127M 5
EL +6.188M

1
01. FOR NOTES & REFERENCES REFER DWG. NO. : 9578-001-110-PVM-P-210 SHT 01.
VENT LINE ORIEN. DIR.=
E 2357.105M WEST 45.0 NORTH
7 LINE: 01LBD62-BR503-0315-DN25
83 N 1473.608M
DWG: (blank)
EL +5.381M
4
2
59
23

TE
01LBD62
E 2357.105M
F CT001 F
01LBD62-BQ052R N 1473.608M
1 EL +5.131M
2

01LBD62-BR001-0315-DN300
CONT. ON
5
DWG: 9578-001-110-PVM-P-210 SHT.05 TE
ORIEN. DIR.=
E 2349.169M 01LBD62
WEST 45.0 NORTH
N 1476.011M CT002

EL +5.937M 7
45.0°
38 E 2357.513M
1
7 N 1473.470M
45.0° EL +4.472M
E
269 2 E
WRITING.

E 2357.243M 9
26
N 1473.470M
EL +4.741M
2
IN

REFERENCE DRAWINGS:
PERMISSION

1
DRAWING NO. DRAWING TITLE
2
42
80 2
THEIR

CONN. TO
WITHOUT

D D
01LAC02-MT001
TP 1001 63
27
BOILER FEED PUMP#B DRIVE TURBINE
LENT

E 2357.513M
N 1473.470M
OR

EL +3.509M
COPIED

9
BE

02 07-NOV-17 ISSUED FOR APPROVAL KHB MRB --- --- DJR --- DK
NOT

01 28-SEP-17 ISSUED FOR APPROVAL KHB MRB --- --- DJR --- DK
MUST

C REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD. C

STAMP:
AND
LIMITED
& LUNDY
SARGENT

PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT


B B
-
L&T

OWNER:
NTPC LIMITED
(A GOVERNMENT OF INDIA ENTERPRISE)
OF

EPC
PROPERTY

CONTRACTOR: LARSEN & TOUBRO LIMITED

ARCHITECT
ENGINEER: L & T - SARGENT & LUNDY LTD.
THE

NTPC
DRG. NO.:
9578-001-110-PVM-P-210 REV. 02
IS

DATE NAME SIGN TITLE:


DESIGN

PREPARED 28-SEP-17 KHB


ISOMETRIC DRAWING FOR

841mm)
CHECKED 28-SEP-17 MRB
A STEAM PIPING TO BFP A
AND

APPROVED 28-SEP-17 DK
DRIVE TURBINE FROM
DEPARTMENT MECHANICAL
DRAWING

(1189mm x
L&T-S&L JOB NO. :LD16005000 DIFFERENT SOURCES
SCALE :NONE
THIS

L&T-S&L DRG. NO.:LD16005-


XJ00-01-LBD-130004 SHT:19 OF 21 REV.02

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME:LD16005-XJ00-01-LBD-130004-18.DGN
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

BILL OF MATERIALS
ITEM SIZE (MM) SCHEDULE/
QTY. DESCRIPTION
NO. (DN) RATING

1 4103 MM 550 STD PIPE, ASTM A335 GRADE P91, ASME B36.10M
M N 2 550 MM 550 XS PIPE, ASTM A 335 GRADE P22, ASME B36.10M
M

3 9465 MM 550 XS PIPE, ASTM A 672 GRADE B60 CLASS 22, ASME B36.10M

4 1 550X200 XS WELDOLET, ASTM A 105, MSS SP-97

5 4 550X150 XS WELDOLET, ASTM A 105, MSS SP-97

6 1 550X25 CLASS 3000 SOCKOLET, ASTM A 105, MSS SP-97

7 1 550 STD 90 DEG LR ELBOW, ASTM A234 GRADE WP91, ASME B16.9

8 2 550 XS 90 DEG LR ELBOW, ASTM A234 GRADE WPBW, ASME B16.9

L L

5

±2

.5°
37
53

40
72
9.

K K
01LBG01-AA201
838

2 1118 8

6
1.
90.0°
07
8
Ø 558.

Ø 538.

TAPER 1:3 E 2338.717M


N 1474.516M
67 EL +32.364M
14 838 TOTAL WEIGHT OF THE SYSTEM (APPROX.) = 8.1 TONNE
3
CONT. ON
0
WEP BY LTP WEP BY CCI 51 DWG: 9578-001-102-PVM-C-015 SHT.02
E 2338.717M
N 1473.678M
1092
0 11 EL +32.356M
J 31 J
DETAIL A
01LBG01-BQ011R
AS PER ASME B16.25 FIG.4
E 2334.401M
01LBG01-BR001-0305-DN550
N 1474.204M 4
0
50 01LBG01-AA101
EL +32.406M

3
PI
8
01LBG01 25
PROCESS LINE
CP501
LINE: 01LBG01-BR401-0305-DN200
DWG: 9578-001-102-PVM-C-015 SHT.07
E 2333.719M 6
I E 2334.655M I
N 1474.516M 6
68 N 1474.516M
EL +32.770M
EL +32.026M

"DETAIL-B" HOLD LIST:

5
A A
REINFORCEMENT
WELDOLET
SAFETY VALVE PAD
4
49 LINE: 01LBG01-BR197-0305-DN150
15
25 DWG: 9578-001-110-PVM-P-249 SHT.07
6
1 01LBG01-BQ144R B
49
H H
E 2331.204M
SAFETY VALVE N 1474.516M 120°
LINE: 01LBG01-BR195-0305-DN150 EL +32.794M 01LBG05-BQ068R
DWG: 9578-001-110-PVM-P-249 SHT.05 01LBG01-BQ143R

9
E 2329.501M 76"DETAIL-B"
N 1474.516M 03
17 5
EL +32.811M

"DETAIL-B"
LEGENDS:
B
5

DETAIL B SECTION B-B


9 SAFETY VALVE
53
LINE: 01LBG01-BR193-0305-DN150 6Ø VENT HOLE
18
25 DWG: 9578-001-110-PVM-P-249 SHT.03 AT ANY LOCATION
NOTES:
8
43
01. FOR GENERAL NOTES & LEGENDS REFER DWG. NO.: 9578-001-110-PVM-P-201.
01LBG01-BQ142R 02. ALL DIMENSIONS ARE IN MM AND ELEVATIONS AND CO- ORDINATES ARE IN
E 2326.983M 10 METER UNLESS NOTED OTHERWISE.
N 1474.516M 01LBG01-BQ070X 03. ELEVATION (EL.) SHOWN ON THE DRAWING IS THE CENTER OF PIPE ELEVATION
01LBG01-BQ067R
EL +32.835M UNLESS NOTED OTHERWISE.

01LBG01-BQ148R 04. BILL OF MATERIAL SHOWN ON THE DRAWING IS FOR ESTABLISHING


9
76 100MM APPROXIMATE PIPE LENGTHS AND PIPE FITTINGS / COMPONENTS.
"DETAIL-B" NO ALLOWANCES ARE CONSIDERED IN BILL OF MATERIAL.(FOR L&T PURPOSE)
SAFETY VALVE 05. PIPING SYSTEMS SHALL BE FABRICATED AND ERECTED IN ACCORDANCE
13 LINE: 01LBG01-BR191-0305-DN150 WITH ASME B31.1. AND NTPC TECHNICAL SPECIFICATION.
F 16 F
DWG: 9578-001-110-PVM-P-249 SHT.01 06. NO COLD PULL IS PERMISSIBLE.
REINFORCEMENT PAD DETAIL 07. HANDLING LUGS FOR ERECTION REQUIREMENT OF ADEQUATE STRENGTH SHALL
MATL (REINFORCEMENT PAD CUT FROM BE ADDED BY PIPING ERECTION CONTRACTOR. THE MATERIAL SHALL BE SAME
5 PARENT PIPE ONLY)
KHG 0325 AS MAIN PIPE & WELDING SHALL BE DONE IN ACCORDANCE WITH THE APPROVED

8 QUALITY ASSURANCE PLAN.


MATL 08. ALL HOLES SHALL BE DRILLED. FLAME CUTTING IS NOT ALLOWED.
90.0°
KHG 0305
SECTION A-A 09. DELETED
E 2325.366M
10. ALL WELDING SHALL BE DONE BY IBR CERTIFIED WELDER.
N 1474.516M
EL +32.494M 2
22
26
MATL
KHG 0325 REFERENCE DRAWINGS:
MATL
E 11 DRAWING NO. DRAWING TITLE E
01LBG05-BQ066R 13 KHG 335
WRITING.

9578-001-999-POC-F-001 GENERAL LAYOUT PLAN


01LBG01-BR003-0325-DN550 9578-001-110-PVM-F-049 TO 053 TG EQUIPMENT LAYOUT DRAWING

9578-001-110-PVM-L-027 P&ID FOR AUXILIARY STEAM SYSTEM

9578-001-110-PVM-B-154 ESSENTIAL DATASHEET FOR POWER CYCLE PIPING


IN

7
6 VENT 9578-001-110-PVI-W-024 TYPICAL INSTRUMENT STUB DETAILS
90.0°
PERMISSION

HOLE (PRESSURE AND TEMPERATURE)


E 2325.366M PLATE SIZE "P"
9578-001-110-PVM-F-057 COMPOSITE PIPING LAYOUT PLAN ABOVE OPERATING
1 N 1472.290M MATL. A515 GR.70 FLOOR IN A-B & B-C BAY
EL +32.530M AUX. STEAM PIPING LAYOUT BELOW 38.0M IN B-C BAY
41 9578-001-102-PVM-F-025
49 INCLUDING EMBEDMENT DETAILS
THEIR

6 9578-001-102-PVM-H-032 DESIGN MEMO FOR THERMAL INSULATION OF PIPING

9578-001-110-PVM-H-006 THERMAL INSULATION SCHEDULE FOR POWER CYCLE PIPING


Temporary Piping. L PIPE SIZE & THK
REFER "S" STRESS CALCULATION & HANGER SCHEDULE FOR
WITHOUT

D PIPE SIZE & THK 9578-001-102-PVM-U-035 D


Elbow to be erected MATL. A106 Gr.B REFER "S"
AUXILIARY STEAM SYSTEM
3 L
43 01LBG30-BR102-0335-DN550 after steam blowing MATL. A106 Gr.B 9578-001-102-PVM-H-024 HANGER DATA SHEET FOR AUXILIARY STEAM SYSTEM

9578-001-110-PVM-B-078 OUTLINE OF LARGE BORE LOW PRESSURE VALVES


LENT

1297 MM BELOW 900# ON PCP/LPP SYSTEMS

9578-001-102-PVM-B-152 GA OF HCPRDS INCLUDING SPRAY CONTROL VALVE WITH


01LBG30-BQ065R
54 ALLOWABLE FORCES,MOMENTS & MOVEMENTS AND NOZZLE
OR

60 PLATE SIZE "P"


"DETAIL-A" SIZES
COPIED

B MATL. A515 GR.70 04 17-NOV-17 ISSUED FOR APPROVAL KHB MRB --- --- DJR --- DK
HOLE
450 MM 6 VENT 03 16-OCT-17 ISSUED FOR APPROVAL KHB MRB --- --- DJR --- DK
TYPE C TYPE D
02 25-SEP-17 ISSUED FOR APPROVAL KHB MRB --- --- DJR --- DK
BE

78 01 12-JUL-17 ISSUED FOR APPROVAL KHB MRB --- --- DJR --- DK
NOT

43 PCV-01LBA30-AA081
Ø 74.00 00 31-AUG-16 ISSUED FOR APPROVAL KHB RSM --- --- PSV --- DK
MUST

C REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD. C


WELDED ATTACHMENT DETAILS
STAMP:
AND

LENGTH END PLATE


SUPPORT TAG VIEW TRUNNION PIPE
CONT. ON TYPE "L" "P"
NO. LOOKING "S"
LIMITED

(MM) (MM X MM X MM THK.)


LINE: 01LBA30-BR104-4537-DN200
13
DWG: 9578-001-102-PVM-C-006 SHT.01 01LBG01-BQ070X EAST DN450 X SCH STD 600 500 X 500 X 8 THK.
D
E 2319.128M
TAPER THREAD Rc 1 INCH
30
& LUNDY

N 1472.290M AS PER IS: 554


01LBG01-BQ148R EAST C DN200 X SCH STD 711 250 X 250 X 8 THK.
40

EL +32.142M

01LBG01-BQ142R EAST C DN200 X SCH STD 690 250 X 250 X 8 THK.


SARGENT

50
10

01LBG01-BQ143R EAST C DN200 X SCH STD 711 250 X 250 X 8 THK.


PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT
B B
-

01LBG01-BQ144R EAST C DN200 X SCH STD 683 250 X 250 X 8 THK.


L&T

OWNER:
NTPC LIMITED
(A GOVERNMENT OF INDIA ENTERPRISE)
OF

NOTE: 1) FOR TRUNNION & END PLATE BOM, PLEASE REFER ABOVE TABLE. EPC
PROPERTY

Ø 32 LARSEN & TOUBRO LIMITED


2) O 6 MM VENT SHOULD BE LOCATED IN THE HIGHEST POSITION ON THE TRUNNION. CONTRACTOR:

ARCHITECT
ENGINEER: L & T - SARGENT & LUNDY LTD.
DETAIL "T"
THE

NTPC
DRG. NO.:
9578-001-102-PVM-C-015 REV. 04
IS

NOTES:
DATE NAME SIGN TITLE:
DESIGN

01. ALL DIMENSIONS IN THE ABOVE FIGURE ARE IN MM.


PREPARED 31-AUG-16 KHB
ISOMETRIC FOR HT

841mm)
CHECKED 31-AUG-16 RSM
A AUX STEAM UNIT HEADER A
AND

APPROVED 31-AUG-16 DK

DEPARTMENT MECHANICAL
DRAWING

(1189mm x
L&T-S&L JOB NO. :LD16005000

SCALE :NONE
THIS

L&T-S&L DRG. NO.:LD16005-


XJ00-01-QH-130003 SHT:01 OF 13 REV.04

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME:LD16005-XJ00-01-QH-130003-01.DGN
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

BILL OF MATERIALS
ITEM SIZE (MM) SCHEDULE/
QTY. DESCRIPTION
NO. (DN) RATING

1 646 MM 550 XS PIPE, ASTM A 672 GRADE B60 CLASS 22, ASME B36.10M
M N 2 837 MM 250 60 PIPE, ASTM A106 GRADE C, ASME B36.10M
M

3 2634 MM 250 40 PIPE, ASTM A 106 GRADE B, ASME B36.10M


4
4 475 MM 200 40 PIPE, ASTM A 106 GRADE B, ASME B36.10M

5 1 550X250 40 REDUCING TEE, ASTM A 234 GRADE WPB, ASME B16.9

6 1 550X100 XS WELDOLET, ASTM A 105, MSS SP-97

7 1 250X250 40 TEE, ASTM A 234 GRADE WPB, ASME B16.9

8 1 250X200 40 REDUCING TEE, ASTM A 234 GRADE WPB, ASME B16.9

9 2 250X150 60 CONCENTRIC REDUCER, ASTM A234 GRADE WPC, ASME B16.9

10 2 250X25 CLASS 3000 SOCKOLET, ASTM A 105, MSS SP-97

11 1 250 40 90 DEG LR ELBOW, ASTM A 234 GRADE WPB, ASME B16.9

L 12 1 200X25 CLASS 3000 SOCKOLET, ASTM A 105, MSS SP-97 L

13 1 200 40 CAP, ASTM A 234 GRADE WPB, ASME B16.9

14 1 25 CLASS 3000 SOCKOLET, ASTM A 105, MSS SP-97

PIPE SIZE & THK


REFER "S"
L
MATL. A106 GR.B

40
72
B

K K
PLATE SIZE "P"

MATL. A515 GR.70 CONT. ON


HOLE
6 VENT DWG: 9578-001-102-PVM-C-015 SHT.01
TYPE D E 2338.717M
N 1473.678M
EL +32.356M 01LBG01-BR001-0305-DN550

WELDED ATTACHMENT DETAILS 1

LENGTH END PLATE E 2338.717M


SUPPORT TAG VIEW TRUNNION PIPE
TYPE "L" "P"
NO. LOOKING "S" 67 N 1473.351M
(MM) (MM X MM X MM THK.) 14 32
3 EL +32.683M

J 01LBC30-BR071G EAST D DN200 X SCH STD 450 250 X 250 X 8 THK. J


6

NOTE: 1) FOR TRUNNION & END PLATE BOM, PLEASE REFER ABOVE TABLE.
B 55
2) O 6 MM VENT SHOULD BE LOCATED IN THE HIGHEST POSITION ON THE TRUNNION. 57

11 SPARE CONNECTION
PROCESS LINE
LINE: 01LBG10-BR016-0305-DN100
74
DWG: 9578-001-102-PVM-C-015 SHT.09 2
5

419
CONT. ON

01LBG05-AA201 DWG: 9578-001-102-PVM-C-015 SHT.03


I I
E 2338.717M
N 1472.193M
EL +32.341M
01LBG05-BQ069R 3
359
HOLD LIST:

67
14 622

01LBG05-BR001-0305-DN250

0
61
H H
11

6
81

8
E 2336.920M

LEGENDS:

3
01LBG05-BR405-0305-DN200
12

2
93 E 2336.920M
7 NOTES:
N 1472.470M
E 2335.988M
EL +31.835M
4 01. FOR NOTES & REFERENCES REFER DWG. NO. : 9578-001-102-PVM-C-015 SHT 01.
PROCESS LINE

4
E 2336.920M
LINE: 01LBG05-BR407-0305-DN25
N 1472.612M
EL +31.584M
4
13
3
01LBC30-BR071G

F 95 F
0
E 2336.920M
5 N 1472.612M
84 01LBG05-BR002-0305-DN250
EL +31.551M
4
14 3
1
26 PROCESS LINE
LINE: 01LBG05-BR406-0305-DN25
01LBC30-AA111
E 2334.195M
N 1472.782M
10 11
EL +32.392M
90.0°
787
MATL E 2335.988M
2
KHG 0305 58 N 1471.663M
2
E 2 16 EL +32.382M E
MATL
3
WRITING.

01LBC30-BR104-0608-DN250 KHG 0608 93

MATL
REFERENCE DRAWINGS:
KHG 0305
PI
IN

MATL DRAWING NO. DRAWING TITLE


01LBC30 3
10
PERMISSION

DRAIN LINE KHG 0608 9578-001-102-PVI-Y-024A VENDOR DATASHEET FOR CONTROL VALVES
CP503 01LBC05-BQ072R
0 INCLUDING ACCESSORIES FOR SGBOP
LINE: 01LBC30-BR406-0608-DN25 15 787
THEIR

01LBC30-AA112

0
15
WITHOUT

D D

E 2334.043M
N 1472.612M 4
51 11B 37
B 38 EL +32.224M
LENT

9
OR

177
PCV-01LBC30-AA081 01LBC30-BR106-0608-DN250
COPIED

178 11B 04 17-NOV-17 ISSUED FOR APPROVAL KHB MRB --- --- DJR --- DK
93 2
25 03 16-OCT-17 ISSUED FOR APPROVAL KHB MRB --- --- DJR --- DK
CONT. ON
560 559 02 25-SEP-17 ISSUED FOR APPROVAL KHB MRB --- --- DJR --- DK
LINE: 01LBC30-BR105-0608-DN150
BE

DWG: 9578-001-102-PVM-C-014 01 12-JUL-17 ISSUED FOR APPROVAL KHB MRB --- --- DJR --- DK
NOT

CONT. ON
E 2333.157M
LINE: 01LBC30-BR107-0608-DN150 93 00 31-AUG-16 ISSUED FOR APPROVAL KHB RSM --- --- PSV --- DK
Temporary Piping. 25
MUST

DWG: 9578-001-102-PVM-C-014 SHT.01 N 1471.663M


C 9 REV. DATE DESCRIPTION BY MEC. ELE. CIV. C&I SES APPD. C
E 2333.157M valve to be erected EL +32.408M
C STAMP:
AND

N 1472.612M after steam blowing MOV-01LBC30-AA012


EL +32.399M
LIMITED

59
13
& LUNDY
SARGENT

PROJECT: 2 X 660MW KHARGONE SUPER THERMAL POWER PROJECT


B B
-
L&T

OWNER:
NTPC LIMITED
(A GOVERNMENT OF INDIA ENTERPRISE)
OF

EPC
PROPERTY

CONTRACTOR: LARSEN & TOUBRO LIMITED

ARCHITECT
ENGINEER: L & T - SARGENT & LUNDY LTD.
THE

NTPC
DRG. NO.:
9578-001-102-PVM-C-015 REV. 04
IS

DATE NAME SIGN TITLE:


DESIGN

PREPARED 31-AUG-16 KHB


ISOMETRIC FOR HT

841mm)
CHECKED 31-AUG-16 RSM
A AUX STEAM UNIT HEADER A
AND

APPROVED 31-AUG-16 DK

DEPARTMENT MECHANICAL
DRAWING

(1189mm x
L&T-S&L JOB NO. :LD16005000

SCALE :NONE
THIS

L&T-S&L DRG. NO.:LD16005-


XJ00-01-QH-130003 SHT:02 OF 13 REV.04

A0
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

FILE NAME:LD16005-XJ00-01-QH-130003-02.DGN
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

BILL OF MATERIALS
ITEM SIZE (MM) SCHEDULE/
Temporary Piping. QTY. DESCRIPTION
NO. (DN) RATING
Elbow to be erected
1 25849 MM 200 40 PIPE, ASTM A 106 GRADE B, ASME B36.10M
M N after steam blowing M
2 1 200X150 40 CONCENTRIC REDUCER, ASTM A 234 GRADE WPB, ASME B16.9

3 1 200X25 CLASS 3000 SOCKOLET, ASTM A 105, MSS SP-97

4 8 200 40 90 DEG LR ELBOW, ASTM A 234 GRADE WPB, ASME B16.9


4
89.9°
E 2349.749M 610
N 1472.360M
EL +38.450M
4
89.5° E 2349.750M
N 1471.750M
EL +38.444M

610
L L
PIPE SIZE & THK
L REFER "S"
MATL. A106, GR B 1
6 VENT 6
HOLE
PLATE SIZE "P"

MATL. A515, GRADE 70

55
36
TYPE B

WELDED ATTACHMENT DETAILS


LENGTH END PLATE
SUPPORT TAG VIEW TRUNNION PIPE 01LBG13-BQ052V

1
K TYPE "L" "P" K
NO. LOOKING "S"
(MM) (MM X MM X MM THK.)

01LBG13-BQ049X EAST B DN150 X SCH STD 450 200 X 200 X 8 THK. 98


26

NOTE: 1) FOR TRUNNION & END PLATE BOM, PLEASE REFER ABOVE TABLE.
2) O 6 MM VENT SHOULD BE LOCATED IN THE HIGHEST POSITION ON THE TRUNNION.
533 CONN. TO
01LAA10-AC001
305 NOZZLE: S9
4
FEEDWATER STORAGE TANK
90.0°
E 2349.750M
E 2345.256M
J N 1471.750M J
N 1472.360M
EL +36.543M EL +36.696M
EL +38.505M 2
01LBG13-AA201 "DETAIL-A"

1
60
00 00
20

01LBG13-BQ051R
C
I I

18
06
HOLD LIST:

A A

10
2

69
Y

7
5
T

P
Y

30
T

°
120°

8
EL.
TYP

H H
50

MOV-01LBG13-AA002
8
°

P
35

Y
T

2 Nos. LUG PL.


50 X 25 X 8 THK
MAT'L ASTM A 575 TYP
GRADE 70 2 1
559 E 2345.256M
34 N 1469.649M
5