Вы находитесь на странице: 1из 71

LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL
DATE TESTED

Test No
Test Location
Tested Level
Hole Depth mm
Sand cone No. 2 2 2
Weight of Standard Sand Before Pouring g
Weight of Standard Sand After Pouring g
Weight of Standard Sand in hole + Cone g
Weight of Standard sand in Cone g 1164 1164 1164
Weight of Standard sand in hole g
Bulk Density of Standard Sand g/cm3 1.562 1.562 1.562
Volume of Hole cm3
Weight of Soil from hole + Container g
Weight of Container g
Weight of Soil from hole g
Wet Density g/cm3

Moisture Content
Container No
Weight of wet soil+container g
Weight of dry soil+container g
Weight of container g
Moisture content %
Dry Density g/cm3

Reference Lab Vaiue


Max. Dry Density of soil g/cm3
Optimum Moisture Content %
Laboratory Sample No
Degree of Compaction %

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Excavated Soil
DATE TESTED 1/2/2015

Test No 3 4 5 6
Test Location H12 H 10/11 G9 H9
Tested Level 76.100 76.190 75.060 75.210
Hole Depth mm 150 150 150 150
Sand cone No. 2 2 2 2
Weight of Standard Sand Before Pouring g 14000 14000 14000 14027
Weight of Standard Sand After Pouring g 9438 9133 9442 9473
Weight of Standard Sand in hole + Cone g 4562 4867 4558 4554
Weight of Standard sand in Cone g 1164 1164 1164 1164
Weight of Standard sand in hole g 3398 3703 3394 3390
Bulk Density of Standard Sand g/cm3 1.562 1.562 1.562 1.562
Volume of Hole cm3 2175.4 2370.7 2172.9 2170.3
Weight of Soil from hole + Container g 5009 5415 4989 4704
Weight of Container g 427 427 427 427
Weight of Soil from hole g 4582 4988 4562 4277
Wet Density g/cm3 2.106 2.104 2.100 1.971

Moisture Content
Container No
Weight of wet soil+container g 261 366 217 419
Weight of dry soil+container g 241 341 201 389
Weight of container g 89 150 89 150
Moisture content % 13.16 13.09 14.29 12.55
Dry Density g/cm3 1.861 1.861 1.837 1.751

Reference Lab Value


Max. Dry Density of soil g/cm3 1.96 1.96 1.96 1.96
Optimum Moisture Content % 10.7 10.7 10.7 10.7
Laboratory Sample No
Degree of Compaction % 94.97 94.92 93.73 89.33

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Excavated Soil and imported soil
DATE TESTED 1/3/2015

Test No 7 8 9
Test Location G10a JH11 JH13
Tested Level 75.945 76.760 76.760
Hole Depth mm 150 160 150
Sand cone No. 2 2 2
Weight of Standard Sand Before Pouring g 13998 14000 13987
Weight of Standard Sand After Pouring g 9279 9454 9546
Weight of Standard Sand in hole + Cone g 4719 4546 4441
Weight of Standard sand in Cone g 1164 1164 1164
Weight of Standard sand in hole g 3555 3382 3277
Bulk Density of Standard Sand g/cm 3
1.562 1.562 1.562
Volume of Hole cm3 2275.9 2165.2 2098.0
Weight of Soil from hole + Container g 5152 4918 4970
Weight of Container g 427 427 427
Weight of Soil from hole g 4725 4491 4543
Wet Density g/cm3 2.076 2.074 2.165

Moisture Content
Container No
Weight of wet soil+container g 323 402 343
Weight of dry soil+container g 302 375 317
Weight of container g 89 150 117
Moisture content % 9.86 12.00 13.00
Dry Density g/cm3 1.890 1.852 1.916

Reference Lab Value


Max. Dry Density of soil g/cm3 1.96 1.902 1.902
Optimum Moisture Content % 10.7 11.95 11.95
Laboratory Sample No
Degree of Compaction % 96.42 97.37 100.75

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Excavated Soil and imported soil
DATE TESTED 1/5/2015

Test No 10 11
Test Location H8/9 G9/10
Tested Level 75.490 75.490
Hole Depth mm 190 150
Sand cone No. 2 2
Weight of Standard Sand Before Pouring g 13482 13813
Weight of Standard Sand After Pouring g 8895 8917
Weight of Standard Sand in hole + Cone g 4587 4896
Weight of Standard sand in Cone g 1164 1164
Weight of Standard sand in hole g 3423 3732
Bulk Density of Standard Sand g/cm3 1.562 1.562
Volume of Hole cm3 2191.4 2389.2
Weight of Soil from hole + Container g 4609 5324
Weight of Container g 427 427
Weight of Soil from hole g 4182 4897
Wet Density g/cm3 1.908 2.050

Moisture Content
Container No
Weight of wet soil+container g 254 427
Weight of dry soil+container g 242 395
Weight of container g 89 150
Moisture content % 7.84 13.06
Dry Density g/cm3 1.770 1.813

Reference Lab Value


Max. Dry Density of soil g/cm3 1.902 1.902
Optimum Moisture Content % 11.95 11.95
Laboratory Sample No
Degree of Compaction % 93.04 95.31

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 1/12/2015

Test No 12 13 13Repeat 12Repeat


Test Location HJ 9 J9
Tested Level
Hole Depth mm 175 150 150 140
Sand cone No. 2 2 2 2
Weight of Standard Sand Before Pouring g 14055 14740 14039 14662
Weight of Standard Sand After Pouring g 8615 9579 8924 10253
Weight of Standard Sand in hole + Cone g 5440 5161 5115 4409
Weight of Standard sand in Cone g 1164 1164 1164 1164
Weight of Standard sand in hole g 4276 3997 3951 3245
Bulk Density of Standard Sand g/cm 3
1.562 1.562 1.562 1.562
Volume of Hole cm3 2737.5 2558.9 2529.4 2077.5
Weight of Soil from hole + Container g 5594 5184 5549 4515
Weight of Container g 427 427 427 427
Weight of Soil from hole g 5167 4757 5122 4088
Wet Density g/cm3 1.887 1.859 2.025 1.968

Moisture Content
Container No
Weight of wet soil+container g 197 250 171 251
Weight of dry soil+container g 188 240 163 245
Weight of container g 89 150 89 150
Moisture content % 9.09 11.11 10.81 6.32
Dry Density g/cm3 1.730 1.673 1.827 1.851

Reference Lab Value


Max. Dry Density of soil g/cm3 1.902 1.902 1.902 1.902
Optimum Moisture Content % 11.95 11.95 11.95 11.95
Laboratory Sample No
Degree of Compaction % 90.97 87.97 96.08 97.31

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 1/13/2015

Test No 14
Test Location HJ 9
Tested Level
Hole Depth mm 175
Sand cone No. 2
Weight of Standard Sand Before Pouring g 15200
Weight of Standard Sand After Pouring g 10119
Weight of Standard Sand in hole + Cone g 5081
Weight of Standard sand in Cone g 1164
Weight of Standard sand in hole g 3917
Bulk Density of Standard Sand g/cm 3
1.562
Volume of Hole cm3 2507.7
Weight of Soil from hole + Container g 5289
Weight of Container g 427
Weight of Soil from hole g 4862
Wet Density g/cm3 1.939

Moisture Content
Container No
Weight of wet soil+container g 153
Weight of dry soil+container g 146
Weight of container g 89
Moisture content % 12.28
Dry Density g/cm3 1.727

Reference Lab Value


Max. Dry Density of soil g/cm3 1.85
Optimum Moisture Content % 13.7
Laboratory Sample No
Degree of Compaction % 93.34

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Excavated soil
DATE TESTED 1/14/2015

Test No 15 16
Test Location F11 E10
Tested Level 75.975 75.790
Hole Depth mm 150 150
Sand cone No. 2 2
Weight of Standard Sand Before Pouring g 14778 13677
Weight of Standard Sand After Pouring g 9920 9147
Weight of Standard Sand in hole + Cone g 4858 4530
Weight of Standard sand in Cone g 1164 1164
Weight of Standard sand in hole g 3694 3366
Bulk Density of Standard Sand g/cm3 1.562 1.562
Volume of Hole cm3 2364.9 2154.9
Weight of Soil from hole + Container g 4768 4726
Weight of Container g 427 427
Weight of Soil from hole g 4341 4299
Wet Density g/cm 3
1.836 1.995

Moisture Content
Container No
Weight of wet soil+container g 228 138
Weight of dry soil+container g 224 132
Weight of container g 150 89
Moisture content % 5.41 13.95
Dry Density g/cm 3
1.741 1.751

Reference Lab Value


Max. Dry Density of soil g/cm3 1.96 1.85
Optimum Moisture Content % 10.7 13.7
Laboratory Sample No
Degree of Compaction % 88.85 94.63

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 1/15/2015

Test No 15 Repeat 17
Test Location F11 E3
Tested Level 75.980 74.150
Hole Depth mm 150 150
Sand cone No. 2 2
Weight of Standard Sand Before Pouring g 13757 14295
Weight of Standard Sand After Pouring g 8930 9272
Weight of Standard Sand in hole + Cone g 4827 5023
Weight of Standard sand in Cone g 1164 1164
Weight of Standard sand in hole g 3663 3859
Bulk Density of Standard Sand g/cm 3
1.562 1.562
Volume of Hole cm3 2345.1 2470.6
Weight of Soil from hole + Container g 5336 5425
Weight of Container g 427 427
Weight of Soil from hole g 4909 4998
Wet Density g/cm3 2.093 2.023

Moisture Content
Container No
Weight of wet soil+container g 165 264
Weight of dry soil+container g 159 251
Weight of container g 89 150
Moisture content % 8.57 12.87
Dry Density g/cm3 1.928 1.792

Reference Lab Value


Max. Dry Density of soil g/cm3 1.96 1.85
Optimum Moisture Content % 10.7 10.7
Laboratory Sample No
Degree of Compaction % 98.37 96.88

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 1/16/2015

Test No 18 Rep-14 19 20
Test Location C-D/1-2 B3 F9 D10
Tested Level 74.360 74.250 75.390 75.400
Hole Depth mm 150 160 150 150
Sand cone No. 2 2 2 2
Weight of Standard Sand Before Pouring g 14816 15870 15046 14531
Weight of Standard Sand After Pouring g 10000 10918 10159 9549
Weight of Standard Sand in hole + Cone g 4816 4952 4887 4982
Weight of Standard sand in Cone g 1164 1164 1164 1164
Weight of Standard sand in hole g 3652 3788 3723 3818
Bulk Density of Standard Sand g/cm 3
1.562 1.562 1.562 1.562
Volume of Hole cm3 2338.0 2425.1 2383.5 2444.3
Weight of Soil from hole + Container g 4839 5127 5332 5428
Weight of Container g 427 427 427 427
Weight of Soil from hole g 4412 4700 4905 5001
Wet Density g/cm3 1.887 1.938 2.058 2.046

Moisture Content
Container No
Weight of wet soil+container g 159 261 189 329
Weight of dry soil+container g 152 250 178 306
Weight of container g 89 150 89 150
Moisture content % 11.11 11.00 12.36 14.74
Dry Density g/cm3 1.698 1.746 1.832 1.783

Reference Lab Value


Max. Dry Density of soil g/cm3 1.857 1.85 1.85 1.85
Optimum Moisture Content % 19.2 13.7 13.7 13.7
Laboratory Sample No
Degree of Compaction % 91.46 94.38 99.00 96.38

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 1/17/2015

Test No 21 22
Test Location G10/9 F/G11
Tested Level 76.660 76.690
Hole Depth mm 150 160
Sand cone No. 2 2
Weight of Standard Sand Before Pouring g 14928 14308
Weight of Standard Sand After Pouring g 10075 9448
Weight of Standard Sand in hole + Cone g 4853 4860
Weight of Standard sand in Cone g 1164 1164
Weight of Standard sand in hole g 3689 3696
Bulk Density of Standard Sand g/cm 3
1.562 1.562
Volume of Hole cm3 2361.7 2366.2
Weight of Soil from hole + Container g 5096 4636
Weight of Container g 427 427
Weight of Soil from hole g 4669 4209
Wet Density g/cm3 1.977 1.779

Moisture Content
Container No
Weight of wet soil+container g 192 168
Weight of dry soil+container g 183 160
Weight of container g 89 89
Moisture content % 9.57 11.27
Dry Density g/cm3 1.804 1.599

Reference Lab Value


Max. Dry Density of soil g/cm3 1.902 1.857
Optimum Moisture Content % 13.7 19.2
Laboratory Sample No
Degree of Compaction % 94.86 86.09

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 1/18/2015

Test No Rep-18 23 24 25
Test Location CD-1/2 E 1/2 E/F 11 D2/3
Tested Level 74.500 74.500 76.600 74.830
Hole Depth mm 140 150 150 150
Sand cone No. 2 2 2 2
Weight of Standard Sand Before Pouring g 14868 15365 15360 15738
Weight of Standard Sand After Pouring g 10310 10280 10683 11037
Weight of Standard Sand in hole + Cone g 4558 5085 4677 4701
Weight of Standard sand in Cone g 1164 1164 1164 1164
Weight of Standard sand in hole g 3394 3921 3513 3537
Bulk Density of Standard Sand g/cm 3
1.562 1.562 1.562 1.562
Volume of Hole cm3 2172.9 2510.2 2249.0 2264.4
Weight of Soil from hole + Container g 5042 5387 5003 4723
Weight of Container g 427 427 427 427
Weight of Soil from hole g 4615 4960 4576 4296
Wet Density g/cm3 2.124 1.976 2.035 1.897

Moisture Content
Container No
Weight of wet soil+container g 242 150 160 192
Weight of dry soil+container g 233 146 152 185
Weight of container g 150 89 89 89
Moisture content % 10.84 7.02 12.70 7.29
Dry Density g/cm3 1.916 1.846 1.805 1.768

Reference Lab Value


Max. Dry Density of soil g/cm3 1.857 1.857 1.857 1.857
Optimum Moisture Content % 19.2 19.2 19.2 19.2
Laboratory Sample No
Degree of Compaction % 103.19 99.43 97.22 95.22

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
Rep-22 26
G11 F4

150 150
2 2
15142 14910
10674 9454
4468 5456
1164 1164
3304 4292
1.562 1.562
2115.2 2747.8
4412 5923
427 427
3985 5496
1.884 2.000

263 242
257 229
150 117
5.61 11.61
1.784 1.792

1.857 1.85
19.2 19.2

96.06 96.87
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 1/19/2015

Test No 27 Rep27
Test Location F10/11 F11
Tested Level
Hole Depth mm
Sand cone No. 2 2
Weight of Standard Sand Before Pouring g 14953 14740
Weight of Standard Sand After Pouring g 10431 9655
Weight of Standard Sand in hole + Cone g 4522 5085
Weight of Standard sand in Cone g 1164 1164
Weight of Standard sand in hole g 3358 3921
Bulk Density of Standard Sand g/cm3 1.562 1.562
Volume of Hole cm3 2149.8 2510.2
Weight of Soil from hole + Container g 4342 5516
Weight of Container g 427 427
Weight of Soil from hole g 3915 5089
Wet Density g/cm3 1.821 2.027

Moisture Content
Container No
Weight of wet soil+container g 179 190
Weight of dry soil+container g 173 181
Weight of container g 89 89
Moisture content % 7.14 9.78
Dry Density g/cm3 1.700 1.847

Reference Lab Value


Max. Dry Density of soil g/cm3 1.857 1.857
Optimum Moisture Content % 19.2 19.2
Laboratory Sample No
Degree of Compaction % 91.53 99.44

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 1/21/2015

Test No 28 29 30
Test Location BC-9 F/G-9 G-5
Tested Level 75.180 75.060 74.310
Hole Depth mm
Sand cone No. 2 2 2
Weight of Standard Sand Before Pouring g 14767 15000 15520
Weight of Standard Sand After Pouring g 10121 10332 10970
Weight of Standard Sand in hole + Cone g 4646 4668 4550
Weight of Standard sand in Cone g 1164 1164 1164
Weight of Standard sand in hole g 3482 3504 3386
Bulk Density of Standard Sand g/cm3 1.562 1.562 1.562
Volume of Hole cm3 2229.2 2243.3 2167.7
Weight of Soil from hole + Container g 5150 4630 4903
Weight of Container g 427 427 427
Weight of Soil from hole g 4723 4203 4476
Wet Density g/cm3 2.119 1.874 2.065

Moisture Content
Container No
Weight of wet soil+container g 193 311 194
Weight of dry soil+container g 184 299 182
Weight of container g 89 150 89
Moisture content % 9.47 8.05 12.90
Dry Density g/cm3 1.935 1.734 1.829

Reference Lab Value


Max. Dry Density of soil g/cm3 1.857 1.857 1.857
Optimum Moisture Content % 19.2 19.2 19.2
Laboratory Sample No
Degree of Compaction % 104.22 93.37 98.48

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 1/22/2015

Test No 31 32
Test Location BC-1/2 C3
Tested Level 75.180 75.250
Hole Depth mm
Sand cone No. 2 2
Weight of Standard Sand Before Pouring g 14613 15352
Weight of Standard Sand After Pouring g 9894 10573
Weight of Standard Sand in hole + Cone g 4719 4779
Weight of Standard sand in Cone g 1164 1164
Weight of Standard sand in hole g 3555 3615
Bulk Density of Standard Sand g/cm3 1.562 1.562
Volume of Hole cm3 2275.9 2314.3
Weight of Soil from hole + Container g 4696 5099
Weight of Container g 427 427
Weight of Soil from hole g 4269 4672
Wet Density g/cm3 1.876 2.019

Moisture Content
Container No
Weight of wet soil+container g 194 186
Weight of dry soil+container g 189 176
Weight of container g 89 89
Moisture content % 5.00 11.49
Dry Density g/cm3 1.786 1.811

Reference Lab Value


Max. Dry Density of soil g/cm3 1.857 1.857
Optimum Moisture Content % 19.2 19.2
Laboratory Sample No
Degree of Compaction % 96.20 97.50

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 1/23/2015

Test No 33
Test Location F-G / 8-9
Tested Level 75.580
Hole Depth mm 150
Sand cone No. 2
Weight of Standard Sand Before Pouring g 15656
Weight of Standard Sand After Pouring g 11242
Weight of Standard Sand in hole + Cone g 4414
Weight of Standard sand in Cone g 1164
Weight of Standard sand in hole g 3250
Bulk Density of Standard Sand g/cm3 1.562
Volume of Hole cm3 2080.7
Weight of Soil from hole + Container g 4781
Weight of Container g 427
Weight of Soil from hole g 4354
Wet Density g/cm3 2.093

Moisture Content
Container No
Weight of wet soil+container g 170
Weight of dry soil+container g 162
Weight of container g 89
Moisture content % 10.96
Dry Density g/cm3 1.886

Reference Lab Value


Max. Dry Density of soil g/cm3 1.857
Optimum Moisture Content % 19.2
Laboratory Sample No
Degree of Compaction % 101.56

Layer:-
Remarks D9/D8 -
H9/H8

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 1/24/2015

Test No 34
Test Location G 3/4
Tested Level 75.250
Hole Depth mm 150
Sand cone No. 2
Weight of Standard Sand Before Pouring g 14169
Weight of Standard Sand After Pouring g 9363
Weight of Standard Sand in hole + Cone g 4806
Weight of Standard sand in Cone g 1164
Weight of Standard sand in hole g 3642
Bulk Density of Standard Sand g/cm3 1.562
Volume of Hole cm3 2331.6
Weight of Soil from hole + Container g 4829
Weight of Container g 427
Weight of Soil from hole g 4402
Wet Density g/cm3 1.888

Moisture Content
Container No
Weight of wet soil+container g 190
Weight of dry soil+container g 185
Weight of container g 89
Moisture content % 5.21
Dry Density g/cm3 1.794

Reference Lab Value


Max. Dry Density of soil g/cm3 1.857
Optimum Moisture Content % 19.2
Laboratory Sample No
Degree of Compaction % 96.63
Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 1/26/2015

Test No 35 36
Test Location C/D-4/5 G-8/9
Tested Level 76.250 77.800
Hole Depth mm 150 150
Sand cone No. 2 2
Weight of Standard Sand Before Pouring g 15044 14943
Weight of Standard Sand After Pouring g 10186 10402
Weight of Standard Sand in hole + Cone g 4858 4541
Weight of Standard sand in Cone g 1164 1164
Weight of Standard sand in hole g 3694 3377
Bulk Density of Standard Sand g/cm3 1.562 1.562
Volume of Hole cm3 2364.9 2162.0
Weight of Soil from hole + Container g 4717 4496
Weight of Container g 427 427
Weight of Soil from hole g 4290 4069
Wet Density g/cm3 1.814 1.882

Moisture Content
Container No
Weight of wet soil+container g 185 277
Weight of dry soil+container g 182 273
Weight of container g 89 150
Moisture content % 3.23 3.25
Dry Density g/cm3 1.757 1.823

Reference Lab Value


Max. Dry Density of soil g/cm3 1.857 1.857
Optimum Moisture Content % 19.2 19.2
Laboratory Sample No
Degree of Compaction % 94.63 98.16
Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 1/28/2015

Test No 37 38 39
Test Location DE 6/7 AB 7/8 CD 10/11
Tested Level 77.750
Hole Depth mm 150 150 150
Sand cone No. 2 2 2
Weight of Standard Sand Before Pouring g 15336 14965 15622
Weight of Standard Sand After Pouring g 10603 10384 10994
Weight of Standard Sand in hole + Cone g 4733 4581 4628
Weight of Standard sand in Cone g 1164 1164 1164
Weight of Standard sand in hole g 3569 3417 3464
Bulk Density of Standard Sand g/cm3 1.562 1.562 1.562
Volume of Hole cm3 2284.9 2187.6 2217.7
Weight of Soil from hole + Container g 4851 4614 4625
Weight of Container g 427 427 427
Weight of Soil from hole g 4424 4187 4198
Wet Density g/cm3 1.936 1.914 1.893

Moisture Content
Container No
Weight of wet soil+container g 177 273 244
Weight of dry soil+container g 173 265 236
Weight of container g 89 150 117
Moisture content % 4.76 6.96 6.72
Dry Density g/cm3 1.848 1.790 1.774

Reference Lab Value


Max. Dry Density of soil g/cm3 1.857 1.857 1.857
Optimum Moisture Content % 19.2 19.2 19.2
Laboratory Sample No
Degree of Compaction % 99.53 96.37 95.52
Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 6/13/2015

Test No 40 41 42
Test Location D-E/8-9 F-G/9-10 E-F/4-5
Tested Level 78.350 78.350 77.950
Hole Depth mm 150 150 160
Sand cone No. 1 1 2
Weight of Standard Sand Before Pouring g 13000 13004 13002
Weight of Standard Sand After Pouring g 8670 8985 7915
Weight of Standard Sand in hole + Cone g 4330 4019 5087
Weight of Standard sand in Cone g 1164 1164 1164
Weight of Standard sand in hole g 3166 2855 3923
Bulk Density of Standard Sand g/cm 3
1.562 1.562 1.562
Volume of Hole cm3 2026.9 1827.8 2511.5
Weight of Soil from hole + Container g 4326 4173 5183
Weight of Container g 427 427 427
Weight of Soil from hole g 3899 3746 4756
Wet Density g/cm3 1.924 2.049 1.894

Moisture Content
Container No 1 1 1
Weight of wet soil+container g 183 249 201
Weight of dry soil+container g 177 243 194
Weight of container g 89 150 89
Moisture content % 6.82 6.45 6.67
Dry Density g/cm3 1.801 1.925 1.775

Reference Lab Value


Max. Dry Density of soil g/cm3 1.852 1.852 1.852
Optimum Moisture Content % 10.8 10.8 10.8
Laboratory Sample No
Degree of Compaction % 97.24 103.96 95.86

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 6/17/2015

Test No 43
Test Location D-E/3-4
Tested Level 77.950
Hole Depth mm 180
Sand cone No. 1
Weight of Standard Sand Before Pouring g 14236
Weight of Standard Sand After Pouring g 9087
Weight of Standard Sand in hole + Cone g 5149
Weight of Standard sand in Cone g 1164
Weight of Standard sand in hole g 3985
Bulk Density of Standard Sand g/cm 3
1.562
Volume of Hole cm3 2551.2
Weight of Soil from hole + Container g 6031
Weight of Container g 427
Weight of Soil from hole g 5604
Wet Density g/cm3 2.197

Moisture Content
Container No 1
Weight of wet soil+container g 297
Weight of dry soil+container g 286
Weight of container g 150
Moisture content % 8.09
Dry Density g/cm3 2.032

Reference Lab Value


Max. Dry Density of soil g/cm3 1.852
Optimum Moisture Content % 10.8
Laboratory Sample No
Degree of Compaction % 109.73

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 7/12/2015

Test No 44 45
Test Location D7 EF/8,9
Tested Level 78.350 78.350
Hole Depth mm 160 180
Sand cone No. 1 1
Weight of Standard Sand Before Pouring g 15005 14118
Weight of Standard Sand After Pouring g 9751 7668
Weight of Standard Sand in hole + Cone g 5254 6450
Weight of Standard sand in Cone g 1164 1164
Weight of Standard sand in hole g 4090 5286
Bulk Density of Standard Sand g/cm 3
1.562 1.562
Volume of Hole cm3 2618.4 3384.1
Weight of Soil from hole + Container g 5733 6787
Weight of Container g 427 427
Weight of Soil from hole g 5306 6360
Wet Density g/cm3 2.026 1.879

Moisture Content
Container No 1 1
Weight of wet soil+container g 222 158
Weight of dry soil+container g 216 153
Weight of container g 150 89
Moisture content % 9.09 7.81
Dry Density g/cm3 1.858 1.743

Reference Lab Value


Max. Dry Density of soil g/cm3 1.852 1.852
Optimum Moisture Content % 10.8 10.8
Laboratory Sample No
Degree of Compaction % 100.30 94.12

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 7/16/2015

Test No 46 45 Rep
Test Location DE/3,4 EF/8,9
Tested Level 77.950 78.350
Hole Depth mm 180 150
Sand cone No. 1 2
Weight of Standard Sand Before Pouring g 14236 15000
Weight of Standard Sand After Pouring g 9087 10160
Weight of Standard Sand in hole + Cone g 5149 4840
Weight of Standard sand in Cone g 1164 1164
Weight of Standard sand in hole g 3985 3676
Bulk Density of Standard Sand g/cm 3
1.562 1.562
Volume of Hole cm3 2551.2 2353.4
Weight of Soil from hole + Container g 6031 5057
Weight of Container g 427 427
Weight of Soil from hole g 5604 4630
Wet Density g/cm3 2.197 1.967

Moisture Content
Container No 1 1
Weight of wet soil+container g 297 182
Weight of dry soil+container g 286 174
Weight of container g 150 89
Moisture content % 8.09 9.41
Dry Density g/cm3 2.032 1.798

Reference Lab Value


Max. Dry Density of soil g/cm3 1.852 1.852
Optimum Moisture Content % 10.8 10.8
Laboratory Sample No
Degree of Compaction % 109.73 97.09

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 8/22/2015

Test No 47 48
Test Location GH/3a4a FH/6,7a
Tested Level 77.950 78.350
Hole Depth mm 170 170
Sand cone No. 1 1
Weight of Standard Sand Before Pouring g 15000 14806
Weight of Standard Sand After Pouring g 9522 9621
Weight of Standard Sand in hole + Cone g 5478 5185
Weight of Standard sand in Cone g 1164 1164
Weight of Standard sand in hole g 4314 4021
Bulk Density of Standard Sand g/cm 3
1.562 1.562
Volume of Hole cm3 2761.8 2574.3
Weight of Soil from hole + Container g 5410 5365
Weight of Container g 427 427
Weight of Soil from hole g 4983 4938
Wet Density g/cm3 1.804 1.918

Moisture Content
Container No 1 1
Weight of wet soil+container g 202 238
Weight of dry soil+container g 193 230
Weight of container g 89 150
Moisture content % 8.65 10.00
Dry Density g/cm3 1.661 1.744

Reference Lab Value


Max. Dry Density of soil g/cm3 1.827 1.827
Optimum Moisture Content % 10.8 10.8
Laboratory Sample No
Degree of Compaction % 90.89 95.45

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 8/23/2015

Test No 47 Rep
Test Location FH/3a4a
Tested Level 77.950
Hole Depth mm 170
Sand cone No. 2
Weight of Standard Sand Before Pouring g 15000
Weight of Standard Sand After Pouring g 9902
Weight of Standard Sand in hole + Cone g 5098
Weight of Standard sand in Cone g 1164
Weight of Standard sand in hole g 3934
Bulk Density of Standard Sand g/cm 3
1.562
Volume of Hole cm3 2518.6
Weight of Soil from hole + Container g 5272
Weight of Container g 427
Weight of Soil from hole g 4845
Wet Density g/cm3 1.924

Moisture Content
Container No 1
Weight of wet soil+container g 307
Weight of dry soil+container g 292
Weight of container g 150
Moisture content % 10.56
Dry Density g/cm3 1.740

Reference Lab Value


Max. Dry Density of soil g/cm3 1.827
Optimum Moisture Content % 10.8
Laboratory Sample No
Degree of Compaction % 95.23

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 8/26/2015

Test No 49
Test Location GH/
Tested Level 78.150
Hole Depth mm 170
Sand cone No. 2
Weight of Standard Sand Before Pouring g 15000
Weight of Standard Sand After Pouring g 9940
Weight of Standard Sand in hole + Cone g 5060
Weight of Standard sand in Cone g 1164
Weight of Standard sand in hole g 3896
Bulk Density of Standard Sand g/cm 3
1.562
Volume of Hole cm3 2494.2
Weight of Soil from hole + Container g 5505
Weight of Container g 427
Weight of Soil from hole g 5078
Wet Density g/cm3 2.036

Moisture Content
Container No 1
Weight of wet soil+container g 205
Weight of dry soil+container g 192
Weight of container g 89
Moisture content % 12.62
Dry Density g/cm3 1.808

Reference Lab Value


Max. Dry Density of soil g/cm3 1.827
Optimum Moisture Content % 10.8
Laboratory Sample No
Degree of Compaction % 98.95

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 8/27/2015

Test No 50
Test Location FG/5-6
Tested Level 78.350
Hole Depth mm 170
Sand cone No. 2
Weight of Standard Sand Before Pouring g 15150
Weight of Standard Sand After Pouring g 9701
Weight of Standard Sand in hole + Cone g 5449
Weight of Standard sand in Cone g 1164
Weight of Standard sand in hole g 4285
Bulk Density of Standard Sand g/cm 3
1.562
Volume of Hole cm3 2743.3
Weight of Soil from hole + Container g 5835
Weight of Container g 427
Weight of Soil from hole g 5408
Wet Density g/cm3 1.971

Moisture Content
Container No 1
Weight of wet soil+container g 183
Weight of dry soil+container g 177
Weight of container g 89
Moisture content % 6.82
Dry Density g/cm3 1.846

Reference Lab Value


Max. Dry Density of soil g/cm3 1.827
Optimum Moisture Content % 10.8
Laboratory Sample No
Degree of Compaction % 101.01

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 9/1/2015

Test No 51 52
Test Location DE/5-6 GH/8-9
Tested Level 78.350 78.200
Hole Depth mm 150 155
Sand cone No. 2 2
Weight of Standard Sand Before Pouring g 15184 15055
Weight of Standard Sand After Pouring g 10485 10402
Weight of Standard Sand in hole + Cone g 4699 4653
Weight of Standard sand in Cone g 1164 1164
Weight of Standard sand in hole g 3535 3489
Bulk Density of Standard Sand g/cm 3
1.562 1.562
Volume of Hole cm3 2263.1 2233.7
Weight of Soil from hole + Container g 4658 5018
Weight of Container g 427 427
Weight of Soil from hole g 4231 4591
Wet Density g/cm3 1.870 2.055

Moisture Content
Container No 1 2
Weight of wet soil+container g 196 289
Weight of dry soil+container g 189 278
Weight of container g 89 150
Moisture content % 7.00 8.59
Dry Density g/cm3 1.747 1.893

Reference Lab Value


Max. Dry Density of soil g/cm3 1.827 1.827
Optimum Moisture Content % 10.8 10.8
Laboratory Sample No
Degree of Compaction % 95.63 103.60

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 9/14/2015

Test No 53
Test Location GH/3,4
Tested Level 78.350
Hole Depth mm 150
Sand cone No. 2
Weight of Standard Sand Before Pouring g 15548
Weight of Standard Sand After Pouring g 10487
Weight of Standard Sand in hole + Cone g 5061
Weight of Standard sand in Cone g 1164
Weight of Standard sand in hole g 3897
Bulk Density of Standard Sand g/cm 3
1.562
Volume of Hole cm3 2494.9
Weight of Soil from hole + Container g 5784
Weight of Container g 427
Weight of Soil from hole g 5357
Wet Density g/cm3 2.147

Moisture Content
Container No 1
Weight of wet soil+container g 281
Weight of dry soil+container g 263
Weight of container g 150
Moisture content % 15.93
Dry Density g/cm3 1.852

Reference Lab Value


Max. Dry Density of soil g/cm3 1.827
Optimum Moisture Content % 10.8
Laboratory Sample No
Degree of Compaction % 101.38

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 10/7/2015

Test No 54
Test Location A9
Tested Level
Hole Depth mm 150
Sand cone No. 2
Weight of Standard Sand Before Pouring g 15000
Weight of Standard Sand After Pouring g 9502
Weight of Standard Sand in hole + Cone g 5498
Weight of Standard sand in Cone g 1164
Weight of Standard sand in hole g 4334
Bulk Density of Standard Sand g/cm 3
1.562
Volume of Hole cm3 2774.6
Weight of Soil from hole + Container g 6286
Weight of Container g 427
Weight of Soil from hole g 5859
Wet Density g/cm3 2.112

Moisture Content
Container No 1
Weight of wet soil+container g 171
Weight of dry soil+container g 162
Weight of container g 89
Moisture content % 12.33
Dry Density g/cm3 1.880

Reference Lab Value


Max. Dry Density of soil g/cm3 1.827
Optimum Moisture Content % 10.8
Laboratory Sample No
Degree of Compaction % 102.89

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 1/8/2016

Test No 55
Test Location C-D/10-11
Tested Level
Hole Depth mm 150
Sand cone No. 2
Weight of Standard Sand Before Pouring g 15000
Weight of Standard Sand After Pouring g 10374
Weight of Standard Sand in hole + Cone g 4626
Weight of Standard sand in Cone g 1164
Weight of Standard sand in hole g 3462
Bulk Density of Standard Sand g/cm 3
1.562
Volume of Hole cm3 2216.4
Weight of Soil from hole + Container g 5153
Weight of Container g 427
Weight of Soil from hole g 4726
Wet Density g/cm3 2.132

Moisture Content
Container No 1
Weight of wet soil+container g 301
Weight of dry soil+container g 281
Weight of container g 151
Moisture content % 15.38
Dry Density g/cm3 1.848

Reference Lab Value


Max. Dry Density of soil g/cm3 1.827
Optimum Moisture Content % 10.8
Laboratory Sample No
Degree of Compaction % 101.15

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 1/28/2016

Test No 56
Test Location 4-5/H 7m off set from the building
Tested Level
Hole Depth mm 150
Sand cone No. 2
Weight of Standard Sand Before Pouring g 16172
Weight of Standard Sand After Pouring g 11475
Weight of Standard Sand in hole + Cone g 4697
Weight of Standard sand in Cone g 1164
Weight of Standard sand in hole g 3533
Bulk Density of Standard Sand g/cm 3
1.562
Volume of Hole cm3 2261.8
Weight of Soil from hole + Container g 4756
Weight of Container g 427
Weight of Soil from hole g 4329
Wet Density g/cm3 1.914

Moisture Content
Container No 1
Weight of wet soil+container g 195
Weight of dry soil+container g 178
Weight of container g 89
Moisture content % 19.10
Dry Density g/cm3 1.607

Reference Lab Value


Max. Dry Density of soil g/cm3 1.827
Optimum Moisture Content % 10.8
Laboratory Sample No
Degree of Compaction % 87.96

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 2/8/2016

Test No 57
Test Location 4/H 7m off set from the building
Tested Level
Hole Depth mm 150
Sand cone No. 2
Weight of Standard Sand Before Pouring g 15128
Weight of Standard Sand After Pouring g 10559
Weight of Standard Sand in hole + Cone g 4569
Weight of Standard sand in Cone g 1164
Weight of Standard sand in hole g 3405
Bulk Density of Standard Sand g/cm 3
1.562
Volume of Hole cm3 2179.9
Weight of Soil from hole + Container g 4502
Weight of Container g 427
Weight of Soil from hole g 4075
Wet Density g/cm3 1.869

Moisture Content
Container No 1
Weight of wet soil+container g 178
Weight of dry soil+container g 174
Weight of container g 89
Moisture content % 4.71
Dry Density g/cm3 1.785

Reference Lab Value


Max. Dry Density of soil g/cm3 1.985
Optimum Moisture Content % 9.2
Laboratory Sample No
Degree of Compaction % 89.94

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 2/17/2016

Test No 58 59 new calibrations


Test Location 6/H 6/H
Tested Level
Hole Depth mm 150 150
Sand cone No. 2 2
Weight of Standard Sand Before Pouring g 15000 15000
Weight of Standard Sand After Pouring g 10845 10845
Weight of Standard Sand in hole + Cone g 4155 4155
Weight of Standard sand in Cone g 1164 1185
Weight of Standard sand in hole g 2991 2970
Bulk Density of Standard Sand g/cm 3
1.562 1.492
Volume of Hole cm3 1914.9 1990.6
Weight of Soil from hole + Container g 4860 4860
Weight of Container g 427 427
Weight of Soil from hole g 4433 4433
Wet Density g/cm3 2.315 2.227

Moisture Content
Container No 1 1
Weight of wet soil+container g 275 275
Weight of dry soil+container g 255 255
Weight of container g 89 89
Moisture content % 12.05 12.05
Dry Density g/cm3 2.066 1.987

Reference Lab Value


Max. Dry Density of soil g/cm3 1.985 1.985
Optimum Moisture Content % 9.2 9.2
Laboratory Sample No
Degree of Compaction % 104.09 100.13

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 2/25/2016

Test No 60
Test Location 4a/J
Tested Level 75.855
Hole Depth mm 150
Sand cone No. 2
Weight of Standard Sand Before Pouring g 14970
Weight of Standard Sand After Pouring g 10519
Weight of Standard Sand in hole + Cone g 4451
Weight of Standard sand in Cone g 1185
Weight of Standard sand in hole g 3266
Bulk Density of Standard Sand g/cm 3
1.492
Volume of Hole cm3 2189.0
Weight of Soil from hole + Container g 4545
Weight of Container g 427
Weight of Soil from hole g 4118
Wet Density g/cm3 1.881

Moisture Content
Container No 1
Weight of wet soil+container g 220
Weight of dry soil+container g 215
Weight of container g 89
Moisture content % 3.97
Dry Density g/cm3 1.809

Reference Lab Value


Max. Dry Density of soil g/cm3 1.985
Optimum Moisture Content % 9.2
Laboratory Sample No
Degree of Compaction % 91.15

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date
LABORATORY REPORT

DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY SAND-CONE METHOD

PROJECT IT Park Project - Sooriyawewa


MATERIAL Backfilling- Imported soil
DATE TESTED 2/26/2016

Test No 61
Test Location 4a/J
Tested Level 75.855
Hole Depth mm 150
Sand cone No. 2
Weight of Standard Sand Before Pouring g 15202
Weight of Standard Sand After Pouring g 10779
Weight of Standard Sand in hole + Cone g 4423
Weight of Standard sand in Cone g 1185
Weight of Standard sand in hole g 3238
Bulk Density of Standard Sand g/cm 3
1.492
Volume of Hole cm3 2170.2
Weight of Soil from hole + Container g 4837
Weight of Container g 427
Weight of Soil from hole g 4410
Wet Density g/cm3 2.032

Moisture Content
Container No 1
Weight of wet soil+container g 201
Weight of dry soil+container g 195
Weight of container g 89
Moisture content % 5.66
Dry Density g/cm3 1.923

Reference Lab Value


Max. Dry Density of soil g/cm3 1.985
Optimum Moisture Content % 9.2
Laboratory Sample No
Degree of Compaction % 96.89

Remarks

Contractor Consultant
Tested by Checked by Approved by
Name
Designation
Signature
Date