LOK NIRMAN VIBHAG

UTTARAKHAND

Circle - 10 th
N.H.Circle, P.W.D., DehraDun

Division - N.H.Division P.W.D.Rudraprayag

YEAR 2019-20
Detailed Estimate
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing
work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00,
Chainage. 218.000 To Km. 235.000 and construction of damage
scuppers and Protection work Chainnage 171.000 To 200.000,
District Chamoli, state Uttarakhand.

Estimated cost Rs:- 3581.74 Lacs


-
Index
Sl.No. Particulars Page

1 Title page 1

2 Index 2

3 Performa for Checking

4 List of Officers

5 Report

6 Annexure -

7 Specification

8 Certificate of Rates

9 Abstract of Cost

10 Bill of quantities

11 Details of measurement

12 Analysis of rates

13 Designs of payment thickness / CBR

14 Drawings
PROFORMA FOR CHECKING OF PRELIMINARY ESTIMATE AND DETAIL
ESTIMATE TO BE PASTED ON EACH ESTIMATE
1 Report
(a) Proper reference have been adopted and attested copies attached to the
estimate

(b) In case of revised estimate the amount of excess has been given item wise
in the comparative statement with the details resons

(c) Signature of A.E.E.E. and S.E. exists.


2 Specification
(a) Detailed Specification for each item of work are included in the estimate.
(b) Signature of A.E.E.E. and S.E. exists.
3 Design
(a) These have been prepared as per Standard and C.E's instruction.

(b) Such design has been signed by A.E.E.E.and S.E. in the end of important
designed by E.E.as wall as C.E.

4 Analysis of rate
(a) Analysis of non schedule rate item have been based on Schedule of market
rate
(b) Signature of A.E.E.E. and S.E. exists.

5 detail of measurement
(a) Each page has been signed J.E.A.E.E.E.and S.E. in the end of each set.
6 Bill of Quantity
(a) Each page has been signed J.E.A.E.E.E.and S.E. in the end of each set.
7 Summary of estimated cost
(a) These have been signed J.E.A.E.E.E.and S.E. in the end of each set.
8 Plans.
(a) These have been signed J.E.A.E.E.E.and S.E. in the end of each set.

9 General
(a) Name and designation should exist below all signatures and corrections
initialed

(b) Each page of designed analysis of rate , detail of measurement ,bill of


Quantities Summary of estimated cost should be certified, checked and
corrected by dividional signature and seal.

(c) The signature of local head of the Deptt. Exists on the reports, Specification
and Summary of estimated cost and plans.

Junior Engineer (Tec.) Junior Engineer (Tec.) Assistant Engineer(Tec.)

NH Div PWD NH Circle PWD Chief Engineer(NH)

Rudraprayag Dehradun Dehradun


Name of Officers Preparing the Estimate
Circle Office

Sl.No. Name Designation Signature

Superintending
1 Er.R.C.Sharma
Engineer

2 Er.Dinesh Kumar Junior Engineer(T)

Divisional Office

1 Er.Jitendra Kumar Tripathi Executive Engineer

2 Er.B.C.Pandey Assistant Engineer

3 Er. Mukesh Kohli Add. Asst. Engineer

4 Er. Gaurav Bhatt Junior Engineer

5 Er. Bipin Agnihotri Junior Engineer(T)


Specification

NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the
road On National Highway 109 ( Old 87E ) Panduwakhal To Karanprayag, From
Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and
construction of damage scuppers and Protection work Chainnage 171.000 To
200.000, District Chamoli, state Uttarakhand.

All the work shall be carried out as per MORTH specifications


and where detailed specifications of M.O.R.T.H is not available the
Standard specifications of State P.W.D. shall be adopted.

Add.Asstt./Junior Engineer Assistant Engineer Executive Engineer


NH Div PWD NH Div PWD NH Div PWD
Rudraprayag Rudraprayag Rudraprayag
Certificate of Rates
District - Chamoli Block - Gairsain
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National
Highway 109 ( Old 87E ) Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage.
218.000 To Km. 235.000 and construction of damage scuppers and Protection work Chainnage 171.000
To 200.000, District Chamoli, state Uttarakhand.
It is the certify that the rates of the following items of the work I.e. from Item No. 1 to
22 requried for preparing the estimate for the work mentioned above are based on current SOR.

S.N Unit Rate in


o. Name of Item per Remark if Any
Figure
1 2 3 4 5
Scarifying existing bituminous surface to a depth of 50 mm by mechanical
means (Scarifying the existing bituminous road surface to a depth of 50
1 mm and disposal of scarified material with in all lifts and lead upto 1000 sqm 6.40 MORT&H 3-15
metres.)

Water Bound Macadam (Providing, laying, spreading and compacting


stone aggregates of specific sizes to water bound macadam specification
including spreading in uniform thickness, hand packing, rolling with
vibratory roller 8-10 tonnes in stages to proper grade and camber, applying
2 and brooming requisite type of screening/ binding Materials to fill up the cum 3061.40 MORT&H 4-9-A-3-B

interstices of coarse aggregate, watering and compacting to the required


density.)

Prime coat
(Providing and applying primer coat with bitumen emulsion on prepared
3 surface of granular Base including clearing of road surface and spraying sqm 25.10 MORT&H 5-1
primer at the rate of 0.6 kg/sqm using mechanical means.)

Tack coat using VG-10 grade bitumen @0.35kg/sqm, over normal bituminous Miscellaneous items 3-1-
4 sqm 14.20 1
surfaces As Per State sor miscellious items 3-1-1 (For BC)
Dense Graded Bituminous Macadam (Providing and laying dense
bituminous macadam with 100-120 TPH batch type HMP producing an
average output of 75 tonnes per hour using crushed aggregates of specified
grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of
total mix of mix and filler, transporting the hot mix to work site, laying
with a hydrostatic paver finisher with sensor control to the required grade, cum
5 9761.10 MORT&H 5-6-2
level and alignment, rolling with smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction as per
MoRTH specification clause No. 507 complete in all respects.) For
Grading II (19mm nominai size)

Tack coat using VG-10 grade bitumen @0.35kg/sqm, over normal bituminous
6 surfaces As Per State sor miscellious items 3-1-1 (For BC) sqm 14.20 Miscellaneous items 3-1-
1
Bituminous Concrete (Providing and laying bituminous concrete with 100-
120 TPH batch type hot mix plant producing an average output of 75
tonnes per hour using crushed aggregates of specified grading, premixed
with bituminous binder @ 5.4 to 5.6 % of mix and filler,
transporting the hot mix to work site, laying with a hydrostatic paver
finisher with sensor control to the required grade, level and alignment, cum
7 10940.20 MORT&H 5-8-2
rolling with smooth wheeled, vibratory and tandem rollers to achieve the
desired compaction as per MORTH specification clause No. 509 complete
in all respects) for Grading-II (bituminous binder @ 5.4 % of mix)
Road Marking with Hot Applied Thermoplastic Compound with
Reflectorising Glass Beads on Bituminous Surface (Providing and laying
of hot applied thermoplastic compound 2.5 mm thick including
8 reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is sqm 454.30 MORT&H 8-13
exclusive of surface applied glass beads as per IRC:35 .The finished
surface to be level, uniform and free from streaks and holes.)

Construction of sub-grade and earthen shoulders with approved material


obtained from borrow pits with all lifts & leads, transporting to site,
9 spreading, grading to required slope and compacted to meet requirement of cum 770.70 MORT&H 3-18
table No. 300-2.

Type - B, "THRIE" : Metal Beam Crash Barrier (Providing and erecting a


"Thrie" metal beam crash barrier comprising of 3 mm thick corrugated
10 sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC Rmt 3810.30 MORTH 8-23-B

series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre,


2 m high with 1.15 m below ground level, all steel parts and fitments to be
Construction
lvanised by hotof dip
unlined surface
process, drains of
all fittings to average
conformcross sectional
to IS:1367 andarea 0.40
IS:1364,
sqm in soilto specified lines, grades, levels and dimensions to the
11 metal beam rail to be fixed on the vertical post with a space of channel
requirement of clause 301 and 309. Excavated material to be used in r/m 92.90 MORT&H 3-24
section 150 x 75 x 5 mm, 546 mm long complete as per clause 810)
embankment within a lead of50 metres (average lead 25 metres)
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone
of standard design as per IRC:8-1980, fixing in position including painting
and printing etc)
12
5th kilometre stone (precast) No. 4171.90 MORT&H 8-14-1

Hectometer stone (Precast) No. 689.60 MORT&H 8-14-3

Road Markers/Road Stud with Lense Reflector


(Providing and fixing of road stud 100x 100 mm, die cast in aluminium,
resistant to corrosive effect of salt and grit, fitted with lense reflectors,
13 installed in concrete or asphaltic surface by drilling hole 30 mm upto a No. 119.40 MORT&H 8-35
depth of 60 mm and bedded in a suitable bituminous grout or epoxy
mortar, all as per BS 873 part 4:1973)

Construction of hill side K.C. type drain in accordance with the


requirement of specification true to lines and grades as per Drawing
14
(Drawing attached) and specification clause No 1606.1 of including
supply of all material, labour, T&P etc. required for proper completion of
the work.

Excavation in foundation for retaining, breast walls etc, in all types of


soilsandrocks including all lead, lift and disposal of surplus material as per
15 direction of engineer - in - charge, as perdrawing and cum 358.30 Miscellaneous items 1-2
technicalspecifications Clause 305.1 of MORD Specifiction

Plain/Reinforced cement concrete in open foundation complete as per


16 cum 6063.00 MORT&H 12-8-A
drawing and technical specifications PCC M15
Plain/Reinforced cement concrete in open foundation complete as per
17 cum 6909.10 MORT&H 12-8-B
drawing and technical specifications PCC M20
Plain/Reinforced cement concrete in sub-structure complete as per drawing
18 cum 7307.70 MORT&H 13-5-B
and technical specifications M20
Plain/Reinforced cement concrete in sub-structure complete as per drawing
19 and technical specifications RCC Grade M25 Height upto 5m Using cum 8428.20 MORT&H 13-5-F-P-1
concrete Mixer
Supplying, fitting and placing HYSD bar reinforcement in sub-structure
20 complete as per drawing and technical specifications ton 63119.80 MORT&H 13-6

Stone masonry work in cement mortar 1:3 in foundation complete as


21 drawing and Technical Specification
21
Random Rubble Masonry cum 4210.80 MORT&H 12-7-B
Stone masonry in cement mortar 1:5 for substructure complete as per
22 drawing & technical specification Clauses 702, 704, 1202 and 1204 cum 3662.80 Mord 12-4-3-3

Random Rubble Stone Masonry laid in 1:6 cement and sand mortar,in
breast wall,retaining wall, parapets,scupper etc. Including supply of all
23 materials,labour,t & p& royality etc,required for proper complition of cum 3430.40 Miscellaneous items 1-4
work.(As per PWD Uttarakhand Specification)

Random Rubble Stone Masonry laid Dry, in breast walls, retaining


walls,etc. including supply of all material, labour, T&P androyaltiies
24 etc.complete as per drawing and technical specifications Clauses 702, cum 1915.40 Miscellaneous items 1-3
704,1202 & 1203 of MORD Specifiction

Back filling behind abutment, wing wall and return wall complete as per
25 cum 1236.30 MORT&H 13-9-A
drawing and Technical specification Granular material
Hand Packed stone filling in back of wallls including cost of all materials,
26 royality, T&P etc. complete as per direction of Engineer-in- charge. (As per cum 787.50 Miscellaneous items 1-5
PWD Uttarakhand specifications)

Dismantling of Structures
(Dismantling of existing structures like culverts, bridges, retaining walls
and other structure comprising of masonry, cement concrete, wood work,
steel work, including T&P and scaffolding wherever necessary, sorting the
27 dismantled material, disposal of unserviceable material and stacking the cum 582.10 MORT&H 2-4-1-2-A

serviceable material with all lifts and lead of


1000 metres)

It is also certified that I amcompetent to approve the rates of all the items, as per
powered conferred in me as SE of 10th NH circle PWD Dehradun by the State Government.

Superintending Engineer
10th NH Circle PWD
Dehradun
Certificate of Rates
District - Chamoli Block -Karanprayag
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National
Highway 109 ( Old 87E ) Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage.
218.000 To Km. 235.000 and construction of damage scuppers and Protection work Chainnage 171.000
To 200.000, District
It isChamoli, state
the certify thatUttarakhand.
the rates of the following items of the work I.e. from Item No. 1 to
22 requried for preparing the estimate for the work mentioned above are based on current SOR.

S.N Unit Rate in


Name of Item Remark if Any
o. per Figure
1 2 3 4 5
Scarifying existing bituminous surface to a depth of 50 mm by mechanical means
1 (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal sqm 6.20 MORT&H 3-15
of scarified material with in all lifts and lead upto 1000 metres.)
Water Bound Macadam (Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10
2 tonnes in stages to proper grade and camber, applying and brooming requisite type cum 3207.40 MORT&H 4-9-A-3-B
of screening/ binding Materials to fill up the interstices of coarse aggregate,
watering and compacting to the required density.)

Prime coat
(Providing and applying primer coat with bitumen emulsion on prepared surface of
3 granular Base including clearing of road surface and spraying primer at the rate of sqm 24.70 MORT&H 5-1

0.6 kg/sqm using mechanical means.)


Tack coat using VG-10 grade bitumen @0.35kg/sqm, over normal bituminous Miscellaneous items 3-1-
4 surfaces As Per State sor miscellious items 3-1-1 (For BC) sqm 14.00 1

Dense Graded Bituminous Macadam (Providing and laying dense bituminous


macadam with 100-120 TPH batch type HMP producing an average output of 75
tonnes per hour using crushed aggregates of specified grading, premixed with
bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler,
5 transporting the hot mix to work site, laying with a hydrostatic paver finisher with cum 10600.60 MORT&H 5-6-2
sensor control to the required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the desired compaction as per
MoRTH specification clause No. 507 complete in all respects.) For Grading II
(19mm nominai size)

Tack coat using VG-10 grade bitumen @0.35kg/sqm, over normal bituminous Miscellaneous items 3-1-
6 surfaces As Per State sor miscellious items 3-1-1 (For BC) sqm 14.00 1

Bituminous Concrete (Providing and laying bituminous concrete with 100-120


TPH batch type hot mix plant producing an average output of 75 tonnes per hour
using crushed aggregates of specified grading, premixed with bituminous binder @
5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a
7 hydrostatic paver finisher with sensor control to the required grade, level and cum 11774.50 MORT&H 5-8-2
alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve
the desired compaction as per MORTH specification clause No. 509 complete in
all respects) for Grading-II (bituminous binder @ 5.4 % of mix)

Road Marking with Hot Applied Thermoplastic Compound with Reflectorising


Glass Beads on Bituminous Surface (Providing and laying of hot applied
thermoplastic compound 2.5 mm thick including
8 reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is sqm 454.20 MORT&H 8-13
exclusive of surface applied glass beads as per IRC:35 .The finished surface to be
level, uniform and free from streaks and holes.)
Construction of sub-grade and earthen shoulders with approved material obtained
9 from borrow pits with all lifts & leads, transporting to site, spreading, grading to cum 761.00 MORT&H 3-18
required slope and compacted to meet requirement of table No. 300-2.
Construction of unlined surface drains of average cross sectional area 0.40 sqm in
soilto specified lines, grades, levels and dimensions to the requirement of clause
10 301 and309. Excavated material to be used in embankment within a lead of50 Rmt. 92.10 MORT&H 3-24 B
metres (average lead 25 metres))

Type - B, "THRIE" : Metal Beam Crash Barrier (Providing and erecting a "Thrie"
metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam
11 rail, 85 cm above road/ground level, fixed on ISMC series channel vertical post, Rmt 3821.30 MORTH 8-23-B
150 x 75 x 5 mm spaced 2 m centre to centre, 2 m high with 1.15 m below ground
level, all steel parts and fitments to be lvanised by hot dip process, all fittings to
conform to for
Excavation IS:1367 and IS:1364,
Structures metal
Earth work in beam rail toofbefoundation
excavation fixed on the vertical post
of structures as
with a space of
per drawing andchannel section
technical 150 x 75 xincluding
specification, 5 mm, 546 mm long
setting out, complete as per
construction of
12 clause
shoring810)
and bracing, removal of stumps and other deleterious matter, dressing of cum 355.40 Miscellaneous items 1-2
sides and bottom and back filling with approved material Mechanical Means Depth
upto 3 m
Plain/Reinforced cement concrete in open foundation complete as per drawing and
13 cum 6343.90 MORT&H 12-8-A
technical specifications PCC Gread M15
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of
standard design as per IRC:8-1980, fixing in position including painting and
printing etc)
14
5th kilometre stone (precast) No. 4255.60 MORT&H 8-14-1
Hectometer stone (Precast) No. 698.30 MORT&H 8-14-3
Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud
100x 100 mm, die cast in aluminium, resistant to corrosive effect of salt and grit,
15 fitted with lense reflectors, installed in concrete or asphaltic surface by drilling No. 119.30 MORT&H 8-35
hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or
epoxy mortar, all as per BS 873 part 4:1973)
Excavation in foundation for retaining, breast walls etc, in all types of
soilsandrocks including all lead, lift and disposal of surplus material as per
16 direction of engineer - in - charge, as perdrawing and technicalspecifications cum 355.40 Miscellaneous items 1-2

Clause 305.1 of MORD Specifiction


Random Rubble Stone Masonry laid in 1:6 cement and sand mortar,in breast
wall,retaining wall, parapets,scupper etc. Including supply of all materials,labour,t
17 & p& royality etc,required for proper complition of work.(As per PWD cum 3430.40 Miscellaneous items 1-4
Uttarakhand Specification)
Hand Packed stone filling in back of wallls including cost of all materials, royality,
T&P etc. complete as per direction of Engineer-in- charge. (As per PWD cum
18 783.70 Miscellaneous items 1-5
Uttarakhand specifications)

It is also certified that I amcompetent to approve the rates of all the items, as per
powered conferred in me as SE of 10th NH circle PWD Dehradun by the State Government.

Superintending Engineer
10th NH Circle PWD
Dehradun
ABSTRACT OF COST

NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work


of the road On National Highway 109 ( Old 87E ) Panduwakhal To
Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To
Km. 235.000 and construction of damage scuppers and Protection
work Chainnage 171.000 To 200.000, District Chamoli, state
Uttarakhand.

Sl.
Amount
No Item of Work
(in Lacs)
.

Under Annual Plan (Year 2019-20) Strengthing work of


the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000
to 200.00 And Chainage. 218.000 To Km. 235.000
District Chamoli, state Uttarakhand.

1 Civil work Rs. 278518231.33

2 Add 12 % GST charges on (01) Rs. 33422187.76

3 Add 2.8 % contingencies on (01) Rs. 7798510.48

4 5% Escalation on (01) Rs. 13925911.57

5 2.5% Maintenance charges on (01) Rs. 6962955.78

6 12% GST on (05) Rs. 835554.69

7 3% construction supervision charge on (01) Rs. 8355546.94

8 3% Agency Charges on (01) Rs. 8355546.94

GRANT TOTAL Rs. 358174445.49

Say Rs. 3581.74 Lacs

Executive Engineer Superintending Engineer


N.H., Div., P.W.D. 10th circle, N.H., P.W.D.
Rudraprayag Dehradun
BILL OF QUANTITY

NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E ) Panduwakhal To Karanprayag, From
Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli,
state Uttarakhand.

SL. ITEM OF WORK


Gairsain Block Karnaprayag Block
NO.
QTY UNIT RATE PER AMOUNT QTY UNIT RATE PER AMOUNT

Scarifying existing bituminous surface to a depth of 50 mm by


mechanical means (Scarifying the existing bituminous road
1 surface to a depth of 50 mm and disposal of scarified material
with in all lifts and lead upto 1000 metres.) 2808.70 sqm 6.40 sqm. 17975.68 557.00 sqm 6.20 sqm 3453.40
Water Bound Macadam (Providing, laying, spreading and
compacting stone aggregates of specific sizes to water bound
macadam specification including spreading in uniform thickness,
hand packing, rolling with vibratory roller 8-10 tonnes in stages to
2 proper grade and camber, applying and brooming requisite type of
screening/ binding Materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density.)
210.66 cum 3061.40 cum 644914.52 41.77 cum 3207.40 cum 133973.10
Prime coat
(Providing and applying primer coat with bitumen emulsion on
3 prepared surface of granular Base including clearing of road surface
and spraying primer at the rate of 0.6 kg/sqm using mechanical
means.)
2808.70 sqm 25.10 sqm 70498.37 557.00 sqm 24.70 13757.90
Tack coat using VG-10 grade bitumen @0.35kg/sqm, over normal
4 bituminous surfaces As Per State sor miscellious items 3-1-1 (For BC) 134258.91 sqm 14.20 sqm 1906476.52 91754.51 sqm 14.00 sqm 1284563.14
Dense Graded Bituminous Macadam (Providing and laying dense
bituminous macadam with 100-120 TPH batch type HMP producing
an average output of 75 tonnes per hour using crushed aggregates of
specified grading, premixed with bituminous binder @ 4.0 to 4.5%
by weight of total mix of mix and filler, transporting the hot mix to
work site, laying with a hydrostatic paver finisher with sensor control
5 to the required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the desired
compaction as per
MoRTH specification clause No. 507 complete in all respects.) For
Grading II (19mm nominai size)

7048.60 cum 9761.10 cum 68802089.46 4817.12 cum 10600.60 cum 51064362.27
Tack coat using VG-10 grade bitumen @0.35kg/sqm, over normal
6 bituminous surfaces As Per State sor miscellious items 3-1-1 (For BC) 134258.91 sqm 14.20 sqm. 1906476.52 91754.51 sqm 14.00 sqm 1284563.14
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E ) Panduwakhal To Karanprayag, From
Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli,
state Uttarakhand.
Bituminous Concrete (Providing and laying bituminous concrete with
100-120 TPH batch type hot mix plant producing an average output
of 75 tonnes per hour using crushed aggregates of specified grading,
premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler,
transporting the hot mix to work site, laying with a hydrostatic paver
finisher with sensor control to the required grade, level and
7 alignment, rolling with smooth wheeled, vibratory and tandem rollers
to achieve the desired compaction as per MORTH specification
clause No. 509 complete in all respects) for Grading-II (bituminous
binder @ 5.4 % of mix)

4027.77 cum 10940.20 44064609.35 2752.64 cum 11774.50 cum 32410959.68


Road Marking with Hot Applied Thermoplastic Compound with
Reflectorising Glass Beads on Bituminous Surface (Providing and
laying of hot applied thermoplastic compound 2.5 mm thick
including reflectorising glass beads @ 250 gms per sqm area,
8 thickness of 2.5 mm is exclusive of surface applied glass beads as per
IRC:35 .The finished surface to be level, uniform and free from
streaks and holes.)
6510.00 sqm 454.30 2957493.00 6390.00 sqm 454.20 sqm 2902338.00
Construction of sub-grade and earthen shoulders with approved
material obtained from borrow pits with all lifts & leads, transporting
9 to site, spreading, grading to required slope and compacted to meet
requirement of table No. 300-2.
4408.00 cum 770.70 3397245.60 2160.00 cum 761.00 cum 1643760.00
Road Markers/Road Stud with Lense Reflector
(Providing and fixing of road stud 100x 100 mm, die cast in
10 aluminium, resistant to corrosive effect of salt and grit, fitted with
lense reflectors, installed in concrete or asphaltic surface by drilling
hole 30 mm upto a depth of 60 mm and bedded in a suitable
bituminous grout or epoxy mortar, all as per BS 873 part 4:1973) 9300.00 No. 119.40 No. 1110420.00 4800.00 No. 119.30 No. 572640.00
Construction of unlined surface drains of average cross
sectional area 0.40 sqm in soilto specified lines, grades, levels
11 and dimensions to the requirement of clause 301 and 309.
Excavated material to be used in embankment within a lead
of50 metres (average lead 25 metres

24395.00 r/m 92.90 r/m 2266295.50 13500.00 r/m 92.10 r/m 1243350.00
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E ) Panduwakhal To Karanprayag, From
Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli,
state Uttarakhand.

Kilo Metre Stone (Reinforced cement concrete M15grade


kilometre stone of standard design as per IRC:8-1980, fixing in
12 position including painting and printing etc) Km. 171 To Km.
200

i 5th kilometre stone (precast) 6.00 No. 4171.90 No. 25031.40 4.00 No. 4255.60 No. 17022.40
ii Hectometer stone (Precast) 124.00 No. 689.60 No. 85510.40 64.00 No. 698.30 No. 44691.20
13 Crash Barrier
Excavation for Structures Earth work in excavation of foundation of
structures as per drawing and technical specification, including
setting out, construction of shoring and bracing, removal of stumps
i and other deleterious matter, dressing of sides and bottom and back
filling with approved material Mechanical Means Depth upto 3 m

91.45 Cum 358.30 Cum 32766.54 34.59 Cum 355.40 Cum 12294.71
Plain cement concrete in open foundation complete as per drawing
ii and technical specifications PCC Grade M15 91.45 Cum 6063.00 Cum 554461.35 34.59 Cum 6343.90 Cum 219460.88
Type - B, "THRIE" : Metal Beam Crash Barrier (Providing and
erecting a "Thrie" metal beam crash barrier comprising of 3 mm
thick corrugated sheet metal beam rail, 85 cm above road/ground
level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm
spaced 2 m centre to centre, 2 m high with 1.15 m below ground
15 level, all steel parts and fitments to be lvanised by hot dip process, all
fittings to conform to IS:1367 and IS:1364, metal beam rail to be
fixed on the vertical post with a space of channel section 150 x 75 x
5 mm, 546 mm long complete as per clause 810)

1850.00 Rmt 3810.30 Rmt 7049055.00 700.00 Rmt 3821.30 Rmt 2674910.00
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E ) Panduwakhal To Karanprayag, From
Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli,
state Uttarakhand.
14 Road side drain
Construction of hill side K.C. type drain in accordance with the
requirement of specification true to lines and grades as per
Drawing (Drawing attached) and specification clause No
1606.1 of including supply of all material, labour, T&P etc.
required for proper completion of the work.

Excavation in foundation for retaining, breast walls etc, in all types


of soilsandrocks including all lead, lift and disposal of surplus
i material as per direction of engineer - in - charge, as perdrawing and
technicalspecifications Clause 305.1 of MORD Specifiction
2771.32 cum 358.30 cum 992963.96
Plain/Reinforced cement concrete in open foundation complete as per
ii drawing and technical specifications PCC M15 1483.51 cum 6063.00 cum 8994521.13
Plain/Reinforced cement concrete in open foundation complete as per
iii drawing and technical specifications PCC M20 1383.13 cum 6909.10 cum 9556183.48
15 2 Meter span culvert
Excavation in foundation for retaining, breast walls etc, in all types
of soilsandrocks including all lead, lift and disposal of surplus
i material as per direction of engineer - in - charge, as perdrawing and
technicalspecifications Clause 305.1 of MORD Specifiction
5261.47 cum 358.30 cum 1885184.70
Random Rubble Stone Masonry laid Dry, in breast walls, retaining
walls,etc. including supply of all material, labour, T&P androyaltiies
ii etc.complete as per drawing and technical specifications Clauses 702,
704,1202 & 1203 of MORD Specifiction
274.90 cum 1915.40 cum 526543.46
Plain/Reinforced cement concrete in open foundation complete as per
iii drawing and technical specifications PCC M15 401.24 cum 6063.00 cum 2432718.12
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E ) Panduwakhal To Karanprayag, From
Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli,
state Uttarakhand.
Random Rubble Stone Masonry laid in 1:5 cement and sand
mortar,in breast wall, retaining wall, parapets,scupper etc. Including
iv supply of all materials,labour,t & p& royality etc,required for proper
complition of work.(As per PWD Uttarakhand Specification)
3550.38 cum 3662.80 cum 13004331.86
Plain/Reinforced cement concrete in sub-structure complete as per
v drawing and technical specifications RCC Grade M25 Height upto
5m Using concrete Mixer 236.80 cum 8428.20 cum 1995797.76
Supplying, fitting and placing HYSD bar reinforcement in sub-
vi structure complete as per drawing and technical specifications
27.87 ton. 63119.80 ton. 1759148.83
Plain/Reinforced cement concrete in open foundation complete as per
vii drawing and technical specifications PCC M20
147.32 cum 6909.10 cum 1017848.61
Hand Packed stone filling in back of wallls including cost of all materials,
royality, T&P etc. complete as per direction of Engineer-in- charge. (As per
viii PWD Uttarakhand specifications)
272.99 cum 1236.30 cum 337497.54
Hand Packed stone filling in back of wallls including cost of all
ix materials, royality, T&P etc. complete as per direction of Engineer-
in- charge. (As per PWD Uttarakhand specifications) 61.05 cum 787.50 cum 48076.88
16 Causeway
Dismantling of Structures
(Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of masonry, cement concrete,
wood work, steel work, including T&P and scaffolding wherever
i necessary, sorting the dismantled material, disposal of unserviceable
material and stacking the serviceable material with all lifts and lead
of 1000 metres)
143.25 sqm 582.10 sqm 83385.83
Scarifying existing bituminous surface to a depth of 50 mm by
mechanical means (Scarifying the existing bituminous road surface
ii to a depth of 50 mm and disposal of scarified material with in all lifts
and lead upto 1000 metres.)
330.00 sqm 6.40 sqm 2112.00
Random Rubble Stone Masonry laid Dry, in breast walls, retaining
walls,etc. including supply of all material, labour, T&P androyaltiies
iii etc.complete as per drawing and technical specifications Clauses 702,
704,1202 & 1203 of MORD Specifiction ( Kharanja)
161.50 cum 1915.40 cum 309337.10
Plain/Reinforced cement concrete in open foundation complete as per
iv drawing and technical specifications PCC M15
80.75 cum 6063.00 cum 489587.25
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E ) Panduwakhal To Karanprayag, From
Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli,
state Uttarakhand.
Plain/Reinforced cement concrete in sub-structure complete as per
v drawing and technical specifications M20 7.43 cum 7307.70 cum 54296.21
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E ) Panduwakhal To Karanprayag, From
Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli,
state Uttarakhand.
Plain/Reinforced cement concrete in sub-structure complete as per
vi drawing and technical specifications RCC Grade M25 Height upto
5m Using concrete Mixer 201.88 cum 8428.20 cum 1701485.02
Supplying, fitting and placing HYSD bar reinforcement in sub-
vii structure complete as per drawing and technical specifications 7.93 ton. 63119.80 ton. 500540.01
Random Rubble Stone Masonry laid in 1:6 cement and sand
mortar,in breast wall, retaining wall, parapets,scupper etc. Including
supply of all materials,labour,t & p& royality etc,required for proper
viii complition of work.(As per PWD Uttarakhand Specification)

52.52 cum 3430.40 cum 180164.61


17 Protection work
Excavation in foundation for retaining, breast walls etc, in all types
of soilsandrocks including all lead, lift and disposal of surplus
i material as per direction of engineer - in - charge, as perdrawing and
technicalspecifications Clause 305.1 of MORD Specifiction

288.98 cum 355.40 cum 102703.49


Random Rubble Stone Masonry laid in 1:6 cement and sand
mortar,in breast wall,retaining wall, parapets,scupper etc. Including
supply of all materials,labour,t & p& royality etc,required for proper
ii
complition of work.(As per PWD Uttarakhand Specification)

541.52 cum 3430.40 cum 1857630.21


Hand Packed stone filling in back of wallls including cost of all
iii materials, royality, T&P etc. complete as per direction of Engineer-
in- charge. (As per PWD Uttarakhand specifications) 342.93 cum 783.70 cum 268754.24

TOTAL 180763043.57 97755187.76

G.TOTAL 278518231.33
Details of Measurement
Block Gairsain

NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Sl. L B Total Area

Unit
Item of work No H(M)
No. (M) (M) (Sqm)

Scarifying existing bituminous surface to


a depth of 50 mm by mechanical means
(Scarifying the existing bituminous road
1 surface to a depth of 50 mm and disposal
of scarified material with in all lifts and
lead upto 1000 metres.)

KM179 Hm. (0-2) 1 x 2 25.00 2.00 100.00 Sqm.


KM178 Hm. (4-6) 1 x 2 25.00 1.80 90.00 Sqm.
KM187 Hm. (8-10) 1 x 1 25.00 2.10 52.50 Sqm.
1 x 1 25.00 2.00 50.00 Sqm.
KM188 Hm. (0-2) 1 x 5 25.00 2.00 250.00 Sqm.
Hm, (2-4) 1 x 5 25.00 1.50 187.50 Sqm.
hm (4-6) 1 x 3 25.00 1.75 131.25 Sqm.
hm (6-8) 1 x 8 25.00 1.50 300.00 Sqm.
hm (8-10) 1 x 2 25.00 2.10 105.00 Sqm.
1 x 5 5.70 2.00 57.00 Sqm.
KM191 Hm. (0-2) 1 x 1 6.00 1.00 6.00 Sqm.
Hm. (2-4) 1 x 1 7.00 1.00 7.00 Sqm.
Hm. (4-6) 1 x 1 25.00 0.80 20.00 Sqm.
1 x 1 25.00 1.20 30.00 Sqm.
1 x 1 6.50 1.50 9.75 Sqm.
Hm. (06-08) 1 x 1 25.00 2.10 52.50 Sqm.
1 x 1 5.50 1.75 9.63 Sqm.
1 x 1 5.60 4.60 25.76 Sqm.
1 x 1 5.50 2.25 12.38 Sqm.
Hm (8-10) 1 x 1 25.00 2.50 62.50 Sqm.
1 x 1 25.00 3.60 90.00 Sqm.
1 x 1 10.00 1.85 18.50 Sqm.
Km 193 (8-10) 1 x 1 25.00 3.60 90.00 Sqm.
1 x 1 22.50 3.75 84.38 Sqm.
1 x 1 11.60 4.10 47.56 Sqm.
Km 194 HM (0-2) 1 x 1 25.00 4.00 100.00 Sqm.
1 x 1 25.00 3.75 93.75 Sqm.
Hm (2-4) 1 x 1 25.00 4.00 100.00 Sqm.
1 x 1 25.00 4.80 120.00 Sqm.
Hm (4-6) 1 x 1 25.00 3.90 97.50 Sqm.
1 x 1 25.00 3.90 97.50 Sqm.
Hm (6-8) 1 x 1 25.00 3.75 93.75 Sqm.
1 x 1 8.75 1.65 14.44 Sqm.
1 x 1 2.00 2.35 4.70 Sqm.
Km 195 HM (8-10) 1 x 1 12.65 2.55 32.26 Sqm.
1 x 1 6.50 2.15 13.98 Sqm.
1 x 1 6.75 1.35 9.11 Sqm.
Km 196 (0-2) 1 x 1 25.00 4.80 120.00 Sqm.
1 x 1 25.00 4.90 122.50 Sqm.
Total 2808.70 Sqm.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

2 Water Bound Macadam

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Providing, laying, spreading and


compacting stone aggregates of specific
sizes to waterbound macadam
specification including spreading in
uniform thickness, hand packing, rolling
with vibratory roller 8-10 tonnes in stages
to proper grade and camber, applyingand
brooming requisite type of screening/
binding Materials to fill up the interstices
of coarse aggregate, watering and
compacting to the required density.)

KM179 Hm. (0-2) 1 x 2 25.00 2.00 0.075 7.50 cum


KM178 Hm. (4-6) 1 x 2 25.00 1.80 0.075 6.75 cum
KM187 Hm. (8-10) 1 x 1 25.00 2.10 0.075 3.94 cum
1 x 1 25.00 2.00 0.075 3.75 cum
KM188 Hm. (0-2) 1 x 5 25.00 2.00 0.075 18.75 cum
Hm, (2-4) 1 x 5 25.00 1.50 0.075 14.06 cum
hm (4-6) 1 x 3 25.00 1.75 0.075 9.84 cum
hm (6-8) 1 x 8 25.00 1.50 0.075 22.50 cum
hm (8-10) 1 x 2 25.00 2.10 0.075 7.88 cum
1 x 5 5.70 2.00 0.075 4.28 cum
KM191 Hm. (0-2) 1 x 1 6.00 1.00 0.075 0.45 cum
Hm. (2-4) 1 x 1 7.00 1.00 0.075 0.53 cum
Hm. (4-6) 1 x 1 25.00 0.80 0.075 1.50 cum
1 x 1 25.00 1.20 0.075 2.25 cum
1 x 1 6.50 1.50 0.075 0.73 cum
Hm. (06-08) 1 x 1 25.00 2.10 0.075 3.94 cum
1 x 1 5.50 1.75 0.075 0.72 cum
1 x 1 5.60 4.60 0.075 1.93 cum
1 x 1 5.50 2.25 0.075 0.93 cum
Hm (8-10) 1 x 1 25.00 2.50 0.075 4.69 cum
1 x 1 25.00 3.60 0.075 6.75 cum
1 x 1 10.00 1.85 0.075 1.39 cum
Km 193 (8-10) 1 x 1 25.00 3.60 0.075 6.75 cum
1 x 1 22.50 3.75 0.075 6.33 cum
1 x 1 11.60 4.10 0.075 3.57 cum
Km 194 HM (0-2) 1 x 1 25.00 4.00 0.075 7.50 cum
1 x 1 25.00 3.75 0.075 7.03 cum
Hm (2-4) 1 x 1 25.00 4.00 0.075 7.50 cum
1 x 1 25.00 4.80 0.075 9.00 cum
Hm (4-6) 1 x 1 25.00 3.90 0.075 7.31 cum
1 x 1 25.00 3.90 0.075 7.31 cum
Hm (6-8) 1 x 1 25.00 3.75 0.075 7.03 cum
1 x 1 8.75 1.65 0.075 1.08 cum
1 x 1 2.00 2.35 0.075 0.35 cum
Km 195 HM (8-10) 1 x 1 12.65 2.55 0.075 2.42 cum
1 x 1 6.50 2.15 0.075 1.05 cum
1 x 1 6.75 1.35 0.075 0.68 cum
Km 196 (0-2) 1 x 1 25.00 4.80 0.075 9.00 cum
1 x 1 25.00 4.90 0.075 9.19 cum
Total 210.66 cum

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Prime coat
(Providing and applying primer coat with
bitumen emulsion on prepared surface of
3 granular Base including clearing of road
surface and spraying primer at the rate of
0.6 kg/sqm using mechanical means.)

KM179 Hm. (0-2) 1 x 2 25.00 2.00 100.00 Sqm.


KM178 Hm. (4-6) 1 x 2 25.00 1.80 90.00 Sqm.
KM187 Hm. (8-10) 1 x 1 25.00 2.10 52.50 Sqm.
1 x 1 25.00 2.00 50.00 Sqm.
KM188 Hm. (0-2) 1 x 5 25.00 2.00 250.00 Sqm.
Hm, (2-4) 1 x 5 25.00 1.50 187.50 Sqm.
hm (4-6) 1 x 3 25.00 1.75 131.25 Sqm.
hm (6-8) 1 x 8 25.00 1.50 300.00 Sqm.
hm (8-10) 1 x 2 25.00 2.10 105.00 Sqm.
1 x 5 5.70 2.00 57.00 Sqm.
KM191 Hm. (0-2) 1 x 1 6.00 1.00 6.00 Sqm.
Hm. (2-4) 1 x 1 7.00 1.00 7.00 Sqm.
Hm. (4-6) 1 x 1 25.00 0.80 20.00 Sqm.
1 x 1 25.00 1.20 30.00 Sqm.
1 x 1 6.50 1.50 9.75 Sqm.
Hm. (06-08) 1 x 1 25.00 2.10 52.50 Sqm.
1 x 1 5.50 1.75 9.63 Sqm.
1 x 1 5.60 4.60 25.76 Sqm.
1 x 1 5.50 2.25 12.38 Sqm.
Hm (8-10) 1 x 1 25.00 2.50 62.50 Sqm.
1 x 1 25.00 3.60 90.00 Sqm.
1 x 1 10.00 1.85 18.50 Sqm.
Km 193 (8-10) 1 x 1 25.00 3.60 90.00 Sqm.
1 x 1 22.50 3.75 84.38 Sqm.
1 x 1 11.60 4.10 47.56 Sqm.
Km 194 HM (0-2) 1 x 1 25.00 4.00 100.00 Sqm.
1 x 1 25.00 3.75 93.75 Sqm.
Hm (2-4) 1 x 1 25.00 4.00 100.00 Sqm.
1 x 1 25.00 4.80 120.00 Sqm.
Hm (4-6) 1 x 1 25.00 3.90 97.50 Sqm.
1 x 1 25.00 3.90 97.50 Sqm.
Hm (6-8) 1 x 1 25.00 3.75 93.75 Sqm.
1 x 1 8.75 1.65 14.44 Sqm.
1 x 1 2.00 2.35 4.70 Sqm.
Km 195 HM (8-10) 1 x 1 12.65 2.55 32.26 Sqm.
1 x 1 6.50 2.15 13.98 Sqm.
1 x 1 6.75 1.35 9.11 Sqm.
Km 196 (0-2) 1 x 1 25.00 4.80 120.00 Sqm.
1 x 1 25.00 4.90 122.50 Sqm.
Total 2808.70 Sqm.
Tack coat using VG-10 grade bitumen
@0.40 kg/sqm, over dry and hungry
4 bituminous surfaces as per state sor
miscllanous items 3-1-2
KM-172 0.00 3.90
171.025 1 x 1 25.00 3.80 96.25 Sqm
171.050 1 x 1 25.00 3.80 95.00 Sqm
171.075 1 x 1 25.00 4.55 104.38 Sqm
171.100 1 x 1 25.00 5.20 121.88 Sqm
171.125 1 x 1 25.00 4.45 120.63 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
171.150 1 x 1 25.00 4.00 105.63 Sqm
171.175 1 x 1 25.00 4.45 105.63 Sqm
171.200 1 x 1 25.00 4.20 108.13 Sqm
171.225 1 x 1 25.00 3.75 99.38 Sqm
171.250 1 x 1 25.00 3.94 96.13 Sqm
171.275 1 x 1 25.00 3.75 96.13 Sqm
171.300 1 x 1 25.00 3.80 94.38 Sqm
171.325 1 x 1 25.00 3.95 96.88 Sqm
171.350 1 x 1 25.00 3.75 96.25 Sqm
171.375 1 x 1 25.00 3.90 95.63 Sqm
171.400 1 x 1 25.00 4.00 98.75 Sqm
171.425 1 x 1 25.00 4.05 100.63 Sqm
171.450 1 x 1 25.00 3.90 99.38 Sqm
171.475 1 x 1 25.00 3.95 98.13 Sqm
171.500 1 x 1 25.00 4.00 99.38 Sqm
171.525 1 x 1 25.00 3.90 98.75 Sqm
171.550 1 x 1 25.00 3.90 97.50 Sqm
171.575 1 x 1 25.00 3.80 96.25 Sqm
171.600 1 x 1 25.00 4.00 97.50 Sqm
171.625 1 x 1 25.00 4.15 101.88 Sqm
171.650 1 x 1 25.00 4.10 103.13 Sqm
171.675 1 x 1 25.00 3.90 100.00 Sqm
171.700 1 x 1 25.00 4.05 99.38 Sqm
171.725 1 x 1 25.00 4.15 102.50 Sqm
171.750 1 x 1 25.00 4.10 103.13 Sqm
171.775 1 x 1 25.00 3.75 98.13 Sqm
171.800 1 x 1 25.00 3.60 91.88 Sqm
171.825 1 x 1 25.00 3.75 91.88 Sqm
171.850 1 x 1 25.00 3.75 93.75 Sqm
171.875 1 x 1 25.00 3.70 93.13 Sqm
171.900 1 x 1 25.00 3.70 92.50 Sqm
171.925 1 x 1 25.00 3.90 95.00 Sqm
171.950 1 x 1 25.00 4.05 99.38 Sqm
171.975 1 x 1 25.00 3.95 100.00 Sqm
172.000 1 x 1 25.00 3.75 96.25 Sqm
Total 3980.50 Sqm
Km 173 0.00 3.75
172.025 1 x 1 25.00 3.75 93.75 Sqm
172.050 1 x 1 25.00 3.70 93.13 Sqm
172.075 1 x 1 25.00 4.90 107.50 Sqm
172.100 1 x 1 25.00 4.00 111.25 Sqm
172.125 1 x 1 25.00 3.90 98.75 Sqm
172.150 1 x 1 25.00 3.80 96.25 Sqm
172.175 1 x 1 25.00 3.90 96.25 Sqm
172.200 1 x 1 25.00 4.45 104.38 Sqm
172.225 1 x 1 25.00 4.25 108.75 Sqm
172.250 1 x 1 25.00 4.05 103.75 Sqm
172.275 1 x 1 25.00 4.15 102.50 Sqm
172.300 1 x 1 25.00 3.80 99.38 Sqm
172.325 1 x 1 25.00 3.85 95.63 Sqm
172.350 1 x 1 25.00 4.15 100.00 Sqm
172.375 1 x 1 25.00 4.30 105.63 Sqm
172.400 1 x 1 25.00 4.45 109.38 Sqm
172.425 1 x 1 25.00 4.20 108.13 Sqm
172.450 1 x 1 25.00 4.15 104.38 Sqm
172.475 1 x 1 25.00 3.80 99.38 Sqm
172.500 1 x 1 25.00 3.95 96.88 Sqm
172.525 1 x 1 25.00 3.65 95.00 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
172.550 1 x 1 25.00 3.85 93.75 Sqm
172.575 1 x 1 25.00 3.90 96.88 Sqm
172.600 1 x 1 25.00 3.95 98.13 Sqm
172.625 1 x 1 25.00 3.80 96.88 Sqm
172.650 1 x 1 25.00 4.05 98.13 Sqm
172.675 1 x 1 25.00 4.00 100.63 Sqm
172.700 1 x 1 25.00 3.90 98.75 Sqm
172.725 1 x 1 25.00 3.75 95.63 Sqm
172.750 1 x 1 25.00 3.80 94.38 Sqm
172.775 1 x 1 25.00 3.75 94.38 Sqm
172.800 1 x 1 25.00 3.75 93.75 Sqm
172.825 1 x 1 25.00 3.95 96.25 Sqm
172.850 1 x 1 25.00 3.80 96.88 Sqm
172.875 1 x 1 25.00 3.95 96.88 Sqm
172.900 1 x 1 25.00 4.40 104.38 Sqm
172.925 1 x 1 25.00 4.60 112.50 Sqm
172.950 1 x 1 25.00 3.95 106.88 Sqm
172.975 1 x 1 25.00 4.15 101.25 Sqm
173.000 1 x 1 25.00 3.90 100.63 Sqm
Ttotal 4006.99 Sqm
Km 174 1 x 0.00 3.90
173.025 1 x 1 25.00 4.35 103.13 Sqm
173.050 1 x 1 25.00 3.90 103.13 Sqm
173.075 1 x 1 25.00 3.85 96.88 Sqm
173.100 1 x 1 25.00 4.25 101.25 Sqm
173.125 1 x 1 25.00 3.95 102.50 Sqm
173.150 1 x 1 25.00 3.90 98.13 Sqm
173.175 1 x 1 25.00 3.75 95.63 Sqm
173.200 1 x 1 25.00 3.55 91.25 Sqm
173.225 1 x 1 25.00 3.75 91.25 Sqm
173.250 1 x 1 25.00 3.75 93.75 Sqm
173.275 1 x 1 25.00 3.65 92.50 Sqm
173.300 1 x 1 25.00 4.35 100.00 Sqm
173.325 1 x 1 25.00 3.90 103.13 Sqm
173.350 1 x 1 25.00 4.15 100.63 Sqm
173.375 1 x 1 25.00 4.65 110.00 Sqm
173.400 1 x 1 25.00 4.90 119.38 Sqm
173.425 1 x 1 25.00 5.20 126.25 Sqm
173.450 1 x 1 25.00 4.90 126.25 Sqm
173.475 1 x 1 25.00 4.75 120.63 Sqm
173.500 1 x 1 25.00 4.50 115.63 Sqm
173.525 1 x 1 25.00 4.20 108.75 Sqm
173.550 1 x 1 25.00 4.15 104.38 Sqm
173.575 1 x 1 25.00 4.25 105.00 Sqm
173.600 1 x 1 25.00 4.60 110.63 Sqm
173.625 1 x 1 25.00 4.50 113.75 Sqm
173.650 1 x 1 25.00 4.15 108.13 Sqm
173.675 1 x 1 25.00 4.10 103.13 Sqm
173.700 1 x 1 25.00 4.20 103.75 Sqm
173.725 1 x 1 25.00 3.90 101.25 Sqm
173.750 1 x 1 25.00 4.15 100.63 Sqm
173.775 1 x 1 25.00 3.90 100.63 Sqm
173.800 1 x 1 25.00 3.80 96.25 Sqm
173.825 1 x 1 25.00 3.85 95.63 Sqm
173.850 1 x 1 25.00 3.90 96.88 Sqm
173.875 1 x 1 25.00 3.85 96.88 Sqm
173.900 1 x 1 25.00 4.15 100.00 Sqm
173.925 1 x 1 25.00 4.20 104.38 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
173.950 1 x 1 25.00 3.95 101.88 Sqm
173.975 1 x 1 25.00 3.80 96.88 Sqm
174.000 1 x 1 25.00 4.10 98.75 Sqm
Total 4138.86 Sqm
Km 175 0.00 4.10
174.025 1 x 1 25.00 3.95 100.63 Sqm
174.050 1 x 1 25.00 4.05 100.00 Sqm
174.075 1 x 1 25.00 3.80 98.13 Sqm
174.100 1 x 1 25.00 3.95 96.88 Sqm
174.125 1 x 1 25.00 4.00 99.38 Sqm
174.150 1 x 1 25.00 4.15 101.88 Sqm
174.175 1 x 1 25.00 4.20 104.38 Sqm
174.200 1 x 1 25.00 4.10 103.75 Sqm
174.225 1 x 1 25.00 4.10 102.50 Sqm
174.250 1 x 1 25.00 4.20 103.75 Sqm
174.275 1 x 1 25.00 4.80 112.50 Sqm
174.300 1 x 1 25.00 7.55 154.38 Sqm
174.325 1 x 1 25.00 4.45 150.00 Sqm
174.350 1 x 1 25.00 4.10 106.88 Sqm
174.375 1 x 1 25.00 4.00 101.25 Sqm
174.400 1 x 1 25.00 4.10 101.25 Sqm
174.425 1 x 1 25.00 4.05 101.88 Sqm
174.450 1 x 1 25.00 3.95 100.00 Sqm
174.475 1 x 1 25.00 4.30 103.13 Sqm
174.500 1 x 1 25.00 5.10 117.50 Sqm
174.525 1 x 1 25.00 4.50 120.00 Sqm
174.550 1 x 1 25.00 4.25 109.38 Sqm
174.575 1 x 1 25.00 3.95 102.50 Sqm
174.600 1 x 1 25.00 3.75 96.25 Sqm
174.625 1 x 1 25.00 4.55 103.75 Sqm
174.650 1 x 1 25.00 4.75 116.25 Sqm
174.675 1 x 1 25.00 5.30 125.63 Sqm
174.700 1 x 1 25.00 4.75 125.63 Sqm
174.725 1 x 1 25.00 3.95 108.75 Sqm
174.750 1 x 1 25.00 3.75 96.25 Sqm
174.775 1 x 1 25.00 3.70 93.13 Sqm
174.800 1 x 1 25.00 3.95 95.63 Sqm
174.825 1 x 1 25.00 4.10 100.63 Sqm
174.850 1 x 1 25.00 4.00 101.25 Sqm
174.875 1 x 1 25.00 4.05 100.63 Sqm
174.900 1 x 1 25.00 4.55 107.50 Sqm
174.925 1 x 1 25.00 4.35 111.25 Sqm
174.950 1 x 1 25.00 5.90 128.13 Sqm
174.975 1 x 1 25.00 4.10 125.00 Sqm
175.000 1 x 1 25.00 4.00 101.25 Sqm
1 x Total 4328.84 Sqm
k.m.176 0.00 4.00
175.025 1 x 1 25.00 4.10 101.25 Sqm
175.050 1 x 1 25.00 4.15 103.13 Sqm
175.075 1 x 1 25.00 4.00 101.88 Sqm
175.100 1 x 1 25.00 3.90 98.75 Sqm
175.125 1 x 1 25.00 4.00 98.75 Sqm
175.150 1 x 1 25.00 3.95 99.38 Sqm
175.175 1 x 1 25.00 4.50 105.63 Sqm
175.200 1 x 1 25.00 4.85 116.88 Sqm
175.225 1 x 1 25.00 4.75 120.00 Sqm
175.250 1 x 1 25.00 4.25 112.50 Sqm
175.275 1 x 1 25.00 5.10 116.88 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
175.300 1 x 1 25.00 4.80 123.75 Sqm
175.325 1 x 1 25.00 4.50 116.25 Sqm
175.350 1 x 1 25.00 5.10 120.00 Sqm
175.375 1 x 1 25.00 6.00 138.75 Sqm
175.400 1 x 1 25.00 6.05 150.63 Sqm
175.425 1 x 1 25.00 6.10 151.88 Sqm
175.450 1 x 1 25.00 6.00 151.25 Sqm
175.475 1 x 1 25.00 6.00 150.00 Sqm
175.500 1 x 1 25.00 5.30 141.25 Sqm
175.525 1 x 1 25.00 5.90 140.00 Sqm
175.550 1 x 1 25.00 6.05 149.38 Sqm
175.575 1 x 1 25.00 6.10 151.88 Sqm
175.600 1 x 1 25.00 6.50 157.50 Sqm
175.625 1 x 1 25.00 7.10 170.00 Sqm
175.650 1 x 1 25.00 7.10 177.50 Sqm
175.675 1 x 1 25.00 7.05 176.88 Sqm
175.700 1 x 1 25.00 6.10 164.38 Sqm
175.725 1 x 1 25.00 6.90 162.50 Sqm
175.750 1 x 1 25.00 6.50 167.50 Sqm
175.775 1 x 1 25.00 6.70 165.00 Sqm
175.800 1 x 1 25.00 7.00 171.25 Sqm
175.825 1 x 1 25.00 7.05 175.63 Sqm
175.850 1 x 1 25.00 7.25 178.75 Sqm
175.875 1 x 1 25.00 6.55 172.50 Sqm
175.900 1 x 1 25.00 4.85 142.50 Sqm
175.925 1 x 1 25.00 4.65 118.75 Sqm
175.950 1 x 1 25.00 4.45 113.75 Sqm
175.975 1 x 1 25.00 4.50 111.88 Sqm
176.000 1 x 1 25.00 4.60 113.75 Sqm
Total 5500.07 Sqm
Km 167 0.00 4.60
176.025 1 x 1 25.00 4.50 113.75 Sqm
176.050 1 x 1 25.00 4.45 111.88 Sqm
176.075 1 x 1 25.00 4.10 106.88 Sqm
176.100 1 x 1 25.00 3.90 100.00 Sqm
176.125 1 x 1 25.00 3.75 95.63 Sqm
176.150 1 x 1 25.00 3.60 91.88 Sqm
176.175 1 x 1 25.00 3.55 89.38 Sqm
176.200 1 x 1 25.00 3.65 90.00 Sqm
176.225 1 x 1 25.00 3.90 94.38 Sqm
176.250 1 x 1 25.00 4.15 100.63 Sqm
176.275 1 x 1 25.00 4.50 108.13 Sqm
176.300 1 x 1 25.00 5.00 118.75 Sqm
176.325 1 x 1 25.00 4.85 123.13 Sqm
176.350 1 x 1 25.00 4.55 117.50 Sqm
176.375 1 x 1 25.00 3.90 105.63 Sqm
176.400 1 x 1 25.00 3.95 98.13 Sqm
176.425 1 x 1 25.00 3.80 96.88 Sqm
176.450 1 x 1 25.00 3.90 96.25 Sqm
176.475 1 x 1 25.00 4.00 98.75 Sqm
176.500 1 x 1 25.00 4.25 103.13 Sqm
176.525 1 x 1 25.00 4.00 103.13 Sqm
176.550 1 x 1 25.00 3.85 98.13 Sqm
176.575 1 x 1 25.00 3.70 94.38 Sqm
176.600 1 x 1 25.00 4.25 99.38 Sqm
176.625 1 x 1 25.00 4.10 104.38 Sqm
176.650 1 x 1 25.00 4.00 101.25 Sqm
176.675 1 x 1 25.00 3.85 98.13 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
176.700 1 x 1 25.00 3.90 96.88 Sqm
176.725 1 x 1 25.00 4.05 99.38 Sqm
176.750 1 x 1 25.00 4.15 102.50 Sqm
176.775 1 x 1 25.00 4.00 101.88 Sqm
176.800 1 x 1 25.00 3.95 99.38 Sqm
176.825 1 x 1 25.00 4.00 99.38 Sqm
176.850 1 x 1 25.00 3.90 98.75 Sqm
176.875 1 x 1 25.00 3.75 95.63 Sqm
176.900 1 x 1 25.00 3.90 95.63 Sqm
176.925 1 x 1 25.00 4.00 98.75 Sqm
176.950 1 x 1 25.00 3.80 97.50 Sqm
176.975 1 x 1 25.00 3.70 93.75 Sqm
177.000 1 x 1 25.00 3.75 93.13 Sqm
1 x Total 4032.01 Sqm
Km 178 0.00 3.75
177.025 1 x 1 25.00 3.65 92.50 Sqm
177.050 1 x 1 25.00 3.75 92.50 Sqm
177.075 1 x 1 25.00 3.65 92.50 Sqm
177.100 1 x 1 25.00 3.80 93.13 Sqm
177.125 1 x 1 25.00 3.75 94.38 Sqm
177.150 1 x 1 25.00 3.75 93.75 Sqm
177.175 1 x 1 25.00 3.75 93.75 Sqm
177.200 1 x 1 25.00 3.75 93.75 Sqm
177.225 1 x 1 25.00 3.65 92.50 Sqm
177.250 1 x 1 25.00 3.75 92.50 Sqm
177.275 1 x 1 25.00 3.75 93.75 Sqm
177.300 1 x 1 25.00 3.65 92.50 Sqm
177.325 1 x 1 25.00 3.70 91.88 Sqm
177.350 1 x 1 25.00 3.55 90.63 Sqm
177.375 1 x 1 25.00 3.85 92.50 Sqm
177.400 1 x 1 25.00 3.70 94.38 Sqm
177.425 1 x 1 25.00 4.15 98.13 Sqm
177.450 1 x 1 25.00 3.80 99.38 Sqm
177.475 1 x 1 25.00 3.75 94.38 Sqm
177.500 1 x 1 25.00 3.65 92.50 Sqm
177.525 1 x 1 25.00 3.65 91.25 Sqm
177.550 1 x 1 25.00 3.75 92.50 Sqm
177.575 1 x 1 25.00 3.65 92.50 Sqm
177.600 1 x 1 25.00 3.60 90.63 Sqm
177.625 1 x 1 25.00 3.90 93.75 Sqm
177.650 1 x 1 25.00 3.75 95.63 Sqm
177.675 1 x 1 25.00 3.60 91.88 Sqm
177.700 1 x 1 25.00 3.75 91.88 Sqm
177.725 1 x 1 25.00 3.60 91.88 Sqm
177.750 1 x 1 25.00 3.95 94.38 Sqm
177.775 1 x 1 25.00 3.85 97.50 Sqm
177.800 1 x 1 25.00 3.70 94.38 Sqm
177.825 1 x 1 25.00 4.00 96.25 Sqm
177.850 1 x 1 25.00 3.75 96.88 Sqm
177.875 1 x 1 25.00 3.65 92.50 Sqm
177.900 1 x 1 25.00 3.80 93.13 Sqm
177.925 1 x 1 25.00 4.10 98.75 Sqm
177.950 1 x 1 25.00 3.90 100.00 Sqm
177.975 1 x 1 25.00 4.10 100.00 Sqm
178.000 1 x 1 25.00 4.45 106.88 Sqm
Total 3773.84 Sqm
km179 0.00 4.45
178.025 1 x 1 25.00 3.60 100.63 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
178.050 1 x 1 25.00 3.55 89.38 Sqm
178.075 1 x 1 25.00 3.65 90.00 Sqm
178.100 1 x 1 25.00 3.60 90.63 Sqm
178.125 1 x 1 25.00 3.55 89.38 Sqm
178.150 1 x 1 25.00 3.75 91.25 Sqm
178.175 1 x 1 25.00 3.75 93.75 Sqm
178.200 1 x 1 25.00 3.80 94.38 Sqm
178.225 1 x 1 25.00 4.15 99.38 Sqm
178.250 1 x 1 25.00 4.20 104.38 Sqm
178.275 1 x 1 25.00 3.90 101.25 Sqm
178.300 1 x 1 25.00 3.85 96.88 Sqm
178.325 1 x 1 25.00 3.65 93.75 Sqm
178.350 1 x 1 25.00 3.85 93.75 Sqm
178.375 1 x 1 25.00 3.90 96.88 Sqm
178.400 1 x 1 25.00 4.15 100.63 Sqm
178.425 1 x 1 25.00 3.75 98.75 Sqm
178.450 1 x 1 25.00 3.65 92.50 Sqm
178.475 1 x 1 25.00 3.75 92.50 Sqm
178.500 1 x 1 25.00 3.60 91.88 Sqm
178.525 1 x 1 25.00 3.80 92.50 Sqm
178.550 1 x 1 25.00 4.05 98.13 Sqm
178.575 1 x 1 25.00 4.10 101.88 Sqm
178.600 1 x 1 25.00 4.00 101.25 Sqm
178.625 1 x 1 25.00 3.75 96.88 Sqm
178.650 1 x 1 25.00 3.80 94.38 Sqm
178.675 1 x 1 25.00 3.80 95.00 Sqm
178.700 1 x 1 25.00 3.75 94.38 Sqm
178.725 1 x 1 25.00 3.60 91.88 Sqm
178.750 1 x 1 25.00 3.75 91.88 Sqm
178.775 1 x 1 25.00 4.00 96.88 Sqm
178.800 1 x 1 25.00 3.75 96.88 Sqm
178.825 1 x 1 25.00 3.75 93.75 Sqm
178.850 1 x 1 25.00 3.75 93.75 Sqm
178.875 1 x 1 25.00 3.95 96.25 Sqm
178.900 1 x 1 25.00 4.00 99.38 Sqm
178.925 1 x 1 25.00 3.80 97.50 Sqm
178.950 1 x 1 25.00 3.65 93.13 Sqm
178.975 1 x 1 25.00 3.75 92.50 Sqm
179.000 1 x 1 25.00 4.00 96.88 Sqm
Total 3816.99 Sqm
km180 0.00 4.00
179.025 1 x 1 25.00 3.75 96.88 Sqm
179.050 1 x 1 25.00 3.65 92.50 Sqm
179.075 1 x 1 25.00 3.55 90.00 Sqm
179.100 1 x 1 25.00 3.65 90.00 Sqm
179.125 1 x 1 25.00 3.75 92.50 Sqm
179.150 1 x 1 25.00 4.10 98.13 Sqm
179.175 1 x 1 25.00 4.05 101.88 Sqm
179.200 1 x 1 25.00 3.95 100.00 Sqm
179.225 1 x 1 25.00 4.00 99.38 Sqm
179.250 1 x 1 25.00 3.80 97.50 Sqm
179.275 1 x 1 25.00 3.75 94.38 Sqm
179.300 1 x 1 25.00 3.60 91.88 Sqm
179.325 1 x 1 25.00 3.60 90.00 Sqm
179.350 1 x 1 25.00 3.75 91.88 Sqm
179.375 1 x 1 25.00 3.85 95.00 Sqm
179.400 1 x 1 25.00 3.80 95.63 Sqm
179.425 1 x 1 25.00 4.10 98.75 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
179.450 1 x 1 25.00 3.95 100.63 Sqm
179.475 1 x 1 25.00 3.75 96.25 Sqm
179.500 1 x 1 25.00 3.65 92.50 Sqm
179.525 1 x 1 25.00 3.75 92.50 Sqm
179.550 1 x 1 25.00 3.60 91.88 Sqm
179.575 1 x 1 25.00 3.85 93.13 Sqm
179.600 1 x 1 25.00 3.95 97.50 Sqm
179.625 1 x 1 25.00 3.80 96.88 Sqm
179.650 1 x 1 25.00 4.00 97.50 Sqm
179.675 1 x 1 25.00 4.10 101.25 Sqm
179.700 1 x 1 25.00 3.85 99.38 Sqm
179.725 1 x 1 25.00 3.80 95.63 Sqm
179.750 1 x 1 25.00 3.75 94.38 Sqm
179.775 1 x 1 25.00 3.80 94.38 Sqm
179.800 1 x 1 25.00 3.90 96.25 Sqm
179.825 1 x 1 25.00 3.60 93.75 Sqm
179.850 1 x 1 25.00 3.75 91.88 Sqm
179.875 1 x 1 25.00 3.80 94.38 Sqm
179.900 1 x 1 25.00 3.80 95.00 Sqm
179.925 1 x 1 25.00 3.85 95.63 Sqm
179.950 1 x 1 25.00 3.90 96.88 Sqm
179.975 1 x 1 25.00 4.05 99.38 Sqm
180.000 1 x 1 25.00 4.15 102.50 Sqm
Total 3825.73 Sqm
Km 181 0.00 4.15
180.025 1 x 1 25.00 4.20 104.38 Sqm
180.050 1 x 1 25.00 4.15 104.38 Sqm
180.075 1 x 1 25.00 4.30 105.63 Sqm
180.100 1 x 1 25.00 3.95 103.13 Sqm
180.125 1 x 1 25.00 3.75 96.25 Sqm
180.150 1 x 1 25.00 3.70 93.13 Sqm
180.175 1 x 1 25.00 3.80 93.75 Sqm
180.200 1 x 1 25.00 3.95 96.88 Sqm
180.225 1 x 1 25.00 4.10 100.63 Sqm
180.250 1 x 1 25.00 3.95 100.63 Sqm
180.275 1 x 1 25.00 3.80 96.88 Sqm
180.300 1 x 1 25.00 4.25 100.63 Sqm
180.325 1 x 1 25.00 4.30 106.88 Sqm
180.350 1 x 1 25.00 4.50 110.00 Sqm
180.375 1 x 1 25.00 4.40 111.25 Sqm
180.400 1 x 1 25.00 4.10 106.25 Sqm
180.425 1 x 1 25.00 4.45 106.88 Sqm
180.450 1 x 1 25.00 4.60 113.13 Sqm
180.475 1 x 1 25.00 4.60 115.00 Sqm
180.500 1 x 1 25.00 4.50 113.75 Sqm
180.525 1 x 1 25.00 4.60 113.75 Sqm
180.550 1 x 1 25.00 4.50 113.75 Sqm
180.575 1 x 1 25.00 4.35 110.63 Sqm
180.600 1 x 1 25.00 4.20 106.88 Sqm
180.625 1 x 1 25.00 4.15 104.38 Sqm
180.650 1 x 1 25.00 4.20 104.38 Sqm
180.675 1 x 1 25.00 4.00 102.50 Sqm
180.700 1 x 1 25.00 4.00 100.00 Sqm
180.725 1 x 1 25.00 4.10 101.25 Sqm
180.750 1 x 1 25.00 3.50 95.00 Sqm
180.775 1 x 1 25.00 4.25 96.88 Sqm
180.800 1 x 1 25.00 4.15 105.00 Sqm
180.825 1 x 1 25.00 4.00 101.88 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
180.850 1 x 1 25.00 4.15 101.88 Sqm
180.875 1 x 1 25.00 4.20 104.38 Sqm
180.900 1 x 1 25.00 3.95 101.88 Sqm
180.925 1 x 1 25.00 4.15 101.25 Sqm
180.950 1 x 1 25.00 4.20 104.38 Sqm
180.975 1 x 1 25.00 3.90 101.25 Sqm
181.000 1 x 1 25.00 4.15 100.63 Sqm
Total 4151.37 Sqm
Km 182 1 x 0.00 4.15 Sqm
181.025 1 x 1 25.00 4.10 103.13 Sqm
181.050 1 x 1 25.00 4.20 103.75 Sqm
181.075 1 x 1 25.00 4.00 102.50 Sqm
181.100 1 x 1 25.00 4.15 101.88 Sqm
181.125 1 x 1 25.00 3.90 100.63 Sqm
181.150 1 x 1 25.00 4.05 99.38 Sqm
181.175 1 x 1 25.00 4.10 101.88 Sqm
181.200 1 x 1 25.00 4.00 101.25 Sqm
181.225 1 x 1 25.00 4.15 101.88 Sqm
181.250 1 x 1 25.00 4.40 106.88 Sqm
181.275 1 x 1 25.00 4.35 109.38 Sqm
181.300 1 x 1 25.00 4.20 106.88 Sqm
181.325 1 x 1 25.00 3.95 101.88 Sqm
181.350 1 x 1 25.00 4.10 100.63 Sqm
181.375 1 x 1 25.00 4.00 101.25 Sqm
181.400 1 x 1 25.00 4.00 100.00 Sqm
181.425 1 x 1 25.00 3.75 96.88 Sqm
181.450 1 x 1 25.00 3.65 92.50 Sqm
181.475 1 x 1 25.00 3.85 93.75 Sqm
181.500 1 x 1 25.00 3.90 96.88 Sqm
181.525 1 x 1 25.00 4.10 100.00 Sqm
181.550 1 x 1 25.00 4.20 103.75 Sqm
181.575 1 x 1 25.00 4.00 102.50 Sqm
181.600 1 x 1 25.00 3.95 99.38 Sqm
181.625 1 x 1 25.00 4.10 100.63 Sqm
181.650 1 x 1 25.00 4.00 101.25 Sqm
181.675 1 x 1 25.00 3.90 98.75 Sqm
181.700 1 x 1 25.00 3.75 95.63 Sqm
181.725 1 x 1 25.00 3.80 94.38 Sqm
181.750 1 x 1 25.00 3.90 96.25 Sqm
181.775 1 x 1 25.00 4.00 98.75 Sqm
181.800 1 x 1 25.00 3.90 98.75 Sqm
181.825 1 x 1 25.00 3.75 95.63 Sqm
181.850 1 x 1 25.00 3.90 95.63 Sqm
181.875 1 x 1 25.00 3.90 97.50 Sqm
181.900 1 x 1 25.00 3.80 96.25 Sqm
181.925 1 x 1 25.00 4.30 101.25 Sqm
181.950 1 x 1 25.00 4.60 111.25 Sqm
181.975 1 x 1 25.00 6.10 133.75 Sqm
182.000 1 x 1 25.00 4.80 136.25 Sqm
Total 4080.72 Sqm
Km183 0.00 4.80
182.025 1 x 1 25.00 4.20 112.50 Sqm
182.050 1 x 1 25.00 3.90 101.25 Sqm
182.075 1 x 1 25.00 3.80 96.25 Sqm
182.100 1 x 1 25.00 3.75 94.38 Sqm
182.125 1 x 1 25.00 3.80 94.38 Sqm
182.150 1 x 1 25.00 3.90 96.25 Sqm
182.175 1 x 1 25.00 3.80 96.25 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
182.200 1 x 1 25.00 3.95 96.88 Sqm
182.225 1 x 1 25.00 4.10 100.63 Sqm
182.250 1 x 1 25.00 3.75 98.13 Sqm
182.275 1 x 1 25.00 3.80 94.38 Sqm
182.300 1 x 1 25.00 3.80 95.00 Sqm
182.325 1 x 1 25.00 3.90 96.25 Sqm
182.350 1 x 1 25.00 4.20 101.25 Sqm
182.375 1 x 1 25.00 4.15 104.38 Sqm
182.400 1 x 1 25.00 3.75 98.75 Sqm
182.425 1 x 1 25.00 3.80 94.38 Sqm
182.450 1 x 1 25.00 3.75 94.38 Sqm
182.475 1 x 1 25.00 3.60 91.88 Sqm
182.500 1 x 1 25.00 3.70 91.25 Sqm
182.525 1 x 1 25.00 3.65 91.88 Sqm
182.550 1 x 1 25.00 3.65 91.25 Sqm
182.575 1 x 1 25.00 3.50 89.38 Sqm
182.600 1 x 1 25.00 3.65 89.38 Sqm
182.625 1 x 1 25.00 3.85 93.75 Sqm
182.650 1 x 1 25.00 3.75 95.00 Sqm
182.675 1 x 1 25.00 3.85 95.00 Sqm
182.700 1 x 1 25.00 3.90 96.88 Sqm
182.725 1 x 1 25.00 3.70 95.00 Sqm
182.750 1 x 1 25.00 4.25 99.38 Sqm
182.775 1 x 1 25.00 4.85 113.75 Sqm
182.800 1 x 1 25.00 4.80 120.63 Sqm
182.825 1 x 1 25.00 4.75 119.38 Sqm
182.850 1 x 1 25.00 4.55 116.25 Sqm
182.875 1 x 1 25.00 4.20 109.38 Sqm
182.900 1 x 1 25.00 3.95 101.88 Sqm
182.925 1 x 1 25.00 3.85 97.50 Sqm
182.950 1 x 1 25.00 3.90 96.88 Sqm
182.975 1 x 1 25.00 3.75 95.63 Sqm
183.000 1 x 1 25.00 3.80 94.38 Sqm
Total 3951.36 Sqm
km184 0.00 3.80
183.025 1 x 1 25.00 4.50 103.75 Sqm
183.050 1 x 1 25.00 4.20 108.75 Sqm
183.075 1 x 1 25.00 4.00 102.50 Sqm
183.100 1 x 1 25.00 4.05 100.63 Sqm
183.125 1 x 1 25.00 3.95 100.00 Sqm
183.150 1 x 1 25.00 3.90 98.13 Sqm
183.175 1 x 1 25.00 3.85 96.88 Sqm
183.200 1 x 1 25.00 3.90 96.88 Sqm
183.225 1 x 1 25.00 4.15 100.63 Sqm
183.250 1 x 1 25.00 4.00 101.88 Sqm
183.275 1 x 1 25.00 3.75 96.88 Sqm
183.300 1 x 1 25.00 4.35 101.25 Sqm
183.325 1 x 1 25.00 3.75 101.25 Sqm
183.350 1 x 1 25.00 3.75 93.75 Sqm
183.375 1 x 1 25.00 3.60 91.88 Sqm
183.400 1 x 1 25.00 3.55 89.38 Sqm
183.425 1 x 1 25.00 4.00 94.38 Sqm
183.450 1 x 1 25.00 3.90 98.75 Sqm
183.475 1 x 1 25.00 3.90 97.50 Sqm
183.500 1 x 1 25.00 4.00 98.75 Sqm
183.525 1 x 1 25.00 4.10 101.25 Sqm
183.550 1 x 1 25.00 4.10 102.50 Sqm
183.575 1 x 1 25.00 4.00 101.25 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
183.600 1 x 1 25.00 4.00 100.00 Sqm
183.625 1 x 1 25.00 4.10 101.25 Sqm
183.650 1 x 1 25.00 3.90 100.00 Sqm
183.675 1 x 1 25.00 4.65 106.88 Sqm
183.700 1 x 1 25.00 4.15 110.00 Sqm
183.725 1 x 1 25.00 4.00 101.88 Sqm
183.750 1 x 1 25.00 3.95 99.38 Sqm
183.775 1 x 1 25.00 4.60 106.88 Sqm
183.800 1 x 1 25.00 4.10 108.75 Sqm
183.825 1 x 1 25.00 4.00 101.25 Sqm
183.850 1 x 1 25.00 4.15 101.88 Sqm
183.875 1 x 1 25.00 4.00 101.88 Sqm
183.900 1 x 1 25.00 4.15 101.88 Sqm
183.925 1 x 1 25.00 3.90 100.63 Sqm
183.950 1 x 1 25.00 4.05 99.38 Sqm
183.975 1 x 1 25.00 3.90 99.38 Sqm
184.000 1 x 1 25.00 3.75 95.63 Sqm
Total 4015.73 Sqm
km 185 0.00 3.75
184.025 1 x 1 25.00 5.00 109.38 Sqm
184.050 1 x 1 25.00 4.95 124.38 Sqm
184.075 1 x 1 25.00 4.75 121.25 Sqm
184.100 1 x 1 25.00 4.35 113.75 Sqm
184.125 1 x 1 25.00 4.20 106.88 Sqm
184.150 1 x 1 25.00 4.10 103.75 Sqm
184.175 1 x 1 25.00 4.05 101.88 Sqm
184.200 1 x 1 25.00 4.20 103.13 Sqm
184.225 1 x 1 25.00 3.90 101.25 Sqm
184.250 1 x 1 25.00 4.00 98.75 Sqm
184.275 1 x 1 25.00 3.95 99.38 Sqm
184.300 1 x 1 25.00 3.80 96.88 Sqm
184.325 1 x 1 25.00 3.80 95.00 Sqm
184.350 1 x 1 25.00 3.95 96.88 Sqm
184.375 1 x 1 25.00 4.25 102.50 Sqm
184.400 1 x 1 25.00 4.15 105.00 Sqm
184.425 1 x 1 25.00 4.80 111.88 Sqm
184.450 1 x 1 25.00 4.70 118.75 Sqm
184.475 1 x 1 25.00 4.55 115.63 Sqm
184.500 1 x 1 25.00 4.40 111.88 Sqm
184.525 1 x 1 25.00 4.65 113.13 Sqm
184.550 1 x 1 25.00 5.05 121.25 Sqm
184.575 1 x 1 25.00 4.70 121.88 Sqm
184.600 1 x 1 25.00 4.75 118.13 Sqm
184.625 1 x 1 25.00 4.50 115.63 Sqm
184.650 1 x 1 25.00 4.65 114.38 Sqm
184.675 1 x 1 25.00 4.40 113.13 Sqm
184.700 1 x 1 25.00 4.75 114.38 Sqm
184.725 1 x 1 25.00 4.85 120.00 Sqm
184.750 1 x 1 25.00 4.75 120.00 Sqm
184.775 1 x 1 25.00 4.80 119.38 Sqm
184.800 1 x 1 25.00 4.70 118.75 Sqm
184.825 1 x 1 25.00 5.00 121.25 Sqm
184.850 1 x 1 25.00 4.05 113.13 Sqm
184.875 1 x 1 25.00 3.90 99.38 Sqm
184.900 1 x 1 25.00 4.15 100.63 Sqm
184.925 1 x 1 25.00 4.50 108.13 Sqm
184.950 1 x 1 25.00 4.60 113.75 Sqm
184.975 1 x 1 25.00 4.25 110.63 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
185.000 1 x 1 25.00 4.20 105.63 Sqm
Total 4420.75 Sqm
km 186 0.00 4.20
185.025 1 x 1 25.00 3.90 101.25 Sqm
185.050 1 x 1 25.00 4.05 99.38 Sqm
185.075 1 x 1 25.00 4.10 101.88 Sqm
185.100 1 x 1 25.00 3.90 100.00 Sqm
185.125 1 x 1 25.00 3.85 96.88 Sqm
185.150 1 x 1 25.00 3.90 96.88 Sqm
185.175 1 x 1 25.00 3.75 95.63 Sqm
185.200 1 x 1 25.00 4.20 99.38 Sqm
185.225 1 x 1 25.00 4.10 103.75 Sqm
185.250 1 x 1 25.00 3.95 100.63 Sqm
185.275 1 x 1 25.00 4.55 106.25 Sqm
185.300 1 x 1 25.00 4.15 108.75 Sqm
185.325 1 x 1 25.00 3.95 101.25 Sqm
185.350 1 x 1 25.00 4.00 99.38 Sqm
185.375 1 x 1 25.00 4.20 102.50 Sqm
185.400 1 x 1 25.00 4.25 105.63 Sqm
185.425 1 x 1 25.00 4.20 105.63 Sqm
185.450 1 x 1 25.00 4.50 108.75 Sqm
185.475 1 x 1 25.00 4.10 107.50 Sqm
185.500 1 x 1 25.00 3.95 100.63 Sqm
185.525 1 x 1 25.00 4.05 100.00 Sqm
185.550 1 x 1 25.00 3.90 99.38 Sqm
185.575 1 x 1 25.00 4.00 98.75 Sqm
185.600 1 x 1 25.00 3.90 98.75 Sqm
185.625 1 x 1 25.00 4.25 101.88 Sqm
185.650 1 x 1 25.00 3.90 101.88 Sqm
185.675 1 x 1 25.00 4.10 100.00 Sqm
185.700 1 x 1 25.00 4.00 101.25 Sqm
185.725 1 x 1 25.00 3.85 98.13 Sqm
185.750 1 x 1 25.00 3.70 94.38 Sqm
185.775 1 x 1 25.00 4.00 96.25 Sqm
185.800 1 x 1 25.00 4.15 101.88 Sqm
185.825 1 x 1 25.00 4.60 109.38 Sqm
185.850 1 x 1 25.00 4.60 115.00 Sqm
185.875 1 x 1 25.00 4.55 114.38 Sqm
185.900 1 x 1 25.00 4.70 115.63 Sqm
185.925 1 x 1 25.00 5.30 125.00 Sqm
185.950 1 x 1 25.00 5.15 130.63 Sqm
185.975 1 x 1 25.00 4.60 121.88 Sqm
186.000 1 x 1 25.00 5.05 120.63 Sqm
Total 4186.99 Sqm
km 187 0.00 5.05
186.025 1 x 1 25.00 4.05 113.75 Sqm
186.050 1 x 1 25.00 3.90 99.38 Sqm
186.075 1 x 1 25.00 3.95 98.13 Sqm
186.100 1 x 1 25.00 5.10 113.13 Sqm
186.125 1 x 1 25.00 4.60 121.25 Sqm
186.150 1 x 1 25.00 4.00 107.50 Sqm
186.175 1 x 1 25.00 3.95 99.38 Sqm
186.200 1 x 1 25.00 4.10 100.63 Sqm
186.225 1 x 1 25.00 4.50 107.50 Sqm
186.250 1 x 1 25.00 4.90 117.50 Sqm
186.275 1 x 1 25.00 5.75 133.13 Sqm
186.300 1 x 1 25.00 6.55 153.75 Sqm
186.325 1 x 1 25.00 4.20 134.38 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
186.350 1 x 1 25.00 4.10 103.75 Sqm
186.375 1 x 1 25.00 3.90 100.00 Sqm
186.400 1 x 1 25.00 3.90 97.50 Sqm
186.425 1 x 1 25.00 3.90 97.50 Sqm
186.450 1 x 1 25.00 4.00 98.75 Sqm
186.475 1 x 1 25.00 4.25 103.13 Sqm
186.500 1 x 1 25.00 4.05 103.75 Sqm
186.525 1 x 1 25.00 3.90 99.38 Sqm
186.550 1 x 1 25.00 3.85 96.88 Sqm
186.575 1 x 1 25.00 4.25 101.25 Sqm
186.600 1 x 1 25.00 4.00 103.13 Sqm
186.625 1 x 1 25.00 3.90 98.75 Sqm
186.650 1 x 1 25.00 4.25 101.88 Sqm
186.675 1 x 1 25.00 4.50 109.38 Sqm
186.700 1 x 1 25.00 4.55 113.13 Sqm
186.725 1 x 1 25.00 4.75 116.25 Sqm
186.750 1 x 1 25.00 5.50 128.13 Sqm
186.775 1 x 1 25.00 6.10 145.00 Sqm
186.800 1 x 1 25.00 8.00 176.25 Sqm
186.825 1 x 1 25.00 4.55 156.88 Sqm
186.850 1 x 1 25.00 4.45 112.50 Sqm
186.875 1 x 1 25.00 4.60 113.13 Sqm
186.900 1 x 1 25.00 4.60 115.00 Sqm
186.925 1 x 1 25.00 4.50 113.75 Sqm
186.950 1 x 1 25.00 4.20 108.75 Sqm
186.975 1 x 1 25.00 4.15 104.38 Sqm
187.000 1 x 1 25.00 4.55 108.75 Sqm
Total 4526.34 Sqm
km 188 0.00 4.55
187.025 1 x 1 25.00 4.90 118.13 Sqm
187.050 1 x 1 25.00 5.15 125.63 Sqm
187.075 1 x 1 25.00 6.80 149.38 Sqm
187.100 1 x 1 25.00 6.95 171.88 Sqm
187.125 1 x 1 25.00 5.60 156.88 Sqm
187.150 1 x 1 25.00 4.80 130.00 Sqm
187.175 1 x 1 25.00 5.95 134.38 Sqm
187.200 1 x 1 25.00 7.00 161.88 Sqm
187.225 1 x 1 25.00 8.00 187.50 Sqm
187.250 1 x 1 25.00 8.50 206.25 Sqm
187.275 1 x 1 25.00 9.25 221.88 Sqm
187.300 1 x 1 25.00 8.55 222.50 Sqm
187.325 1 x 1 25.00 6.55 188.75 Sqm
187.350 1 x 1 25.00 4.80 141.88 Sqm
187.375 1 x 1 25.00 5.90 133.75 Sqm
187.400 1 x 1 25.00 7.00 161.25 Sqm
187.425 1 x 1 25.00 3.90 136.25 Sqm
187.450 1 x 1 25.00 4.15 100.63 Sqm
187.475 1 x 1 25.00 4.05 102.50 Sqm
187.500 1 x 1 25.00 4.20 103.13 Sqm
187.525 1 x 1 25.00 3.90 101.25 Sqm
187.550 1 x 1 25.00 5.00 111.25 Sqm
187.575 1 x 1 25.00 5.10 126.25 Sqm
187.600 1 x 1 25.00 5.00 126.25 Sqm
187.625 1 x 1 25.00 5.35 129.38 Sqm
187.650 1 x 1 25.00 6.50 148.13 Sqm
187.675 1 x 1 25.00 8.00 181.25 Sqm
187.700 1 x 1 25.00 7.50 193.75 Sqm
187.725 1 x 1 25.00 6.80 178.75 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
187.750 1 x 1 25.00 6.95 171.88 Sqm
187.775 1 x 1 25.00 6.80 171.88 Sqm
187.800 1 x 1 25.00 6.70 168.75 Sqm
187.825 1 x 1 25.00 10.50 215.00 Sqm
187.850 1 x 1 25.00 11.00 268.75 Sqm
187.875 1 x 1 25.00 8.80 247.50 Sqm
187.900 1 x 1 25.00 7.00 197.50 Sqm
187.925 1 x 1 25.00 3.85 135.63 Sqm
187.950 1 x 1 25.00 3.65 93.75 Sqm
187.975 1 x 1 25.00 3.75 92.50 Sqm
188.000 1 x 1 25.00 3.60 91.88 Sqm
Total 6205.71 Sqm
km 189 3.60
188.025 1 x 1 25.00 3.65 90.63 Sqm
188.050 1 x 1 25.00 3.75 92.50 Sqm
188.075 1 x 1 25.00 3.80 94.38 Sqm
188.100 1 x 1 25.00 3.90 96.25 Sqm
188.125 1 x 1 25.00 4.00 98.75 Sqm
188.150 1 x 1 25.00 4.00 100.00 Sqm
188.175 1 x 1 25.00 4.10 101.25 Sqm
188.200 1 x 1 25.00 4.40 106.25 Sqm
188.225 1 x 1 25.00 3.85 103.13 Sqm
188.250 1 x 1 25.00 3.90 96.88 Sqm
188.275 1 x 1 25.00 3.75 95.63 Sqm
188.300 1 x 1 25.00 3.75 93.75 Sqm
188.325 1 x 1 25.00 4.05 97.50 Sqm
188.350 1 x 1 25.00 3.80 98.13 Sqm
188.375 1 x 1 25.00 4.10 98.75 Sqm
188.400 1 x 1 25.00 4.00 101.25 Sqm
188.425 1 x 1 25.00 3.75 96.88 Sqm
188.450 1 x 1 25.00 3.80 94.38 Sqm
188.475 1 x 1 25.00 3.60 92.50 Sqm
188.500 1 x 1 25.00 3.70 91.25 Sqm
188.525 1 x 1 25.00 4.30 100.00 Sqm
188.550 1 x 1 25.00 4.15 105.63 Sqm
188.575 1 x 1 25.00 3.80 99.38 Sqm
188.600 1 x 1 25.00 3.80 95.00 Sqm
188.625 1 x 1 25.00 3.90 96.25 Sqm
188.650 1 x 1 25.00 3.75 95.63 Sqm
188.675 1 x 1 25.00 3.70 93.13 Sqm
188.700 1 x 1 25.00 3.80 93.75 Sqm
188.725 1 x 1 25.00 4.20 100.00 Sqm
188.750 1 x 1 25.00 4.00 102.50 Sqm
188.775 1 x 1 25.00 3.95 99.38 Sqm
188.800 1 x 1 25.00 4.65 107.50 Sqm
188.825 1 x 1 25.00 4.15 110.00 Sqm
188.850 1 x 1 25.00 3.75 98.75 Sqm
188.875 1 x 1 25.00 4.00 96.88 Sqm
188.900 1 x 1 25.00 4.65 108.13 Sqm
188.925 1 x 1 25.00 3.50 101.88 Sqm
188.950 1 x 1 25.00 3.90 92.50 Sqm
188.975 1 x 1 25.00 3.45 91.88 Sqm
189.000 1 x 1 25.00 3.60 88.13 Sqm
Total 3916.34 Sqm
k.m.190 0.00 3.60
189.025 1 x 1 25.00 3.65 90.63 Sqm
189.050 1 x 1 25.00 3.75 92.50 Sqm
189.075 1 x 1 25.00 3.80 94.38 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
189.100 1 x 1 25.00 3.80 95.00 Sqm
189.125 1 x 1 25.00 3.75 94.38 Sqm
189.150 1 x 1 25.00 4.15 98.75 Sqm
189.175 1 x 1 25.00 4.00 101.88 Sqm
189.200 1 x 1 25.00 3.80 97.50 Sqm
189.225 1 x 1 25.00 3.75 94.38 Sqm
189.250 1 x 1 25.00 3.65 92.50 Sqm
189.275 1 x 1 25.00 3.60 90.63 Sqm
189.300 1 x 1 25.00 3.75 91.88 Sqm
189.325 1 x 1 25.00 4.40 101.88 Sqm
189.350 1 x 1 25.00 4.55 111.88 Sqm
189.375 1 x 1 25.00 5.30 123.13 Sqm
189.400 1 x 1 25.00 3.90 115.00 Sqm
189.425 1 x 1 25.00 3.80 96.25 Sqm
189.450 1 x 1 25.00 3.90 96.25 Sqm
189.475 1 x 1 25.00 3.75 95.63 Sqm
189.500 1 x 1 25.00 4.00 96.88 Sqm
189.525 1 x 1 25.00 4.00 100.00 Sqm
189.550 1 x 1 25.00 4.55 106.88 Sqm
189.575 1 x 1 25.00 3.90 105.63 Sqm
189.600 1 x 1 25.00 4.55 105.63 Sqm
189.625 1 x 1 25.00 4.15 108.75 Sqm
189.650 1 x 1 25.00 4.15 103.75 Sqm
189.675 1 x 1 25.00 4.10 103.13 Sqm
189.700 1 x 1 25.00 4.65 109.38 Sqm
189.725 1 x 1 25.00 4.35 112.50 Sqm
189.750 1 x 1 25.00 4.00 104.38 Sqm
189.775 1 x 1 25.00 4.20 102.50 Sqm
189.800 1 x 1 25.00 4.60 110.00 Sqm
189.825 1 x 1 25.00 4.15 109.38 Sqm
189.850 1 x 1 25.00 3.80 99.38 Sqm
189.875 1 x 1 25.00 4.00 97.50 Sqm
189.900 1 x 1 25.00 5.25 115.63 Sqm
189.925 1 x 1 25.00 4.60 123.13 Sqm
189.950 1 x 1 25.00 4.00 107.50 Sqm
189.975 1 x 1 25.00 4.00 100.00 Sqm
190.000 1 x 1 25.00 3.75 96.88 Sqm
Total 4093.24 Sqm
k.m.191 0.00 3.75
190.025 1 x 1 25.00 3.95 96.25 Sqm
190.050 1 x 1 25.00 3.90 98.13 Sqm
190.075 1 x 1 25.00 4.00 98.75 Sqm
190.100 1 x 1 25.00 4.05 100.63 Sqm
190.125 1 x 1 25.00 3.85 98.75 Sqm
190.150 1 x 1 25.00 4.15 100.00 Sqm
190.175 1 x 1 25.00 4.00 101.88 Sqm
190.200 1 x 1 25.00 3.65 95.63 Sqm
190.225 1 x 1 25.00 3.80 93.13 Sqm
190.250 1 x 1 25.00 4.00 97.50 Sqm
190.275 1 x 1 25.00 4.10 101.25 Sqm
190.300 1 x 1 25.00 4.65 109.38 Sqm
190.325 1 x 1 25.00 4.40 113.13 Sqm
190.350 1 x 1 25.00 4.45 110.63 Sqm
190.375 1 x 1 25.00 4.00 105.63 Sqm
190.400 1 x 1 25.00 3.90 98.75 Sqm
190.425 1 x 1 25.00 3.85 96.88 Sqm
190.450 1 x 1 25.00 3.90 96.88 Sqm
190.475 1 x 1 25.00 3.75 95.63 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
190.500 1 x 1 25.00 4.00 96.88 Sqm
190.525 1 x 1 25.00 4.00 100.00 Sqm
190.550 1 x 1 25.00 4.45 105.63 Sqm
190.575 1 x 1 25.00 3.90 104.38 Sqm
190.600 1 x 1 25.00 3.75 95.63 Sqm
190.625 1 x 1 25.00 3.95 96.25 Sqm
190.650 1 x 1 25.00 4.20 101.88 Sqm
190.675 1 x 1 25.00 4.10 103.75 Sqm
190.700 1 x 1 25.00 4.65 109.38 Sqm
190.725 1 x 1 25.00 4.35 112.50 Sqm
190.750 1 x 1 25.00 3.90 103.13 Sqm
190.775 1 x 1 25.00 3.85 96.88 Sqm
190.800 1 x 1 25.00 3.90 96.88 Sqm
190.825 1 x 1 25.00 4.15 100.63 Sqm
190.850 1 x 1 25.00 4.05 102.50 Sqm
190.875 1 x 1 25.00 3.95 100.00 Sqm
190.900 1 x 1 25.00 3.75 96.25 Sqm
190.925 1 x 1 25.00 4.00 96.88 Sqm
190.950 1 x 1 25.00 4.05 100.63 Sqm
190.975 1 x 1 25.00 4.10 101.88 Sqm
191.000 1 x 1 25.00 4.00 101.25 Sqm
Total 4032.00 Sqm
km 192 0.00 3.75
191.025 1 x 1 25.00 3.85 95.00 Sqm
191.050 1 x 1 25.00 4.30 101.88 Sqm
191.075 1 x 1 25.00 5.25 119.38 Sqm
191.100 1 x 1 25.00 5.00 128.13 Sqm
191.125 1 x 1 25.00 5.10 126.25 Sqm
191.150 1 x 1 25.00 4.15 115.63 Sqm
191.175 1 x 1 25.00 4.00 101.88 Sqm
191.200 1 x 1 25.00 4.20 102.50 Sqm
191.225 1 x 1 25.00 5.10 116.25 Sqm
191.250 1 x 1 25.00 4.80 123.75 Sqm
191.275 1 x 1 25.00 4.90 121.25 Sqm
191.300 1 x 1 25.00 4.30 115.00 Sqm
191.325 1 x 1 25.00 5.60 123.75 Sqm
191.350 1 x 1 25.00 5.00 132.50 Sqm
191.375 1 x 1 25.00 4.80 122.50 Sqm
191.400 1 x 1 25.00 4.60 117.50 Sqm
191.425 1 x 1 25.00 5.00 120.00 Sqm
191.450 1 x 1 25.00 4.90 123.75 Sqm
191.475 1 x 1 25.00 4.80 121.25 Sqm
191.500 1 x 1 25.00 4.90 121.25 Sqm
191.525 1 x 1 25.00 5.30 127.50 Sqm
191.550 1 x 1 25.00 5.10 130.00 Sqm
191.575 1 x 1 25.00 4.40 118.75 Sqm
191.600 1 x 1 25.00 4.30 108.75 Sqm
191.625 1 x 1 25.00 3.90 102.50 Sqm
191.650 1 x 1 25.00 4.00 98.75 Sqm
191.675 1 x 1 25.00 3.75 96.88 Sqm
191.700 1 x 1 25.00 3.80 94.38 Sqm
191.725 1 x 1 25.00 3.80 95.00 Sqm
191.750 1 x 1 25.00 4.00 97.50 Sqm
191.775 1 x 1 25.00 3.60 95.00 Sqm
191.800 1 x 1 25.00 4.30 98.75 Sqm
191.825 1 x 1 25.00 4.30 107.50 Sqm
191.850 1 x 1 25.00 4.25 106.88 Sqm
191.875 1 x 1 25.00 3.90 101.88 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
191.900 1 x 1 25.00 4.50 105.00 Sqm
191.925 1 x 1 25.00 4.95 118.13 Sqm
191.950 1 x 1 25.00 7.10 150.63 Sqm
191.975 1 x 1 25.00 5.00 151.25 Sqm
192.000 1 x 1 25.00 4.00 112.50 Sqm
Total 4566.93 Sqm
km 193 0.00 4.00
192.025 1 x 1 25.00 4.00 100.00 Sqm
192.050 1 x 1 25.00 4.60 107.50 Sqm
192.075 1 x 1 25.00 4.30 111.25 Sqm
192.100 1 x 1 25.00 4.40 108.75 Sqm
192.125 1 x 1 25.00 3.90 103.75 Sqm
192.150 1 x 1 25.00 3.85 96.88 Sqm
192.175 1 x 1 25.00 4.50 104.38 Sqm
192.200 1 x 1 25.00 4.60 113.75 Sqm
192.225 1 x 1 25.00 3.75 104.38 Sqm
192.250 1 x 1 25.00 4.00 96.88 Sqm
192.275 1 x 1 25.00 4.10 101.25 Sqm
192.300 1 x 1 25.00 5.50 120.00 Sqm
192.325 1 x 1 25.00 4.10 120.00 Sqm
192.350 1 x 1 25.00 4.30 105.00 Sqm
192.375 1 x 1 25.00 4.50 110.00 Sqm
192.400 1 x 1 25.00 4.00 106.25 Sqm
192.425 1 x 1 25.00 4.20 102.50 Sqm
192.450 1 x 1 25.00 4.60 110.00 Sqm
192.475 1 x 1 25.00 4.80 117.50 Sqm
192.500 1 x 1 25.00 5.20 125.00 Sqm
192.525 1 x 1 25.00 4.95 126.88 Sqm
192.550 1 x 1 25.00 4.85 122.50 Sqm
192.575 1 x 1 25.00 4.60 118.13 Sqm
192.600 1 x 1 25.00 4.00 107.50 Sqm
192.625 1 x 1 25.00 3.95 99.38 Sqm
192.650 1 x 1 25.00 3.80 96.88 Sqm
192.675 1 x 1 25.00 4.00 97.50 Sqm
192.700 1 x 1 25.00 4.20 102.50 Sqm
192.725 1 x 1 25.00 4.20 105.00 Sqm
192.750 1 x 1 25.00 4.50 108.75 Sqm
192.775 1 x 1 25.00 4.20 108.75 Sqm
192.800 1 x 1 25.00 5.50 121.25 Sqm
192.825 1 x 1 25.00 4.90 130.00 Sqm
192.850 1 x 1 25.00 4.60 118.75 Sqm
192.875 1 x 1 25.00 4.55 114.38 Sqm
192.900 1 x 1 25.00 4.30 110.63 Sqm
192.925 1 x 1 25.00 4.60 111.25 Sqm
192.950 1 x 1 25.00 4.90 118.75 Sqm
192.975 1 x 1 25.00 4.60 118.75 Sqm
193.000 1 x 1 25.00 5.05 120.63 Sqm
Total 4423.18 Sqm
km194 0.00 5.05
193.025 1 x 1 25.00 4.60 120.63 Sqm
193.050 1 x 1 25.00 4.50 113.75 Sqm
193.075 1 x 1 25.00 4.20 108.75 Sqm
193.100 1 x 1 25.00 3.60 97.50 Sqm
193.125 1 x 1 25.00 4.50 101.25 Sqm
193.150 1 x 1 25.00 3.60 101.25 Sqm
193.175 1 x 1 25.00 3.75 91.88 Sqm
193.200 1 x 1 25.00 3.90 95.63 Sqm
193.225 1 x 1 25.00 4.00 98.75 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
193.250 1 x 1 25.00 3.75 96.88 Sqm
193.275 1 x 1 25.00 4.00 96.88 Sqm
193.300 1 x 1 25.00 4.80 110.00 Sqm
193.325 1 x 1 25.00 3.90 108.75 Sqm
193.350 1 x 1 25.00 3.90 97.50 Sqm
193.375 1 x 1 25.00 4.50 105.00 Sqm
193.400 1 x 1 25.00 4.90 117.50 Sqm
193.425 1 x 1 25.00 4.25 114.38 Sqm
193.450 1 x 1 25.00 4.55 110.00 Sqm
193.475 1 x 1 25.00 3.75 103.75 Sqm
193.500 1 x 1 25.00 3.80 94.38 Sqm
193.525 1 x 1 25.00 4.00 97.50 Sqm
193.550 1 x 1 25.00 4.50 106.25 Sqm
193.575 1 x 1 25.00 4.60 113.75 Sqm
193.600 1 x 1 25.00 4.90 118.75 Sqm
193.625 1 x 1 25.00 4.00 111.25 Sqm
193.650 1 x 1 25.00 3.90 98.75 Sqm
193.675 1 x 1 25.00 3.80 96.25 Sqm
193.700 1 x 1 25.00 3.90 96.25 Sqm
193.725 1 x 1 25.00 3.95 98.13 Sqm
193.750 1 x 1 25.00 4.20 101.88 Sqm
193.775 1 x 1 25.00 4.50 108.75 Sqm
193.800 1 x 1 25.00 4.40 111.25 Sqm
193.825 1 x 1 25.00 4.50 111.25 Sqm
193.850 1 x 1 25.00 4.60 113.75 Sqm
193.875 1 x 1 25.00 4.70 116.25 Sqm
193.900 1 x 1 25.00 4.80 118.75 Sqm
193.925 1 x 1 25.00 4.50 116.25 Sqm
193.950 1 x 1 25.00 4.60 113.75 Sqm
193.975 1 x 1 25.00 4.20 110.00 Sqm
194.000 1 x 1 25.00 4.30 106.25 Sqm
Total 4249.42 Sqm
km 195 0.00 4.30
194.025 1 x 1 25.00 4.00 103.75 Sqm
194.050 1 x 1 25.00 4.10 101.25 Sqm
194.075 1 x 1 25.00 4.20 103.75 Sqm
194.100 1 x 1 25.00 4.40 107.50 Sqm
194.125 1 x 1 25.00 3.60 100.00 Sqm
194.150 1 x 1 25.00 3.65 90.63 Sqm
194.175 1 x 1 25.00 3.75 92.50 Sqm
194.200 1 x 1 25.00 3.60 91.88 Sqm
194.225 1 x 1 25.00 3.70 91.25 Sqm
194.250 1 x 1 25.00 3.80 93.75 Sqm
194.275 1 x 1 25.00 3.90 96.25 Sqm
194.300 1 x 1 25.00 4.30 102.50 Sqm
194.325 1 x 1 25.00 4.20 106.25 Sqm
194.350 1 x 1 25.00 4.80 112.50 Sqm
194.375 1 x 1 25.00 5.30 126.25 Sqm
194.400 1 x 1 25.00 4.50 122.50 Sqm
194.425 1 x 1 25.00 4.30 110.00 Sqm
194.450 1 x 1 25.00 3.60 98.75 Sqm
194.475 1 x 1 25.00 3.75 91.88 Sqm
194.500 1 x 1 25.00 3.75 93.75 Sqm
194.525 1 x 1 25.00 3.85 95.00 Sqm
194.550 1 x 1 25.00 3.90 96.88 Sqm
194.575 1 x 1 25.00 3.85 96.88 Sqm
194.600 1 x 1 25.00 4.10 99.38 Sqm
194.625 1 x 1 25.00 3.85 99.38 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
194.650 1 x 1 25.00 3.90 96.88 Sqm
194.675 1 x 1 25.00 3.60 93.75 Sqm
194.700 1 x 1 25.00 3.55 89.38 Sqm
194.725 1 x 1 25.00 3.75 91.25 Sqm
194.750 1 x 1 25.00 4.50 103.13 Sqm
194.775 1 x 1 25.00 4.30 110.00 Sqm
194.800 1 x 1 25.00 5.00 116.25 Sqm
194.825 1 x 1 25.00 3.95 111.88 Sqm
194.850 1 x 1 25.00 4.50 105.63 Sqm
194.875 1 x 1 25.00 4.80 116.25 Sqm
194.900 1 x 1 25.00 4.60 117.50 Sqm
194.925 1 x 1 25.00 3.80 105.00 Sqm
194.950 1 x 1 25.00 3.90 96.25 Sqm
194.975 1 x 1 25.00 4.00 98.75 Sqm
195.000 1 x 1 25.00 4.35 104.38 Sqm
Total 4080.69 Sqm
km196 0.00 4.35
195.025 1 x 1 25.00 3.75 101.25 Sqm
195.050 1 x 1 25.00 3.75 93.75 Sqm
195.075 1 x 1 25.00 3.80 94.38 Sqm
195.100 1 x 1 25.00 3.80 95.00 Sqm
195.125 1 x 1 25.00 4.00 97.50 Sqm
195.150 1 x 1 25.00 4.50 106.25 Sqm
195.175 1 x 1 25.00 4.60 113.75 Sqm
195.200 1 x 1 25.00 5.20 122.50 Sqm
195.225 1 x 1 25.00 3.80 112.50 Sqm
195.250 1 x 1 25.00 5.20 112.50 Sqm
195.275 1 x 1 25.00 4.60 122.50 Sqm
195.300 1 x 1 25.00 4.00 107.50 Sqm
195.325 1 x 1 25.00 3.50 93.75 Sqm
195.350 1 x 1 25.00 3.75 90.63 Sqm
195.375 1 x 1 25.00 3.80 94.38 Sqm
195.400 1 x 1 25.00 3.90 96.25 Sqm
195.425 1 x 1 25.00 3.75 95.63 Sqm
195.450 1 x 1 25.00 3.80 94.38 Sqm
195.475 1 x 1 25.00 3.85 95.63 Sqm
195.500 1 x 1 25.00 3.60 93.13 Sqm
195.525 1 x 1 25.00 4.50 101.25 Sqm
195.550 1 x 1 25.00 4.40 111.25 Sqm
195.575 1 x 1 25.00 4.60 112.50 Sqm
195.600 1 x 1 25.00 5.00 120.00 Sqm
195.625 1 x 1 25.00 4.00 112.50 Sqm
195.650 1 x 1 25.00 4.50 106.25 Sqm
195.675 1 x 1 25.00 5.60 126.25 Sqm
195.700 1 x 1 25.00 5.50 138.75 Sqm
195.725 1 x 1 25.00 5.40 136.25 Sqm
195.750 1 x 1 25.00 4.40 122.50 Sqm
195.775 1 x 1 25.00 4.60 112.50 Sqm
195.800 1 x 1 25.00 4.40 112.50 Sqm
195.825 1 x 1 25.00 4.60 112.50 Sqm
195.850 1 x 1 25.00 4.65 115.63 Sqm
195.875 1 x 1 25.00 4.65 116.25 Sqm
195.900 1 x 1 25.00 4.20 110.63 Sqm
195.925 1 x 1 25.00 4.45 108.13 Sqm
195.950 1 x 1 25.00 4.55 112.50 Sqm
195.975 1 x 1 25.00 4.20 109.38 Sqm
196.000 1 x 1 25.00 4.35 106.88 Sqm
Total 4337.56 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
km197 0.00 4.35
196.025 1 x 1 25.00 3.75 101.25 Sqm
196.050 1 x 1 25.00 3.80 94.38 Sqm
196.075 1 x 1 25.00 3.90 96.25 Sqm
196.100 1 x 1 25.00 4.00 98.75 Sqm
196.125 1 x 1 25.00 3.90 98.75 Sqm
196.150 1 x 1 25.00 3.95 98.13 Sqm
196.175 1 x 1 25.00 3.95 98.75 Sqm
196.200 1 x 1 25.00 4.00 99.38 Sqm
196.225 1 x 1 25.00 3.95 99.38 Sqm
196.250 1 x 1 25.00 3.85 97.50 Sqm
196.275 1 x 1 25.00 3.75 95.00 Sqm
196.300 1 x 1 25.00 3.75 93.75 Sqm
196.325 1 x 1 25.00 4.30 100.63 Sqm
196.350 1 x 1 25.00 4.40 108.75 Sqm
196.375 1 x 1 25.00 5.05 118.13 Sqm
196.400 1 x 1 25.00 4.30 116.88 Sqm
196.425 1 x 1 25.00 4.20 106.25 Sqm
196.450 1 x 1 25.00 4.20 105.00 Sqm
196.475 1 x 1 25.00 3.95 101.88 Sqm
196.500 1 x 1 25.00 4.00 99.38 Sqm
196.525 1 x 1 25.00 3.90 98.75 Sqm
196.550 1 x 1 25.00 3.80 96.25 Sqm
196.575 1 x 1 25.00 4.00 97.50 Sqm
196.600 1 x 1 25.00 4.20 102.50 Sqm
196.625 1 x 1 25.00 3.90 101.25 Sqm
196.650 1 x 1 25.00 3.80 96.25 Sqm
196.675 1 x 1 25.00 4.50 103.75 Sqm
196.700 1 x 1 25.00 5.00 118.75 Sqm
196.725 1 x 1 25.00 3.90 111.25 Sqm
196.750 1 x 1 25.00 3.70 95.00 Sqm
196.775 1 x 1 25.00 3.75 93.13 Sqm
196.800 1 x 1 25.00 3.85 95.00 Sqm
196.825 1 x 1 25.00 3.75 95.00 Sqm
196.850 1 x 1 25.00 3.70 93.13 Sqm
196.875 1 x 1 25.00 4.00 96.25 Sqm
196.900 1 x 1 25.00 3.94 99.25 Sqm
196.925 1 x 1 25.00 3.95 98.63 Sqm
196.950 1 x 1 25.00 3.85 97.50 Sqm
196.975 1 x 1 25.00 3.80 95.63 Sqm
197.000 1 x 1 25.00 3.90 96.25 Sqm
Total 4009.19 Sqm
km198 0.00 3.90
197.025 1 x 1 25.00 4.00 98.75 Sqm
197.050 1 x 1 25.00 3.75 96.88 Sqm
197.075 1 x 1 25.00 4.70 105.63 Sqm
197.100 1 x 1 25.00 5.55 128.13 Sqm
197.125 1 x 1 25.00 4.00 119.38 Sqm
197.150 1 x 1 25.00 3.90 98.75 Sqm
197.175 1 x 1 25.00 3.95 98.13 Sqm
197.200 1 x 1 25.00 3.75 96.25 Sqm
197.225 1 x 1 25.00 4.30 100.63 Sqm
197.250 1 x 1 25.00 4.50 110.00 Sqm
197.275 1 x 1 25.00 4.35 110.63 Sqm
197.300 1 x 1 25.00 3.75 101.25 Sqm
197.325 1 x 1 25.00 3.70 93.13 Sqm
197.350 1 x 1 25.00 3.65 91.88 Sqm
197.375 1 x 1 25.00 3.80 93.13 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
197.400 1 x 1 25.00 3.75 94.38 Sqm
197.425 1 x 1 25.00 3.85 95.00 Sqm
197.450 1 x 1 25.00 3.90 96.88 Sqm
197.475 1 x 1 25.00 4.30 102.50 Sqm
197.500 1 x 1 25.00 4.20 106.25 Sqm
197.525 1 x 1 25.00 4.10 103.75 Sqm
197.550 1 x 1 25.00 4.25 104.38 Sqm
197.575 1 x 1 25.00 4.05 103.75 Sqm
197.600 1 x 1 25.00 4.20 103.13 Sqm
197.625 1 x 1 25.00 3.90 101.25 Sqm
197.650 1 x 1 25.00 4.10 100.00 Sqm
197.675 1 x 1 25.00 4.20 103.75 Sqm
197.700 1 x 1 25.00 4.40 107.50 Sqm
197.725 1 x 1 25.00 3.90 103.75 Sqm
197.750 1 x 1 25.00 4.20 101.25 Sqm
197.775 1 x 1 25.00 4.25 105.63 Sqm
197.800 1 x 1 25.00 4.30 106.88 Sqm
197.825 1 x 1 25.00 3.80 101.25 Sqm
197.850 1 x 1 25.00 3.70 93.75 Sqm
197.875 1 x 1 25.00 4.00 96.25 Sqm
197.900 1 x 1 25.00 3.95 99.38 Sqm
197.925 1 x 1 25.00 3.95 98.75 Sqm
197.950 1 x 1 25.00 3.85 97.50 Sqm
197.975 1 x 1 25.00 3.85 96.25 Sqm
198.000 1 x 1 25.00 3.90 96.88 Sqm
Total 4062.59 Sqm
km199 0.00 3.90
198.025 1 x 1 25.00 3.75 95.63 Sqm
198.050 1 x 1 25.00 3.70 93.13 Sqm
198.075 1 x 1 25.00 3.85 94.38 Sqm
198.100 1 x 1 25.00 3.95 97.50 Sqm
198.125 1 x 1 25.00 3.60 94.38 Sqm
198.150 1 x 1 25.00 3.80 92.50 Sqm
198.175 1 x 1 25.00 3.95 96.88 Sqm
198.200 1 x 1 25.00 3.75 96.25 Sqm
198.225 1 x 1 25.00 3.70 93.13 Sqm
198.250 1 x 1 25.00 3.65 91.88 Sqm
198.275 1 x 1 25.00 3.55 90.00 Sqm
198.300 1 x 1 25.00 4.00 94.38 Sqm
198.325 1 x 1 25.00 3.95 99.38 Sqm
198.350 1 x 1 25.00 4.50 105.63 Sqm
198.375 1 x 1 25.00 5.80 128.75 Sqm
198.400 1 x 1 25.00 4.50 128.75 Sqm
198.425 1 x 1 25.00 3.85 104.38 Sqm
198.450 1 x 1 25.00 3.90 96.88 Sqm
198.475 1 x 1 25.00 4.30 102.50 Sqm
198.500 1 x 1 25.00 4.10 105.00 Sqm
198.525 1 x 1 25.00 4.55 108.13 Sqm
198.550 1 x 1 25.00 4.50 113.13 Sqm
198.575 1 x 1 25.00 4.05 106.88 Sqm
198.600 1 x 1 25.00 4.60 108.13 Sqm
198.625 1 x 1 25.00 4.55 114.38 Sqm
198.650 1 x 1 25.00 4.65 115.00 Sqm
198.675 1 x 1 25.00 4.35 112.50 Sqm
198.700 1 x 1 25.00 4.40 109.38 Sqm
198.725 1 x 1 25.00 6.50 136.25 Sqm
198.750 1 x 1 25.00 5.65 151.88 Sqm
198.775 1 x 1 25.00 5.60 140.63 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
198.800 1 x 1 25.00 4.10 121.25 Sqm
198.825 1 x 1 25.00 3.90 100.00 Sqm
198.850 1 x 1 25.00 3.95 98.13 Sqm
198.875 1 x 1 25.00 3.80 96.88 Sqm
198.900 1 x 1 25.00 4.00 97.50 Sqm
198.925 1 x 1 25.00 4.60 107.50 Sqm
198.950 1 x 1 25.00 4.50 113.75 Sqm
198.975 1 x 1 25.00 4.75 115.63 Sqm
199.000 1 x 1 25.00 4.30 113.13 Sqm
Total 4281.37 Sqm
km200 0.00 4.30
199.025 1 x 1 25.00 5.40 121.25 Sqm
199.050 1 x 1 25.00 5.60 137.50 Sqm
199.075 1 x 1 25.00 4.80 130.00 Sqm
199.100 1 x 1 25.00 3.95 109.38 Sqm
199.125 1 x 1 25.00 4.10 100.63 Sqm
199.150 1 x 1 25.00 4.50 107.50 Sqm
199.175 1 x 1 25.00 4.50 112.50 Sqm
199.200 1 x 1 25.00 4.70 115.00 Sqm
199.225 1 x 1 25.00 3.70 105.00 Sqm
199.250 1 x 1 25.00 3.75 93.13 Sqm
199.275 1 x 1 25.00 3.75 93.75 Sqm
199.300 1 x 1 25.00 3.85 95.00 Sqm
199.325 1 x 1 25.00 3.95 97.50 Sqm
199.350 1 x 1 25.00 4.05 100.00 Sqm
199.375 1 x 1 25.00 3.95 100.00 Sqm
199.400 1 x 1 25.00 3.95 98.75 Sqm
199.425 1 x 1 25.00 4.25 102.50 Sqm
199.450 1 x 1 25.00 4.00 103.13 Sqm
199.475 1 x 1 25.00 4.50 106.25 Sqm
199.500 1 x 1 25.00 4.50 112.50 Sqm
199.525 1 x 1 25.00 3.85 104.38 Sqm
199.550 1 x 1 25.00 4.10 99.38 Sqm
199.575 1 x 1 25.00 4.50 107.50 Sqm
199.600 1 x 1 25.00 5.00 118.75 Sqm
199.625 1 x 1 25.00 5.20 127.50 Sqm
199.650 1 x 1 25.00 5.15 129.38 Sqm
199.675 1 x 1 25.00 4.85 125.00 Sqm
199.700 1 x 1 25.00 4.40 115.63 Sqm
199.725 1 x 1 25.00 6.40 135.00 Sqm
199.750 1 x 1 25.00 5.60 150.00 Sqm
199.775 1 x 1 25.00 5.00 132.50 Sqm
199.800 1 x 1 25.00 3.75 109.38 Sqm
199.825 1 x 1 25.00 3.95 96.25 Sqm
199.850 1 x 1 25.00 4.35 103.75 Sqm
199.875 1 x 1 25.00 4.15 106.25 Sqm
199.900 1 x 1 25.00 5.45 120.00 Sqm
199.925 1 x 1 25.00 5.00 130.63 Sqm
199.950 1 x 1 25.00 4.50 118.75 Sqm
199.975 1 x 1 25.00 4.75 115.63 Sqm
200.000 1 x 1 25.00 4.30 113.13 Sqm
Total 4500.06 Sqm

KM-218 4.50
217.025 1 x 1 25.00 4.40 111.25 Sqm
217.050 1 x 1 25.00 4.90 116.25 Sqm
217.075 1 x 1 25.00 4.60 118.75 Sqm
217.100 1 x 1 25.00 4.80 117.50 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
217.125 1 x 1 25.00 4.60 117.50 Sqm
217.150 1 x 1 25.00 4.30 111.25 Sqm
217.175 1 x 1 25.00 6.10 130.00 Sqm
217.200 1 x 1 25.00 5.80 148.75 Sqm
217.225 1 x 1 25.00 5.85 145.63 Sqm
217.250 1 x 1 25.00 5.70 144.38 Sqm
217.275 1 x 1 25.00 6.80 156.25 Sqm
217.300 1 x 1 25.00 6.20 162.50 Sqm
217.325 1 x 1 25.00 5.95 151.88 Sqm
217.350 1 x 1 25.00 6.05 150.00 Sqm
217.375 1 x 1 25.00 5.75 147.50 Sqm
217.400 1 x 1 25.00 5.50 140.63 Sqm
217.425 1 x 1 25.00 6.15 145.63 Sqm
217.450 1 x 1 25.00 5.85 150.00 Sqm
217.475 1 x 1 25.00 5.65 143.75 Sqm
217.500 1 x 1 25.00 5.85 143.75 Sqm
217.525 1 x 1 25.00 5.70 144.38 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
217.550 1 x 1 25.00 5.90 145.00 Sqm
217.575 1 x 1 25.00 5.80 146.25 Sqm
217.600 1 x 1 25.00 5.95 146.88 Sqm
217.625 1 x 1 25.00 5.90 148.13 Sqm
217.650 1 x 1 25.00 6.10 150.00 Sqm
217.675 1 x 1 25.00 6.00 151.25 Sqm
217.700 1 x 1 25.00 6.05 150.63 Sqm
217.725 1 x 1 25.00 6.00 150.63 Sqm
217.750 1 x 1 25.00 6.10 151.25 Sqm
217.775 1 x 1 25.00 5.80 148.75 Sqm
217.800 1 x 1 25.00 5.75 144.38 Sqm
217.825 1 x 1 25.00 5.90 145.63 Sqm
217.850 1 x 1 25.00 5.65 144.38 Sqm
217.875 1 x 1 25.00 5.95 145.00 Sqm
217.900 1 x 1 25.00 5.90 148.13 Sqm
217.925 1 x 1 25.00 6.10 150.00 Sqm
217.950 1 x 1 25.00 6.00 151.25 Sqm
217.975 1 x 1 25.00 6.05 150.63 Sqm
218.000 1 x 1 25.00 6.00 150.63 Sqm
Total 5716.33 Sqm
Km 219 0.00 6.00
218.025 1 x 1 25.00 5.90 148.75 Sqm
218.050 1 x 1 25.00 5.80 146.25 Sqm
218.075 1 x 1 25.00 5.95 146.88 Sqm
218.100 1 x 1 25.00 6.05 150.00 Sqm
218.125 1 x 1 25.00 5.75 147.50 Sqm
218.150 1 x 1 25.00 5.70 143.13 Sqm
218.175 1 x 1 25.00 6.15 148.13 Sqm
218.200 1 x 1 25.00 5.85 150.00 Sqm
218.225 1 x 1 25.00 5.65 143.75 Sqm
218.250 1 x 1 25.00 5.85 143.75 Sqm
218.275 1 x 1 25.00 5.70 144.38 Sqm
218.300 1 x 1 25.00 5.90 145.00 Sqm
218.325 1 x 1 25.00 5.80 146.25 Sqm
218.350 1 x 1 25.00 5.95 146.88 Sqm
218.375 1 x 1 25.00 5.90 148.13 Sqm
218.400 1 x 1 25.00 6.10 150.00 Sqm
218.425 1 x 1 25.00 6.00 151.25 Sqm
218.450 1 x 1 25.00 6.05 150.63 Sqm
218.475 1 x 1 25.00 5.55 145.00 Sqm
218.500 1 x 1 25.00 6.10 145.63 Sqm
218.525 1 x 1 25.00 5.80 148.75 Sqm
218.550 1 x 1 25.00 5.65 143.13 Sqm
218.575 1 x 1 25.00 5.85 143.75 Sqm
218.600 1 x 1 25.00 5.70 144.38 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
218.625 1 x 1 25.00 5.90 145.00 Sqm
218.650 1 x 1 25.00 5.80 146.25 Sqm
218.675 1 x 1 25.00 6.05 148.13 Sqm
218.700 1 x 1 25.00 6.00 150.63 Sqm
218.725 1 x 1 25.00 5.95 149.38 Sqm
218.750 1 x 1 25.00 5.75 146.25 Sqm
218.775 1 x 1 25.00 5.50 140.63 Sqm
218.800 1 x 1 25.00 6.10 145.00 Sqm
218.825 1 x 1 25.00 6.00 151.25 Sqm
218.850 1 x 1 25.00 6.05 150.63 Sqm
218.875 1 x 1 25.00 6.00 150.63 Sqm
218.900 1 x 1 25.00 6.10 151.25 Sqm
218.925 1 x 1 25.00 5.60 146.25 Sqm
218.950 1 x 1 25.00 6.75 154.38 Sqm
218.975 1 x 1 25.00 5.90 158.13 Sqm
219.000 1 x 1 25.00 5.65 144.38 Sqm
Ttotal 5899.47 Sqm

Total Area 135111.17 Sqm

deduction as per deduction seat(80a) 852.26 Sqm

Grand Total 134258.91 Sqm


5 Dense Graded Bituminous Macadam
Dense Graded Bituminous Macadam
Providing and laying dense graded
bituminous macadam with 100-120 TPH
batch type HMP producing an average
output of 75 tonnes per hour using
crushedaggregates of specified grading,
premixed with bituminous binder @ 5 per
cent by weight of total mix and filler,
transporting the hot mix to work site,
laying with a hydrostatic paver finisher
with sensor control to the required grade,
level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to
achieve the desired compaction as per
MoRTH specification clause No. 507
complete in all respects. For GradingII(19
mm nominal size)

Km 171.000- 200.000, km 218, 219 Qty. Shall be total area of tack coat x 0.050
134258.91 x 0.05 6712.95 cum

Adding 5% extra for depression and undulation 335.65 cum


Total 7048.60 cum
Tack coat using VG-10 grade bitumen
@0.35kg/sqm, over normal bituminous
6 surfaces As Per State sor miscellious
items 3-1-1 (For BC)
same as item no 4 134258.91 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Bituminous concrete
Providing and laying bituminous concrete
with 100-120 TPH batch type hot mix
plant producing an average output of 75
tonnes per hour using crushed aggregates
of specified grading, premixed with
bituminous binder @ 5.5 per cent of mix
and filler, transporting the hot mix to
work site, laying with a hydrostatic paver
finisher with sensor control to the required
7 grade, level and alignment, rolling with
smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction
as per MORTH specification clause No.
509 complete in all respects for Grading-
II(10 mm nominal size) As Per MORTH

Km 171.000- 200..000 &218,219 Qty. Shall be total area of tack coat x 0.030
134258.91 x 0.03 4027.77 cum
Total 4027.77 cum
Providing and laying of hot applied
thermoplastic compound 2.5 mm thick
including reflectorising glass beads @
250 gms per sqm area, thickness of 2.5
8 mm is exclusive of surface applied glass
beads as per IRC:35 .The finished surface
to be level, uniform and free from streaks
and holes.

Km 171.000- 200.000 & Km 218,219


Continuous edge line alongboth side 2 x 31 1000.00 0.10 6200.00 sqm
Adding 5% extra for stoping lines and zebra crossings etc 310.00 sqm
Total 6510.00 Sqm
Construction of sub-grade and earthen
shoulders with approved material obtained
from borrow pits with all lifts & leads,
transporting to site, spreading, grading to
9 required slope and compacted to meet
requirement of table No. 300-2.

Km 171.000- 200.000&km 218,219


Along both side 2 x 31 1000.00 1.00 0.08 4960.00 cum
Deduct Strengthing of shouler By C.C. in Resdential Area Page No. 80c) 552.00 cum

Total 4408.00 cum

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Road Markers/Road Stud with Lense


Reflector
(Providing and fixing of road stud
100x 100 mm, die cast in aluminium,
resistant to corrosive effect of salt and
grit, fitted with lense reflectors,
installed in concrete or asphaltic
10 surface by drilling hole 30 mm upto a
depth of 60 mm and bedded in a
suitable bituminous grout or epoxy
mortar, all as per BS 873 part 4:1973)

Km. 171 To Km200 & Km 218,219 2 x 31 900/6 9300.00 Nos.

Total 9300.00 Nos.


Kilo Metre Stone (Reinforced cement
concrete M15grade kilometre stone of
11 standard design as per IRC:8-1980, fixing
in position including painting and printing
etc) Km. 171 To Km. 200

i 5th kilometre stone (precast) 1 x 6 6 Nos.


ii Hectometer stone (Precast) 31 x 4 124 Nos.

12 Surface drains

Construction of unlined surface drains of


average cross sectional area 0.40 sqm in
soilto specified lines, grades, levels and
dimensions to the requirement of clause
301 and 309. Excavated material to be
used in embankment within a lead of50
metres (average lead 25 metres

km 171-km 200(ch 171.000- 200.000) 25 x 40 31 Total 31000.00 Rmt


Deduct as Per Dudection Sheet (Page No. 80 c) (B) 6605.00 Rmt
Grand total(A-B) 24395.00 Rmt
13 For Crash Barrier
Excavation for Structures Earth work in
excavation of foundation of structures as
per drawing and technical specification,
including setting out, construction of
shoring and bracing, removal of stumps
i and other deleterious matter, dressing of
sides and bottom and back filling with
approved material Mechanical Means
Depth upto 3 m

Km. 179 (0-2) To (8-10) 1 x 126 0.350 0.35 0.80 12.35 Cum
Km. 180 (0-2) To (8-10) 1 x 101 0.350 0.35 0.80 9.90 Cum
Km. 192 (0-2) To (8-10) 1 x 101 0.350 0.35 0.80 9.90 Cum
Km. 194 (0-2) To (8-10) 1 x 101 0.350 0.35 0.80 9.90 Cum

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Km. 195 (0-2) To (8-10) 1 x 126 0.350 0.35 0.80 12.35 Cum
Km. 196 (0-2) To (8-10) 1 x 126 0.350 0.35 0.80 12.35 Cum
Km. 197 (0-2) To (8-10) 1 x 126 0.350 0.35 0.80 12.35 Cum
Km. 198 (0-2) To (8-10) 1 x 126 0.350 0.35 0.80 12.35 Cum
Total 91.45 Cum
Plain cement concrete in open foundation
complete as per drawing and technical
ii specifications PCC Grade M15

Crash Barrier
Km. 179 (0-2) To (8-10) 1 x 126 0.350 0.350 0.80 12.35 Cum
Km. 180 (0-2) To (8-10) 1 x 101 0.350 0.350 0.80 9.90 Cum
Km. 192 (0-2) To (8-10) 1 x 101 0.350 0.350 0.80 9.90 Cum
Km. 193 (0-2) To (8-10) 1 x 101 0.350 0.350 0.80 9.90 Cum
Km. 195 (0-2) To (8-10) 1 x 126 0.350 0.350 0.80 12.35 Cum
Km. 196 (0-2) To (8-10) 1 x 126 0.350 0.350 0.80 12.35 Cum
Km. 197 (0-2) To (8-10) 1 x 126 0.350 0.350 0.80 12.35 Cum
Km. 198 (0-2) To (8-10) 1 x 126 0.350 0.350 0.80 12.35 Cum
Total 91.45 Cum
Type - B, "THRIE" : Metal Beam Crash
Barrier (Providing and erecting a "Thrie"
metal beam crash barrier comprising of 3
mm thick corrugated sheet metal beam
rail, 85 cm above road/ground level, fixed
on ISMC series channel vertical post, 150
x 75 x 5 mm spaced 2 m centre to centre,
2 m high with 1.15 m below ground level,
all steel parts and fitments to be lvanised
iii
by hot dip process, all fittings to conform
to IS:1367 and IS:1364, metal beam rail
to be fixed on the vertical post with a
space of channel section 150 x 75 x 5 mm,
546 mm long complete as per clause 810)

Km. 179 (0-2) To (8-10) 1 x 10 25.00 250.00 Rmt


Km. 180 (0-2) To (8-10) 1 x 8 25.00 200.00 Rmt
Km. 192 (0-2) To (8-10) 1 x 8 25.00 200.00 Rmt
Km. 193 (0-2) To (8-10) 1 x 8 25.00 200.00 Rmt
Km. 195 (0-2) To (8-10) 1 x 10 25.00 250.00 Rmt
Km. 196 (0-2) To (8-10) 1 x 10 25.00 250.00 Rmt
Km. 197 (0-2) To (8-10) 1 x 10 25.00 250.00 Rmt
Km. 198 (0-2) To (8-10) 1 x 10 25.00 250.00 Rmt
Total 1850.00 Rmt
Construction of hill side K.C. type drain in
accordance with the requirement of
specification true to lines and grades as per
Drawing (Drawing attached) and
14 specification clause No 1606.1 of including
supply of all material, labour, T&P etc.
required for proper completion of the work.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Excavation in foundation for retaining,


breast walls etc, in all types of
soilsandrocks including all lead, lift and
i disposal of surplus material as per
direction of engineer - in - charge, as
perdrawing and technicalspecifications
Clause 305.1 of MORD Specifiction

km 175 H.m(8-10) 1 x 8 25.00 0.50 (0.20+0.15)/2 17.50 cum


Km. 175 H.M.- 8-10 Shoulder Hill side 1 x 8 25.00 1.00 0.30 60.00 cum.
km 176 H.m(00-02) to (08-10) 1 x 30 25.00 0.50 (0.20+0.15)/2 65.63 cum
Km. 176 H.M.- (00-02) to (8-10) Shoulder
Hill side 1 x 30 25.00 1.00 0.30 225.00 cum.
km 177 H.m(0-2) 1 x 8 25.00 0.50 (0.20+0.15)/2 17.50 cum
Km. 177 H.M.- 0-02 Shoulder Hill side 1 x 8 25.00 1.00 0.30 60.00 cum.
km 180 H.m(06-08) 1 x 8 25.00 0.50 (0.20+0.15)/2 17.50 cum
km 180 H.m(08-10) 1 x 8 25.00 0.50 (0.20+0.15)/2 17.50 cum
Km. 180 H.M.- 06-08 Shoulder Hill side 1 x 8 25.00 1.00 0.30 60.00 cum.
Km. 180 H.M.- 08-10 Shoulder Hill side 1 x 8 25.00 0.45 0.30 27.00 cum.
km 183 H.m(04-06) 1 x 4 25.00 0.50 (0.20+0.15)/2 8.75 cum
km 183 H.m(06-08) 1 x 8 25.00 0.50 (0.20+0.15)/2 17.50 cum
km 183 H.m(08-10) 1 x 8 20.00 0.50 (0.20+0.15)/2 14.00 cum
Km. 183 H.M.- 04-06 Shoulder Hill side 1 x 4 25.00 1.00 0.30 30.00 cum.
Km. 183 H.M.- 06-08 Shoulder Hill side 1 x 8 25.00 1.00 0.30 60.00 cum.
Km. 183 H.M.- 08-10 Shoulder Hill side 1 x 8 25.00 1.00 0.30 60.00 cum.
km 184 H.m(00-02) 1 x 8 25.00 0.90 (0.45+0.15)/2 54.00 cum
km 184 H.m(02-04) 1 x 8 25.00 0.90 (0.45+0.15)/2 54.00 cum
Km. 184 H.M.- 0-02 Shoulder Hill side 1 x 8 25.00 1.00 0.30 60.00 cum.
Km. 184 H.M.- 02-04 Shoulder Hill side 1 x 8 25.00 1.00 0.30 60.00 cum.
km 185 H.m(0-02) (2-6) 1 x 16 20.00 0.50 (0.20+0.15)/2 28.00 cum
km 185 H.m(08-10) 1 x 8 20.00 0.50 (0.20+0.15)/2 14.00 cum
Km. 185 H.M.- 06-08 Shoulder Hill side 1 x 8 25.00 1.00 0.30 60.00 cum.
Km. 185 H.M.- 08-10 Shoulder Hill side 1 x 8 25.00 1.00 0.30 60.00 cum.
km 188 H.m(0-02) (2-6) 1 x 16 25.00 0.50 (0.20+0.15)/2 35.00 cum
km 188 H.m(08-10) 1 x 8 25.00 0.50 (0.20+0.15)/2 17.50 cum
Km. 188 H.M. (08-10) Shoulder Hill side 1 x 4 25.00 1.00 0.30 30.00 cum.
Km. 188 H.M.- (00-02) to (08-10) Shoulder
Hill side 1 x 8 25.00 1.00 0.30 60.00 cum.
km 189 H.m(00-02) to (08-10) 1 x 35 25.00 0.50 (0.20+0.15)/2 76.56 cum
Km. 189 H.M.- 00-02 to (08-10) Shoulder Hill
side 1 x 35 25.00 1.00 0.30 262.50 cum.
km 190 H.m(00-02) to (08-10) 1 x 35 20.00 0.50 (0.20+0.15)/2 61.25 cum
Km. 190 H.M.- 00-02 to 08-10 Shoulder Hill
side 1 x 35 25.00 1.00 0.30 262.50 cum.
km 191 H.m(00-02) to (06-08) 1 x 30 25.00 0.50 (0.20+0.15)/2 65.63 cum
Km. 191 H.M.- 00-02 to 06-08 Shoulder Hill
side 1 x 30 25.00 1.00 0.30 225.00 cum.
Km. 194 H.M.- 02-04 to 08-10 1 x 30 25.00 1.00 0.30 225.00 cum.
Km. 194 H.M.- 02-04 to 08-10 Shoulder Hill
side 1 x 30 25.00 1.00 0.30 225.00 cum.
km 199 H.m(08-10) 1 x 8 25.00 0.50 (0.20+0.15)/2 17.50 cum

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Km. 199 H.M.- 08-10 Shoulder Hill side 1 x 8 25.00 1.00 0.30 60.00 cum.
Total 2771.32 Cum
Plain/Reinforced cement concrete in open
foundation complete as per drawing and
iii technical specifications PCC M15

For Shoulders
Km. 175 H.M.- 8-10 Shoulder Hill side 1 x 8 25.00 1.00 0.10 20.00 cum.
Km. 176 H.M.- (00-02) to (8-10) Shoulder 1 x 30 25.00 1.00 0.10 75.00 cum.
Km. 177 H.M.- Hill
0-02side
Shoulder Hill side 1 x 8 25.00 1.00 0.10 20.00 cum.
Km. 180 H.M.- 06-08 Shoulder Hill side 1 x 8 25.00 1.00 0.10 20.00 cum.
Km. 180 H.M.- 08-10 Shoulder Hill side 1 x 8 25.00 1.00 0.10 20.00 cum.
Km. 183 H.M.- 04-06 Shoulder Hill side 1 x 4 25.00 1.00 0.10 10.00 cum.
Km. 183 H.M.- 06-08 Shoulder Hill side 1 x 8 25.00 1.00 0.10 20.00 cum.
Km. 183 H.M.- 08-10 Shoulder Hill side 1 x 8 25.00 1.00 0.10 20.00 cum.
Km. 184 H.M.- 0-02 Shoulder Hill side 1 x 8 25.00 1.00 0.10 20.00 cum.
Km. 184 H.M.- 02-04 Shoulder Hill side 1 x 8 25.00 1.00 0.10 20.00 cum.
Km. 185 H.M.- 06-08 Shoulder Hill side 1 x 8 25.00 1.00 0.10 20.00 cum.
Km. 185 H.M.- 08-10 Shoulder Hill side 1 x 8 25.00 1.00 0.10 20.00 cum.
Km. 188 H.M.(0-02) (2-6)Shoulder Hill side 1 x 16 25.00 1.00 0.10 40.00 cum.
Km. 188 H.M. (08-10) Shoulder Hill side 1 x 8 25.00 1.00 0.10 20.00 cum.
Km. 189 H.M.- 00-02 to (08-10) Shoulder Hill 1 x 35 25.00 1.00 0.10 87.50 cum.
side
Km. 190 H.M.- 00-02 to 08-10 Shoulder Hill 25.00
1 x 35 1.00 0.10 87.50 cum.
side
Km. 191 H.M.- 00-02 to 06-08 Shoulder Hill 25.00
1 x 30 1.00 0.10 75.00 cum.
side
Km. 194 H.M.- 02-04 to 08-10 Shoulder Hill 25.00
1 x 30 1.00 0.10 75.00 cum.
side Shoulder Hill side
Km. 199 H.M.- 08-10 1 x 8 25.00 1.00 0.10 20.00 cum.
For KC Drain
km 175 H.m(8-10) For Channel 1 x 8 25.00 0.50 0.15 15.00 cum
For Karb 1 x 8 25.00 0.20 0.20 8.00 cum
km 176 H.m(0-02) to (08-10)For Channel 1 x 30 25.00 0.50 0.15 56.25 cum
For Karb 1 x 30 25.00 0.20 0.20 30.00 cum
km 177 H.m(0-2)For Channel 1 x 8 25.00 0.50 0.15 15.00 cum
For Karb 1 x 8 25.00 0.20 0.20 8.00 cum
km 180 H.m(06-08)For Channel 1 x 8 25.00 0.50 0.15 15.00 cum
For Karb 1 x 8 25.00 0.20 0.20 8.00 cum
km 180 H.m(08-10)For Channel 1 x 8 25.00 0.50 0.15 15.00 cum
For Karb 1 x 8 25.00 0.20 0.20 8.00 cum
km 183 H.m(04-06) to (08-10)For Channel 1 x 20 25.00 0.50 0.15 37.50 cum
For Karb 1 x 20 25.00 0.20 0.20 20.00 cum
km 184 H.m(00-02)For Channel 1 x 8 25.00 0.50 0.15 15.00 cum
For Karb 1 x 8 25.00 0.20 0.20 8.00 cum
km 184 H.m(02-04)For Channel 1 x 8 25.00 0.50 0.15 15.00 cum
For Karb 1 x 8 25.00 0.20 0.20 8.00 cum
km 185 H.m(06-08)For Channel 1 x 8 25.00 0.50 0.15 15.00 cum
For Karb 1 x 8 25.00 0.20 0.20 8.00 cum
km 185 H.m(08-10)For Channel 1 x 8 25.00 0.50 0.15 15.00 cum
For Karb 1 x 8 25.00 0.20 0.20 8.00 cum

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

km 188 H.m(0-02) (2-6))For Channel 1 x 16 25.00 0.50 0.15 30.00 cum


For Karb 1 x 16 25.00 0.20 0.20 16.00 cum
km 188 H.m(0-02) (2-6))For Channel 1 x 8 25.00 0.50 0.15 15.00 cum
For Karb 1 x 8 25.00 0.20 0.20 8.00 cum
km 189 H.m(00-02) to (08-10)For Channel 1 x 35 25.00 0.50 0.15 65.63 cum.
For Karb 1 x 35 25.00 0.20 0.20 35.00 cum.
km 190 H.m(00-02) to (08-10)For Channel 1 x 35 25.00 0.50 0.15 65.63 cum.
For Karb 1 x 35 25.00 0.20 0.20 35.00 cum.
km 191 H.m(00-02) to (06-08)For Channel 1 x 30 25.00 0.50 0.15 56.25 cum.
For Karb 1 x 30 25.00 0.20 0.20 30.00 cum.
km 194 H.m(02-04) to (08-10)For Channel 1 x 30 25.00 0.50 0.15 56.25 cum.
For Karb 1 x 30 25.00 0.20 0.20 30.00 cum.
km 199 H.m(06-08)For Channel 1 x 8 25.00 0.50 0.15 15.00 cum.
For Karb 1 x 8 25.00 0.20 0.20 8.00 cum.
Total 1483.51 cum
Providing concrete for plain/ reinforced
concrete in open foundations complete as
iv per drawings and technical specifications
Clause 802, 803, 1202 & 1203 M20

Km. 175 H.M.- 8-10 Shoulder Hill side 1 x 8 25.00 1.00 0.20 40.00 cum.
Km. 176 H.M.- 0-02 to 08-10 Shoulder Hill
side 1 x 30 25.00 1.00 0.20 150.00 cum.
Km. 177 H.M.- 0-02 Shoulder Hill side 1 x 8 25.00 1.00 0.20 40.00 cum.
Km. 180 H.M.- 06-08 Shoulder Hill side 1 x 8 25.00 1.00 0.20 40.00 cum.
Km. 180 H.M.- 08-10 Shoulder Hill side 1 x 8 25.00 1.00 0.20 40.00 cum.
km 183 H.m(04-06) to (08-10)For Channel 1 x 20 25.00 0.50 0.15 37.50 cum
Km. 184 H.M.- 00-02 Shoulder Hill side 1 x 8 25.00 1.00 0.20 40.00 cum.
Km. 184 H.M.- 02-04 Shoulder Hill side 1 x 8 25.00 1.00 0.20 40.00 cum.
Km. 185 H.M.- 06-08 Shoulder Hill side 1 x 8 25.00 1.00 0.20 40.00 cum.
Km. 185 H.M.- 08-10 Shoulder Hill side 1 x 8 25.00 1.00 0.20 40.00 cum.

Km. 188 H.M.-(0-02) (2-6)Shoulder Hill side 1 x 16 25.00 1.00 0.20 80.00 cum.
Km. 188 H.M.- 08-10 Shoulder Hill side 1 x 8 25.00 1.00 0.20 40.00 cum.
Km. 189 H.M.- 00-02 to 08-10 Shoulder Hill
side 1 x 35 25.00 1.00 0.20 175.00 cum.
km 190 H.m(00-02) to (08-10)For Channel 1 x 35 25.00 0.50 0.15 65.63 cum.
Km. 190 H.M.- 00-02 to 08-10 Shoulder Hill
side 1 x 35 25.00 1.00 0.20 175.00 cum.
Km. 191 H.M.- 00-02 to 06-08 Shoulder Hill
side 1 x 30 25.00 1.00 0.20 150.00 cum.
Km. 194 H.M.- 02-04 to 08-10 Shoulder Hill
side 1 x 30 25.00 1.00 0.20 150.00 cum.
Km. 199 H.M.- 08-10 Shoulder Hill side 1 x 8 25.00 1.00 0.20 40.00 cum.
Total 1383.13 cum
13 2 Meter span culvert

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Excavation in foundation for retaining,


breast walls etc, in all types of
soilsandrocks including all lead, lift and
i disposal of surplus material as per
direction of engineer - in - charge, as
perdrawing and technicalspecifications
Clause 305.1 of MORD Specifiction

Km. 174 Hm. (04-06) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 5.00 1.35 3.00 20.25 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 175 Hm. (06-08) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.30 19.32 cum.
Km. 176 Hm. (00-02) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 2.00 16.20 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 176 Hm. (02-04) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 176 Hm. (06-08) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 177 Hm. (00-02) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 2.00 2.00 22.00 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 177 Hm. (04-06) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 178 Hm. (06-08) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 179 Hm. (04-06) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.70 1.60 2.00 18.24 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 179 Hm. (04-06) Abutment 1 x 1 7.70 4.60 2.50 88.55 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Km. 182 Hm. (06-08) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 183 Hm. (06-08) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 184 Hm. (00-02) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 184 Hm. (02-04) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 185 Hm. (02-04) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 185 Hm. (06-08) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 186 Hm. (04-06) Abutment 1 x 1 7.70 4.60 2.50 88.55 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 186 Hm. (06-08) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Return Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 189 Hm. (02-04) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 190 Hm. (02-04) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 190 Hm. (06-08) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 191 Hm. (02-04) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.


Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 192 Hm. (04-06) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 192 Hm. (06-08) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 192 Hm. (08-10) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 193 Hm. (2-4) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 193 Hm. (06-08) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 194 Hm. (04-06) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 194 Hm. (08-10) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 196 Hm. (00-02) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 196 Hm. (02-04) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 196 Hm. (08-10) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Km. 197 Hm. (04-06) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Km. 198 Hm. (06-08) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.30 19.32 cum.
Km. 199 Hm. (08-10) Abutment 1 x 1 7.20 4.60 2.50 82.80 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.30 19.32 cum.
Km. 200 Hm. (06-08) Abutment 1 x 1 7.70 4.60 2.50 88.55 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.30 19.32 cum.
Km. 200 Hm. (08-10) Abutment 1 x 1 7.70 4.60 2.50 88.55 cum.
T/Wall 1 x 1 5.50 1.60 2.00 17.60 cum.
Wing Wall 1 x 2x1/2 6.00 1.35 3.00 24.30 cum.
Catch Pit With Protection Wall 1 x 1 4.20 2.00 2.00 16.80 cum.
Total 5261.47 cum.
Random Rubble Stone Masonry laid Dry,
in breast walls, retaining walls,etc.
including supply of all material, labour,
ii T&P androyaltiies etc.complete as per
drawing and technical specifications
Clauses 702, 704,1202 & 1203 of MORD
Specifiction

Km. 174 Hm. (04-06) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 175 Hm. (06-08) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 176 Hm. (00-02) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 176 Hm. (02-04) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 176 Hm. (06-08) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 177 Hm. (00-02) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 177 Hm. (04-06) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 178 Hm. (06-08) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 179 Hm. (04-06) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 179 Hm. (04-06) Abutment 1 x 1 4.60 6.70 0.20 6.16 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 182 Hm. (06-08) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 183 Hm. (06-08) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.


Km. 184 Hm. (00-02) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 184 Hm. (02-04) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 185 Hm. (02-04) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 185 Hm. (06-08) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 186 Hm. (04-06) Abutment 1 x 1 4.60 6.70 0.20 6.16 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 186 Hm. (06-08) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 189 Hm. (02-04) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 190 Hm. (02-04) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 190 Hm. (06-08) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 191 Hm. (02-04) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 192 Hm. (04-06) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 192 Hm. (06-08) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 192 Hm. (08-10) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 193 Hm. (02-04) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 193 Hm. (06-08) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 194 Hm. (04-06) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 194 Hm. (08-10) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 196 Hm. (00-02) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 196 Hm. (02-04) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 196 Hm. (08-10) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 197 Hm. (04-06) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 198 Hm. (06-08) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 199 Hm. (08-10) Abutment 1 x 1 4.60 6.20 0.20 5.70 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.


Km. 200 Hm. (06-08) Abutment 1 x 1 4.60 6.70 0.20 6.16 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Km. 200 Hm. (08-10) Abutment 1 x 1 4.60 6.70 0.20 6.16 cum.
Catch pit 1 x 1 4.20 2.00 0.20 1.68 cum.
Total 274.90 cum.
Plain/Reinforced cement concrete in open
foundation complete as per drawing and
iii technical specifications PCC M15

Km. 174 Hm. (04-06) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 175 Hm. (06-08) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 176 Hm. (00-02) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 176 Hm. (02-04) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 176 Hm. (06-08) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 177 Hm. (00-02) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 177 Hm. (04-06) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 178 Hm. (06-08) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 179 Hm. (04-06) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 179 Hm. (04-06) Abutment 1 x 1 7.70 4.60 0.20 7.08 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 182 Hm. (06-08) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 183 Hm. (06-08) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 184 Hm. (00-02) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.


Approch 1 x 2 2.00 0.45 0.20 0.36 cum.
Perapet 2 x 2 2.00 0.45 0.60 2.16 cum.
Km. 184 Hm. (02-04) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 185 Hm. (02-04) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 185 Hm. (06-08) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 186 Hm. (04-06) Abutment 1 x 1 7.70 4.60 0.20 7.08 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.50 1.00 0.20 3.00 cum.
Perapet 2 x 2 2.00 0.45 0.60 2.16 cum.
Km. 186 Hm. (06-08) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 189 Hm. (02-04) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 190 Hm. (02-04) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 190 Hm. (06-08) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 191 Hm. (02-04) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 192 Hm. (04-06) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 192 Hm. (06-08) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 192 Hm. (08-10) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 193 Hm. (06-08) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 193 Hm. (06-08) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Km. 194 Hm. (04-06) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 194 Hm. (08-10) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Perapet 2 x 2 2.00 0.45 0.60 2.16 cum.
Km. 196 Hm. (00-02) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 196 Hm. (02-04) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 196 Hm. (08-10) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 197 Hm. (04-06) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 198 Hm. (06-08) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 199 Hm. (08-10) Abutment 1 x 1 7.20 4.60 0.20 6.62 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 200 Hm. (06-08) Abutment 1 x 1 7.70 4.60 0.20 7.08 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Km. 200 Hm. (08-10) Abutment 1 x 1 7.70 4.60 0.20 7.08 cum.
Catch Pit 1 x 1 4.20 2.00 0.15 1.26 cum.
Approch 1 x 2 7.00 1.00 0.20 2.80 cum.
Total 401.24 cum.
Random Rubble Stone Masonry laid in
1:5 cement and sand mortar,in breast wall,
retaining wall, parapets,scupper etc.
Including supply of all materials,labour,t
iv & p& royality etc,required for proper
complition of work.(As per PWD
Uttarakhand Specification)

Km. 174 Hm. (04-06) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 175 Hm. (06-08) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.


Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 1 4.20 2.00 1.80 15.12 cum.
Km. 176 Hm. (00-02) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 1 4.20 2.00 1.80 15.12 cum.
Km. 176 Hm. (02-04) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 1 4.20 2.00 1.80 15.12 cum.
Km. 176 Hm. (06-08) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 177 Hm. (00-02) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 177 Hm. (04-06) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 178 Hm. (06-08) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 2.00 6.40 cum.
Km. 179 Hm. (04-06) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 179 Hm. (04-06) Abutment 1 x 2 7.50+7.70/2 0.60+1.52/2 2.00 32.22 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 182 Hm. (06-08)Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.


1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 183 Hm. (06-08) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 184 Hm. (00-02) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 2.00 6.40 cum.
Km. 184 Hm. (02-04) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 185 Hm. (02-04)Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 5.00 0.60+1.00/2 2.00 16.00 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 185 Hm. (06-08)Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 5.00 0.60+1.00/2 2.00 16.00 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 186 Hm. (04-06) Abutment 1 x 2 7.50+7.70/2 0.60+1.52/2 2.00 32.22 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Return Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 186 Hm. (06-08) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 189 Hm. (02-04) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 190 Hm. (02-04) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

1 x 1 4.20 2.00 1.80 15.12 cum.


Km. 190 Hm. (06-08) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit With Protection Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 1 4.20 2.00 1.80 15.12 cum.
Km. 191 Hm. (02-04) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 192 Hm. (04-06) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 192 Hm. (06-08) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 192 Hm. (08-10) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 193 Hm. (02-04) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 193 Hm. (06-08) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 194Hm. (04-06) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 194 Hm. (08-10) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Km. 196 Hm. (00-02) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 196 Hm. (02-04) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 196 Hm. (08-10) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 197 Hm. (04-06) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 198 Hm. (06-08) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 199 Hm. (08-10) Abutment 1 x 2 7.00+7.20/2 0.60+1.52/2 2.00 30.10 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 200 Hm. (06-08) Abutment 1 x 2 7.50+7.70/2 0.60+1.52/2 2.00 32.22 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Km. 200 Hm. (08-10) Abutment 1 x 2 7.50+7.70/2 0.60+1.52/2 2.00 32.22 cum.
T/Wall 1 x 1 5.50 1.00+1.60/2 2.00 14.30 cum.
Wing Wall 1 x 2 6.00 0.60+1.35/2 3.00 35.10 cum.
Catch Pit Wall 1 x 1 4.00 0.60+1.10/2 3.00 10.20 cum.
1 x 2 2.00 0.60+1.0/2 1.80 5.76 cum.
Total 3550.38 cum.
Plain/Reinforced cement concrete in sub-
structure complete as per drawing and
v technical specifications RCC Grade M25
Height upto 5m Using concrete Mixer

Km. 174 Hm. (04-06) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Slab 1 x 1 7.00 2.60 0.25 4.55 cum.


Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 175 Hm. (06-08) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 176 Hm. (00-02) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 176 Hm. (02-04) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 176 Hm. (06-08) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 177 Hm. (00-02) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 177 Hm. (04-06) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 178 Hm. (06-08) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 179 Hm. (04-06) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 179 Hm. (04-06) Bed Block 1 x 2 7.50 0.30 0.15 0.68 cum.
Slab 1 x 1 7.50 2.60 0.25 4.88 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.


1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 182 Hm. (06-08) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 183 Hm. (06-08) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 184 Hm. (00-02) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 184 Hm. (02-04) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 185 Hm. (02-04) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 185 Hm. (06-08) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 186 Hm. (04-06) Bed Block 1 x 2 7.50 0.30 0.15 0.68 cum.
Slab 1 x 1 7.50 2.60 0.25 4.88 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 186 Hm. (06-08) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 189 Hm. (02-04) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.


1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 190 Hm. (02-04) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 190 Hm. (06-08) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 191 Hm. (02-04) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 192 Hm. (04-06) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 192 Hm. (06-08) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 192 Hm. (08-10) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 193 Hm. (00-02) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 193 Hm. (06-08) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 194 Hm. (04-06) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

1 x 2 2.00 0.25 0.50 0.50 cum.


Km. 194 Hm. (08-10) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 196 Hm. (00-02) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 196 Hm. (02-04) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 196 Hm. (08-10) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 197 Hm. (04-06) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 198 Hm. (06-08) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 199 Hm. (08-10) Bed Block 1 x 2 7.00 0.30 0.15 0.63 cum.
Slab 1 x 1 7.00 2.60 0.25 4.55 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 200 Hm. (06-08) Bed Block 1 x 2 7.50 0.30 0.15 0.68 cum.
Slab 1 x 1 7.50 2.60 0.25 4.88 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.
Km. 200 Hm. (08-10) Bed Block 1 x 2 7.50 0.30 0.15 0.68 cum.
Slab 1 x 1 7.50 2.60 0.25 4.88 cum.
Parapet with slab 1 x 2 2.00 0.50 0.15 0.30 cum.
1 x 2 2.00 (0.50+0.25)/2 0.25 0.38 cum.
1 x 2 2.00 0.25 0.50 0.50 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Total 236.80 cum.


Supplying, fitting and placing HYSD bar
reinforcement in sub-structure complete
vi as per drawing and technical
specifications
1.50% of item No. 5 3.55 cum
at the rate of 7.85 Tonne/cum 27.87 Ton
TOTAL 27.87 Ton
Providing concrete for plain/ reinforced
concrete in open foundations complete as
vii per drawings and technical specifications
Clause 802, 803, 1202 & 1203 M20

Km. 174 Hm. (04-06) Water runway 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 175 Hm. (06-08)Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 176 Hm. (00-02) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 176 Hm. (02-04) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 176 Hm. (06-08) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 177 Hm. (00-02) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 177 Hm. (04-06)Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 178 Hm. (06-08) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 179 Hm. (04-06) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 179 Hm. (04-06) Water run way 1 x 1 7.70 1.50 0.10 1.16 cum.
In Approch slab 1 x 2 7.50 1.00 0.20 3.00 cum.
Km. 182 Hm. (06-08) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 183 Hm. (06-08) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 184 Hm. (00-02) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 184 Hm. (02-04)Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 185 Hm. (02-04)Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 185 Hm. (06-08) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 186 Hm. (04-06) Water run way 1 x 1 7.70 1.50 0.10 1.16 cum.
In Approch slab 1 x 2 7.50 1.00 0.20 3.00 cum.
Km. 186 Hm. (06-08) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.


Km. 189 Hm. (02-04) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 190 Hm. (02-04) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 190 Hm. (06-08) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 191 Hm. (02-04)Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 192 Hm. (04-06) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 192 Hm. (06-08) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 192 Hm. (08-10) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 193 Hm. (00-02) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 193 Hm. (06-08) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 194 Hm. (04-06) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 194 Hm. (08-10) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 196 Hm. (00-02) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 196 Hm. (02-04) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 196 Hm. (08-10)Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 197 Hm. (04-06) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 198 Hm. (06-08) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 199 Hm. (08-10) Water run way 1 x 1 7.20 1.50 0.10 1.08 cum.
In Approch slab 1 x 2 7.20 1.00 0.20 2.88 cum.
Km. 200 Hm. (06-08)Water run way 1 x 1 7.70 1.50 0.10 1.16 cum.
In Approch slab 1 x 2 7.50 1.00 0.20 3.00 cum.
Km. 200 Hm. (08-10) Water run way 1 x 1 7.70 1.50 0.10 1.16 cum.
In Approch slab 1 x 2 7.50 1.00 0.20 3.00 cum.
Total 147.32 cum.
Back filling behind abutment, wing wall
and return wall complete as per drawing
viii and Technical specification Granular
material
Km. 174 Hm. (04-06) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 175 Hm. (06-08) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 176 Hm. (00-02) 2 x 1/2 5.80 0.70 1.80 7.31 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Km. 176 Hm. (02-04) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 176 Hm. (06-08) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 177 Hm. (00-02) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 177 Hm. (04-06) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 178 Hm. (06-08) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 179 Hm. (04-06) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 179 Hm. (04-06) 2 x 1/2 6.30 0.70 1.80 7.94 cum.
Km. 182 Hm. (06-08) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 183 Hm. (06-08) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 184 Hm. (00-02) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 184 Hm. (02-04) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 185 Hm. (02-04) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 185 Hm. (06-08) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 186 Hm. (04-06) 2 x 1/2 6.30 0.70 1.80 7.94 cum.
Km. 186 Hm. (06-08) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 189 Hm. (02-04) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 190 Hm. (02-04) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 190 Hm. (06-08) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 191 Hm. (02-04) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 192 Hm. (04-06) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 192 Hm. (06-08) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 192 Hm. (08-10) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 193 Hm. (00-02) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 193 Hm. (06-08) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 194 Hm. (04-06) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 194 Hm. (08-10) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 196 Hm. (00-02) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 196 Hm. (02-04) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 196 Hm. (08-10) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 197 Hm. (04-06) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 198 Hm. (06-08) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 199 Hm. (08-10) 2 x 1/2 5.80 0.70 1.80 7.31 cum.
Km. 200 Hm. (06-08) 2 x 1/2 6.30 0.70 1.80 7.94 cum.
Km. 200 Hm. (08-10) 2 x 1/2 6.30 0.70 1.80 7.94 cum.
Total 272.99 cum.
Hand Packed stone filling in back of
wallls including cost of all materials,
ix royality, T&P etc. complete as per
direction of Engineer-in- charge. (As per
PWD Uttarakhand specifications)

Km. 174 Hm. (04-06) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 175 Hm. (06-08) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 176 Hm. (00-02) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 176 Hm. (02-04) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 176 Hm. (06-08) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 177 Hm. (00-02) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 177 Hm. (04-06) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Km. 178 Hm. (06-08) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 179 Hm. (04-06) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 179 Hm. (06-08) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 182 Hm. (06-08) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 183 Hm. (06-08) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 184 Hm. (00-02) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 184 Hm. (02-04) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 185 Hm. (02-04) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 185 Hm. (06-08) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 186 Hm. (04-06) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 189 Hm. (02-04) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 190 Hm. (02-04) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 190 Hm. (06-08) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 191 Hm. (02-04) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 192 Hm. (04-06) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 192 Hm. (06-08) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 192 Hm. (08-10) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 193 Hm. (00-02) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 193 Hm. (06-08) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 194 Hm. (04-06) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 194 Hm. (08-10) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 195 Hm. (04-06) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 196 Hm. (00-02) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 196 Hm. (02-04) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 196 Hm. (08-10) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 197 Hm. (04-06) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 198 Hm. (06-08) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 199 Hm. (08-10) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 200 Hm. (0-08) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Km. 200 Hm. (08-10) T/Wall 1 x 1x1/2 5.50 0.60 1.00 1.65 cum.
Total 61.05 cum.
14 Causeway
Dismantling of Structures
(Dismantling of existing structures like
culverts, bridges, retaining walls and other
structure comprising of masonry, cement
concrete, wood work, steel work,
including T&P and scaffolding wherever
i necessary, sorting the dismantled material,
disposal of unserviceable material and
stacking the serviceable material with all
lifts and lead of 1000 metres)

Km. 178 Hm. (06-08) 1 x 1 10.00+12.00/2 8.00 0.30 26.40 cum.


Km. 179 Hm. (00-02) 1 x 1 10.00+12.00/2 7.50 0.30 24.75 cum.
Km. 189 Hm. (02-04) 1 x 1 14.00+18.00/2 8.00 0.30 38.40 cum.
Km. 192 Hm. (00-02) 1 x 1 8.00+12.00/2 8.00 0.30 24.00 cum.
Km. 183 Hm. (08-10) 1 x 1 10.00+12.00/2 9.00 0.30 29.70 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Total 143.25 cum.


Scarifying existing bituminous surface to
a depth of 50 mm by mechanical means
(Scarifying the existing bituminous road
ii surface to a depth of 50 mm and disposal
of scarified material with in all lifts and
lead upto 1000 metres.)

Km. 179 Hm. (02-04) Water Logging


Portion 1 x 2 25.00 6.60 330.00 Sqm
Total 330.00 Sqm
Random Rubble Stone Masonry laid Dry,
in breast walls, retaining walls,etc.
including supply of all material, labour,
iii T&P androyaltiies etc.complete as per
drawing and technical specifications
Clauses 702, 704,1202 & 1203 of MORD
Specifiction ( Kharanja)

Km. 178 Hm. (06-08) 1 x 1 10.00+12.00/2 8.00 0.20 17.60 cum.


Km. 179 Hm. (00-02) 1 x 1 10.00+12.00/2 7.50 0.20 16.50 cum.
Km. 179 Hm. (02-04) Water Logging
Portion 1 x 2 25.00 6.60 0.20 66.00 cum.
Km. 189 Hm. (02-04) 1 x 1 14.00+18.00/2 8.00 0.20 25.60 cum.
Km. 192 Hm. (00-02) 1 x 1 8.00+12.00/2 8.00 0.20 16.00 cum.
Km. 183 Hm. (08-10) 1 x 1 10.00+12.00/2 9.00 0.20 19.80 cum.
Total 161.50 cum.
Plain/Reinforced cement concrete in open
foundation complete as per drawing and
iv technical specifications PCC M15

Km. 178 Hm. (06-08) 1 x 1 10.00+12.00/2 8.00 0.10 8.80 cum.


Km. 178 Hm. (04-06) Water Logging
Portion 1 x 2 25.00 6.60 0.10 33.00 cum.
Km. 179 Hm. (00-02) 1 x 1 10.00+12.00/2 7.50 0.10 8.25 cum.
Km. 189 Hm. (02-04) 1 x 1 14.00+18.00/2 8.00 0.10 12.80 cum.
Km. 192 Hm. (00-02) 1 x 1 8.00+12.00/2 8.00 0.10 8.00 cum.
Km. 183 Hm. (08-10) 1 x 1 10.00+12.00/2 9.00 0.10 9.90 cum.
Total 80.75 cum.
Plain/Reinforced cement concrete in sub-
v structure complete as per drawing and
technical specifications M20
Check Wall Top 1 x 1 12.00 0.75 0.15 1.35 cum.
Check Wall Top 1 x 1 12.00 0.75 0.15 1.35 cum.
Check Wall Top 1 x 1 18.00 0.75 0.15 2.03 cum.
Check Wall Top 1 x 1 12.00 0.75 0.15 1.35 cum.
Check Wall Top 1 x 1 12.00 0.75 0.15 1.35 cum.
Total 7.43 cum.

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Plain/Reinforced cement concrete in sub-


structure complete as per drawing and
vi technical specifications RCC Grade M25
Height upto 5m Using concrete Mixer

Km. 178 Hm. (06-08) 1 x 1 10.00+12.00/2 8.00 0.25 22.00 cum.


Km. 179 Hm. (04-06) Water Logging
Portion 1 x 2 25.00 6.60 0.25 82.50 cum.
Km. 179 Hm. (00-02) 1 x 1 10.00+12.00/2 7.50 0.25 20.63 cum.
Km. 189 Hm. (02-04) 1 x 1 14.00+18.00/2 8.00 0.25 32.00 cum.
Km. 192 Hm. (00-02) 1 x 1 8.00+12.00/2 8.00 0.25 20.00 cum.
Km. 183 Hm. (08-10) 1 x 1 10.00+12.00/2 9.00 0.25 24.75 cum.
Total 201.88 cum.
Supplying, fitting and placing HYSD bar
reinforcement in sub-structure complete
vii as per drawing and technical
specifications
201.88 cum.
0.50% of item No. 4 1.01
at the rate of 7.85 Tonne/cum 7.93
Total 7.93 Tonn
Random Rubble Stone Masonry laid in
1:6 cement and sand mortar,in breast wall,
retaining wall, parapets,scupper etc.
Including supply of all materials,labour,t
viii & p& royality etc,required for proper
complition of work.(As per PWD
Uttarakhand Specification)

Km. 178 Hm. (06-08) Check wall 1 x 1 12.00 (0.75+1.00)/2 0.75 7.88 cum.
Km. 179 Hm. (00-02) Check wall 1 x 1 12.00 (0.75+1.00)/2 0.75 7.88 cum.
Km. 189 Hm. (02-04) Check wall 1 x 1 18.00 (0.75+1.00)/2 0.75 11.81 cum.
Km. 192 Hm. (00-02) Check wall 1 x 1 12.00 (0.75+1.00)/2 0.75 7.88 cum.
Km. 183 Hm. (08-10) Check wall 1 x 1 12.00 (0.75+1.00)/2 0.75 7.88 cum.
Total 52.52 cum.

A.A.E./J.E. . A.E.
Details of Measurement
Block Karnaprayag

NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Item of work
Sl. L B Total Area

Unit
No H(M)
No. (M) (M) (Sqm)

Scarifying existing bituminous surface to


a depth of 50 mm by mechanical means
(Scarifying the existing bituminous road
1 surface to a depth of 50 mm and disposal
of scarified material with in all lifts and
lead upto 1000 metres.)

Km 220 (4-6) 1 x 2 2.50 6.00 30.00 Sqm.


Km 221 (8-10) 1 x 2 2.00 6.00 24.00 Sqm.
Km 222 (0-2) 1 x 2 2.00 6.00 24.00 Sqm.
Km 222 (2-4) 1 x 2 2.00 6.00 24.00 Sqm.
Km 222 (2-4) 1 x 2 2.00 6.00 24.00 Sqm.
Km 222 (8-10) 1 x 2 2.00 6.00 24.00 Sqm.
Km 224 (8-10) 1 x 2 2.00 6.00 24.00 Sqm.
Km 227 (8-10) 1 x 1 20.00 3.00 60.00 Sqm.
Km 228(4-6) 1 x 2 2.00 6.00 24.00 Sqm.
Km 228(4-6) 1 x 2 2.00 6.00 24.00 Sqm.
Km 230(8-10) 1 x 1 25.00 5.50 137.50 Sqm.
Km 231(0-2) 1 x 1 25.00 5.50 137.50 Sqm.
Total 557.00 Sqm.
Providing, laying, spreading and
compacting stone aggregates of specific
sizes to waterbound macadam
specification including spreading in
uniform thickness, hand packing, rolling
with vibratory roller 8-10 tonnes in stages
2 to proper grade and camber, applyingand
brooming requisite type of screening/
binding Materials to fill up the interstices
of coarse aggregate, watering and
compacting to the required density.)

Km 220 (4-6) 1 x 2 2.50 6.00 0.075 2.25 cum


Km 221 (8-10) 1 x 2 2.00 6.00 0.075 1.80 cum
Km 222 (0-2) 1 x 2 2.00 6.00 0.075 1.80 cum
Km 222 (2-4) 1 x 2 2.00 6.00 0.075 1.80 cum
Km 222 (2-4) 1 x 2 2.00 6.00 0.075 1.80 cum
Km 222 (8-10) 1 x 2 2.00 6.00 0.075 1.80 cum
Km 224 (8-10) 1 x 2 2.00 6.00 0.075 1.80 cum
Km 227 (8-10) 1 x 1 20.00 3.00 0.075 4.50 cum
Km 228(4-6) 1 x 2 2.00 6.00 0.075 1.80 cum
Km 228(4-6) 1 x 2 2.00 6.00 0.075 1.80 cum
Km 230(8-10) 1 x 1 25.00 5.50 0.075 10.31 cum
Km 231(0-2) 1 x 1 25.00 5.50 0.075 10.31 cum
Total 41.77 cum

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Prime coat
(Providing and applying primer coat with
bitumen emulsion on prepared surface of
granular Base including clearing of road
surface and spraying primer at the rate of
0.6 kg/sqm using mechanical means.)

Km 220 (4-6) 1 x 2 2.50 6.00 30.00 Sqm.


Km 221 (8-10) 1 x 2 2.00 6.00 24.00 Sqm.
Km 222 (0-2) 1 x 2 2.00 6.00 24.00 Sqm.
Km 222 (2-4) 1 x 2 2.00 6.00 24.00 Sqm.
Km 222 (2-4) 1 x 2 2.00 6.00 24.00 Sqm.
Km 222 (8-10) 1 x 2 2.00 6.00 24.00 Sqm.
Km 224 (8-10) 1 x 2 2.00 6.00 24.00 Sqm.
Km 227 (8-10) 1 x 1 20.00 3.00 60.00 Sqm.
Km 228(4-6) 1 x 2 2.00 6.00 24.00 Sqm.
Km 228(4-6) 1 x 2 2.00 6.00 24.00 Sqm.
Km 230(8-10) 1 x 1 25.00 5.50 137.50 Sqm.
Km 231(0-2) 1 x 1 25.00 5.50 137.50 Sqm.
Total 557.00 Sqm.
Tack coat using VG-10 grade bitumen
@0.35kg/sqm, over normal bituminous
3 surfaces As Per State sor miscellious
items 3-1-1 (For BC)
Km 220 5.65 0.00
219.025 1 x 1 25.00 5.90 144.38 Sqm
219.050 1 x 1 25.00 6.10 150.00 Sqm
219.075 1 x 1 25.00 6.00 151.25 Sqm
219.100 1 x 1 25.00 6.05 150.63 Sqm
219.125 1 x 1 25.00 5.65 146.25 Sqm
219.150 1 x 1 25.00 6.10 146.88 Sqm
219.175 1 x 1 25.00 6.05 151.88 Sqm
219.200 1 x 1 25.00 5.65 146.25 Sqm
219.225 1 x 1 25.00 6.00 145.63 Sqm
219.250 1 x 1 25.00 5.70 146.25 Sqm
219.275 1 x 1 25.00 5.90 145.00 Sqm
219.300 1 x 1 25.00 5.65 144.38 Sqm
219.325 1 x 1 25.00 6.05 146.25 Sqm
219.350 1 x 1 25.00 6.00 150.63 Sqm
219.375 1 x 1 25.00 5.95 149.38 Sqm
219.400 1 x 1 25.00 5.75 146.25 Sqm
219.425 1 x 1 25.00 5.65 142.50 Sqm
219.450 1 x 1 25.00 6.10 146.88 Sqm
219.475 1 x 1 25.00 6.00 151.25 Sqm
219.500 1 x 1 25.00 5.95 149.38 Sqm
219.525 1 x 1 25.00 6.00 149.38 Sqm
219.550 1 x 1 25.00 6.15 151.88 Sqm
219.575 1 x 1 25.00 5.60 146.88 Sqm
219.600 1 x 1 25.00 6.75 154.38 Sqm
219.625 1 x 1 25.00 6.15 161.25 Sqm
219.650 1 x 1 25.00 6.10 153.13 Sqm
219.675 1 x 1 25.00 5.95 150.63 Sqm
219.700 1 x 1 25.00 5.65 145.00 Sqm
219.725 1 x 1 25.00 5.75 142.50 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
219.750 1 x 1 25.00 6.05 147.50 Sqm
219.775 1 x 1 25.00 6.05 151.25 Sqm
219.800 1 x 1 25.00 6.10 151.88 Sqm
219.825 1 x 1 25.00 5.65 146.88 Sqm
219.850 1 x 1 25.00 7.00 158.13 Sqm
219.875 1 x 1 25.00 8.50 193.75 Sqm
219.900 1 x 1 25.00 6.40 186.25 Sqm
219.925 1 x 1 25.00 5.80 152.50 Sqm
219.950 1 x 1 25.00 5.85 145.63 Sqm
219.975 1 x 1 25.00 5.90 146.88 Sqm
220.000 1 x 1 25.00 6.05 149.38 Sqm
Total 6036.36 Sqm
Km 221 6.05
220.025 1 x 1 25.00 6.10 151.88 Sqm
220.050 1 x 1 25.00 5.55 145.63 Sqm
220.075 1 x 1 25.00 6.80 154.38 Sqm
220.100 1 x 1 25.00 5.95 159.38 Sqm
220.125 1 x 1 25.00 5.75 146.25 Sqm
220.150 1 x 1 25.00 5.45 140.00 Sqm
220.175 1 x 1 25.00 5.85 141.25 Sqm
220.200 1 x 1 25.00 6.25 151.25 Sqm
220.225 1 x 1 25.00 5.95 152.50 Sqm
220.250 1 x 1 25.00 6.15 151.25 Sqm
220.275 1 x 1 25.00 5.80 149.38 Sqm
220.300 1 x 1 25.00 6.00 147.50 Sqm
220.325 1 x 1 25.00 6.00 150.00 Sqm
220.350 1 x 1 25.00 6.00 150.00 Sqm
220.375 1 x 1 25.00 5.65 145.63 Sqm
220.400 1 x 1 25.00 5.85 143.75 Sqm
220.425 1 x 1 25.00 6.05 148.75 Sqm
220.450 1 x 1 25.00 5.95 150.00 Sqm
220.475 1 x 1 25.00 5.95 148.75 Sqm
220.500 1 x 1 25.00 5.80 146.88 Sqm
220.525 1 x 1 25.00 4.95 134.38 Sqm
220.550 1 x 1 25.00 5.55 131.25 Sqm
220.575 1 x 1 25.00 6.00 144.38 Sqm
220.600 1 x 1 25.00 6.10 151.25 Sqm
220.625 1 x 1 25.00 5.95 150.63 Sqm
220.650 1 x 1 25.00 6.15 151.25 Sqm
220.675 1 x 1 25.00 5.35 143.75 Sqm
220.700 1 x 1 25.00 6.75 151.25 Sqm
220.725 1 x 1 25.00 5.85 157.50 Sqm
220.750 1 x 1 25.00 5.80 145.63 Sqm
220.775 1 x 1 25.00 5.75 144.38 Sqm
220.800 1 x 1 25.00 6.25 150.00 Sqm
220.825 1 x 1 25.00 5.95 152.50 Sqm
220.850 1 x 1 25.00 6.05 150.00 Sqm
220.875 1 x 1 25.00 6.05 151.25 Sqm
220.900 1 x 1 25.00 6.05 151.25 Sqm
220.925 1 x 1 25.00 5.65 146.25 Sqm
220.950 1 x 1 25.00 6.75 155.00 Sqm
220.975 1 x 1 25.00 6.00 159.38 Sqm
221.000 1 x 1 25.00 6.00 150.00 Sqm
Total 5945.69 Sqm
k.m.222 6.00

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
221.025 1 x 1 25.00 5.65 145.63 Sqm
221.050 1 x 1 25.00 5.45 138.75 Sqm
221.075 1 x 1 25.00 6.20 145.63 Sqm
221.100 1 x 1 25.00 6.00 152.50 Sqm
221.125 1 x 1 25.00 5.85 148.13 Sqm
221.150 1 x 1 25.00 5.85 146.25 Sqm
221.175 1 x 1 25.00 6.05 148.75 Sqm
221.200 1 x 1 25.00 5.95 150.00 Sqm
221.225 1 x 1 25.00 6.10 150.63 Sqm
221.250 1 x 1 25.00 5.65 146.88 Sqm
221.275 1 x 1 25.00 5.65 141.25 Sqm
221.300 1 x 1 25.00 5.45 138.75 Sqm
221.325 1 x 1 25.00 5.85 141.25 Sqm
221.350 1 x 1 25.00 5.90 146.88 Sqm
221.375 1 x 1 25.00 7.05 161.88 Sqm
221.400 1 x 1 25.00 8.80 198.13 Sqm
221.425 1 x 1 25.00 6.50 191.25 Sqm
221.450 1 x 1 25.00 5.95 155.63 Sqm
221.475 1 x 1 25.00 5.75 146.25 Sqm
221.500 1 x 1 25.00 6.05 147.50 Sqm
221.525 1 x 1 25.00 6.10 151.88 Sqm
221.550 1 x 1 25.00 5.65 146.88 Sqm
221.575 1 x 1 25.00 6.05 146.25 Sqm
221.600 1 x 1 25.00 6.00 150.63 Sqm
221.625 1 x 1 25.00 6.10 151.25 Sqm
221.650 1 x 1 25.00 6.02 151.50 Sqm
221.675 1 x 1 25.00 6.75 159.63 Sqm
221.700 1 x 1 25.00 6.05 160.00 Sqm
221.725 1 x 1 25.00 5.80 148.13 Sqm
221.750 1 x 1 25.00 5.55 141.88 Sqm
221.775 1 x 1 25.00 5.65 140.00 Sqm
221.800 1 x 1 25.00 5.30 136.88 Sqm
221.825 1 x 1 25.00 6.10 142.50 Sqm
221.850 1 x 1 25.00 6.00 151.25 Sqm
221.875 1 x 1 25.00 6.15 151.88 Sqm
221.900 1 x 1 25.00 5.30 143.13 Sqm
221.925 1 x 1 25.00 5.65 136.88 Sqm
221.950 1 x 1 25.00 5.65 141.25 Sqm
221.975 1 x 1 25.00 5.95 145.00 Sqm
222.000 1 x 1 25.00 5.85 147.50 Sqm
Total 5986.22 Sqm
Km 223 5.85
222.025 1 x 1 25.00 7.50 166.88 Sqm
222.050 1 x 1 25.00 6.00 168.75 Sqm
222.075 1 x 1 25.00 5.65 145.63 Sqm
222.100 1 x 1 25.00 5.65 141.25 Sqm
222.125 1 x 1 25.00 6.05 146.25 Sqm
222.150 1 x 1 25.00 6.05 151.25 Sqm
222.175 1 x 1 25.00 5.75 147.50 Sqm
222.200 1 x 1 25.00 5.50 140.63 Sqm
222.225 1 x 1 25.00 5.60 138.75 Sqm
222.250 1 x 1 25.00 5.65 140.63 Sqm
222.275 1 x 1 25.00 5.55 140.00 Sqm
222.300 1 x 1 25.00 6.20 146.88 Sqm
222.325 1 x 1 25.00 6.10 153.75 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
222.350 1 x 1 25.00 6.00 151.25 Sqm
222.375 1 x 1 25.00 6.00 150.00 Sqm
222.400 1 x 1 25.00 5.50 143.75 Sqm
222.425 1 x 1 25.00 7.00 156.25 Sqm
222.450 1 x 1 25.00 5.65 158.13 Sqm
222.475 1 x 1 25.00 6.10 146.88 Sqm
222.500 1 x 1 25.00 6.05 151.88 Sqm
222.525 1 x 1 25.00 6.45 156.25 Sqm
222.550 1 x 1 25.00 6.10 156.88 Sqm
222.575 1 x 1 25.00 5.50 145.00 Sqm
222.600 1 x 1 25.00 6.10 145.00 Sqm
222.625 1 x 1 25.00 5.60 146.25 Sqm
222.650 1 x 1 25.00 6.00 145.00 Sqm
222.675 1 x 1 25.00 5.45 143.13 Sqm
222.700 1 x 1 25.00 5.60 138.13 Sqm
222.725 1 x 1 25.00 6.05 145.63 Sqm
222.750 1 x 1 25.00 6.42 155.88 Sqm
222.775 1 x 1 25.00 6.10 156.50 Sqm
222.800 1 x 1 25.00 5.55 145.63 Sqm
222.825 1 x 1 25.00 6.10 145.63 Sqm
222.850 1 x 1 25.00 5.50 145.00 Sqm
222.875 1 x 1 25.00 6.00 143.75 Sqm
222.900 1 x 1 25.00 5.95 149.38 Sqm
222.925 1 x 1 25.00 5.60 144.38 Sqm
222.950 1 x 1 25.00 6.05 145.63 Sqm
222.975 1 x 1 25.00 5.50 144.38 Sqm
223.000 1 x 1 25.00 6.05 144.38 Sqm
Total 5928.10 Sqm
Km 224 6.05
223.025 1 x 1 25.00 5.50 144.38 Sqm
223.050 1 x 1 25.00 6.30 147.50 Sqm
223.075 1 x 1 25.00 5.45 146.88 Sqm
223.100 1 x 1 25.00 6.30 146.88 Sqm
223.125 1 x 1 25.00 5.65 149.38 Sqm
223.150 1 x 1 25.00 6.10 146.88 Sqm
223.175 1 x 1 25.00 5.75 148.13 Sqm
223.200 1 x 1 25.00 5.65 142.50 Sqm
223.225 1 x 1 25.00 6.05 146.25 Sqm
223.250 1 x 1 25.00 5.65 146.25 Sqm
223.275 1 x 1 25.00 6.35 150.00 Sqm
223.300 1 x 1 25.00 5.90 153.13 Sqm
223.325 1 x 1 25.00 5.45 141.88 Sqm
223.350 1 x 1 25.00 6.25 146.25 Sqm
223.375 1 x 1 25.00 5.65 148.75 Sqm
223.400 1 x 1 25.00 5.60 140.63 Sqm
223.425 1 x 1 25.00 5.30 136.25 Sqm
223.450 1 x 1 25.00 6.10 142.50 Sqm
223.475 1 x 1 25.00 6.00 151.25 Sqm
223.500 1 x 1 25.00 6.45 155.63 Sqm
223.525 1 x 1 25.00 6.00 155.63 Sqm
223.550 1 x 1 25.00 6.15 151.88 Sqm
223.575 1 x 1 25.00 5.65 147.50 Sqm
223.600 1 x 1 25.00 6.45 151.25 Sqm
223.625 1 x 1 25.00 5.95 155.00 Sqm
223.650 1 x 1 25.00 5.45 142.50 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
223.675 1 x 1 25.00 5.90 141.88 Sqm
223.700 1 x 1 25.00 5.55 143.13 Sqm
223.725 1 x 1 25.00 5.75 141.25 Sqm
223.750 1 x 1 25.00 6.15 148.75 Sqm
223.775 1 x 1 25.00 6.15 153.75 Sqm
223.800 1 x 1 25.00 6.10 153.13 Sqm
223.825 1 x 1 25.00 6.00 151.25 Sqm
223.850 1 x 1 25.00 6.75 159.38 Sqm
223.875 1 x 1 25.00 5.45 152.50 Sqm
223.900 1 x 1 25.00 5.65 138.75 Sqm
223.925 1 x 1 25.00 5.45 138.75 Sqm
223.950 1 x 1 25.00 5.85 141.25 Sqm
223.975 1 x 1 25.00 6.05 148.75 Sqm
224.000 1 x 1 25.00 5.65 146.25 Sqm
Total 5893.83 Sqm
km 225 5.65
224.025 1 x 1 25.00 5.50 139.38 Sqm
224.050 1 x 1 25.00 6.05 144.38 Sqm
224.075 1 x 1 25.00 6.55 157.50 Sqm
224.100 1 x 1 25.00 6.25 160.00 Sqm
224.125 1 x 1 25.00 6.05 153.75 Sqm
224.150 1 x 1 25.00 5.85 148.75 Sqm
224.175 1 x 1 25.00 6.25 151.25 Sqm
224.200 1 x 1 25.00 5.65 148.75 Sqm
224.225 1 x 1 25.00 5.60 140.63 Sqm
224.250 1 x 1 25.00 6.10 146.25 Sqm
224.275 1 x 1 25.00 5.75 148.13 Sqm
224.300 1 x 1 25.00 6.05 147.50 Sqm
224.325 1 x 1 25.00 5.45 143.75 Sqm
224.350 1 x 1 25.00 6.05 143.75 Sqm
224.375 1 x 1 25.00 5.65 146.25 Sqm
224.400 1 x 1 25.00 6.15 147.50 Sqm
224.425 1 x 1 25.00 5.45 145.00 Sqm
224.450 1 x 1 25.00 6.05 143.75 Sqm
224.475 1 x 1 25.00 6.25 153.75 Sqm
224.500 1 x 1 25.00 6.10 154.38 Sqm
224.525 1 x 1 25.00 5.85 149.38 Sqm
224.550 1 x 1 25.00 6.00 148.13 Sqm
224.575 1 x 1 25.00 5.75 146.88 Sqm
224.600 1 x 1 25.00 5.75 143.75 Sqm
224.625 1 x 1 25.00 6.15 148.75 Sqm
224.650 1 x 1 25.00 5.95 151.25 Sqm
224.675 1 x 1 25.00 6.05 150.00 Sqm
224.700 1 x 1 25.00 6.25 153.75 Sqm
224.725 1 x 1 25.00 5.65 148.75 Sqm
224.750 1 x 1 25.00 5.85 143.75 Sqm
224.775 1 x 1 25.00 5.75 145.00 Sqm
224.800 1 x 1 25.00 6.15 148.75 Sqm
224.825 1 x 1 25.00 6.20 154.38 Sqm
224.850 1 x 1 25.00 6.05 153.13 Sqm
224.875 1 x 1 25.00 5.55 145.00 Sqm
224.900 1 x 1 25.00 5.65 140.00 Sqm
224.925 1 x 1 25.00 5.85 143.75 Sqm
224.950 1 x 1 25.00 6.35 152.50 Sqm
224.975 1 x 1 25.00 6.05 155.00 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
225.000 1 x 1 25.00 5.55 145.00 Sqm
Total 5931.30 Sqm
km226 5.55
225.025 1 x 1 25.00 6.10 145.63 Sqm
225.050 1 x 1 25.00 5.60 146.25 Sqm
225.075 1 x 1 25.00 6.05 145.63 Sqm
225.100 1 x 1 25.00 5.55 145.00 Sqm
225.125 1 x 1 25.00 5.75 141.25 Sqm
225.150 1 x 1 25.00 5.75 143.75 Sqm
225.175 1 x 1 25.00 6.00 146.88 Sqm
225.200 1 x 1 25.00 6.00 150.00 Sqm
225.225 1 x 1 25.00 6.05 150.63 Sqm
225.250 1 x 1 25.00 5.95 150.00 Sqm
225.275 1 x 1 25.00 5.80 146.88 Sqm
225.300 1 x 1 25.00 5.60 142.50 Sqm
225.325 1 x 1 25.00 6.05 145.63 Sqm
225.350 1 x 1 25.00 5.75 147.50 Sqm
225.375 1 x 1 25.00 6.00 146.88 Sqm
225.400 1 x 1 25.00 6.00 150.00 Sqm
225.425 1 x 1 25.00 6.05 150.63 Sqm
225.450 1 x 1 25.00 6.00 150.63 Sqm
225.475 1 x 1 25.00 5.95 149.38 Sqm
225.500 1 x 1 25.00 5.65 145.00 Sqm
225.525 1 x 1 25.00 6.15 147.50 Sqm
225.550 1 x 1 25.00 6.00 151.88 Sqm
225.575 1 x 1 25.00 6.00 150.00 Sqm
225.600 1 x 1 25.00 6.05 150.63 Sqm
225.625 1 x 1 25.00 5.65 146.25 Sqm
225.650 1 x 1 25.00 6.10 146.88 Sqm
225.675 1 x 1 25.00 5.60 146.25 Sqm
225.700 1 x 1 25.00 6.05 145.63 Sqm
225.725 1 x 1 25.00 5.95 150.00 Sqm
225.750 1 x 1 25.00 5.65 145.00 Sqm
225.775 1 x 1 25.00 5.70 141.88 Sqm
225.800 1 x 1 25.00 6.25 149.38 Sqm
225.825 1 x 1 25.00 5.45 146.25 Sqm
225.850 1 x 1 25.00 5.65 138.75 Sqm
225.875 1 x 1 25.00 5.35 137.50 Sqm
225.900 1 x 1 25.00 6.25 145.00 Sqm
225.925 1 x 1 25.00 5.85 151.25 Sqm
225.950 1 x 1 25.00 6.05 148.75 Sqm
225.975 1 x 1 25.00 5.65 146.25 Sqm
226.000 1 x 1 25.00 5.40 138.13 Sqm
Total 5863.21 Sqm
Km 227 5.40
226.025 1 x 1 25.00 5.55 136.88 Sqm
226.050 1 x 1 25.00 6.10 145.63 Sqm
226.075 1 x 1 25.00 5.85 149.38 Sqm
226.100 1 x 1 25.00 6.05 148.75 Sqm
226.125 1 x 1 25.00 5.50 144.38 Sqm
226.150 1 x 1 25.00 6.05 144.38 Sqm
226.175 1 x 1 25.00 5.65 146.25 Sqm
226.200 1 x 1 25.00 6.15 147.50 Sqm
226.225 1 x 1 25.00 5.85 150.00 Sqm
226.250 1 x 1 25.00 5.50 141.88 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
226.275 1 x 1 25.00 5.70 140.00 Sqm
226.300 1 x 1 25.00 5.90 145.00 Sqm
226.325 1 x 1 25.00 5.85 146.88 Sqm
226.350 1 x 1 25.00 5.45 141.25 Sqm
226.375 1 x 1 25.00 6.20 145.63 Sqm
226.400 1 x 1 25.00 5.65 148.13 Sqm
226.425 1 x 1 25.00 5.80 143.13 Sqm
226.450 1 x 1 25.00 5.40 140.00 Sqm
226.475 1 x 1 25.00 5.35 134.38 Sqm
226.500 1 x 1 25.00 6.05 142.50 Sqm
226.525 1 x 1 25.00 6.00 150.63 Sqm
226.550 1 x 1 25.00 5.95 149.38 Sqm
226.575 1 x 1 25.00 5.60 144.38 Sqm
226.600 1 x 1 25.00 5.75 141.88 Sqm
226.625 1 x 1 25.00 5.60 141.88 Sqm
226.650 1 x 1 25.00 5.65 140.63 Sqm
226.675 1 x 1 25.00 6.10 146.88 Sqm
226.700 1 x 1 25.00 5.65 146.88 Sqm
226.725 1 x 1 25.00 5.45 138.75 Sqm
226.750 1 x 1 25.00 6.20 145.63 Sqm
226.775 1 x 1 25.00 6.05 153.13 Sqm
226.800 1 x 1 25.00 5.35 142.50 Sqm
226.825 1 x 1 25.00 6.10 143.13 Sqm
226.850 1 x 1 25.00 6.00 151.25 Sqm
226.875 1 x 1 25.00 6.00 150.00 Sqm
226.900 1 x 1 25.00 5.65 145.63 Sqm
226.925 1 x 1 25.00 5.85 143.75 Sqm
226.950 1 x 1 25.00 6.05 148.75 Sqm
226.975 1 x 1 25.00 6.35 155.00 Sqm
227.000 1 x 1 25.00 5.95 153.75 Sqm
Total 5815.74 Sqm
Km 228 5.95
227.025 1 x 1 25.00 5.45 142.50 Sqm
227.050 1 x 1 25.00 5.95 142.50 Sqm
227.075 1 x 1 25.00 6.00 149.38 Sqm
227.100 1 x 1 25.00 6.00 150.00 Sqm
227.125 1 x 1 25.00 5.45 143.13 Sqm
227.150 1 x 1 25.00 5.55 137.50 Sqm
227.175 1 x 1 25.00 5.65 140.00 Sqm
227.200 1 x 1 25.00 5.95 145.00 Sqm
227.225 1 x 1 25.00 5.65 145.00 Sqm
227.250 1 x 1 25.00 5.80 143.13 Sqm
227.275 1 x 1 25.00 6.20 150.00 Sqm
227.300 1 x 1 25.00 6.00 152.50 Sqm
227.325 1 x 1 25.00 6.00 150.00 Sqm
227.350 1 x 1 25.00 5.45 143.13 Sqm
227.375 1 x 1 25.00 5.60 138.13 Sqm
227.400 1 x 1 25.00 5.85 143.13 Sqm
227.425 1 x 1 25.00 5.80 145.63 Sqm
227.450 1 x 1 25.00 5.80 145.00 Sqm
227.475 1 x 1 25.00 5.60 142.50 Sqm
227.500 1 x 1 25.00 6.00 145.00 Sqm
227.525 1 x 1 25.00 5.95 149.38 Sqm
227.550 1 x 1 25.00 6.15 151.25 Sqm
227.575 1 x 1 25.00 5.60 146.88 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
227.600 1 x 1 25.00 6.50 151.25 Sqm
227.625 1 x 1 25.00 5.80 153.75 Sqm
227.650 1 x 1 25.00 5.50 141.25 Sqm
227.675 1 x 1 25.00 5.65 139.38 Sqm
227.700 1 x 1 25.00 6.00 145.63 Sqm
227.725 1 x 1 25.00 6.10 151.25 Sqm
227.750 1 x 1 25.00 5.45 144.38 Sqm
227.775 1 x 1 25.00 6.00 143.13 Sqm
227.800 1 x 1 25.00 5.60 145.00 Sqm
227.825 1 x 1 25.00 5.60 140.00 Sqm
227.850 1 x 1 25.00 6.10 146.25 Sqm
227.875 1 x 1 25.00 5.45 144.38 Sqm
227.900 1 x 1 25.00 5.65 138.75 Sqm
227.925 1 x 1 25.00 5.60 140.63 Sqm
227.950 1 x 1 25.00 5.85 143.13 Sqm
227.975 1 x 1 25.00 6.00 148.13 Sqm
228.000 1 x 1 25.00 5.80 147.50 Sqm
Total 5804.46 Sqm
Km229 5.80
228.025 1 x 1 25.00 5.60 142.50 Sqm
228.050 1 x 1 25.00 5.80 142.50 Sqm
228.075 1 x 1 25.00 6.00 147.50 Sqm
228.100 1 x 1 25.00 5.95 149.38 Sqm
228.125 1 x 1 25.00 5.90 148.13 Sqm
228.150 1 x 1 25.00 6.00 148.75 Sqm
228.175 1 x 1 25.00 5.60 145.00 Sqm
228.200 1 x 1 25.00 5.70 141.25 Sqm
228.225 1 x 1 25.00 5.70 142.50 Sqm
228.250 1 x 1 25.00 5.90 145.00 Sqm
228.275 1 x 1 25.00 5.95 148.13 Sqm
228.300 1 x 1 25.00 6.00 149.38 Sqm
228.325 1 x 1 25.00 6.00 150.00 Sqm
228.350 1 x 1 25.00 5.85 148.13 Sqm
228.375 1 x 1 25.00 6.00 148.13 Sqm
228.400 1 x 1 25.00 6.00 150.00 Sqm
228.425 1 x 1 25.00 6.10 151.25 Sqm
228.450 1 x 1 25.00 6.20 153.75 Sqm
228.475 1 x 1 25.00 5.60 147.50 Sqm
228.500 1 x 1 25.00 5.40 137.50 Sqm
228.525 1 x 1 25.00 5.60 137.50 Sqm
228.550 1 x 1 25.00 5.85 143.13 Sqm
228.575 1 x 1 25.00 6.00 148.13 Sqm
228.600 1 x 1 25.00 6.05 150.63 Sqm
228.625 1 x 1 25.00 5.80 148.13 Sqm
228.650 1 x 1 25.00 5.75 144.38 Sqm
228.675 1 x 1 25.00 6.30 150.63 Sqm
228.700 1 x 1 25.00 6.20 156.25 Sqm
228.725 1 x 1 25.00 6.25 155.63 Sqm
228.750 1 x 1 25.00 6.25 156.25 Sqm
228.775 1 x 1 25.00 5.60 148.13 Sqm
228.800 1 x 1 25.00 5.60 140.00 Sqm
228.825 1 x 1 25.00 5.85 143.13 Sqm
228.850 1 x 1 25.00 5.40 140.63 Sqm
228.875 1 x 1 25.00 5.60 137.50 Sqm
228.900 1 x 1 25.00 4.50 126.25 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
228.925 1 x 1 25.00 4.55 113.13 Sqm
228.950 1 x 1 25.00 4.65 115.00 Sqm
228.975 1 x 1 25.00 4.50 114.38 Sqm
229.000 1 x 1 25.00 6.00 131.25 Sqm
Total 5736.34 Sqm
km230
229.025 1 x 1 25.00 6.00 75.00 Sqm
229.050 1 x 1 25.00 6.00 150.00 Sqm
229.075 1 x 1 25.00 6.20 152.50 Sqm
229.100 1 x 1 25.00 5.80 150.00 Sqm
229.125 1 x 1 25.00 5.50 141.25 Sqm
229.150 1 x 1 25.00 5.55 138.13 Sqm
229.175 1 x 1 25.00 5.60 139.38 Sqm
229.200 1 x 1 25.00 5.65 140.63 Sqm
229.225 1 x 1 25.00 5.50 139.38 Sqm
229.250 1 x 1 25.00 5.55 138.13 Sqm
229.275 1 x 1 25.00 6.10 145.63 Sqm
229.300 1 x 1 25.00 5.60 146.25 Sqm
229.325 1 x 1 25.00 5.80 142.50 Sqm
229.350 1 x 1 25.00 6.00 147.50 Sqm
229.375 1 x 1 25.00 5.85 148.13 Sqm
229.400 1 x 1 25.00 5.65 143.75 Sqm
229.425 1 x 1 25.00 6.00 145.63 Sqm
229.450 1 x 1 25.00 5.60 145.00 Sqm
229.475 1 x 1 25.00 6.00 145.00 Sqm
229.500 1 x 1 25.00 5.70 146.25 Sqm
229.525 1 x 1 25.00 5.75 143.13 Sqm
229.550 1 x 1 25.00 5.65 142.50 Sqm
229.575 1 x 1 25.00 5.60 140.63 Sqm
229.600 1 x 1 25.00 6.00 145.00 Sqm
229.625 1 x 1 25.00 5.80 147.50 Sqm
229.650 1 x 1 25.00 5.80 145.00 Sqm
229.675 1 x 1 25.00 6.10 148.75 Sqm
229.700 1 x 1 25.00 5.80 148.75 Sqm
229.725 1 x 1 25.00 5.95 146.88 Sqm
229.750 1 x 1 25.00 5.90 148.13 Sqm
229.775 1 x 1 25.00 5.90 147.50 Sqm
229.800 1 x 1 25.00 5.60 143.75 Sqm
229.825 1 x 1 25.00 6.00 145.00 Sqm
229.850 1 x 1 25.00 5.70 146.25 Sqm
229.875 1 x 1 25.00 6.75 155.63 Sqm
229.900 1 x 1 25.00 5.50 153.13 Sqm
229.925 1 x 1 25.00 6.05 144.38 Sqm
229.950 1 x 1 25.00 5.90 149.38 Sqm
229.975 1 x 1 25.00 5.95 148.13 Sqm
230.000 1 x 1 25.00 4.25 127.50 Sqm
Total 5736.96 Sqm
km 231 4.25 Sqm
230.025 1 x 1 25.00 4.20 105.63 Sqm
230.050 1 x 1 25.00 6.00 127.50 Sqm
230.075 1 x 1 25.00 5.60 145.00 Sqm
230.100 1 x 1 25.00 5.80 142.50 Sqm
230.125 1 x 1 25.00 6.00 147.50 Sqm
230.150 1 x 1 25.00 6.10 151.25 Sqm
230.175 1 x 1 25.00 6.60 158.75 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
230.200 1 x 1 25.00 6.05 158.13 Sqm
230.225 1 x 1 25.00 5.40 143.13 Sqm
230.250 1 x 1 25.00 5.50 136.25 Sqm
230.275 1 x 1 25.00 4.50 125.00 Sqm
230.300 1 x 1 25.00 4.55 113.13 Sqm
230.325 1 x 1 25.00 4.30 110.63 Sqm
230.350 1 x 1 25.00 4.60 111.25 Sqm
230.375 1 x 1 25.00 5.50 126.25 Sqm
230.400 1 x 1 25.00 5.55 138.13 Sqm
230.425 1 x 1 25.00 5.65 140.00 Sqm
230.450 1 x 1 25.00 5.45 138.75 Sqm
230.475 1 x 1 25.00 5.50 136.88 Sqm
230.500 1 x 1 25.00 5.65 139.38 Sqm
230.525 1 x 1 25.00 5.60 140.63 Sqm
230.550 1 x 1 25.00 5.90 143.75 Sqm
230.575 1 x 1 25.00 5.85 146.88 Sqm
230.600 1 x 1 25.00 5.80 145.63 Sqm
230.625 1 x 1 25.00 6.00 147.50 Sqm
230.650 1 x 1 25.00 5.50 143.75 Sqm
230.675 1 x 1 25.00 6.15 145.63 Sqm
230.700 1 x 1 25.00 6.00 151.88 Sqm
230.725 1 x 1 25.00 5.75 146.88 Sqm
230.750 1 x 1 25.00 5.60 141.88 Sqm
230.775 1 x 1 25.00 6.00 145.00 Sqm
230.800 1 x 1 25.00 5.55 144.38 Sqm
230.825 1 x 1 25.00 5.60 139.38 Sqm
230.850 1 x 1 25.00 5.45 138.13 Sqm
230.875 1 x 1 25.00 5.95 142.50 Sqm
230.900 1 x 1 25.00 6.10 150.63 Sqm
230.925 1 x 1 25.00 5.90 150.00 Sqm
230.950 1 x 1 25.00 5.60 143.75 Sqm
230.975 1 x 1 25.00 5.65 140.63 Sqm
231.000 1 x 1 25.00 5.80 143.13 Sqm
Total 5586.98 Sqm
km 232 5.80
231.025 1 x 1 25.00 7.10 161.25 Sqm
231.050 1 x 1 25.00 7.20 178.75 Sqm
231.075 1 x 1 25.00 7.50 183.75 Sqm
231.100 1 x 1 25.00 6.05 169.38 Sqm
231.125 1 x 1 25.00 6.10 151.88 Sqm
231.150 1 x 1 25.00 6.20 153.75 Sqm
231.175 1 x 1 25.00 6.15 154.38 Sqm
231.200 1 x 1 25.00 5.65 147.50 Sqm
231.225 1 x 1 25.00 4.65 128.75 Sqm
231.250 1 x 1 25.00 4.80 118.13 Sqm
231.275 1 x 1 25.00 5.50 128.75 Sqm
231.300 1 x 1 25.00 5.80 141.25 Sqm
231.325 1 x 1 25.00 6.00 147.50 Sqm
231.350 1 x 1 25.00 6.10 151.25 Sqm
231.375 1 x 1 25.00 5.60 146.25 Sqm
231.400 1 x 1 25.00 5.75 141.88 Sqm
231.425 1 x 1 25.00 5.35 138.75 Sqm
231.450 1 x 1 25.00 5.85 140.00 Sqm
231.475 1 x 1 25.00 6.10 149.38 Sqm
231.500 1 x 1 25.00 5.80 148.75 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
231.525 1 x 1 25.00 5.50 141.25 Sqm
231.550 1 x 1 25.00 5.50 137.50 Sqm
231.575 1 x 1 25.00 6.00 143.75 Sqm
231.600 1 x 1 25.00 5.60 145.00 Sqm
231.625 1 x 1 25.00 5.45 138.13 Sqm
231.650 1 x 1 25.00 6.20 145.63 Sqm
231.675 1 x 1 25.00 6.10 153.75 Sqm
231.700 1 x 1 25.00 5.55 145.63 Sqm
231.725 1 x 1 25.00 5.90 143.13 Sqm
231.750 1 x 1 25.00 5.75 145.63 Sqm
231.775 1 x 1 25.00 5.45 140.00 Sqm
231.800 1 x 1 25.00 6.10 144.38 Sqm
231.825 1 x 1 25.00 6.20 153.75 Sqm
231.850 1 x 1 25.00 5.45 145.63 Sqm
231.875 1 x 1 25.00 6.05 143.75 Sqm
231.900 1 x 1 25.00 5.65 146.25 Sqm
231.925 1 x 1 25.00 5.40 138.13 Sqm
231.950 1 x 1 25.00 5.85 140.63 Sqm
231.975 1 x 1 25.00 5.35 140.00 Sqm
232.000 1 x 1 25.00 6.20 144.38 Sqm
Total 5857.58 Sqm
km 233 6.20
232.025 1 x 1 25.00 6.10 153.75 Sqm
232.050 1 x 1 25.00 4.65 134.38 Sqm
232.075 1 x 1 25.00 5.05 121.25 Sqm
232.100 1 x 1 25.00 5.00 125.63 Sqm
232.125 1 x 1 25.00 5.55 131.88 Sqm
232.150 1 x 1 25.00 5.60 139.38 Sqm
232.175 1 x 1 25.00 6.20 147.50 Sqm
232.200 1 x 1 25.00 5.40 145.00 Sqm
232.225 1 x 1 25.00 6.00 142.50 Sqm
232.250 1 x 1 25.00 5.30 141.25 Sqm
232.275 1 x 1 25.00 6.25 144.38 Sqm
232.300 1 x 1 25.00 6.10 154.38 Sqm
232.325 1 x 1 25.00 5.50 145.00 Sqm
232.350 1 x 1 25.00 5.60 138.75 Sqm
232.375 1 x 1 25.00 6.10 146.25 Sqm
232.400 1 x 1 25.00 5.80 148.75 Sqm
232.425 1 x 1 25.00 6.30 151.25 Sqm
232.450 1 x 1 25.00 5.80 151.25 Sqm
232.475 1 x 1 25.00 5.45 140.63 Sqm
232.500 1 x 1 25.00 6.20 145.63 Sqm
232.525 1 x 1 25.00 5.90 151.25 Sqm
232.550 1 x 1 25.00 5.70 145.00 Sqm
232.575 1 x 1 25.00 5.80 143.75 Sqm
232.600 1 x 1 25.00 6.05 148.13 Sqm
232.625 1 x 1 25.00 5.60 145.63 Sqm
232.650 1 x 1 25.00 5.60 140.00 Sqm
232.675 1 x 1 25.00 5.95 144.38 Sqm
232.700 1 x 1 25.00 5.65 145.00 Sqm
232.725 1 x 1 25.00 6.10 146.88 Sqm
232.750 1 x 1 25.00 5.80 148.75 Sqm
232.775 1 x 1 25.00 6.00 147.50 Sqm
232.800 1 x 1 25.00 6.20 152.50 Sqm
232.825 1 x 1 25.00 5.45 145.63 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
232.850 1 x 1 25.00 6.00 143.13 Sqm
232.875 1 x 1 25.00 5.40 142.50 Sqm
232.900 1 x 1 25.00 5.55 136.88 Sqm
232.925 1 x 1 25.00 6.00 144.38 Sqm
232.950 1 x 1 25.00 5.60 145.00 Sqm
232.975 1 x 1 25.00 5.90 143.75 Sqm
233.000 1 x 1 25.00 5.80 146.25 Sqm
Total 5755.08 Sqm
km 234 5.80
233.025 1 x 1 25.00 5.60 142.50 Sqm
233.050 1 x 1 25.00 6.05 145.63 Sqm
233.075 1 x 1 25.00 5.75 147.50 Sqm
233.100 1 x 1 25.00 6.10 148.13 Sqm
233.125 1 x 1 25.00 5.50 145.00 Sqm
233.150 1 x 1 25.00 5.60 138.75 Sqm
233.175 1 x 1 25.00 5.80 142.50 Sqm
233.200 1 x 1 25.00 5.40 140.00 Sqm
233.225 1 x 1 25.00 5.45 135.63 Sqm
233.250 1 x 1 25.00 5.60 138.13 Sqm
233.275 1 x 1 25.00 5.30 136.25 Sqm
233.300 1 x 1 25.00 5.55 135.63 Sqm
233.325 1 x 1 25.00 5.55 138.75 Sqm
233.350 1 x 1 25.00 5.65 140.00 Sqm
233.375 1 x 1 25.00 6.00 145.63 Sqm
233.400 1 x 1 25.00 5.80 147.50 Sqm
233.425 1 x 1 25.00 5.85 145.63 Sqm
233.450 1 x 1 25.00 5.50 141.88 Sqm
233.475 1 x 1 25.00 5.60 138.75 Sqm
233.500 1 x 1 25.00 5.80 142.50 Sqm
233.525 1 x 1 25.00 5.50 141.25 Sqm
233.550 1 x 1 25.00 6.10 145.00 Sqm
233.575 1 x 1 25.00 5.65 146.88 Sqm
233.600 1 x 1 25.00 5.75 142.50 Sqm
233.625 1 x 1 25.00 5.50 140.63 Sqm
233.650 1 x 1 25.00 5.50 137.50 Sqm
233.675 1 x 1 25.00 5.40 136.25 Sqm
233.700 1 x 1 25.00 5.35 134.38 Sqm
233.725 1 x 1 25.00 5.25 132.50 Sqm
233.750 1 x 1 25.00 5.60 135.63 Sqm
233.775 1 x 1 25.00 5.85 143.13 Sqm
233.800 1 x 1 25.00 5.10 136.88 Sqm
233.825 1 x 1 25.00 5.65 134.38 Sqm
233.850 1 x 1 25.00 5.30 136.88 Sqm
233.875 1 x 1 25.00 5.60 136.25 Sqm
233.900 1 x 1 25.00 5.15 134.38 Sqm
233.925 1 x 1 25.00 5.90 138.13 Sqm
233.950 1 x 1 25.00 5.60 143.75 Sqm
233.975 1 x 1 25.00 5.20 135.00 Sqm
234.000 1 x 1 25.00 5.30 131.25 Sqm
Total 5598.84 Sqm
km 235 5.30
234.025 1 x 1 25.00 5.60 136.25 Sqm
234.050 1 x 1 25.00 5.80 142.50 Sqm
234.075 1 x 1 25.00 5.65 143.13 Sqm
234.100 1 x 1 25.00 5.85 143.75 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
234.125 1 x 1 25.00 5.65 143.75 Sqm
234.150 1 x 1 25.00 6.15 147.50 Sqm
234.175 1 x 1 25.00 5.45 145.00 Sqm
234.200 1 x 1 25.00 5.00 130.63 Sqm
234.225 1 x 1 25.00 5.20 127.50 Sqm
234.250 1 x 1 25.00 5.30 131.25 Sqm
234.275 1 x 1 25.00 5.55 135.63 Sqm
234.300 1 x 1 25.00 5.65 140.00 Sqm
234.325 1 x 1 25.00 5.45 138.75 Sqm
234.350 1 x 1 25.00 5.35 135.00 Sqm
234.375 1 x 1 25.00 5.25 132.50 Sqm
234.400 1 x 1 25.00 6.20 143.13 Sqm
234.425 1 x 1 25.00 6.20 155.00 Sqm
234.450 1 x 1 25.00 5.40 145.00 Sqm
234.475 1 x 1 25.00 5.20 132.50 Sqm
234.500 1 x 1 25.00 5.35 131.88 Sqm
234.525 1 x 1 25.00 5.30 133.13 Sqm
234.550 1 x 1 25.00 5.60 136.25 Sqm
234.575 1 x 1 25.00 5.65 140.63 Sqm
234.600 1 x 1 25.00 5.35 137.50 Sqm
234.625 1 x 1 25.00 5.35 133.75 Sqm
234.650 1 x 1 25.00 5.65 137.50 Sqm
234.675 1 x 1 25.00 5.45 138.75 Sqm
234.700 1 x 1 25.00 5.50 136.88 Sqm
234.725 1 x 1 25.00 5.80 141.25 Sqm
234.750 1 x 1 25.00 5.95 146.88 Sqm
234.775 1 x 1 25.00 5.50 143.13 Sqm
234.800 1 x 1 25.00 5.45 136.88 Sqm
234.825 1 x 1 25.00 5.40 135.63 Sqm
234.850 1 x 1 25.00 5.60 137.50 Sqm
234.875 1 x 1 25.00 5.10 133.75 Sqm
234.900 1 x 1 25.00 5.15 128.13 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.
234.925 1 x 1 25.00 5.90 138.13 Sqm
234.950 1 x 1 25.00 5.60 143.75 Sqm
234.975 1 x 1 25.00 6.00 145.00 Sqm
235.000 1 x 1 25.00 7.50 168.75 Sqm
Total 5573.82 Sqm

Total Area 93050.51 Sqm

deduction as per deduction seat(Page99a) 1296.00 Sqm

Grand Total 91754.51 Sqm


4 Dense Graded Bituminous Macadam
Dense Graded Bituminous Macadam
Providing and laying dense graded
bituminous macadam with 100-120 TPH
batch type HMP producing an average
output of 75 tonnes per hour using
crushedaggregates of specified grading,
premixed with bituminous binder @ 5 per
cent by weight of total mix and filler,
transporting the hot mix to work site,
laying with a hydrostatic paver finisher
with sensor control to the required grade,
level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to
achieve the desired compaction as per
MoRTH specification clause No. 507
complete in all respects. For GradingII(19
mm nominal size)

Km 171.000- 200.000 Qty. Shall be total area of tack coat x 0.050


91754.51 x 0.05 4587.73 cum

Adding 5% extra for depression and undulation 229.39 cum


Total 4817.12 cum
Tack coat using VG-10 grade bitumen
@0.35kg/sqm, over normal bituminous
5 surfaces As Per State sor miscellious
items 3-1-1 (For BC)
same as item no 4 91754.51 Sqm

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Bituminous concrete
Providing and laying bituminous concrete
with 100-120 TPH batch type hot mix
plant producing an average output of 75
tonnes per hour using crushed aggregates
of specified grading, premixed with
bituminous binder @ 5.5 per cent of mix
and filler, transporting the hot mix to
work site, laying with a hydrostatic paver
finisher with sensor control to the required
6 grade, level and alignment, rolling with
smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction
as per MORTH specification clause No.
509 complete in all respects for Grading-
II(10 mm nominal size) As Per MORTH

Km 220-235 Qty. Shall be total area of tack coat x 0.030


91754.51 x 0.03 2752.64 cum
Total 2752.64 cum
Providing and laying of hot applied
thermoplastic compound 2.5 mm thick
including reflectorising glass beads @
250 gms per sqm area, thickness of 2.5
5 mm is exclusive of surface applied glass
beads as per IRC:35 .The finished surface
to be level, uniform and free from streaks
and holes.

Km 220.000-235.000
Continuous edge line alongboth side 2 x 16 1000.00 0.15 4800.00 sqm
Adding 5% extra for stoping lines and zebra crossings etc 240.00 sqm
for middle strip 1 x 9 1000.00 0.15 1350.00 sqm
Total 6390.00 Sqm
Construction of sub-grade and earthen
shoulders with approved material obtained
from borrow pits with all lifts & leads,
transporting to site, spreading, grading to
7 required slope and compacted to meet
requirement of table No. 300-2.

Km 220.000-235000
Along both side 2 x 13.5 1000.00 1.00 0.08 2160.00 cum

Total 2160.00 cum

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Road Markers/Road Stud with Lense


Reflector
(Providing and fixing of road stud 100x
100 mm, die cast in aluminium, resistant
to corrosive effect of salt and grit, fitted
with lense reflectors, installed in concrete
8 or asphaltic surface by drilling hole 30
mm upto a depth of 60 mm and bedded in
a suitable bituminous grout or epoxy
mortar, all as per BS 873 part 4:1973

Km. 220.000To Km 235.000 Both Side 2 x 16 900/6 4800.00 Nos.

Total 4800.00 Nos.


8 Surface drains
Construction of unlined surface drains of
average cross sectional area 0.40 sqm in
soilto specified lines, grades, levels and
dimensions to the requirement of clause
301 and 309. Excavated material to be
used in embankment within a lead of50
metres (average lead 25 metres

km 220-km 235 25 x 40 13.500 Total 13500.00 Rmt


Grand total 13500.00 Rmt
9 Crash barrier
Excavation for Structures Earth work in
excavation of foundation of structures as
per drawing and technical specification,
including setting out, construction of
shoring and bracing, removal of stumps
i and other deleterious matter, dressing of
sides and bottom and back filling with
approved material Mechanical Means
Depth upto 3 m

Km. 221 (0-2) To (2-4) 1 x 126 0.350 0.35 0.80 12.35 Cum
Km. 224 (4-6) To (6-8) 1 x 126 0.350 0.35 0.80 12.35 Cum
Km. 235 (6-8) To (8-10) 1 x 101 0.350 0.35 0.80 9.90 Cum
Total 34.59 Cum

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Plain cement concrete in open foundation


complete as per drawing and technical
ii specifications PCC Grade M15

Km. 221 (0-2) To (2-4) 1 x 126 0.350 0.35 0.80 12.35 Cum
Km. 224 (4-6) To (6-8) 1 x 126 0.350 0.35 0.80 12.35 Cum
Km. 235 (6-8) To (8-10) 1 x 101 0.350 0.35 0.80 9.90 Cum
Total 34.59 Cum
Type - B, "THRIE" : Metal Beam Crash
Barrier (Providing and erecting a "Thrie"
metal beam crash barrier comprising of 3
mm thick corrugated sheet metal beam
rail, 85 cm above road/ground level, fixed
on ISMC series channel vertical post, 150
x 75 x 5 mm spaced 2 m centre to centre,
2 m high with 1.15 m below ground level,
all steel parts and fitments to be lvanised
iii by hot dip process, all fittings to conform
to IS:1367 and IS:1364, metal beam rail
to be fixed on the vertical post with a
space of channel section 150 x 75 x 5 mm,
546 mm long complete as per clause 810)

Km. 221 (0-2) To (2-4) 1 x 10 25.00 250.00 Rmt


Km. 224 (4-6) To (6-8) 1 x 10 25.00 250.00 Rmt
Km. 235 (6-8) To (8-10) 1 x 8 25.00 200.00 Rmt
Total 700.00 Rmt
Kilo Metre Stone (Reinforced cement
concrete M15grade kilometre stone of
10 standard design as per IRC:8-1980, fixing
in position including painting and printing
etc) Km. 217 To Km. 235
i 5th kilometre stone (precast) 1 x 4 4 Nos.
ii Hectometer stone (Precast) 16 x 4 64 Nos.
11 Protection work
Excavation in foundation for retaining,
breast walls etc, in all types of
soilsandrocks including all lead, lift and
i disposal of surplus material as per
direction of engineer - in - charge, as
perdrawing and technicalspecifications
Clause 305.1 of MORD Specifiction

Km. 224 Hm. (2-4) R/Wall 1 x 1/3 9.70 1.72 4.50 25.03 cum
Km. 225 Hm. (0-2) R/Wall 1 x 1/3 8.10 1.47 3.50 13.89 cum
Km. 228 Hm. (8-10) B/Wall 1 x 1/3 9.00 0.90 2.50 6.75 cum
Km. 229 Hm. (0-2) R/Wall 1 x 1/3 11.70 1.47 3.50 20.07 cum
Km. 229 Hm. (2-4) T/Wall 1 x 1/2 34.70 2.00 2.00 69.40 cum
Km. 229 Hm. (2-4) R/Wall 1 x 1/3 34.70 2.10 6.00 145.74 cum
Km. 234 Hm. (2-4) R/Wall 1 x 1/3 6.00 1.35 3.00 8.10 cum
Total 288.98 cum

A.A.E./J.E. . A.E.
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of
damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state Uttarakhand.

Random Rubble Stone Masonry laid in


1:6 cement and sand mortar,in breast
wall,retaining wall, parapets,scupper etc.
Including supply of all materials,labour,t
ii & p& royality etc,required for proper
complition of work.(As per PWD
Uttarakhand Specification)

Km. 224 Hm. (2-4) R/Wall 1 x 1 9.70 (1.72+0.60)/2 4.50 50.63 cum
Km. 225 Hm. (0-2) R/Wall 1 x 1 8.10 (1.47+0.60)/2 3.50 29.20 cum
Km. 228 Hm. (8-10) B/Wall 1 x 1 9.00 (0.90+0.60)/2 2.50 16.88 cum
Km. 229 Hm. (0-2) R/Wall 1 x 1 11.70 (1.47+0.60)/2 3.50 42.18 cum
Km. 229 Hm. (2-4) T/Wall 1 x 1 34.70 (2.00+1.00)/2 2.00 104.10 cum
Km. 229 Hm. (2-4) R/Wall 1 x 1 34.70 (2.10+0.60)/2 6.00 281.07 cum
Km. 234 Hm. (2-4) R/Wall 1 x 1 6.00 (1.35+0.60)/2 3.00 17.46 cum
Total 541.52 cum
Hand Packed stone filling in back of
wallls including cost of all materials,
iii royality, T&P etc. complete as per
direction of Engineer-in- charge. (As per
PWD Uttarakhand specifications)
Km. 224 Hm. (2-4) R/Wall 1 x 1/3 9.70 2.20 4.50 32.01 cum
Km. 225 Hm. (0-2) R/Wall 1 x 1/3 8.10 2.10 3.50 19.85 cum
Km. 228 Hm. (8-10) B/Wall 1 x 1/3 9.00 1.00 2.50 7.50 cum
Km. 229 Hm. (0-2) R/Wall 1 x 1/3 11.70 2.10 3.50 28.67 cum
Km. 229 Hm. (2-4) T/Wall 1 x 1/2 34.70 1.00 2.00 34.70 cum
Km. 229 Hm. (2-4) R/Wall 1 x 1/3 34.70 3.00 6.00 208.20 cum
Km. 234 Hm. (2-4) R/Wall 1 x 1/3 6.00 2.00 3.00 12.00 cum
Total 342.93 cum

A.A.E./J.E. . A.E.
Detail of Measurements

NAME OF WORK :- Under Annual Plan (Year 2018-19) Strengthing of the road On National Highway 109 ( Old 87E )
Panduwakhal To Karanprayag, From Km. 171.00 To Km.200.00 District Chamoli, state Uttarakhand .

Sl no. Km length width area Type of stucture


Deduction Area
1 Km. 178 Hm. (06-08) 11.00 4.00 44.00 causeway
2 Km. 179 Hm. (0-2) 15.00 4.00 60.00 causeway
3 Km. 183 Hm. (08-10) 12.00 4.00 48.00 causeway
4 Km. 186 Hm. (08-10) 11.00 4.00 44.00 causeway
5 Km. 186 Hm. (08-10) 11.00 4.00 44.00 causeway
6 Km. 189 Hm. (02-04) 16.00 4.00 64.00 causeway
7 Km. 192 Hm. (00-02) 10.00 4.00 40.00 causeway
8 Km. 192 Hm. (08-10) 13.00 4.00 52.00 causeway
9 Km. 198 Hm. (08-10) 11.00 4.00 44.00 causeway
10 K.M 176 (04-06) 60.00 4.25 255.00 Bridge
11 K.M 181 (04-06) 6.00 4.25 25.50 Bridge
12 K.M 189 (08-10) 16.70 4.25 70.98 Bridge
13 K.M 193 (00-02) 14.30 4.25 60.78 Bridge
207.00 Total 852.26
Detail of Measurements
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old
87E ) Panduwakhal To Karanprayag, From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and
construction of damage scuppers and Protection work Chainnage 171.000 To 200.000, District Chamoli, state
Uttarakhand.

Sl no. Km length width area Type of stucture


Deduction Area
2 Km. 223 Hm. (04-06) 15.00 6.00 90.00 causeway
3 Km. 223 Hm. (04-06) 15.00 6.00 90.00 causeway
4 Km. 227 Hm. (00-02) 11.00 6.00 66.00 causeway
5 Km. 227 Hm. (02-04) 11.00 6.00 66.00 causeway
6 Km. 231 Hm. (00-02) 15.00 6.00 90.00 causeway
7 Km. 232 Hm. (00-02) 10.00 6.00 60.00 causeway
8 Km. 233 Hm. (08-10) 25.00 6.00 150.00 C.C. Road
9 Km. 234 Hm. (02-04) 15.00 6.00 90.00 causeway
10 Km. 235 Hm. (06-08) 10.00 6.00 60.00 causeway
11 Km. 235 Hm. (08-10) 11.00 6.00 66.00 causeway
12 K.M 228 Hm (06-08) 48.00 6.00 288.00 Bridge
13 K.M 232 Hm (02-04) 15.00 6.00 90.00 Bridge
14 K.M 235 Hm (02-04) 15.00 6.00 90.00 Bridge
201.00 Total 1206.00
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E ) Panduwakhal To Karanprayag,
From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of damage scuppers and Protection work Chainnage 171.000 To
200.000, District Chamoli, state Uttarakhand.
Block - Gairsain

Mahalchouri Agar chati

Km.172 Km.173 Km.174 Km.175 Km.176 Km.177 Km.178 Km.179 Km.180 Km.181

Dadimdali Dhunar ghat Gairsain Kalimati

Km.182 Km.183 Km.184 Km.185 Km.186 Km.187 Km.188 Km.189 Km.190 Km.191

Km.192 Km.193 Km.194 Km.195 Km.196 Km.197 Km.198 Km.199 Km.200

Km.218 Km.219

DBMBC Work
C.C. Drain
Causeway/C.C.Road
unlined surface drains
NAME OF WORK :- Under Annual Plan (Year 2019-20) Strengthing work of the road On National Highway 109 ( Old 87E ) Panduwakhal To Karanprayag,
From Chainage.171.000 to 200.00, Chainage. 218.000 To Km. 235.000 and construction of damage scuppers and Protection work Chainnage 171.000 To
200.000, District Chamoli, state Uttarakhand.
Block - Karanprayag

Ujjal pur Bhatoli

Km.220 Km.221 Km.222 Km.223 Km.224 Km.225 Km.226 Km.227

Simali Paduli Karanprayag

Km.228 Km.229 Km.230 Km.231 Km.232 Km.233 Km.234 Km.235

DBMBC Work
Causeway/C.C.Road
unlined surface drains