Coal getting
Dolphin to Accommodate
7000 DWT Barge
Jetty Operational
Effective operating hours coal getting to pit stock pile receciving = 360 hours
Effective operating hours loading to DT at pit stock pile = 360 hours
Effective operating hauling from pit stock pile to Pelindo = 360
hours
Loading Jetty/Stock Pile and Coal Handling System – Sub structure – Basic Engineering Design
Topography for 12 Ha of area
Bathymetry Survey
Soil Investigation : deep bore hole and sondir and laboratories test for soil for total of 12 point
Conceptual design – Civil- for Sub structure and Loading Jetty, mechanical refer to Coal Handling
Design
Utilities building
Reclamation and soil improvement study and calculation for Pressure load of stock pile up to
60,000 MT
Barging Study from Kuala Cenaku up to Mother Vessel
Coal loading onto 10 DT
at Pit Stock pile
10 Tons DT through 80 km
hauling road to Pelindo stock
pile
Coal Dump at Pelindo
Stock Pile
From stock pile coal to
be crush,and load to
barge with conveyor
Loading operation to
the barge
Pelindo Stock Pile and Laoding Facility
MESS,OFFICE AND HOUSING AT PELINDO STOCK PILE
Flow of coal Laoding at Pelindo Stock Pile
1 2
3 4
Raw Coal number 1 and 2
with 30,000 MT
Capacity/each total of Stockpile no.2
60,000 MT
Stockpile no.1
Weight bridge
Conveyor No. 2
Conveyor No. 1
Indragiri River
5 Stockpile No
4
Conveyor Parts : 3
1. Feeder Breaker 2 1
2. Chain feeder
3. Vibrating Screen
4. Roller Crusher
5. Transfer Conveyor
6. Hopper
7. Loading Conveyor
Indragiri River
Dolphin