PROJECT TITLE : PROPOSED RENOVATION PROJECT

LOCATION : ANAO MEXICO, PAMPANGA

OWNER : LAGMAN FAMILY

ARCHITECT : JORDAN GUEVARRA, uap & JOHN DALE MEDINA,uap

QUOTATION FOR LABOR & MATERIALS

ITEM DESCRIPTION QTY UNIT UNIT COST AMOUNT


NO.

1 GENERAL REQUIREMENTS
a. Mobilization 1 lot - 8,500.00
b. Demobilization 1 lot - 10,000.00
c. hauling of debris ( BY OWNER ) 1 lot -

SUB TOTAL 18,500.00

CONFIDENTIAL
2 Living area
a. Dismantling of Existing ceiling 1 lot 5,000.00 5,000.00
b. New Ceiling Design with Drop ceiling & Accessories 1 lot 15,000.00 15,000.00
c New Painting Wall & Ceiling 1 lot 23,000.00 23,000.00
d Tv Console and Wall Accent 1 lot 18,500.00 18,500.00
e Vertical Accent Trellis 1 lot 8,000.00 8,000.00
f Accent Pormica with Adhesive 1 lot 10,000.00 10,000.00
SUB TOTAL 79,500.00

3 Dining Area
a. Dismantling of Existing ceiling 1 lot 5,000.00 5,000.00
b. New Ceiling Design with Drop ceiling & Accessories 1 lot 21,500.00 21,500.00
c New Painting Wall & Ceiling 1 lot 20,000.00 20,000.00
d Backing with Full Height Mirror 1 lot 16,000.00 16,000.00

SUB TOTAL 62,500.00

4 Formal Kitchen
a. Dismantling of Existing ceiling 1 lot 5,000.00 5,000.00
b. New Ceiling Design with Horizntal grooves 1 lot 15,600.00 15,600.00
c. New Painting Wall & Ceiling with Lighting Fixtures 1 lot 18,000.00 18,000.00
d. Nook Counter & Kitchen Cabinets with Painted inside 1 lot 38,000.00 38,000.00

SUB TOTAL 76,600.00

5 Masters Bedroom
a. Dismantling of Existing ceiling 1 lot 5,000.00 5,000.00
b. New Ceiling Design with Covelights 1 lot 23,500.00 23,500.00
c New Painting Wall & Ceiling 1 lot 20,000.00 20,000.00
d Cabinets and Paintings 1 lot 23,000.00 23,000.00
SUB TOTAL 71,500.00

6 Bedroom 01
a. Dismantling of Existing ceiling 1 lot 5,000.00 5,000.00
b. New Ceiling Design with Horizntal grooves 1 lot 15,600.00 15,600.00
c New Painting Wall & Ceiling 1 lot 20,000.00 20,000.00

CONFIDENTIAL
d Cabinets and Paintings 1 lot 19,000.00 19,000.00

SUB TOTAL 59,600.00

7 Bedroom 02
a. Dismantling of Existing ceiling 1 lot 5,000.00 5,000.00
b. New Ceiling Design with Covelights 1 lot 15,600.00 15,600.00
c New Painting Wall & Ceiling 1 lot 18,000.00 18,000.00

SUB TOTAL 38,600.00

8 ELECTRICAL
a. Dismantling of Existing ceiling Wiring 1 lot 8,500.00 8,500.00
b. New Ceiling Design Electrical Wiring 1 lot 10,000.00 10,000.00
SUB TOTAL 18,500.00

TOTAL COST OF THE PROJECT Php 425,300.00


LABOR COST 191,385.00
CONTINGENCIES 20,000.00

TOTAL LABOR AND MATERIALS 636,685.00

CONFIDENTIAL