HEALTHS,SAFETY AND ENVIRONMENTAL RISK ANALYSIS


Title Shear Wall jumping platform

Company: Shapoorji Pallonji Mideast LLC

Site: Park- Heights I,II @ Dubai Hills Page 1 of 06

Ref: SPML /HSE/HIRA/50 Rev: 00 Date: 11-09-2018


1. Hazards and Risk Identifications 2. Risk Evaluations and Controls
Health, Safety Initial Risk
Health, Safety Risks Law / Person in-
Activity Hazards and Rating Residual
Sl.# and Environmental Control Measures Compli charge
Description Environmental Risk Ratings
Impacts L S R ance (P/C)
Aspects

 Unskilled workers  Only trained & experienced workers


 Non-awareness of are allowed to perform the task.
site-specific rules  All employees must undergo site
& regulation. specific safety induction covering all
 Improper material emergency related procedures etc.
handling.  Proper material handling procedure
Mobilization of  Improper access. must be followed. Foreman/Si
manpower and  Inadequate  All workers must wear adequate te
 Personal injury.
equipment for storage of PPE such as Safety helmet, gloves, engineer/P
 Property damage.
1 preparation of materials. 3 3 9 dust mask, Safety goggles etc. Y 1 3 3 roject
 Lifting failure
Shear wall  Improper PPE.  Ensure Tower crane shall be third engineer/
jumping  Inadequate tools. party certified. Constructio
platforms  Improper cable  All lifting gears shall be third party n Manager
management. certified.
 Adverse weather  Operator and Rigger must have the
condition. valid third party certification,
 Work must be carried out under
continues & Competent supervision

1
CLIENT CONSULTANT
MAIN CONTRACTOR

HEALTHS,SAFETY AND ENVIRONMENTAL RISK ANALYSIS


Title Shear Wall jumping platform

Company: Shapoorji Pallonji Mideast LLC

Site: Park- Heights I,II @ Dubai Hills Page 2 of 06

Ref: SPML /HSE/HIRA/50 Rev: 00 Date: 11-09-2018


1. Hazards and Risk Identifications 2. Risk Evaluations and Controls
Health, Safety Initial Risk
Health, Safety Risks Law / Person in-
Activity Hazards and Rating Residual
Sl.# and Environmental Control Measures Compli charge
Description Environmental Risk Ratings
Impacts L S R ance (P/C)
Aspects

 Non-availability  All work must be performed as per


of approved the approved drawings and as per
drawings. the MSRA
 Inadequate  All workers shall be attend the Pre
materials used for task briefing.
preparation.  Materials used for the shear wall
 Inadequate platform preparation must be free Formwork
Preparation of supervision.  Personal injury. from any cracks, damage etc. supervisor/
Shear Wall  Keeping  Property damage.  All materials must be stacked Site
2. 4 3 12 Y 1 3 3
Jumping unwanted  Lifting failure adequately without obstructing the engineer/C
Platforms. materials on access. onstruction
jumping platform  Brackets using for shear wall Manager.
 Inadequate Lifting platform without any damage
Procedure  Ensure the platform wedges are
fixed properly.
 Edge protection of the share wall
platform as per the recommended
height as per regulation

2
CLIENT CONSULTANT
MAIN CONTRACTOR

HEALTHS,SAFETY AND ENVIRONMENTAL RISK ANALYSIS


Title Shear Wall jumping platform

Company: Shapoorji Pallonji Mideast LLC

Site: Park- Heights I,II @ Dubai Hills Page 3 of 06

Ref: SPML /HSE/HIRA/50 Rev: 00 Date: 11-09-2018


1. Hazards and Risk Identifications 2. Risk Evaluations and Controls
Health, Safety Initial Risk
Health, Safety Risks Law / Person in-
Activity Hazards and Rating Residual
Sl.# and Environmental Control Measures Compli charge
Description Environmental Risk Ratings
Impacts L S R ance (P/C)
Aspects

 Do not keep any materials on the


shear wall platform during lifting
 All platform related works must be
carried out under the competent
supervision from formwork
department.
 Working without  Core wall platforms Foreman/Si
Valid Permit. installation/Jumping must be te
 Working without carried out with Proper supervision. Engineer/C
proper planning.  All workers involving the lifting onstruction
Installation/
 Nearby activity shall be undergo the Pre task Manager
Jumping of  Personal injury.
obstruction. briefing.
shear wall  Property damage
3  Non-availability 4 4 16  Platform erection/jumping works Y 1 4 4
platforms  Fatal accident.
of adequate must be properly planned &
using tower  Heat stress.
riggers. communicated to avoid any persons
crane.
 Poor working near or under the erection
housekeeping. area.
 Loose materials  Nearby obstruction (scaffold
scattered. structure) if any to be dismantled to
3
CLIENT CONSULTANT
MAIN CONTRACTOR

HEALTHS,SAFETY AND ENVIRONMENTAL RISK ANALYSIS


Title Shear Wall jumping platform

Company: Shapoorji Pallonji Mideast LLC

Site: Park- Heights I,II @ Dubai Hills Page 4 of 06

Ref: SPML /HSE/HIRA/50 Rev: 00 Date: 11-09-2018


1. Hazards and Risk Identifications 2. Risk Evaluations and Controls
Health, Safety Initial Risk
Health, Safety Risks Law / Person in-
Activity Hazards and Rating Residual
Sl.# and Environmental Control Measures Compli charge
Description Environmental Risk Ratings
Impacts L S R ance (P/C)
Aspects

 Inadequate avoid any accidental contact with


bolting of cone load.
screw.  All lifting works must be controlled
 Persons working by the respective riggers.
under suspended  All lifting points shall be inspected.
load.  Proper housekeeping to be
 Working during maintained to the platforms before
adverse weather. any lifting/jumping to avoid any fall
 Working without of materials.
FBSH.  Cone screw tightened to the
 Inadequate access clamping screw.
to the platform.  All connection through the concrete
wall for platform shall be ensured
properly.
 Lifting of platforms are not allowed
during windy conditions.
 Proper tag line to be tied to the load
to control the swing

4
CLIENT CONSULTANT
MAIN CONTRACTOR

HEALTHS,SAFETY AND ENVIRONMENTAL RISK ANALYSIS


Title Shear Wall jumping platform

Company: Shapoorji Pallonji Mideast LLC

Site: Park- Heights I,II @ Dubai Hills Page 5 of 06

Ref: SPML /HSE/HIRA/50 Rev: 00 Date: 11-09-2018


1. Hazards and Risk Identifications 2. Risk Evaluations and Controls
Health, Safety Initial Risk
Health, Safety Risks Law / Person in-
Activity Hazards and Rating Residual
Sl.# and Environmental Control Measures Compli charge
Description Environmental Risk Ratings
Impacts L S R ance (P/C)
Aspects

 Adequate access/egress must be


provided to enter the platform
safely.
 All persons must be with adequate
FBSH.
RISK MATRIX
1. Identify Risks – These may include brainstorming, Interacting with workforces, Site visit, systematic process reviews, Process Hazard Analysis and Job Observations
2. Analyse Risks – Determine consequences and likelihood of each risk. Write these items onto the table next to each risk.
Severity Likelihood This risk assessment is prepared based on the following legal requirement from DM Code of
Level Descriptor Level Descriptor Construction Safety Practices.
1 Minor 1 Improbable
2 Appreciable 2 Remote Section 4: Personnel Protective Equipment’s.
3 Serious 3 Occasional Section 8: Scaffolding Safety
4 Major 4 Probable Section 21: Slinging and lifting equipment
5 Catastrophic 5 Frequent Section 22 : Crane

3. Evaluate Risks –Use the grid below to identify the level of risk.
How severely could it How likely is it to be that bad?
- + + + ++

5
CLIENT CONSULTANT
MAIN CONTRACTOR

HEALTHS,SAFETY AND ENVIRONMENTAL RISK ANALYSIS


Title Shear Wall jumping platform

Company: Shapoorji Pallonji Mideast LLC

Site: Park- Heights I,II @ Dubai Hills Page 6 of 06

Ref: SPML /HSE/HIRA/50 Rev: 00 Date: 11-09-2018


1. Hazards and Risk Identifications 2. Risk Evaluations and Controls
Health, Safety Initial Risk
Health, Safety Risks Law / Person in-
Activity Hazards and Rating Residual
Sl.# and Environmental Control Measures Compli charge
Description Environmental Risk Ratings
Impacts L S R ance (P/C)
Aspects

Hurt someone or how will could it make someone? 1-7=Low Unlikely to likely to occur more
Extremely Could possibly Common or repeating
Risk, 8-14= Medium Risk, 15-19= High Risk, 20-25= very high risk occur than once
unlikely to occur or known to occur occurrences
 Minor (Not significant / No lost time) 1 2 3 4 5
Appreciable (First aid require
 2 4 6 8 10
d)
 Serious (medical attention and several days off work) 3 6 9 12 15
 Major (Fatality) 4 8 12 16 20
 Catastrophic (Multiple fatality) 5 10 15 20 25
4. Identify and evaluate existing risk controls – Identify what happens already to manage the risks and consider how well these strategies are working (good, adequate, variable). How does this effect
the level of risk? Fill these items in on the table. If you are not happy with the level of risk at this stage proceed to step 5.
5. Further risk treatments and opportunities for improvement – What actions are needed to bring risks to an acceptable level (these actions are incorporated into other planning processes and include
responsibilities, resources and timelines)? What opportunities are there for improvement? Write these onto the table.
Prepared by: Approved
_____________________________________________ ----------------------------------------------------------------------

Project HSE Manager Project Director