Schedule-C
Declaring Capacity of Petroleum and Petroleum Products and Natural Gas
Pipeline by the Petroleum and Natural Gas Regulatory Board
Date of declaration of capacity by the 03.07.2014
Board: eee
1 Name of Entity Reliance Gas Transportation Infrastructure Limited
RK. Dhadda,
Managing Director ~ RGTIL,
‘Address and Contact details of | Reliance Corporate Park, Building No. 7, A Wing.
2 entity Second Floor, Ghansoli, Navi Mumbai 400701.
Tel: 022 44770000 Fax: 022 44710065
3__|Name of Pipeline East West Pipe Line (EWPL)
Details of injection/entry point
4 |and delivery/exit points and Please refer Annexure-A
sections on the pipeline
Name of the software package
5 lused by the entity [nner
6 Heidoher aia sed tor the Panhandle - B Modified
Product Quality
7 _ |specifications/gas Parameters ee
considered for the purpose of
capacity determination
Maximum achievable capacity
8 _|of the pipeline under steady 85 MMSCMD
state conditions
Section wise maximum
9 achievable capacity of the Please referAnnexure-A
pipeline
Note: The Declared Capacity shall be applicable from 1" Apr'2010 to 31° Mar’ 2011
Secretary|
Gas Regulatory Board|Table — 1; Section-wise Capacity of EWPL
Annexure-Al
ic Delivered
# | Section, ExitPoint | Capacity {Limiting Parametor| Remarks
MMscMD
Tap-offfor Spur | 89.9] i
Inlet to CS-1 at OT] ne to GAIL EG 8.01 Rated RPM | 12 MMECMD faw through)
1a | Section 1 | ad seated ce ‘pur line(C'S-04 Station
o cea ee discharge 93,7 Barg)
Frap-of for Spurtine| (83,1) (S-0F running at ated
ae | section 1 |nletto CS-1 ator] toGAILEG 8-01 Ratod RPM speed
(Gadimoga) Network, 6100
Gadimoga (83.1) (Oduru Flow tteximurn)
FepattorSputne] (68.1 csr anny rae
1c | section + [nletio CS-1 at oT] to GALES goon J CSD1R AARP | Ogu Pow Ni)
(Gacimoga) Network, 6100
‘comma (Station discharge 97.0
Bax
Tap-oft for (23.1) ceae
ng | Inlet to CS-1 at OT [Dedicated Spur tne} O2 im | Pipeline section capacily
2 | Section 2 Saimoga) |W LKPRL, segment maxi vnitation
Chevutuns (89.9) ee
(83.1)
Tap-off for GAIL csor-cso2
3 | sezton a M#t22S-1 = OT LaLa iercomect segment ranimum | Petre section capacty
s Ghotsei fe9.9) | PBeline capacity
Tap-offfor Spur | [83.1] ean
Inlet to CS-1 at OT] line to GSPL Pipeline section capacity
4 | Section 4M Sacimoga) | Network, segment maximum imitation
(Gadimoga) i i
Kanjanhari {90.9 _| Pipeline capacity
163.1]
Tap-off for cso1-cso2
5 | secion | ett2C5-1 807] satin o Has, soginert maximum | Pete secon capacity
oe Velanja tag} | Pete capacity
Tap-off for 163.11 e
«6 | sections |Itletto CS-1 at OT] interconnect to segment mancmum | Pisetine section capacity
(Gadimoga) | GSPL at CS 104, a limitation
Bhadbhut 189.9) _ | Pipeline capacity
Tap-offfor Spur | [83.1]
Inlet to CS-1 at OT] line to GAIL DVPL aoe e imum | Pipeline section capacity
7 | Section 7 segment maximum
(Gadimoga) | network from ee limitation
68108, Bhadbhut | (gag) | PiPeline can
Note: a) [] means the maximum possible gas the section can draw at its inlet end with all en-route tap-off and source points,
being open.
b) {} means the capacity any section can deliver at the end point of the section with all tap-off and source points en-route
being closed.‘COMPOSITION (MOLE %)
NITROGEN.
METHANE
ETHANNE.
N-BUTANE
1SO-BUTANE
I-PENTANE
N-HEXANE_
N-NONANE-
N-DECANE
0.002
0
0
0
Annexure-
PROPANEDeclaring capacity of Petroleum and Petroleum Products and Natural Gas
Schedule-C
eline by the Petroleum and Natural Gas Requl: B
[wate araaclarction of Capaclhy by he |
pens 03.07.2014
Name of Entity Reliance Gas Transportation infrasiruciure Limited
RK, Dhodda,
Address and Contact details of
Entity
Managing Director - RGTIL,
Reliance Corporate Park, Building No. 7, A Wing,
Second Floor, Ghansoli, Navi Mumbai 400701,
Tel: 022 44770000 Fox: 022 44710065
Name of Pipeline
East West Pipe Line (EWPL)
Details of injection/entry point
land delivery/exit points and
sections on the pipeline
Please refer Annexure-A
Name of the software package
lused by the entity
TGNET / SynerGEE
Flow equation used for the
purpose
Panhandle - 8 Modified
Product Quality
specifications/gas Parameters
considered for the purpose of
capacity determination
Please referAnnexure-B
Maximum achievable capacity
lof the pipeline under steady
state conditions
95 MMSCMD
[Section wise maximum.
achievable capacity of the
pipeline
Please refer Annexure-C
Note: The Declared Capacity shall be applicable from 1" Apr'2011 to 31" Mar’ 2012
Secretary
Petroleum and Natural Gas Regulatory Board|Annexure-Al
Details of injection/entry point and delivery/ exit point(s) and section of pipeline
ny Inlet to CS-1 at OT (Gadimaoga)
inimum Pressure avaliable at OT = 72 Bar
LE a Minimum Pressure avaliable at OT= 72 Bare
points: Tale at SHELL, Mora
Minimum Pressure avallable at Mora = 85
earg
B. Details of delivery/ exit points:
i Diameter
iti finch) Length (Ken)
Details of inter:
[Gait DUPL Network interconnact(nihaskel)
[GSPL interconnect from CS 108 (Bhadohut)
[oSPt. interconnect from CS 10k (Bhadbhut)
[GSP incerconnect from CS 108 (Bhaubiat)
JaGt interconnect Shemirpet)
I
[ca Ec nerwork Spurtne (Oaurup Fa Boat
locicated Spur fine for {KPPL (Kondapall) 30. 9.95
[6SPL South Gujarat Spur line (Atakpardl) 30 6.65
[Spur line for Haaira (Hazira} 28 2777
[GAIL DVPL Spur ine (Ankot) 30, 1652Product Quality specifications / Gas Para
meters (Mole 9%)
Shell-Hazira A
Sr no. Tape KG Basin
NITROGEN 0.22 0.2345
CARBON DIOXIDE 0 0.3573
METHANE 93.36 97.6817
ETHANE _ 0.9662
PROPANE 0.0:‘Annexure-C|
Tate = 1 Section wae Capacity of WEL
Dolivered
section | nt Point | cxtpoint | C*P8¢1% | mting Pacamot Remarks
muscu
Topottor Spur | 09) asl
1. | secton 1 fiett2 65-1 stor] Ineto GALES 5.01 Ratea Rpm | "2 MMSCMD tow tous
1m | secion notte CS-tat OT] Ineo Gale Ls spur ine(CS-01 Salon
era ‘Sactorge 037 Bar)
ma STG wT
niet to 5-1 807 65.01 Rated RPM soe
18] Section «1 Gaciogs 8100
a en (Cues Flow Maximum)
CEO ng aa
[raeottorspurine| 6°17 speed
te. |socion 1|iatiocss ator] “ecanes | (631) [csr RateaReM | (Osu Few nip
(Gadeoge) | Nowe e100 pamela
839)
Tapa ter 7 esa
niet to €-1 at OT] Dedieted Spur 801-0502 | pipwine secon capaciy
2 | seston segment maximum
(Gadinegs) | tne LKPPL, bene capacity naan
‘Chevwiurs wo) | ene capa
Topottor GAL | {88.1
5 Vscouons} nies ator] "our S228, | Paine econ inaty
tGrsmomy | tmucomes, | |Seinecnaaty titan
Tosa tar Sar | eT
4 | section line to GSPL. ete um | Pipeline section capacity
CGeamoss) | Theme” | oa, | seine creo imation
ee |e
Tapa or csorcse | y,
5 seton 5 te225- 2121] sputie to Hac, segment irenmam | MOAine ston apacty
Welania eo _| ovine capacty
Tapatior | (68.1
«sectors nite 65-1 at oT] rerimect eafS0-2802 | epetne ston canacty
(Gadimoga) | GSPL at CS 108, pent candi ‘taton
Bhacbrut eahea eeeeeveeeres
Tepotter Sour | (63.11
niet to 68-1 at OT| ine to GAIL DVPL Cs0r-0802 | pipet secon capacity
7 | Section 71 Gadimoge) | network rom segment maxim vtaton
$108, aradehut| yeaa) | Palme capacty
being open,
lncing closes.
[cavacity is vallable inthe part downstream of C5-09.
Note: 0) { means the maximum possible gas the section can drow otis inlet end with all en-route tap-off and source points
lo) ) means the capacity any section con deliver atthe end point ofthe section with al tap-off ond source points en-route
|) The sectional capacities are some forthe period April 2011 to March 2012 as per the earlier period except thot additional