Вы находитесь на странице: 1из 7
Schedule-C Declaring Capacity of Petroleum and Petroleum Products and Natural Gas Pipeline by the Petroleum and Natural Gas Regulatory Board Date of declaration of capacity by the 03.07.2014 Board: eee 1 Name of Entity Reliance Gas Transportation Infrastructure Limited RK. Dhadda, Managing Director ~ RGTIL, ‘Address and Contact details of | Reliance Corporate Park, Building No. 7, A Wing. 2 entity Second Floor, Ghansoli, Navi Mumbai 400701. Tel: 022 44770000 Fax: 022 44710065 3__|Name of Pipeline East West Pipe Line (EWPL) Details of injection/entry point 4 |and delivery/exit points and Please refer Annexure-A sections on the pipeline Name of the software package 5 lused by the entity [nner 6 Heidoher aia sed tor the Panhandle - B Modified Product Quality 7 _ |specifications/gas Parameters ee considered for the purpose of capacity determination Maximum achievable capacity 8 _|of the pipeline under steady 85 MMSCMD state conditions Section wise maximum 9 achievable capacity of the Please referAnnexure-A pipeline Note: The Declared Capacity shall be applicable from 1" Apr'2010 to 31° Mar’ 2011 Secretary| Gas Regulatory Board| Table — 1; Section-wise Capacity of EWPL Annexure-Al ic Delivered # | Section, ExitPoint | Capacity {Limiting Parametor| Remarks MMscMD Tap-offfor Spur | 89.9] i Inlet to CS-1 at OT] ne to GAIL EG 8.01 Rated RPM | 12 MMECMD faw through) 1a | Section 1 | ad seated ce ‘pur line(C'S-04 Station o cea ee discharge 93,7 Barg) Frap-of for Spurtine| (83,1) (S-0F running at ated ae | section 1 |nletto CS-1 ator] toGAILEG 8-01 Ratod RPM speed (Gadimoga) Network, 6100 Gadimoga (83.1) (Oduru Flow tteximurn) FepattorSputne] (68.1 csr anny rae 1c | section + [nletio CS-1 at oT] to GALES goon J CSD1R AARP | Ogu Pow Ni) (Gacimoga) Network, 6100 ‘comma (Station discharge 97.0 Bax Tap-oft for (23.1) ceae ng | Inlet to CS-1 at OT [Dedicated Spur tne} O2 im | Pipeline section capacily 2 | Section 2 Saimoga) |W LKPRL, segment maxi vnitation Chevutuns (89.9) ee (83.1) Tap-off for GAIL csor-cso2 3 | sezton a M#t22S-1 = OT LaLa iercomect segment ranimum | Petre section capacty s Ghotsei fe9.9) | PBeline capacity Tap-offfor Spur | [83.1] ean Inlet to CS-1 at OT] line to GSPL Pipeline section capacity 4 | Section 4M Sacimoga) | Network, segment maximum imitation (Gadimoga) i i Kanjanhari {90.9 _| Pipeline capacity 163.1] Tap-off for cso1-cso2 5 | secion | ett2C5-1 807] satin o Has, soginert maximum | Pete secon capacity oe Velanja tag} | Pete capacity Tap-off for 163.11 e «6 | sections |Itletto CS-1 at OT] interconnect to segment mancmum | Pisetine section capacity (Gadimoga) | GSPL at CS 104, a limitation Bhadbhut 189.9) _ | Pipeline capacity Tap-offfor Spur | [83.1] Inlet to CS-1 at OT] line to GAIL DVPL aoe e imum | Pipeline section capacity 7 | Section 7 segment maximum (Gadimoga) | network from ee limitation 68108, Bhadbhut | (gag) | PiPeline can Note: a) [] means the maximum possible gas the section can draw at its inlet end with all en-route tap-off and source points, being open. b) {} means the capacity any section can deliver at the end point of the section with all tap-off and source points en-route being closed. ‘COMPOSITION (MOLE %) NITROGEN. METHANE ETHANNE. N-BUTANE 1SO-BUTANE I-PENTANE N-HEXANE_ N-NONANE- N-DECANE 0.002 0 0 0 Annexure- PROPANE Declaring capacity of Petroleum and Petroleum Products and Natural Gas Schedule-C eline by the Petroleum and Natural Gas Requl: B [wate araaclarction of Capaclhy by he | pens 03.07.2014 Name of Entity Reliance Gas Transportation infrasiruciure Limited RK, Dhodda, Address and Contact details of Entity Managing Director - RGTIL, Reliance Corporate Park, Building No. 7, A Wing, Second Floor, Ghansoli, Navi Mumbai 400701, Tel: 022 44770000 Fox: 022 44710065 Name of Pipeline East West Pipe Line (EWPL) Details of injection/entry point land delivery/exit points and sections on the pipeline Please refer Annexure-A Name of the software package lused by the entity TGNET / SynerGEE Flow equation used for the purpose Panhandle - 8 Modified Product Quality specifications/gas Parameters considered for the purpose of capacity determination Please referAnnexure-B Maximum achievable capacity lof the pipeline under steady state conditions 95 MMSCMD [Section wise maximum. achievable capacity of the pipeline Please refer Annexure-C Note: The Declared Capacity shall be applicable from 1" Apr'2011 to 31" Mar’ 2012 Secretary Petroleum and Natural Gas Regulatory Board| Annexure-Al Details of injection/entry point and delivery/ exit point(s) and section of pipeline ny Inlet to CS-1 at OT (Gadimaoga) inimum Pressure avaliable at OT = 72 Bar LE a Minimum Pressure avaliable at OT= 72 Bare points: Tale at SHELL, Mora Minimum Pressure avallable at Mora = 85 earg B. Details of delivery/ exit points: i Diameter iti finch) Length (Ken) Details of inter: [Gait DUPL Network interconnact(nihaskel) [GSPL interconnect from CS 108 (Bhadohut) [oSPt. interconnect from CS 10k (Bhadbhut) [GSP incerconnect from CS 108 (Bhaubiat) JaGt interconnect Shemirpet) I [ca Ec nerwork Spurtne (Oaurup Fa Boat locicated Spur fine for {KPPL (Kondapall) 30. 9.95 [6SPL South Gujarat Spur line (Atakpardl) 30 6.65 [Spur line for Haaira (Hazira} 28 2777 [GAIL DVPL Spur ine (Ankot) 30, 1652 Product Quality specifications / Gas Para meters (Mole 9%) Shell-Hazira A Sr no. Tape KG Basin NITROGEN 0.22 0.2345 CARBON DIOXIDE 0 0.3573 METHANE 93.36 97.6817 ETHANE _ 0.9662 PROPANE 0.0: ‘Annexure-C| Tate = 1 Section wae Capacity of WEL Dolivered section | nt Point | cxtpoint | C*P8¢1% | mting Pacamot Remarks muscu Topottor Spur | 09) asl 1. | secton 1 fiett2 65-1 stor] Ineto GALES 5.01 Ratea Rpm | "2 MMSCMD tow tous 1m | secion notte CS-tat OT] Ineo Gale Ls spur ine(CS-01 Salon era ‘Sactorge 037 Bar) ma STG wT niet to 5-1 807 65.01 Rated RPM soe 18] Section «1 Gaciogs 8100 a en (Cues Flow Maximum) CEO ng aa [raeottorspurine| 6°17 speed te. |socion 1|iatiocss ator] “ecanes | (631) [csr RateaReM | (Osu Few nip (Gadeoge) | Nowe e100 pamela 839) Tapa ter 7 esa niet to €-1 at OT] Dedieted Spur 801-0502 | pipwine secon capaciy 2 | seston segment maximum (Gadinegs) | tne LKPPL, bene capacity naan ‘Chevwiurs wo) | ene capa Topottor GAL | {88.1 5 Vscouons} nies ator] "our S228, | Paine econ inaty tGrsmomy | tmucomes, | |Seinecnaaty titan Tosa tar Sar | eT 4 | section line to GSPL. ete um | Pipeline section capacity CGeamoss) | Theme” | oa, | seine creo imation ee |e Tapa or csorcse | y, 5 seton 5 te225- 2121] sputie to Hac, segment irenmam | MOAine ston apacty Welania eo _| ovine capacty Tapatior | (68.1 «sectors nite 65-1 at oT] rerimect eafS0-2802 | epetne ston canacty (Gadimoga) | GSPL at CS 108, pent candi ‘taton Bhacbrut eahea eeeeeveeeres Tepotter Sour | (63.11 niet to 68-1 at OT| ine to GAIL DVPL Cs0r-0802 | pipet secon capacity 7 | Section 71 Gadimoge) | network rom segment maxim vtaton $108, aradehut| yeaa) | Palme capacty being open, lncing closes. [cavacity is vallable inthe part downstream of C5-09. Note: 0) { means the maximum possible gas the section can drow otis inlet end with all en-route tap-off and source points lo) ) means the capacity any section con deliver atthe end point ofthe section with al tap-off ond source points en-route |) The sectional capacities are some forthe period April 2011 to March 2012 as per the earlier period except thot additional

Вам также может понравиться