JASA KONSTRUKSI PEMBANGUNAN TANKI LPG

PRESSURIZED 3 X 3000 MT DI TERMINAL LPG BALONGAN


BERIKUT SARFAS PENDUKUNG
DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 1 of 26

CLIENT : PT PERTAMINA (PERSERO)

CONTRACTOR : PT WIJAYA KARYA (PERSERO)

PROJECT NAME : JASA PEMBANGUNAN TANKI TIMBUN LPG BALONGAN


2 X 3000 MT

LOCATION : BALONGAN

A IFR 13/2/2019 HNR LA / BRM SM


PREP CHECK APPR CHECK APPR
REV. DATE DESCRIPTION
WIKA PT. PERTAMINA (PERSERO)
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG
PRESSURIZED 3 X 3000 MT DI TERMINAL LPG
BALONGAN BERIKUT SARFAS PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 2 of 26**8888****

TABLE OF CONTENTS
Page

1. GENERAL ................................................................................................................. 3
1.1. Scope of Work ...................................................................................................3
1.2. Document Reference ......................................................................................... 3
1.3. Units ..................................................................................................................3
1.4. Major Material ....................................................................................................3
1.5. Basic Design ..................................................................................................... 3
1.6. Parameter ......................................................................................................... 3
1.7. Load Type ......................................................................................................... 4
1.8. Load Combination ............................................................................................. 4

2. DESIGN LOADING .....................................................................................................5


2.1. Erection Load E(E) ............................................................................................ 5
2.2. Operating Load E(O)........................................................................................... 5
2.3. Test Load E(T).................................................................................................... 5
2.4. Wind Load (W).................................................................................................... 5
2.5. Earthquake Load (EQ)......................................................................................... 6

3. FOUNDATION & PILE ARRANGEMENT DESIGN....................................................... 10


3.1. Foundation Dimension ....................................................................................... 10
3.2. Pile Arrangement................................................................................................. 10
3.3. Foundation Weight ............................................................................................ 12
3.4. Overtuning Moment ........................................................................................... 12

4. PILE REACTION CHECK 12


4.1. Load Combination Unfactored ........................................................................... 12
4.2. Pile Reaction....................................................................................................... 13

5. PEDESTAL REINFORCEMENT ..................................................................................14

6. PILECAP REINFORCEMENT ..................................................................................... 18


6.1. Model Design .......................................................................................................18
6.1.1. Maximum Moment Ultimate (Mu) ............................................................ 19
6.2. Reinforcement Design ........................................................................................ 20
6.3. Punching Shear Check ....................................................................................... 21

7. ANCHOR BOLT ......................................................................................................... 22

8. FOUNDATION SETTLEMENT .................................................................................... 25

ATTACHMENTS.......................................................................................................... AA

- ATTACHMENT-1 : PILE GROUP EFFICIENCY CHECK


- ATTACHMENT-2 : LOADING DATA
- ATTACHMENT-3 : TANK FOUNDATION LOCATION
-ATTACHMENT-4 : PILE REACTION
- ATTACHMENT-5 : SOIL & PILE DATA
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG PRESSURIZED 3 X
3000 MT DI TERMINAL LPG BALONGAN BERIKUT SARFAS
PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4
Hal 3 of 26**88999888****
1.0. GENERAL
1.1. Scope of Work
This calculation sheet is purposed to design of Foundation for LPG Tank (T-04/05/06) for "JASA PEMBANGUNAN
TANKI TIMBUN LPG BALONGAN TANK 3 X 3000 MT".

1.2. Document Reference


1. Codes:
- SNI 1726 : 2012 : Tata cara perencanaan ketahanan gempa untuk struktur bangunan
gedung dan non gedung
- ASCE 7-10 : Minimum Design Loads for Building and Other Structures
- ACI 318-14 : Building Code Requirements for Structural Concrete

2. Project Specification
- BLG-ENG-C-BOD-001-W-A4 Rev 1 : Civil and Structural Design Basis
3. Other Document
- S5504-D-03 : Loading Data (Balongan)

1.3. Units
All unit are in SI unit, unless noted otherwise

1.4. Major Materials


1. Concrete
Concrete Grade for Structure, fc' = 275 kg/cm2
Concrete grade for Lean Concrete, fc' = 150 kg/cm2
Unit weight of concrete (γconc.) = 2400 kg/m3
2. Reinforcing Steel Bar :
g of Deformed bar, SNI 07-0052-1997,BJTD40 =
Yield strength = g
4000 kg/cm2
Yield strength of Plain bar, SNI 09-2052-1997, BJTP24 = 2400 kg/cm2
3. Steel Structure
ASTM A-36 or JIS G3101 Grade SS400 Yield strength, fy = 2400 kg/cm2
Unit weight of steel (γs) = 7850 kg/m3
4. Soil & Sand
Unit Weight of Compacted Soil (γs) = 1850 kg/m3
Unit Weight of Sand (γ sand) = 1600 kg/m3

5. Anchor Bolt and Nuts


Bolt ASTM A36 or Equivalent Type C
Allowable Tension Stress, Ft = 0.7 Fy = 1680 kg/cm2
Allowable Shear Stress, Fv = 0.3 Fy = 720 kg/cm2

1.5. Basic Design


The footing foundation is treated as rigid material. The base slab pressure of footing
will act linearly to the ground, and soil pressure is designed to be in compression
condition for the entire base slab area

1.6. Parameter

Pile Foundation Capacity


Reference: Soil Investigation Final Report, BH-01 & 02 Doc. No. BLG-ENG-C-SPE-002-W-A4
Pile material = Spun pile
Quality of concrete = 600 kg/cm2
Spun Pile Dia. = 500 mm
Pile length = 40 m
Single pile net. capacity Spun Pile 500 mm :
Condition Qcomp Qtens Qlat
( kN ) ( kN ) ( kN )
Allowable Capacity :
Permanent 642.50 358.90 179.00
Temporary, incr. 33% 963.70 466.57 232.70

c. Allowable settlement = 25.00 mm


d. Concrete cover for Foundation = 75.00 mm
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG PRESSURIZED 3 X
3000 MT DI TERMINAL LPG BALONGAN BERIKUT SARFAS
PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4
Hal 4 of 26**88999888****

1.7. Load Type


Primary load can be written as :
No Load Title Description Remarks
1 Load 1 D Dead Load Foundation
2 Load 2 EE Empty Load Equip
3 Load 3 EO Operating Load Equipment
4 Load 4 ET Test Load Equipment
5 Load 5 Wx Wind Load X direction
6 Load 6 Wz Wind Load Z direction
7 Load 7 Esx Seismic Load X direction
8 Load 8 Esz Seismic Load Z direction

1.8. Load Combination


A. Foundation Stability Design
- For X-direction and Z-direction are not similar due to asymmetrical shape:
Load Condition Symbol Load Combination Remarks
Empty LC-1 D + EE Permanent
LC-2 D + EE + Wx Temporary
LC-3 D + EE + Wz Temporary
LC-4 D + EE + 0.7 Esx Temporary
LC-5 D + EE + 0.7 Esz Temporary
Operating LC-6 D + EO Permanent
LC-7 D + EO + Wx Temporary
LC-8 D + EO + Wz Temporary
LC-9 D + EO + 0.7 Esx Temporary
LC-10 D + EO + 0.7 Esz Temporary
Test LC-11 D + ET Temporary
LC-12 D + ET + Wx Temporary
LC-13 D + ET + Wz Temporary

B. Concrete Foundation Design


- For X-direction and Z-direction are not similar due to asymmetrical shape:
Load Condition Symbol Load Combination Remarks
Empty LC-21 1.4D+ 1.4EE Permanent
LC-22 1.2D+ 1.2EE + 1.6Wx Temporary
LC-23 1.2D+ 1.2EE + 1.6Wz Temporary
LC-24 1.2D+ 1.2EE + Esx Temporary
LC-25 1.2D+ 1.2EE + Esz Temporary
Operating LC-26 1.4D+ 1.4EO Permanent
LC-27 1.2D+ 1.2EO + 1.6Wx Temporary
LC-28 1.2D+ 1.2EO + 1.6Wz Temporary
LC-29 1.2D+ 1.2EO + Esx Temporary
LC-30 1.2D+ 1.2EO + Esz Temporary
Test LC-31 1.4D+ 1.4ET Temporary
LC-32 1.2D+ 1.2ET + 1.6Wx Temporary
LC-33 1.2D+ 1.2ET + 1.6Wz Temporary
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG PRESSURIZED 3 X
3000 MT DI TERMINAL LPG BALONGAN BERIKUT SARFAS
PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4
Hal 5 of 26**88999888****

2. DESIGN LOADING

Design loading for Tank based on Document from PT. TKI (See attach. 2)
The data taken from Tank load see in below :
2.1. Erection Load : E(E)
T-04/05/06, E(E) 797.00 ton = 797000.00 kg
2.2. Operating Load : E(O)
T-04/05/06, E(O) 3985.00 ton = 3985000.00 kg
2.3. Test Load : E(T)
T-04/05/06, E(T) 7195.00 ton = 7195000.00 kg

Illustrate of Load
W

V ID
H1

C.o.G T-04

El. + 0.700
Hg
Hs

Where:
1. TANK (T-04/05/06)
I.D = 23000.00 mm (I.D = Inside Diameter for Tank )
H1 = 26500.00 mm (H = Tank Height)
C.o.G = 14250.00 mm (C.o.G = Central of Gravity from bottom of base plate to center of Tank height)
hg = 400.00 mm (ht = Height from Tank Bottom to Ground Level)
hs = 700.00 mm (hs = Height from Ground Level to Foundation Bottom)

2.4. Wind Load ( W )


Specification :
Basic wind speed : 25.30 m/s (Ref. 2 Sect 6.10)
Exposure : C
Structure Category : III (Ref. ASCE/SEI 7-10 Table 1.5-1)
Wind Directionaly Factor (Kd) : : 0.95 (Ref. ASCE/SEI 7-10 Table 26.6-1)
Velocity Pressure Exposure Coefficient (Kz) : 1.231 (Ref. ASCE/SEI 7-10 Table 29.3-1)
Using interpolation)
Topographic Factor (Kzt) : 1 (Ref. ASCE/SEI 7-10 Sect 26.8-2)
Importance Factor (I) : 1 (Ref. ASCE/SEI 7-10 Table 1.5-2)
2
Wind Pressure (qz) = 0.613 Kz Kzt Kd V I (Ref. ASCE/SEI 7-10 Sect 27.3-2)
= 0.613 x 1.23 x 1 x 0.95 x 25.3^2 x 1
= 458.86 N/m2
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG PRESSURIZED 3 X
3000 MT DI TERMINAL LPG BALONGAN BERIKUT SARFAS
PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4
Hal 6 of 26**88999888****

Gust Factor (G) = 0.85 (Ref. ASCE/SEI 7-10 Sect. C26.9)


Height Tank (H1) = 26.50 m
Wind Load (W) = qz*G*Cf*Af

D qz^0.5 = 23 x 458.87^0.5
= 492.69
H1/D = 26.5 / 23
= 1.15
Force Coefficient(Cf) = 1.01 (Ref. ASCE/SEI 7-10 Figure 29.5-1)

Projected Area (Af) = Dxh


= 23 x 26.5
2
= 609.50 m

= 458.87 x 0.85 x 1.01 x 609.5


= 1,009.00 kN = 102889.34 kg
Mo Wind = 1009 x 13.25
= 13369.25 kN.m = 1363283.81 kgm
Wind Force Design :

Shear Force (W total) = 102889.34 kg (all Load Condition)


Moment (M1 = Mi.Total) = 1363283.81 kgm (all Load Condition)

2.5. Earthquake Load ( EQ )

Earthquake load is calculated using API 650 Appendix-E


Appendix E.
Earthquake design parameters are provided in Design Specification as follows.

Tank Data :
Tank diameter D= 23.00 m
Tank height H= 26.50 m
Tank shell thickness (Assumed) tu = 18.00 mm

Modulus of Elasticity, E E = 2.00E+05 MPa


Specific Gravity SG = 1.000
3
Mass Density ρ = SG x ρair = 1000.00 kg/m
Seismic Parameters
Site Class E
Seismic Use Group (I, II, or III) (ASCE 7-2010 & API 650) III
Importance Factor, I (API 650- E.3.1) I= 1.25
Determine of Spectral Acceleration Coefficients
Type of tank supporting, Type = Self-Anchored
Force reduction factor for the impulsive mode, Rwi = 3.50 (Table E.4)
Force reduction factor for the convective mode, Rwc = 2.00 (Table E.4)
Design level peak ground acceleration parameter, Sp Sp = 0.302
Spectral response acceleration at short period, 0.2 s SS = 2.5 x SP = 0.76 g
Spectral response acceleration at one period, 1.0 s S1 = 1.25 x SP = 0.38 g
Acceleration-based site coefficient, 0.2 s Fa = 1.19
Velocity-based site coefficient, 1.0 s Fv = 2.40
Scaling factor from the MCE to the design level spectral
accelerations, equal 2/3 for ASCE. Q= 0.67
Spectral response acceleration parameter, 0.2 s SDS = Q x Fa x Ss = 0.60
Spectral response acceleration parameter, 1.0 s SD1 = Q x Fv x S1 = 0.60
Ts = SD1 / SDS = 1.01 Second
To = 0.2 SD1 / SDS = 0.20 Second

Impulsive spectral acceleration parameter, Ai = 0.875 SP x I / Rwi = 0.094 (E.4.6.1-3)


JASA KONSTRUKSI PEMBANGUNAN TANKI LPG PRESSURIZED 3 X
3000 MT DI TERMINAL LPG BALONGAN BERIKUT SARFAS
PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4
Hal 7 of 26**88999888****

Check, Ai > 0.5 S1 ( I/Rw1) Ai > 0.07 Ok


Ai > 0.5 S1 ( I/Rw1) Ok
Convective spectral acceleration parameter, Ac

Convective (sloshing) period,

Ks = 0.58

Natural period of the convective mode of behavior of the liquid Tc = 4.99 Second
Regional-dependent transition period for longer period TL = 3.00 Second
ground motion
Tc > TL
Ac = K x SD1 x (TL/Tc^2 ) x ( I/Rwc ) < Ai

Coefficient to adjust the spectral acceleration, K= 1.50 API 650


Ac = 0.07 < Ai = 0.094 (E.4.6.1-5)

Operating Condition
Determining seismic base shear force and overturning moment :
The seismic base shear force is given by the square root sum of the squares combination impulsive and
convective forces. The seismic base shear force is determined by equation E.6-1/API 650 as follows :

Determine the impulsive water parameters according to clause E.6.1.1 API 650
Wi is the impulsive weight.
D= 23.00 m
H= 26.50 m
D/H= 0.87 less than 1.333 then use eq. E.6.1.1-2

Total weight of the tank contents based on the design specific gravity of the product,Wp

Working capacity for Tank V = 10,806.52 m3


Wp = 1.08E+08 N
Wp = 10,806.52 Ton
Wi = 8,761.85 Ton

Xis, height from the bottom of the tank shell to the center of action of the lateral seismic force related
to the impulsive liquid force for the slab moment,

Xis = 12.34 m

Ai, the impulsive spectral acceleration parameter Ai = 0.301 g


JASA KONSTRUKSI PEMBANGUNAN TANKI LPG PRESSURIZED 3 X
3000 MT DI TERMINAL LPG BALONGAN BERIKUT SARFAS
PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4
Hal 8 of 26**88999888****
Determine the convective water parameters according to clause E.6.1.1-3 API 650

Wc = 2,156.31 Ton

Xcs, height from the bottom of the tank shell to the center of action of the lateral seismic force related
to the convective liquid force for the slab moment,

Xcs = 20.58 m
Ac, the convective spectral acceleration parameter Ac = 0.07 g
The sloshing period, Tc Tc = 4.99 Second

Determine the seismic base shear (horizontal force) :


The impulsive component is determined by eq. E.6.1-2 API 650

Vi = Ai x ( Ws + Wr + Wf + Wi )

The total weight of tank operating condition, Wo Ws = 3,985.00 Ton

Vi = 1,199.49 Ton
The convective component is determined by eq. E.6.1-3 API 650

Vc = Ac x Wc

The effective convective (sloshing) portion of the liquid weight Wc = 2,156.31 Ton
Vc = 147.07 Ton

The seismic base shear is


V= 1,208.47 Ton

Empty Condition
Determining seismic base shear force and overturning moment :
The seismic base shear force is given by the square root sum of the squares combination impulsive and
convective forces. The seismic base shear force is determined by equation E.6-1/API 650 as follows :

Determine the impulsive water parameters according to clause E.6.1.1 API 650
Wi is the impulsive weight.
D= 23.00 m
H= 26.50 m
D/H= 0.87 less than 1.333 then use eq. E.6.1.1-2

Total weight of the tank contents based on the design specific gravity of the product,Wp
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG PRESSURIZED 3 X
3000 MT DI TERMINAL LPG BALONGAN BERIKUT SARFAS
PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4
Hal 9 of 26**88999888****

Working capacity for Tank V = 10,806.52 m3


Wp = 7.97E+06 N
Wp = 797.00 Ton

Wi = 646.20 Ton

Xis, height from the bottom of the tank shell to the center of action of the lateral seismic force related
to the impulsive liquid force for the slab moment,

Xis = 12.34 m

Ai, the impulsive spectral acceleration parameter Ai = 0.301 g

Determine the convective water parameters according to clause E.6.1.1-3 API 650

Wc = 159.03 Ton

g from the bottom of the tank shell to the center of action of the lateral seismic force related
Xcs, height
to the convective liquid force for the slab moment,

Xcs = 20.58 m
Ac, the convective spectral acceleration parameter Ac = 0.07 g
The sloshing period, Tc Tc = 4.99 Second

Determine the seismic base shear (horizontal force) :


The impulsive component is determined by eq. E.6.1-2 API 650
Vi = Ai x ( Ws + Wr + Wf + Wi )

The total weight of tank empty condition, We Ws = 797.00 Ton


Vi = 239.90 Ton

The convective component is determined by eq. E.6.1-3 API 650


Vc = Ac x Wc

The effective convective (sloshing) portion of the liquid weight Wc = 159.03 Ton
Vc = 10.85 Ton

The seismic base shear is


V= 240.14 Ton

Earthquake Load Design at Pilecap :

Shear Force (V1) = V(O) - Pp 1208467.88 kg (Operating Condition)


Moment (M1=V1*C.O.G) = 17220667.32 kgm (Operating Condition)
Shear Force (V2) = V(E) - Pp 240142.09 kg (Empty Condition)
Moment (M1=V2*C.O.G) = 3422024.83 kgm (Empty Condition)
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG
PRESSURIZED 3 X 3000 MT DI TERMINAL LPG BALONGAN
BERIKUT SARFAS PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 10 of 26**88999999999999999999888****

Equipment Weight
Empty Weight E(E) : 797000.00 kg
Operating Weight E(O) : 3985000.00 kg
Hydrostatic Test Weight E(T) : 7195000.00 kg
Wind Load at Base Elev.
Shear Force (H1) : 102889.34 kg ( FOR ALL COND )
Moment (M1) : 1363283.81 kgm ( FOR ALL COND )

Seismic Load at Base Elev.


Shear Force (H1) : 1208467.88 (kg) ( FOR OPERATING COND )
Moment (M1) : 17220667.32 kgm( FOR OPERATING COND )
Shear Force (H2) : 240142.09 (kg) ( FOR EMPTY COND )
Moment (M2) : 3422024.83 kgm ( FOR EMPTY COND )

3. FOUNDATION AND PILE ARRANGEMENT DESIGN


3.1. Foundation Dimension
hpc = 1.10 m (Tank Foundation Height Total)
hg = 0.40 m (ht = Height from Tank Bottom to Ground Level)
hs = 0.70 m (hs = Height from Ground Level to Foundation Top)
hrw = 0.00 m (hrw = Height of Ring Wall)
hpc = 1.10 m (hpc = Height of Pilecap)
D1 = 4.00 m (Pilecap Width)
ID Tanki = 23.00 m (I.D = Tank Inside Diameter )
D2 = 0.00 m (D2 = Ring Wall Outside Diameter )
D3 = 23.20 m (D3 = BCD = Bolt Circle Diameter, Assumed = fixed after Mech. Data)
S1 = 1.50 m (Distance between Center Pile to Pile Circle Diameter)
S2 = 0.50 m (Distance from Center Pile to Foundation Outside)
br = 0.00 m (Ring Wall Width)
D4 = 0.00 m (D4 = Ring Wall Inside Diameter )
D1
D2
D3

ID Tanki
C
L
Y
S2
S1
S1

x 0.00

D4
T.o.C. EL 0.700
300
hg
400
Ground Level +0.000
hpc
hs 700

Pile Arrangement Illustration


3.2. Pile Arrangement
- Pile Diameter : φ = 0.5 m
- Pile Length : L = 40 m
- Distance between PCD, S1 = n x D, = n= 3.00 (2.5~7 φ)
- PCD Amount ( n ) = 3 pcs
- PCD1 = 26.00 m
- Pile Amount to PCD1: (n1) = 45 pcs
- PCD2 = 23.00 m
- Pile Amount to PCD2: (n2) = 45 pcs
- PCD3 = 19.50 m
- Pile Amount to PCD3: (n3) = 30 pcs

- Amount Pile Total (np) = 120 pcs


JASA KONSTRUKSI PEMBANGUNAN TANKI LPG
PRESSURIZED 3 X 3000 MT DI TERMINAL LPG BALONGAN
BERIKUT SARFAS PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 11 of 26**88999999999999999999888****

PCD2
PCD1 PCD3
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG
PRESSURIZED 3 X 3000 MT DI TERMINAL LPG BALONGAN
BERIKUT SARFAS PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 12 of 26**88999999999999999999888****

Check Pile Spacing


Pile
Dist. Pile to Pile in each
Amount Si Mean =
PCD PCD Dia. PCD (Si)
(Ni) (Ni x Si)/ΣN
(m)
(pcs)
PCD 1 26.00 m 45 pcs 1.81 m 3.63 D
PCD 2 23.00 m 45 pcs 1.60 m 3.21 D
1.79 m 3.58 D
PCD 3 19.50 m 30 pcs 2.04 m 4.08 D

Pile Σ 120 pcs

PCD = Pile Circle Diameter


Inertia Polar of Piles Group 2.8

Ip =

= 8204.06 m2

3.3. Foundation Weight (Above Soil)


Unit Weight of Concrete ( γc ) = 2400.00 kg/m3
Unit Weight of Soil (γs) = 1850.00 kg/m3
Unit Weight of Sand (γsand) = 1600.00 kg/m3
2 2
Concrete Weight
g = ((1/4π∗(D
(( )) γ
( -d ))*hpc)+(Lp*Bp*Hp*12))*γc
p ) ( p p p = 787999.62 kg
g
Sand Weight = (1/4π∗D42*hrw*γsand) = 0.00 kg
Soil Weight = (1/4π*(D12-D22)*hs*γs) = 0.00 kg
Total Foundation Weight (Wf) = 787999.62 kg

3.4. Overtuning Moment


3.4.1. Overtuning Moment w/ Wind Load (Mw)
Mo = M + (H x hF) = 1476462.09 kgm (Empty Condition)

3.4.2. Overtuning Moment w/ Seismic Load (Me)


Me1 = M1 + (H1 x hF) = 18549981.99 kgm (Operating Condition)
Me2 = M2 + (H2 x hF) = 3686181.14 kgm (Empty Condition)

3.4.3. Shear & Overturning Moment due to Seismic at Foundation (Mef)


Hef = Vs x Wf = 238964.17 kg (Operating Condition)
Mef =Hef x hf/2 = 131430.30 kgm (Operating Condition)

4. PILE REACTION CHECK


4.1. Load Combination Unfactored
1. Empty Condition D + EE
D + EE + Wx
D + EE + Wz
D + EE + 0.7 Esx
D + EE + 0.7 Esz
2. Operating Condition D + EO
D + EO + Wx
D + EO + Wz
D + EO + 0.7 Esx
D + EO + 0.7 Esz
3. Test Condition D + ET
D + ET + Wx
D + ET + Wz

where : D= Dead Load = Wf


E= Equipment Load
W= Wind Load
EQ = Earthquake Load
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG
PRESSURIZED 3 X 3000 MT DI TERMINAL LPG BALONGAN
BERIKUT SARFAS PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 13 of 26**88999999999999999999888****

Load Combination V H M
(kg) (kg) (kgm)
1. D + EE 1584999.62 0.00 0.00
2. D + EE + Wx 1584999.62 102889.34 1476462.09
3. D + EE + Wz 1584999.62 102889.34 1476462.09
4. D + EE + 0.7 Esx 1584999.62 167274.92 3686181.14
5. D + EE + 0.7 Esz 1584999.62 167274.92 3686181.14
6. D + EO 4772999.62 0.00 0.00
7. D + EO + Wx 4772999.62 102889.34 1476462.09
8. D + EO + Wz 4772999.62 102889.34 1476462.09
9. D + EO + 0.7 Esx 4772999.62 167274.92 18681412.29
10. D + EO + 0.7 Esz 4772999.62 167274.92 18681412.29
11. D + ET 7982999.62 0.00 0.00
12. D + ET + Wx 7982999.62 102889.34 1476462.09
13. D + ET + Wz 7982999.62 102889.34 1476462.09
Note : Vertical Load was included Foundation Weight

4.2. Pile Reaction

Vmax = Vmin =

Hp = H / np

Reference: Soil Investigation Final Report Doc. No. BLG-ENG-C-SPE-002-W-A4


Borehole reference: Average BH-01 & 02, Pile Dia. 500, Length 40 m.

Axial Allowable Force :


- Permanent Condition = 65.52 ton
- Temporary Condition = 98.27 ton

Lateral Allowable Force :


- Permanent Condition = 18.25 ton
- Temporary Condition = 24.28 ton

Allowable Pile Capacity, after pile group efficiency Check (See Attach. 1 for detail) :

Load Pile Reaksi ( kg ) Allowable Pile Capacity (kg) Ratio (act/all)


Combination Vmax Vmin Hmax V(Compression) H(Lateral) NOTE Remark
V H
1. D + EE 13208.33 13208.33 0.00 47761.71 10271.53 0.28 0.00 OK Perm't.
2. D + EE + Wx 15547.90 10868.76 857.41 71638.85 13661.14 0.22 0.06 OK Temp.
3. D + EE + Wz 15547.90 10868.76 857.41 71638.85 13661.14 0.22 0.06 OK Temp.
4. D + EE + 0.7 Esx 19049.38 7367.28 1393.96 71638.85 13661.14 0.27 0.10 OK Temp.
5. D + EE + 0.7 Esz 19049.38 7367.28 1393.96 71638.85 13661.14 0.27 0.10 OK Temp.
6. D + EO 39775.00 39775.00 0.00 47761.71 10271.53 0.83 0.00 OK Perm't.
7. D + EO + Wx 42114.57 37435.42 857.41 71638.85 13661.14 0.59 0.06 OK Temp.
8. D + EO + Wz 42114.57 37435.42 857.41 71638.85 13661.14 0.59 0.06 OK Temp.
9. D + EO + 0.7 Esx 69377.20 10172.79 1393.96 71638.85 13661.14 0.97 0.10 OK Temp.
10. D + EO + 0.7 Esz 69377.20 10172.79 1393.96 71638.85 13661.14 0.97 0.10 OK Temp.
11. D + ET 66525.00 66525.00 0.00 71638.85 13661.14 0.93 0.00 OK Temp.
12. D + ET + Wx 68864.57 64185.42 857.41 71638.85 13661.14 0.96 0.06 OK Temp.
13. D + ET + Wz 68864.57 64185.42 857.41 71638.85 13661.14 0.96 0.06 OK Temp.

Vertical Pile Ratio = Pile Ratio < Allowable ====> OK !


Permanent 0.93 > 1.00 ====> OK !
Temporary 0.97 > 1.00 ====> OK !
Horiz'l Pile Ratio = Pile Ratio < Allowable ====> OK !
Permanent 0.00 < 1.00 ====> OK !
Temporary 0.10 < 1.00 ====> OK !
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG
PRESSURIZED 3 X 3000 MT DI TERMINAL LPG
BALONGAN BERIKUT SARFAS PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 14 of 26**8899
5.0.Pedestal Reinforcement
hp Height of pedestal = 0.30 m
Lp Length of pedestal = 1.70 m
Bp Width of pedestal = 1.70 m
c Concrete cover = 0.05 m
f'c Ultimate strength of concrete = 22.83 Mpa
Fy Yield strength of flexural reinforcement = 392.27 Mpa
Fyv Yield strength for shear reinforcement = 235.36 Mpa
Es Elastic Modulus of steel = 200000.00 MPa
d Effective height of pedestal cross section = 1.63 m
Øs Capacity reduction factor for shear = 0.75 unitless
Øa Capacity for axial reduction factor = 0.65 unitless
Ø Flexural capacity reduction factor = 0.90 unitless
Db Diameter of flexural reinforcement = 22 mm
Øv Diameter of shear reinforcement = 13 mm

Trial Reinforcement Ratio


ρ min Minimum reinforcement ratio
1 % of gross vettical cross section
ρt Trial reinforcement ratio = min. reinf. ratio = 1.00%
2
As(trial) Trial reinforcement area = ρt x bw x d = 0.0281 m
Number of reinforcement = 80 ea
2
As Reinforcement area = 0.0304 m
n min Number of reinforcement in layer 1 = 40 ea
2
As1 Reinforcement Area in layer 1 = 0.015 m
d1 = 1.63 m
n min number of reinforcement in layer 2 = 40 ea
2
As2 Reinforcement Area in layer 1 = 0.015 m
= 1.63 m
Reinf. Layer 1

Lp
Reinf. Layer 2
footing effective thickness = d

Pedestal with two side reinforcement Bp

b = Lp = 1700 mm Ag = 2890000 mm2


h = Bp = 1700 mm
d = 1626 mm
d' = 74 mm Vertical
eu = 0.003 unitless Rebar
Es = 200000 MPa Shear Rebar
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG
PRESSURIZED 3 X 3000 MT DI TERMINAL LPG
BALONGAN BERIKUT SARFAS PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 15 of 26**8899
Bottom steel
n dia As
40 22 15198 mm2
Top steel
n' dia' As' As tot
40 22 15198 mm2 30395

Cover = 50.00 mm
f c' = 22.83 MPa b1 = 0.85
Fy = 392.27 MPa

Maximum Axial Load Capacity


Po = 67992.62 = 0.85 x f'c x b x h + Ast x fy
Øa.Po = 44195.20 = 0.7 x Po
0.8.Øa.Po = 35356.16 = 0.8 x Øa x Po

Balance condition
ab = 835.72
835 72 = eu x Es / ( eu x Es + Fy) x b1 x d
cb = 983.20 = ab/β1
Pb = 27563.94 = 0.85 x f'c x ab x b + ( As - As' ) x Fy
Øa.Pb = 17916.56 = 0.7 x Pb
(0.85*fc'*b*h*(d - 0.5*h)+As' *Fy*( d - d' ))
d" = 776.00 =
(0.85*fc'*b*h+(As+As')*Fy))

eb = 432.14 = d - d'' - 0.5xab


Mb = 21163.68 = 0.85 x f'c x ab x b x eb + as' x (d - d' - d'' )+ as x Fy x d"
Øa.Mb = 14814.58 = 0.7 x Mb
Reverse point
Øa.Pb = 19294.76
0,1fc'Ag = 6596.43 ====> 6596.43 take the smallest
stress checking yield OK
e's = 0.00277 = eu x (cb - d') / cb
ey = 0.00196 = Fy / Es

ØMn in Moment absolute condition


0 = 0.85 x fc' x a x b + ( As' x 600 x (a - β1 x d')) / a - As x Fy
32982.13 3157058.24 -5.74E+08
a = 92.43
fs' = 191.68 = 600 x (a- f'c x d') / a
Mo = 9336.96 = (0.85 x fc' x a x b x (d - d" - 0.5x a) + As' x fs' x (d - d' - d") +
As x Fy x d"
ØMo = 8403.26 = 0.9 x Mo
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG
PRESSURIZED 3 X 3000 MT DI TERMINAL LPG
BALONGAN BERIKUT SARFAS PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 16 of 26**8899
Chart data
Unreduced Pedestal Capacity (Mn Vs Pn)

moment axial
0 67992.62
21163.68 27563.94
9336.96 0

Reduced Pedestal Capacity (ØMn Vs ØPn)


moment axial
0 44195.20
14814.58 17916.56
9288.91 6596.425
8403.26 0

Axial limit
0.0 35356.2
4983.0 35356.2

Hx
Node Combination
(kN)
MAX 11851.02 horizontal force value for
pedestal design

50000
45000 44195.20
40000
35000
30000
25000
20000
17916.56
Pn (kN)

15000
10000
5000 6596.425
0 0
0 2000 4000 6000 8000 10000 12000 14000 16000
Mn (kN.m)
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG
PRESSURIZED 3 X 3000 MT DI TERMINAL LPG
BALONGAN BERIKUT SARFAS PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 17 of 26**8899

Hor. Force = 11851.02 kN ( due to earthquake load )


hp = 0.30 m
Moment = 3555.31 kN.m ==> Mu
Axial = 290.46 kN ==> Pu
Pedestal condition OK ! by inspection of interaction diagram
Use : 80 D 22
Hor. Force

Hor.x
Mu
hpedestal

hf

Lf

Bp Pedestal width = 1.70 m


Vu Ultimate shear forces = 11851.02 kN
Leg of shear reinforcement = 2
bar diameter = 13 mm
area section of shear reinforcement ( Av ) = 265.46 mm2
Ø Shear capacity reduction factor = 0.75
Nu fc '
Vc = (1 + ) * bw * d
14 Ag 6 = 2216.82 kN
Dimension requirement
Vu<0.5 *Øs*Vc No reinforcement required
0,5*Øs*Vc<Vu<Øs*Vc use minimum reinforcement
(Vu - Øs*Vc )< 0.67*bw*d*√fc' pedestal dimension ok, if not, dimension need to be made
larger
0.5 ØsVc Vu ØsVc
831.31 < 11851.02 ==> need reinforcement
will use min. shear reiforcement

s max = 200 mm the least among 0.5 d or 200


Av,min /s = 75/1200 * √fc' * B/fyv
= 75/1200 * √22.825 * 1700/235.3596
Av,min /s = 2.16 mm
if use:
s = 100 mm
Av,min /s = 215.7 mm2 < Av.
Use 2 leg D13-100 mm shear reinforcement.
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG PRESSURIZED
3 X 3000 MT DI TERMINAL LPG BALONGAN BERIKUT SARFAS
PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 18 of 26**8nnn7777789

6. PILECAP REINFORCEMENT
1. Empty Condition : 1.4D+ 1.4EE
1.2D+ 1.2EE + 1.6Wx
1.2D+ 1.2EE + 1.6Wz
1.2D+ 1.2EE + Esx
1.2D+ 1.2EE + Esz
2. Operating Condition : 1.4D+ 1.4EO
1.2D+ 1.2EO + 1.6Wx
1.2D+ 1.2EO + 1.6Wz
1.2D+ 1.2EO + Esx
1.2D+ 1.2EO + Esz
3. Test Condition : 1.4D+ 1.4ET
1.2D+ 1.2ET + 1.6Wx
1.2D+ 1.2ET + 1.6Wz

V H M
Kombinasi Pembebanan
(kg) (kg) (kgm)
1. 1.4D+ 1.4EE 2218999.47 0.00 0.00
2. 1.2D+ 1.2EE + 1.6Wx 1901999.55 164622.95 1476462.09
3. 1.2D+ 1.2EE + 1.6Wz 1901999.55 164622.95 1476462.09
4. 1.2D+ 1.2EE + Esx 1901999.55 238964.17 3686181.14
5. 1.2D+ 1.2EE + Esz 1901999.55 238964.17 3686181.14
6. 1.4D+ 1.4EO 6682199.47 0.00 0.00
7. 1.2D+ 1.2EO + 1.6Wx 5727599.55 164622.95 1476462.09
8. 1.2D+ 1.2EO + 1.6Wz 5727599.55 164622.95 1476462.09
9. 1.2D+ 1.2EO + Esx 5727599.55 238964.17 18549981.99
10. 1.2D+ 1.2EO + Esz 5727599.55 238964.17 18549981.99
11. 1.4D+ 1.4ET 11176199.47 0.00 0.00
12. 1.2D+ 1.2ET + 1.6Wx 9579599.55 164622.95 1476462.09
13. 1.2D+ 1.2ET + 1.6Wz 9579599.55 164622.95 1476462.09

6.1. Model Design


Strip 1 m wide is adopted to calculate reinforcement requirement for the concrete slab in which
the strip is assumed as continuous beam by fixed support.
Y

X b = 1.0 m

b = 1.0 m
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG PRESSURIZED
3 X 3000 MT DI TERMINAL LPG BALONGAN BERIKUT SARFAS
PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 19 of 26**8nnn7777789

6.1.1 Maximum Moment Ultimate (Mu)


q

c c c c c c c c c c

a 1st PCD a

D1

Where :
a = S2 = 0.50 m ( Distance Center of Pile to Foundation Outside)
c = max S1 = 2.04 m ( Maximum distance Center Pile to Pile )
1st PCD = 26.00 m ( Distance Pile Circle Diameter Outside)
D1 = 4.00 m ( Foundation Width )
hpc = 1.10 m ( Pile Cap Thickness)
Area Load = 254.35 m2

q pile cap = b * Hpc * γc = 2640.00 kg/m


q ring wall = b * Brw * hrw*γc * 2 / D1 = 0.00 kg/m
q sand = b * Hrw * γsand = 0 00
0.00 kg/m
q Tank = b * H1 * γwater = 17666.67 kg/m
q total = 20306.67 kg/m
q factored = 1.4 x q total = 28429.33 kg/m
q (Test Condition) = 43940.84 kg/m
Mu + = 1/8 * q factored * c^2 = 22820.06 kg.m

The result of Pile Cap based on the two way plate formula
(Based on ACI 318-2014)
ly = 2.04 m
lx = 2.04 m lx2 = 4.15
ly / lx = 1.00
lx

ly

Loading : qu factored = 1.4 x (q total / b) = 28429.33 kg/m2

(M Interior negative) = 0.70


(M positif) = 0.57
(M Exterior negative) = 0.16

(M Interior negative) = (-0.7 x 28429.33 x 4.15)/8 = -10335.06 kgm


(M positif) = (0.57 x 28429.33 x 4.15)/8 = 8415.69 kgm
(M Exterior negative) = (-0.16 x 28429.33 x 4.15)/8 = -2362.30 kgm
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG PRESSURIZED
3 X 3000 MT DI TERMINAL LPG BALONGAN BERIKUT SARFAS
PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 20 of 26**8nnn7777789

6.2. Reinforcement Design


fc' = 275 kg/cm2
fy = 4000 kg/cm2
c= 75 mm (Concrete Cover)
d = 1025 mm
hf = 1100 mm
b = 1000 mm
β1 = 0.85

Mu (based on Staad Pro) = 597 547


597.547 kN m
kN.m = 60932 82 kg.m
60932.82 kg m

Mu Max = 60932.82 kg.m


m = fy / (0.85 x fc') = 17.11
Rn = Mu / (0.9 x b x deff2) = 6.44 (kg/cm2)
ρb = ((0.85 x β1 x fc')/fy) x (6120/(6120+fy)) (for kg/cm2)
ρ max = 0.75 ρb
ρ max = 0.75 x 0.85 x β1 x fc' / fy x (6120/(6120 + fy))
= 0.0225 (for footing)
ρ req = {1 -(1 - 2 x m x Rn / fy)0.5} / m = 0.001634
ρmin = (ACI 318 Sect. 7.12.2.1) = 0.00180
ρprovided = = 0.00180
Asreq = ρprovided x d x b = 18.45 cm2
Asmin = ρmin x b x d = 18.45 cm2
Use D = 19 mm - 150 mm c/c
As provided = 21.74 cm2
Asmax = ρmax x b x d = 230.92 cm2
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG PRESSURIZED
3 X 3000 MT DI TERMINAL LPG BALONGAN BERIKUT SARFAS
PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 21 of 26**8nnn7777789

6.3 Punching Shear Check

Rebar Dia. 19 - 150


PLL fc' = 275.00 kg/cm2

t = 1.10 m

Bx = 2.72 m cover = 0.075 m

By = 2.72 m

HS = 110.00 cm
c = 7.50 cm = concrete cover

Vu = Pu max = 599583.33 kg
bo = 2 x (Bx + By) = 10862 00
10862.00 mm
d = 1015.5 mm (for Slab)
Vc = 0.53 * bo * d * √fc' ( ACI 318 Sect.11.3)
Vc = 969464.57 kg
φ = 0.75 ( ACI 318 Sect.9.3.2.3)
φVc = 727098.43 kg
Check : Vu < φVc ===> OK -----> Use minimum shear reinforcement D13 - 200
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG PRESSURIZED
3 X 3000 MT DI TERMINAL LPG BALONGAN BERIKUT SARFAS
PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 22 of 26**8nnn7777789

7. ANCHOR BOLT
(Based on As Built Drawing from PT. TKI Doc. No. Q17-5504A-02)

Bolt Perimeter = 4.89 m

Use: Anchor Bolt ASTM A370


db = 2 1/4 in
= 58.00 mm
Ab = 2642.08 mm2
Ft = 119.97 MPa
Fv = 70.61 MPa
Fy = 235.36 MPa
n bolts = 4 ea
min distance to edge (E) = 200 mm
min bolt pitch (F) = 171 mm
min bolt embedment (Le) = 1280 mm

Zp bolt = (n / 2) x 1.223
Zp bolt = 2 x1.223
= 2.45 m
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG PRESSURIZED
3 X 3000 MT DI TERMINAL LPG BALONGAN BERIKUT SARFAS
PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 23 of 26**8nnn7777789

Unfactored Load
Load Axial Horizontal Overturning
Condition Combination Force (P) Force (H) Moment (M)
( kg ) ( kg ) ( kg.m )
Permanent 1. D + EE 132083.30 0.00 0.00
Temporary 2. D + EE + Wx 132083.30 8574.11 123038.51
Temporary 3. D + EE + Wz 132083.30 8574.11 123038.51
Temporary 4. D + EE + 0.7 Esx 132083.30 13939.58 307181.76
Temporary 5. D + EE + 0.7 Esz 132083.30 13939.58 307181.76
Permanent 6. D + EO 397749.97 0.00 0.00
Temporary 7. D + EO + Wx 397749.97 8574.11 123038.51
Temporary 8. D + EO + Wz 397749.97 8574.11 123038.51
Temporary 9. D + EO + 0.7 Esx 397749.97 13939.58 1556784.36
Temporary 10. D + EO + 0.7 Esz 397749.97 13939.58 1556784.36
Permanent 11. D + ET 665249.97 0.00 0.00
Temporary 12. D + ET + Wx 665249.97 8574.11 123038.51
Temporary 13. D + ET + Wz 665249.97 8574.11 123038.51

Maximum Unfactored Forces Applied to Single Anchor Bolt:


Condition Load P/n H/n
Combination ( kg ) ( kg )
Permanent 1 D + EE
1. 33020 83
33020.83 0 00
0.00
Temporary 2. D + EE + Wx 25400.63 1648.87
Temporary 3. D + EE + Wz 25400.63 1648.87
Temporary 4. D + EE + 0.7 Esx 25400.63 2680.69
Temporary 5. D + EE + 0.7 Esz 25400.63 2680.69
Permanent 6. D + EO 99437.49 0.00
Temporary 7. D + EO + Wx 76490.38 1648.87
Temporary 8. D + EO + Wz 76490.38 1648.87
Temporary 9. D + EO + 0.7 Esx 76490.38 2680.69
Temporary 10. D + EO + 0.7 Esz 76490.38 2680.69
Permanent 11. D + ET 166312.49 0.00
Temporary 12. D + ET + Wx 127932.69 1648.87
Temporary 13. D + ET + Wz 127932.69 1648.87
To simplify direct comparison between bolt maximum forces and bolt capacity, maximum
forces in temporary condition shall be divided by 1.3

H/n max = 2680.69 kg


Bolt Shear Strength = 17845.03 kg
Shear SF = 6.66 > 1….. OK
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG PRESSURIZED
3 X 3000 MT DI TERMINAL LPG BALONGAN BERIKUT SARFAS
PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 24 of 26**8nnn7777789

Bolt shear and tension combination for A307:


Ft allowable Tension = 1680.00 ( kg/cm2 )
fv = H/(n x Abolt)
Tall = Ft allowable
Condition Load fv Tall T Remark
Combination ( kg/cm2 ) ( kg ) ( kg )
Permanent 1. D + EE 0.00 44386.93 0.00 OK
Temporary 2. D + EE + Wx 62.41 44386.93 50301.92 No Tension - OK
Temporary 3. D + EE + Wz 62.41 44386.93 50301.92 No Tension - OK
Temporary 4. D + EE + 0.7 Esx 101.46 44386.93 125585.35 No Tension - OK
Temporary 5. D + EE + 0.7 Esz 101.46 44386.93 125585.35 No Tension - OK
Permanent 6. D + EO 0.00 44386.93 0.00 OK
Temporary 7. D + EO + Wx 62.41 44386.93 50301.92 No Tension - OK
Temporary 8. D + EO + Wz 62.41 44386.93 50301.92 No Tension - OK
Temporary 9. D + EO + 0.7 Esx 101.46 44386.93 636461.31 No Tension - OK
Temporary 10. D + EO + 0.7 Esz 101.46 44386.93 636461.31 No Tension - OK
Permanent 11. D + ET 0.00 44386.93 0.00 OK
Temporary 12. D + ET + Wx 62.41 44386.93 50301.92 No Tension - OK
Temporary 13. D + ET + Wz 62.41 44386.93 50301.92 No Tension - OK

Minimum Pedestal Diameter = BCD1 + 2E


= 5.292
5 292 m < 6 80 m
6.80 (ok)

Nab Qty of anchor bolt 4 ea


Tmax Maximum Tension force in each bolt - kg
Tab Anchor bolt system allowable tension 34466.40 kg
Check Tmax < Tab ....OK

Vmax Maximum shear force in each bolt 2680.69 kg


Vab Anchor bolt allowable shear 19022.97 kg
Check Vmax < Vab ....OK
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG PRESSURIZED
3 X 3000 MT DI TERMINAL LPG BALONGAN BERIKUT SARFAS
PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 25 of 26**8nnn7777789

8. Foundation Settlement
The settlement of pile group with average depth of 10 m was analyzed using elastic half-space theory proposed
by Timoshenko and Goodier (1951) and Poulos and Davis (1980) as shown below. Imaginary raft at the depth of
2/3 the length of pile was assumed with load spreading of 4v : 1h. The settlement were estimated below.

1
4
p

Figure B.11.1 Scheme of load distribution

Check Settlement
where,
Vu Maximum Load 680.36 kN (sect 4.2)
Lp Length of pile 40.0 m
B Raft = (4 - (2 x 0.5))+(2 x 40 x 2/3 x 1/4) = 16.33 m
Ar Area of Imaginary raft = 209.53 m2
p Load per unit area
p = V/Ar = 3.25 kPa
µ Poisson ratio (Bowles Table 2-7) = 0.3
Es Modulus Elastic, Sand Loose (Soil Invest. Report) 8333.33 kPa
Ip Influence Factor = 0.88

Si Elastic Settlement,

1− μ2 Si = 0.0051 m
S i = p.B. Ip
Es 5.10 mm < 25.40mm OK
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG PRESSURIZED
3 X 3000 MT DI TERMINAL LPG BALONGAN BERIKUT SARFAS
PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4 Hal 26 of 26**8nnn7777789
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG
PRESSURIZED 3 X 3000 MT DI TERMINAL LPG BALONGAN
BERIKUT SARFAS PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4

ATTACHMENT - 1

PILE GROUP EFFICIENCY CHECK


ATTACHMENT-1 :

PILE GROUP EFFICIENCY CHECK

1. In Prakash Book, Pile Group Effect are occurs for Vertical Load :

3.00 D = 0.70 (Reduction for Pile Group Effect)


4.00 D = 0.75 (Reduction for Pile Group Effect)

Using Interpolation (Mean Spacing) :


3.58 D = 0.73 (Reduction for Pile Group Effect)

2. Pile Group Effect are occurs for Lateral Load :

S = 1.81 m
B = 0.50 m

3 < S/B < 4


3 < 3.63 < 4

Reduction for Pile Group Effect = 0.56

Page 1 of 1
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG
PRESSURIZED 3 X 3000 MT DI TERMINAL LPG BALONGAN
BERIKUT SARFAS PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4

ATTACHMENT - 2

LOADING DATA
ATTACHMENT-2 :

Page 1 of 1
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG
PRESSURIZED 3 X 3000 MT DI TERMINAL LPG BALONGAN
BERIKUT SARFAS PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4

ATTACHMENT - 3

TANK FOUNDATION LOCATION


ATTACHMENT-3 :

LPG TANK (T-04/05/06)


FOUNDATION LOCATION

Page 1 of 1
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG
PRESSURIZED 3 X 3000 MT DI TERMINAL LPG
BALONGAN BERIKUT SARFAS PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4

ATTACHMENT - 4

PILE REACTION
ATTACHMENT-4 :

Radius of Pile Coord. of pile P I L E R E A C T I O N ( kg )


pile circle αo No. X Y x y LOADING COMBINATION
(m) (m) (m) cos sin 1 2 3 4 5 6 7 8 9 10 11 12 13
13.00 8 1 13.00 0 13.00 0.00 13208.33 15547.90 15547.90 19049.38 19049.38 39775.00 42114.57 42114.57 69377.20 69377.20 66525.00 68864.57 68864.57
2 12.87 1.8 12.87 1.80 13208.33 15524.51 15524.51 18990.97 18990.97 39775.00 42091.17 42091.17 69081.18 69081.18 66525.00 68841.17 68841.17
PCD-1 3 12.49 3.58 12.49 3.58 13208.33 15456.12 15456.12 18820.23 18820.23 39775.00 42022.79 42022.79 68215.89 68215.89 66525.00 68772.79 68772.79
4 11.87 5.28 11.87 5.28 13208.33 15344.54 15344.54 18541.66 18541.66 39775.00 41911.21 41911.21 66804.09 66804.09 66525.00 68661.21 68661.21
5 11.02 6.89 11.02 6.89 13208.33 15191.57 15191.57 18159.74 18159.74 39775.00 41758.24 41758.24 64868.56 64868.56 66525.00 68508.24 68508.24
6 10 8.35 9.95 8.35 13208.33 14999.00 14999.00 17678.98 17678.98 39775.00 41565.67 41565.67 62432.07 62432.07 66525.00 68315.67 68315.67
7 8.69 9.66 8.69 9.66 13208.33 14772.25 14772.25 17112.85 17112.85 39775.00 41338.91 41338.91 59562.93 59562.93 66525.00 68088.91 68088.91
8 7.26 10.78 7.26 10.78 13208.33 14514.89 14514.89 16470.33 16470.33 39775.00 41081.56 41081.56 56306.69 56306.69 66525.00 67831.56 67831.56
9 5.69 11.68 5.69 11.68 13208.33 14232.34 14232.34 15764.91 15764.91 39775.00 40799.01 40799.01 52731.66 52731.66 66525.00 67549.01 67549.01
10 4.01 12.36 4.01 12.36 13208.33 13930.00 13930.00 15010.07 15010.07 39775.00 40496.67 40496.67 48906.14 48906.14 66525.00 67246.67 67246.67
11 2.25 12.8 2.25 12.80 13208.33 13613.26 13613.26 14219.28 14219.28 39775.00 40179.92 40179.92 44898.46 44898.46 66525.00 66929.92 66929.92
12 0.44 12.99 0.44 12.99 13208.33 13287.52 13287.52 13406.03 13406.03 39775.00 39854.18 39854.18 40776.92 40776.92 66525.00 66604.18 66604.18
13 -1.36 12.92 -1.36 12.92 13208.33 12963.57 12963.57 12597.27 12597.27 39775.00 39530.24 39530.24 36678.15 36678.15 66525.00 66280.24 66280.24
14 -3.15 12.61 -3.15 12.61 13208.33 12641.43 12641.43 11793.00 11793.00 39775.00 39208.10 39208.10 32602.15 32602.15 66525.00 65958.10 65958.10
15 -4.87 12.04 -4.87 12.04 13208.33 12331.89 12331.89 11020.18 11020.18 39775.00 38898.56 38898.56 28685.55 28685.55 66525.00 65648.56 65648.56
16 -6.5 11.25 -6.50 11.25 13208.33 12038.54 12038.54 10287.80 10287.80 39775.00 38605.21 38605.21 24973.89 24973.89 66525.00 65355.21 65355.21
17 -8.01 10.23 -8.01 10.23 13208.33 11766.79 11766.79 9609.34 9609.34 39775.00 38333.46 38333.46 21535.48 21535.48 66525.00 65083.46 65083.46
18 -9.36 9.02 -9.36 9.02 13208.33 11523.84 11523.84 9002.77 9002.77 39775.00 38090.50 38090.50 18461.41 18461.41 66525.00 64840.50 64840.50
19 -10.52 7.63 -10.52 7.63 13208.33 11315.08 11315.08 8481.57 8481.57 39775.00 37881.74 37881.74 15819.98 15819.98 66525.00 64631.74 64631.74
20 -11.48 6.09 -11.48 6.09 13208.33 11142.31 11142.31 8050.23 8050.23 39775.00 37708.97 37708.97 13633.97 13633.97 66525.00 64458.97 64458.97
21 -12.22 4.43 -12.22 4.43 13208.33 11009.13 11009.13 7717.74 7717.74 39775.00 37575.80 37575.80 11948.92 11948.92 66525.00 64325.80 64325.80
22 -12.71 2.68 -12.71 2.68 13208.33 10920.95 10920.95 7497.58 7497.58 39775.00 37487.61 37487.61 10833.15 10833.15 66525.00 64237.61 64237.61
23 -12.96 0.89 -12.96 0.89 13208.33 10875.96 10875.96 7385.25 7385.25 39775.00 37442.62 37442.62 10263.87 10263.87 66525.00 64192.62 64192.62
24 -12.96 -0.92 -12.96 -0.92 13208.33 10875.96 10875.96 7385.25 7385.25 39775.00 37442.62 37442.62 10263.87 10263.87 66525.00 64192.62 64192.62
25 -12.71 -2.72 -12.71 -2.72 13208.33 10920.95 10920.95 7497.58 7497.58 39775.00 37487.61 37487.61 10833.15 10833.15 66525.00 64237.61 64237.61
26 -12.2 -4.46 -12.20 -4.46 13208.33 11012.73 11012.73 7726.73 7726.73 39775.00 37579.40 37579.40 11994.46 11994.46 66525.00 64329.40 64329.40
27 -11.46 -6.11 -11.46 -6.11 13208.33 11145.91 11145.91 8059.22 8059.22 39775.00 37712.57 37712.57 13679.51 13679.51 66525.00 64462.57 64462.57
28 -10.5 -7.65 -10.50 -7.65 13208.33 11318.67 11318.67 8490.56 8490.56 39775.00 37885.34 37885.34 15865.52 15865.52 66525.00 64635.34 64635.34
29 -9.33 -9.04 -9.33 -9.04 13208.33 11529.24 11529.24 9016.25 9016.25 39775.00 38095.90 38095.90 18529.72 18529.72 66525.00 64845.90 64845.90
30 -7.98 -10.25 -7.98 -10.25 13208.33 11772.19 11772.19 9622.82 9622.82 39775.00 38338.86 38338.86 21603.80 21603.80 66525.00 65088.86 65088.86
31 -6.48 -11.26 -6.48 -11.26 13208.33 12042.14 12042.14 10296.79 10296.79 39775.00 38608.81 38608.81 25019.44 25019.44 66525.00 65358.81 65358.81
32 -4.84 -12.06 -4.84 -12.06 13208.33 12337.29 12337.29 11033.66 11033.66 39775.00 38903.96 38903.96 28753.87 28753.87 66525.00 65653.96 65653.96
33 -3.12 -12.61 -3.12 -12.61 13208.33 12646.83 12646.83 11806.48 11806.48 39775.00 39213.50 39213.50 32670.47 32670.47 66525.00 65963.50 65963.50
34 -1.33 -12.93 -1.33 -12.93 13208.33 12968.97 12968.97 12610.75 12610.75 39775.00 39535.64 39535.64 36746.46 36746.46 66525.00 66285.64 66285.64
35 0.47 -12.99 0.47 -12.99 13208.33 13292.91 13292.91 13419.51 13419.51 39775.00 39859.58 39859.58 40845.23 40845.23 66525.00 66609.58 66609.58
36 2.28 -12.79 2.28 -12.79 13208.33 13618.66 13618.66 14232.76 14232.76 39775.00 40185.32 40185.32 44966.77 44966.77 66525.00 66935.32 66935.32
37 4.04 -12.35 4.04 -12.35 13208.33 13935.40 13935.40 15023.55 15023.55 39775.00 40502.06 40502.06 48974.45 48974.45 66525.00 67252.06 67252.06
38 5.72 -11.67 5.72 -11.67 13208.33 14237.74 14237.74 15778.39 15778.39 39775.00 40804.41 40804.41 52799.97 52799.97 66525.00 67554.41 67554.41

Page 1 of 3
39 7.29 -10.76 7.29 -10.76 13208.33 14520.29 14520.29 16483.81 16483.81 39775.00 41086.96 41086.96 56375.00 56375.00 66525.00 67836.96 67836.96
40 8.71 -9.64 8.71 -9.64 13208.33 14775.84 14775.84 17121.83 17121.83 39775.00 41342.51 41342.51 59608.48 59608.48 66525.00 68092.51 68092.51
41 9.97 -8.33 9.97 -8.33 13208.33 15002.60 15002.60 17687.97 17687.97 39775.00 41569.27 41569.27 62477.61 62477.61 66525.00 68319.27 68319.27
42 11.04 -6.86 11.04 -6.86 13208.33 15195.17 15195.17 18168.73 18168.73 39775.00 41761.83 41761.83 64914.10 64914.10 66525.00 68511.83 68511.83
43 11.88 -5.25 11.88 -5.25 13208.33 15346.34 15346.34 18546.15 18546.15 39775.00 41913.01 41913.01 66826.86 66826.86 66525.00 68663.01 68663.01
44 12.5 -3.55 12.50 -3.55 13208.33 15457.92 15457.92 18824.73 18824.73 39775.00 42024.59 42024.59 68238.66 68238.66 66525.00 68774.59 68774.59
45 12.87 -1.77 12.87 -1.77 13208.33 15524.51 15524.51 18990.97 18990.97 39775.00 42091.17 42091.17 69081.18 69081.18 66525.00 68841.17 68841.17
11.5 8 1 11.5 0 11.50 0.00 13208.33 15277.95 15277.95 18375.41 18375.41 39775.00 41844.62 41844.62 65961.56 65961.56 66525.00 68594.62 68594.62
2 11.38 1.6 11.38 1.60 13208.33 15256.36 15256.36 18321.50 18321.50 39775.00 41823.02 41823.02 65688.31 65688.31 66525.00 68573.02 68573.02
PCD-2 3 11.05 3.17 11.05 3.17 13208.33 15196.97 15196.97 18173.22 18173.22 39775.00 41763.63 41763.63 64936.87 64936.87 66525.00 68513.63 68513.63
4 10.5 4.67 10.50 4.67 13208.33 15097.99 15097.99 17926.10 17926.10 39775.00 41664.65 41664.65 63684.47 63684.47 66525.00 68414.65 68414.65
5 9.75 6.09 9.75 6.09 13208.33 14963.01 14963.01 17589.12 17589.12 39775.00 41529.68 41529.68 61976.65 61976.65 66525.00 68279.68 68279.68
6 8.8 7.39 8.80 7.39 13208.33 14792.04 14792.04 17162.27 17162.27 39775.00 41358.71 41358.71 59813.41 59813.41 66525.00 68108.71 68108.71
7 7.69 8.54 7.69 8.54 13208.33 14592.28 14592.28 16663.54 16663.54 39775.00 41158.94 41158.94 57285.84 57285.84 66525.00 67908.94 67908.94
8 6.42 9.53 6.42 9.53 13208.33 14363.72 14363.72 16092.91 16092.91 39775.00 40930.39 40930.39 54393.93 54393.93 66525.00 67680.39 67680.39
9 5.03 10.33 5.03 10.33 13208.33 14113.57 14113.57 15468.37 15468.37 39775.00 40680.23 40680.23 51228.77 51228.77 66525.00 67430.23 67430.23
10 3.54 10.93 3.54 10.93 13208.33 13845.41 13845.41 14798.89 14798.89 39775.00 40412.08 40412.08 47835.91 47835.91 66525.00 67162.08 67162.08
11 1.99 11.32 1.99 11.32 13208.33 13566.46 13566.46 14102.46 14102.46 39775.00 40133.13 40133.13 44306.41 44306.41 66525.00 66883.13 66883.13
12 0.39 11.49 0.39 11.49 13208.33 13278.52 13278.52 13383.56 13383.56 39775.00 39845.18 39845.18 40663.06 40663.06 66525.00 66595.18 66595.18
13 -1.2 11.43 -1.20 11.43 13208.33 12992.37 12992.37 12669.16 12669.16 39775.00 39559.04 39559.04 37042.49 37042.49 66525.00 66309.04 66309.04
14 -2.79 11.15 -2.79 11.15 13208.33 12706.22 12706.22 11954.75 11954.75 39775.00 39272.89 39272.89 33421.91 33421.91 66525.00 66022.89 66022.89
15 -4.31 10.65 -4.31 10.65 13208.33 12432.67 12432.67 11271.80 11271.80 39775.00 38999.34 38999.34 29960.73 29960.73 66525.00 65749.34 65749.34
16 -5.75 9.95 -5.75 9.95 13208.33 12173.52 12173.52 10624.79 10624.79 39775.00 38740.19 38740.19 26681.71 26681.71 66525.00 65490.19 65490.19
17 -7.08 9.05 -7.08 9.05 13208.33 11934.16 11934.16 10027.20 10027.20 39775.00 38500.83 38500.83 23653.18 23653.18 66525.00 65250.83 65250.83
18 -8.28 7.98 -8.28 7.98 13208.33 11718.20 11718.20 9488.03 9488.03 39775.00 38284.87 38284.87 20920.67 20920.67 66525.00 65034.87 65034.87
19 -9.31 6.75 -9.31 6.75 13208.33 11532.84 11532.84 9025.24 9025.24 39775.00 38099.50 38099.50 18575.26 18575.26 66525.00 64849.50 64849.50
20 -10.15 5.38 -10.15 5.38 13208.33 11381.66 11381.66 8647.82 8647.82 39775.00 37948.33 37948.33 16662.50 16662.50 66525.00 64698.33 64698.33
21 -10.81 3.92 -10.81 3.92 13208.33 11262.88 11262.88 8351.27 8351.27 39775.00 37829.55 37829.55 15159.62 15159.62 66525.00 64579.55 64579.55
22 -11.25 2.37 -11.25 2.37 13208.33 11183.70 11183.70 8153.57 8153.57 39775.00 37750.37 37750.37 14157.70 14157.70 66525.00 64500.37 64500.37
23 -11.47 0.78 -11.47 0.78 13208.33 11144.11 11144.11 8054.73 8054.73 39775.00 37710.77 37710.77 13656.74 13656.74 66525.00 64460.77 64460.77
24 -11.47 -0.81 -11.47 -0.81 13208.33 11144.11 11144.11 8054.73 8054.73 39775.00 37710.77 37710.77 13656.74 13656.74 66525.00 64460.77 64460.77
25 -11.24 -2.4 -11.24 -2.40 13208.33 11185.50 11185.50 8158.07 8158.07 39775.00 37752.17 37752.17 14180.47 14180.47 66525.00 64502.17 64502.17
26 -10.8 -3.94 -10.80 -3.94 13208.33 11264.68 11264.68 8355.76 8355.76 39775.00 37831.35 37831.35 15182.39 15182.39 66525.00 64581.35 64581.35
27 -10.14 -5.41 -10.14 -5.41 13208.33 11383.46 11383.46 8652.31 8652.31 39775.00 37950.13 37950.13 16685.28 16685.28 66525.00 64700.13 64700.13
28 -9.29 -6.77 -9.29 -6.77 13208.33 11536.43 11536.43 9034.22 9034.22 39775.00 38103.10 38103.10 18620.80 18620.80 66525.00 64853.10 64853.10
29 -8.25 -8 -8.25 -8.00 13208.33 11723.60 11723.60 9501.51 9501.51 39775.00 38290.27 38290.27 20988.98 20988.98 66525.00 65040.27 65040.27
30 -7.06 -9.07 -7.06 -9.07 13208.33 11937.76 11937.76 10036.19 10036.19 39775.00 38504.43 38504.43 23698.72 23698.72 66525.00 65254.43 65254.43
31 -5.73 -9.96 -5.73 -9.96 13208.33 12177.12 12177.12 10633.77 10633.77 39775.00 38743.78 38743.78 26727.25 26727.25 66525.00 65493.78 65493.78
32 -4.28 -10.67 -4.28 -10.67 13208.33 12438.07 12438.07 11285.28 11285.28 39775.00 39004.74 39004.74 30029.04 30029.04 66525.00 65754.74 65754.74

Page 2 of 3
33 -2.76 -11.16 -2.76 -11.16 13208.33 12711.62 12711.62 11968.23 11968.23 39775.00 39278.29 39278.29 33490.22 33490.22 66525.00 66028.29 66028.29
34 -1.18 -11.43 -1.18 -11.43 13208.33 12995.97 12995.97 12678.14 12678.14 39775.00 39562.64 39562.64 37088.03 37088.03 66525.00 66312.64 66312.64
35 0.42 -11.49 0.42 -11.49 13208.33 13283.92 13283.92 13397.04 13397.04 39775.00 39850.58 39850.58 40731.38 40731.38 66525.00 66600.58 66600.58
36 2.01 -11.32 2.01 -11.32 13208.33 13570.06 13570.06 14111.45 14111.45 39775.00 40136.73 40136.73 44351.95 44351.95 66525.00 66886.73 66886.73
37 3.57 -10.92 3.57 -10.92 13208.33 13850.81 13850.81 14812.37 14812.37 39775.00 40417.48 40417.48 47904.22 47904.22 66525.00 67167.48 67167.48
38 5.06 -10.32 5.06 -10.32 13208.33 14118.96 14118.96 15481.85 15481.85 39775.00 40685.63 40685.63 51297.09 51297.09 66525.00 67435.63 67435.63
39 6.45 -9.52 6.45 -9.52 13208.33 14369.12 14369.12 16106.39 16106.39 39775.00 40935.79 40935.79 54462.25 54462.25 66525.00 67685.79 67685.79
40 7.71 -8.52 7.71 -8.52 13208.33 14595.88 14595.88 16672.52 16672.52 39775.00 41162.54 41162.54 57331.38 57331.38 66525.00 67912.54 67912.54
41 8.82 -7.37 8.82 -7.37 13208.33 14795.64 14795.64 17171.26 17171.26 39775.00 41362.31 41362.31 59858.96 59858.96 66525.00 68112.31 68112.31
42 9.76 -6.07 9.76 -6.07 13208.33 14964.81 14964.81 17593.61 17593.61 39775.00 41531.48 41531.48 61999.42 61999.42 66525.00 68281.48 68281.48
43 10.51 -4.65 10.51 -4.65 13208.33 15099.79 15099.79 17930.60 17930.60 39775.00 41666.45 41666.45 63707.24 63707.24 66525.00 68416.45 68416.45
44 11.06 -3.14 11.06 -3.14 13208.33 15198.77 15198.77 18177.72 18177.72 39775.00 41765.43 41765.43 64959.64 64959.64 66525.00 68515.43 68515.43
45 11.39 -1.57 11.39 -1.57 13208.33 15258.16 15258.16 18325.99 18325.99 39775.00 41824.82 41824.82 65711.08 65711.08 66525.00 68574.82 68574.82
9.75 12 1 9.75 0 9.75 0.00 13208.33 14963.01 14963.01 17589.12 17589.12 39775.00 41529.68 41529.68 61976.65 61976.65 66525.00 68279.68 68279.68
2 9.53 2.02 9.53 2.02 13208.33 14923.42 14923.42 17490.27 17490.27 39775.00 41490.08 41490.08 61475.69 61475.69 66525.00 68240.08 68240.08
PCD-3 3 8.90 3.96 8.90 3.96 13208.33 14810.04 14810.04 17207.20 17207.20 39775.00 41376.70 41376.70 60041.12 60041.12 66525.00 68126.70 68126.70
4 7.88 5.73 7.88 5.73 13208.33 14626.47 14626.47 16748.91 16748.91 39775.00 41193.14 41193.14 57718.49 57718.49 66525.00 67943.14 67943.14
5 6.52 7.24 6.52 7.24 13208.33 14381.72 14381.72 16137.84 16137.84 39775.00 40948.38 40948.38 54621.64 54621.64 66525.00 67698.38 67698.38
6 4.87 8.44 4.87 8.44 13208.33 14084.77 14084.77 15396.48 15396.48 39775.00 40651.44 40651.44 50864.44 50864.44 66525.00 67401.44 67401.44
7 3 9.27 3.00 9.27 13208.33 13748.23 13748.23 14556.27 14556.27 39775.00 40314.90 40314.90 46606.28 46606.28 66525.00 67064.90 67064.90
8 1.01 9.69 1.01 9.69 13208.33 13390.10 13390.10 13662.13 13662.13 39775.00 39956.76 39956.76 42074.86 42074.86 66525.00 66706.76 66706.76
9 -1.02 9.69 -1.02 9.69 13208.33 13024.76 13024.76 12750.03 12750.03 39775.00 39591.43 39591.43 37452.36 37452.36 66525.00 66341.43 66341.43
10 -3.01 9.27 -3.01 9.27 13208.33 12666.63 12666.63 11855.90 11855.90 39775.00 39233.30 39233.30 32920.95 32920.95 66525.00 65983.30 65983.30
11 -4.88 8.43 -4.88 8.43 13208.33 12330.09 12330.09 11015.69 11015.69 39775.00 38896.76 38896.76 28662.78 28662.78 66525.00 65646.76 65646.76
12 -6.53 7.23 -6.53 7.23 13208.33 12033.14 12033.14 10274.32 10274.32 39775.00 38599.81 38599.81 24905.58 24905.58 66525.00 65349.81 65349.81
13 -7.89 5.72 -7.89 5.72 13208.33 11788.39 11788.39 9663.26 9663.26 39775.00 38355.06 38355.06 21808.73 21808.73 66525.00 65105.06 65105.06
14 -8.91 3.95 -8.91 3.95 13208.33 11604.82 11604.82 9204.96 9204.96 39775.00 38171.49 38171.49 19486.10 19486.10 66525.00 64921.49 64921.49
15 -9.53 2.01 -9.53 2.01 13208.33 11493.24 11493.24 8926.39 8926.39 39775.00 38059.91 38059.91 18074.30 18074.30 66525.00 64809.91 64809.91
16 -9.74 -0.01 -9.74 -0.01 13208.33 11455.45 11455.45 8832.03 8832.03 39775.00 38022.12 38022.12 17596.11 17596.11 66525.00 64772.12 64772.12
17 -9.53 -2.04 -9.53 -2.04 13208.33 11493.24 11493.24 8926.39 8926.39 39775.00 38059.91 38059.91 18074.30 18074.30 66525.00 64809.91 64809.91
18 -8.9 -3.97 -8.90 -3.97 13208.33 11606.62 11606.62 9209.46 9209.46 39775.00 38173.29 38173.29 19508.87 19508.87 66525.00 64923.29 64923.29
19 -7.87 -5.74 -7.87 -5.74 13208.33 11791.99 11791.99 9672.25 9672.25 39775.00 38358.66 38358.66 21854.28 21854.28 66525.00 65108.66 65108.66
20 -6.51 -7.25 -6.51 -7.25 13208.33 12036.74 12036.74 10283.31 10283.31 39775.00 38603.41 38603.41 24951.12 24951.12 66525.00 65353.41 65353.41
21 -4.86 -8.45 -4.86 -8.45 13208.33 12333.69 12333.69 11024.68 11024.68 39775.00 38900.36 38900.36 28708.33 28708.33 66525.00 65650.36 65650.36
22 -2.99 -9.27 -2.99 -9.27 13208.33 12670.23 12670.23 11864.89 11864.89 39775.00 39236.89 39236.89 32966.49 32966.49 66525.00 65986.89 65986.89
23 -1 -9.69 -1.00 -9.69 13208.33 13028.36 13028.36 12759.02 12759.02 39775.00 39595.03 39595.03 37497.90 37497.90 66525.00 66345.03 66345.03
24 1.03 -9.69 1.03 -9.69 13208.33 13393.70 13393.70 13671.12 13671.12 39775.00 39960.36 39960.36 42120.40 42120.40 66525.00 66710.36 66710.36
25 3.03 -9.26 3.03 -9.26 13208.33 13753.63 13753.63 14569.74 14569.74 39775.00 40320.30 40320.30 46674.59 46674.59 66525.00 67070.30 67070.30
26 4.89 -8.43 4.89 -8.43 13208.33 14088.37 14088.37 15405.46 15405.46 39775.00 40655.04 40655.04 50909.98 50909.98 66525.00 67405.04 67405.04
27 6.53 -7.23 6.53 -7.23 13208.33 14383.52 14383.52 16142.34 16142.34 39775.00 40950.18 40950.18 54644.41 54644.41 66525.00 67700.18 67700.18
28 7.9 -5.71 7.90 -5.71 13208.33 14630.07 14630.07 16757.89 16757.89 39775.00 41196.74 41196.74 57764.03 57764.03 66525.00 67946.74 67946.74
29 8.91 -3.94 8.91 -3.94 13208.33 14811.84 14811.84 17211.70 17211.70 39775.00 41378.50 41378.50 60063.89 60063.89 66525.00 68128.50 68128.50
30 9.54 -2 9.54 -2.00 13208.33 14925.22 14925.22 17494.76 17494.76 39775.00 41491.88 41491.88 61498.46 61498.46 66525.00 68241.88 68241.88

Page 3 of 3
JASA KONSTRUKSI PEMBANGUNAN TANKI LPG
PRESSURIZED 3 X 3000 MT DI TERMINAL LPG
BALONGAN BERIKUT SARFAS PENDUKUNG

DOCUMENT NO : REV A
LPG TANK FOUNDATION-3 TANK @3000MT
BLG-ENG-C-CAL-001-W-A4

ATTACHMENT - 5

SOIL & PILE DATA


ATTACHMENT-5 :

Page 1 of 2
Page 2 of 2