Date of approval of the unit 24 May 2019
cost:
Contact: National Bank for Agriculture and Rural
Development
Rajasthan Regional Office
3, Nehru Place, Tonk Road,
Post Box No. 104,
Jaipur, Rajasthan – 302 015
Tel : 01412740821
Email : jaipur@nabard.org
Website: www.nabard.org,
www.youtube.com/nabardonline
Disclaimer
The unit costs and parameters suggested are based on the information available
with NABARD. All Unit costs are indicative in nature and Banks/Govt. agencies
may, at their discretion, arrive at the unit costs for respective activities based on the
conditions prevailing in their area of operation, technical feasibility, financial
viability and bankability of the project. NABARD does not accept any financial
liability to anyone using this report for any purpose.
Content
1. Minor Irrigation 1
2. Farm Mechanisation 2
3. Land Development 3
5. Forestry 6
6. Animal Husbandry 6
8. Renewable Energy 8
9. Other Activities 9
10. Annexure 10
Unit Cost for Investment Activities 2019-20
1. Minor Irrigation
1|Page
Unit Cost for Investment Activities 2019-20
DC 384000
AC with inverter 497000.00
b) SPV Surface Pump (5HP)
DC 450000.00
AC with inverter 365000
415000
SPV Submersible Pump (3 DC
c) 5000
Hp)
Manual Tracker
20000
Auto Tracker
520000.00
AC with inverter
485000.00
SPV Submersible Pump (5 DC
d)
Hp) 5000.00
Manual Tracker
20000.00
Auto Tracker
Drip Irrigation Sets for Given in the
5. Orchard Crops annexure
2. Farm Mechanisation
3 Leveller 25000.00
2|Page
Unit Cost for Investment Activities 2019-20
3. Land Development
3|Page
Unit Cost for Investment Activities 2019-20
4.1 Crops
Sweet Orange/
1 Ha 6mX6m 96000.00
11 Kinnow
Citrus
12 Lime/ Lemon 1 Ha 6mX6m 76000.00
Lemon High
13 1 Ha 4m x 4.5 m 90500.00
density planting
4|Page
Unit Cost for Investment Activities 2019-20
5|Page
Unit Cost for Investment Activities 2019-20
5. Forestry
S. Activity Specification
Unit Cost
No. Area Spacing No. of
Plants/Ha.
(Rs.)
1 Teak 1 ha 2.5 m X 2.5 m 1600 98900.00
6. Animal Husbandry
Specifications Unit
S. No. Activity Unit Cost
Cost (Rs.)
Size
A Dairy Development:
1 Buffalo
Murrah/ Graded Murrah Buffalo 170000.
a 2 85000.00
(Average lactation yield 10 liters/ day) 00
Surti Buffalo (Average lactation yield 8 140000.
b 2 70000.00
liters / day) 00
Crossbred Cows
2 Crossbred Cow (Average lactation yield 140000.
2 70000.00
10 - 15 liters/ day) 00
3 Conservation of Indigenous Cattle Breeds
Rathi/ Tharparkar/ Gir/ Sahiwal 100000.
a 2 50000.00
(Average lactation yield 10 liters/ day) 00
Kankrej/ Malvi (Average lactation yield 80000.0
b 2 40000.00
7 liters/ day) 0
Shed for 02 Animals ( Buffalo or Cow ) 50000.0
4 100 500.00
- 100 sqft (Optional ) 0
Fodder Cultivation: Lucerne in One 35000.0
5 1 35000.00
Acre Area for Dairy Units 0
6|Page
Unit Cost for Investment Activities 2019-20
7|Page
Unit Cost for Investment Activities 2019-20
8. Renewable Energy
8|Page
Unit Cost for Investment Activities 2019-20
Amount
S. No. Items
(Rs)
Building
1 1800000.00
Machinery & Equipments
2 1500000.00
Electrification/ Office Furniture & Fixtures
3 200000.00
Unit Cost 3500000.00
9|Page
Unit Cost for Investment Activities 2019-20
ANNEXURE
WATER RESOURCES
a) Dug Wells / Dug-Cum – Bore Wells
DW Dia -
i)DW (RCC) Dia -
4m x 5300.0
120400.00 107000.00 5200.00 3 to 5
3m x Depth 24m Depth 0
20m
ii)DCBW Dug
2 Alwar portion Dia 2.5m x
Depth 12m Boring 80000.00 -
Dia 100mm x Depth
20m
iii) Cavity Well
(Boring 100 mm Dia 19200.00 - - - - -
x 20 m Depth)
i)DW
(Comman
DW Dia - 3m x
5200.0
3 Banswara 86500.00 d area) 79700.00 4600.00 3 to 5
Depth 16m 0
Dia - 3m x
Depth 16m
10 | P a g e
Unit Cost for Investment Activities 2019-20
ii)DW
(Non
command 5200.00
- 106500.00
area) Dia -
4m x
Depth 16m
DW Dia -
i)DW Dia - 3m x
4m x 5300.0
126300.00 124000.00 5300.00 5
Depth 18m Depth 0
18m
4 Baran &
Kota ii)DCBW Dug
portion Dia 2m x
Depth 16m Boring 86500.00 - - - - -
Dia 100mm x Depth
20m
i)DW Dia -
i)DW Dia - 2.8m x
4m x 5200.0
126300.00 178500.00 5300.00 5 to 7.5
Depth 30m Depth 0
30m
5
Barmer
ii)DCBW Dug
portion Dia 2m x SIP -10
Depth 40m Boring 189800.00 - - - -
to12.5
Dia 100mm x Depth
30m
11 | P a g e
Unit Cost for Investment Activities 2019-20
i)DCBW Dug
portion Dia 2m x 10 to 12.5
Depth 45m 281400.00 - - - - SIP - 15 to
Boring(DTH) Dia 20
200mm x Depth
30m
6 Bikaner
ii)DCBW Dug
portion Dia 2m x
Depth 45m 298400.00 - - - - - do -
Boring(Percussion)
Dia 200mm x
Depth 30m
i)DW Dia
i) DW (RCC) Dia -
5200.0
95300.00 - 4m x 91000.00 5200.00 3 to 5
3m x Depth 17m 0
Depth 15m
7 Bharatpur
ii) Cavity Well Dia
100 mm x Depth 20 19200.00 - - - - -
m
i)DW Dia
i)DW Dia - 3m x
5500.0
8 Bhilwara 115200.00 - 4m x 120400.00 5300.00 5
Depth 19m 0
Depth 19m
i)DW Dia
i)DW Dia - 3m x 97500.00 - 4m x 105000.00 5471.00 5300.00 5
9 Bundi
Depth 16m Depth 16m
12 | P a g e
Unit Cost for Investment Activities 2019-20
Depth 19m
i)DCBW Dug
portion Dia 2m x 10 to12.5
Depth 45m 284400.00 - - - - SIP - 10
Boring(DTH) Dia TO15
200mm x Depth
30m
11 Churu
ii) DCBW Dug
portion Dia 2m x
Depth 10 to 12.5
298400.00 - - - -
45mBoring(Percussi SIP - 10 to15
on) Dia 200mm x
Depth 30m
i)DW Dia -
i)DW (RCC)Dia - 3m
4m x 5500.0
132200.00 123000.00 5300.00 5 to 7.5
x Depth 23m Depth 0
23m
Dausa &
12
Jaipur ii)DCBW Dug
portion Dia 2.5mx
Depth 16m Boring
90800.00 - -
Dia 100mm x Depth
20m
i)DW Dia
i)DW Dia - 3m x
5300.0
13 Dholpur 96800.00 - 4m x 97000.00 5300.00 3 to 5
Depth 17m 0
Depth 15m
13 | P a g e
Unit Cost for Investment Activities 2019-20
i)DCBW Dug
portion Dia 2m x 10 to 12.5
Depth 45m 156900.00 - SIP - 12.5
Boring(DTH) Dia to 20
200mm x Depth
25m
15 Jaisalmer
ii)DCBW Dug
portion Dia 2m x 10 to12.5
Depth 45m 298400.00 - SIP - 12.5 to
Boring(Percussion) 20
Dia 200mm x
Depth 30m
i)DW Dia
i)DW Dia - 3m x
- 4m x 5300.0
16 Jalore 129300.00 136800.00 5300.00 5 to 7.5
Depth 23m Depth 0
23m
i)DW Dia
i)DW Dia - 3m x
5500.0
17 Jhalawar 112600.00 - 4m x 109500.00 5300.00 5
Depth 16m 0
Depth 16m
i)DW Dia 5300.0
Jhunjhunu i)DW (RCC) Dia - 132000.00 139500.00 5300.00 5 to 7.5
18 - 4m x 0
& Sikar 3m x depth 24m
Depth
14 | P a g e
Unit Cost for Investment Activities 2019-20
24m
ii)DCBW Dug
portion Dia 1.6m x
Depth 40m Boring 146200.00 - - - - -
Dia 100mm x Depth
20m
19 Jodhpur
ii) DCBW(DTH)
Dug portion Dia 2m
x Depth 30m Boring 193200.00 - - - - -
Dia 200mm x
Depth 40m
i)DW Dia -
5 to 10
i)DW Dia - 3m x
4m x 5300.0
20 Nagaur 168400.00 132800.00 5300.00 SIP-10 to
Depth 30m Depth 0
17.5
25m
15 | P a g e
Unit Cost for Investment Activities 2019-20
ii)DCBW(Rotary)
Dug portion Dia
1.6m x Depth 30m 142700.00 -
Boring Dia 100mm x
Depth 30m
ii)DCBW(DTH) Dug
portion Dia 2.5m x 193200.00 - - - - -
Depth 30m Boring Dia
200mm x Depth 40m
i)DW Dia -
i)DW Dia - 3m x 4m x 5300.0
21 Pali 123200.00 118700.00 5300.00 5 to 7.5
Depth 22m Depth 0
22m
Rajsaman i)DW Dia -
i)DW Dia - 3m x 5500.0
22 d& 117000.00 4m x 102500.00 5500.00 5 to 7.5
Depth 16m 0
Udaipur Depth 16m
i)DW Dia -
Sawai
i)DW Dia - 3m x 4m x 5300.0
23 Madhopur 108200.00 116300.00 5300.00 5
Depth 20m Depth 0
& Karauli
20m
i)DW Dia -
i)DW Dia - 3m x 4m x 5300.0
24 Sirohi 111700.00 119000.00 5300.00 5
Depth 20m Depth 0
20m
16 | P a g e
Unit Cost for Investment Activities 2019-20
i)DCBW Dug
portion Dia 2m x
Depth 20m Boring 158700.00 - - - - 5 to 7.5
i)DW Dia -
i)DW Dia - 3m x 5300.0
26 Tonk 107200.00 4m x 112200.00 5300.00
Depth 19m 0
Depth 19m
D. HDPE Sprinkler Sets of various models viz. 1.0 ha, 1.5 ha , 2.0 ha , 3.0 ha & 4.0 ha.
S.
Unit 1.0 ha Model 1.5 ha Model 2.0 ha Model 3.0 ha Model 4.0 ha Model
No
Item of work rate Quantit Unit Quantit Unit Quantit Unit Quantit Unit Quantit Unit
.
(Rs) y cost y cost y cost y cost y cost
(Nos) (Rs) (Nos) (Rs) (Nos) (Rs) (Nos) (Rs) (Nos) (Rs)
1 75 mm dia x 6m 758 21.00 15918 25 18950 30 22740 37 28046 45 34110
long main line
HDPE pipe with
quick action
coupler (class I
pipe 2.5 kg/cm2).
17 | P a g e
Unit Cost for Investment Activities 2019-20
The repayment period is 5 years without any gestation period. All component are subject to BIS
pecification.
E. Drip Irrigation Sets for Orchard Crops
S.No Spacing Lateral Size (mm) 0.2ha model 2.0 ha model 3.0 ha model
1mx0.3m 16 32674.00 298082.00 445243.00
(a)
1.2mx0.6m 16 31816.00 245357.00 371391.00
(b)
18 | P a g e
Unit Cost for Investment Activities 2019-20
19 | P a g e
Unit Cost for Investment Activities 2019-20
20 | P a g e
Unit Cost for Investment Activities 2019-20
Xvi Feather Processing Units/ litter Varies with unit size. The subsidy
management ceiling is Rs. 125 lakh.
Xvii Technology upgradation/ innovations Varies with the component. The
including waste disposal/ incinerators, subsidy ceiling is Rs. 125 lakh. For
minihatchers, egg vending machines new/ innovative projects EC may
etc. decide the subsidy/ value cap
depending upon the scope and
importance of the project.
ii Breeding farms with 100 ewe / does + 5 ram / bucks At 25 % level subsidy ceiling Rs. 2,50,000/-
iii Commercial rabbit- Angora units At 25 % level subsidy ceiling Rs. 75,000/-
i Mini Units: Rearing of male Buffalo calves upto 25 calves. At 25% level subsidy - subsidy ceiling Rs. 6,250/-
per calf. It would be implemented by the State
21 | P a g e
Unit Cost for Investment Activities 2019-20
Proportion of Subsidy for various areas and various categories of beneficiaries (i) NORMAL AREAS:
Category Back ended subsidy Credit Beneficiary Share / Margin
Money
BPL / SC / ST 33.33% 56.67% 10%
APL 25% 65% 10%
23 | P a g e