Unit costs for investment activities in

agriculture and allied sectors


Rajasthan
2019- 20

National Bank for Agriculture and Rural Development


Rajasthan Regional Office
Jaipur
Vision
“Development Bank of the Nation
for fostering rural prosperity”

Mission
“Promote sustainable
and equitable agriculture
and rural development
through participative financial
and non-financial interventions,
innovations, technology
and institutional development
for securing prosperity”
Date of approval of the unit 24 May 2019
cost:
Contact: National Bank for Agriculture and Rural
Development
Rajasthan Regional Office
3, Nehru Place, Tonk Road,
Post Box No. 104,
Jaipur, Rajasthan – 302 015

Tel : 01412740821
Email : jaipur@nabard.org
Website: www.nabard.org,
www.youtube.com/nabardonline
Disclaimer
The unit costs and parameters suggested are based on the information available
with NABARD. All Unit costs are indicative in nature and Banks/Govt. agencies
may, at their discretion, arrive at the unit costs for respective activities based on the
conditions prevailing in their area of operation, technical feasibility, financial
viability and bankability of the project. NABARD does not accept any financial
liability to anyone using this report for any purpose.
Content

S. No. Sectors Page

1. Minor Irrigation 1

2. Farm Mechanisation 2

3. Land Development 3

4. Plantation and Horticulture 4

5. Forestry 6

6. Animal Husbandry 6

7. Fisheries and Aquaculture 8

8. Renewable Energy 8

9. Other Activities 9

10. Annexure 10
Unit Cost for Investment Activities 2019-20

1. Minor Irrigation

S. No. Activity Specification Unit Cost (Rs.)

1. Dug Wells / Dug-Cum – Given in the


Bore Wells annexure

2. Deepening of Existing Wells


a) Deepening of Existing Indicative Per meter 5500.00
Wells in Alluvial Area cost (Rs)
Maximum 4m depth 26500.00
(inclusive of
lumpsum dewatering
charges etc. Rs.
4400/-)
b) Deepening of Existing Indicative Per meter 5350.00
Wells in Hard Rock Area cost(Rs)
Maximum 4m depth 25900.00
(inclusive of
lumpsum dewatering
charges etc. Rs.
4400/-)
3. Water Lifting Devices- Agricultural Pump Set
a) Diesel Pump Set 5.0 35000.00
6.5 37000.00
8.0 46000.00
10.0 46000.00
b) Electric Pump Set 3.0 26400.00
5.0 30000.00
7.5 36400.00
10.0 42100.00
12.5 50000.00
c) Submersible Pump Set 5.0 36800.00
7.5 42800.00
10.0 51300.00
12.5 74100.00
15.0 79900.00
17.5 91300.00
20.0 99800.00
d) Cost of Delivery Upto 8 HP 350.00
Pipe(Rs/meter)* Upto 13 HP 450.00
More than 13 HP 600.00
e) Cost of Cable Upto 13 HP 44.00
(Rs/meter)* More than 13 HP 50.00
4. Solar Pumps
a) SPV Surface Pump (3 Hp) AC with inverter 330000

1|Page
Unit Cost for Investment Activities 2019-20

DC 384000
AC with inverter 497000.00
b) SPV Surface Pump (5HP)
DC 450000.00
AC with inverter 365000
415000
SPV Submersible Pump (3 DC
c) 5000
Hp)
Manual Tracker
20000
Auto Tracker
520000.00
AC with inverter
485000.00
SPV Submersible Pump (5 DC
d)
Hp) 5000.00
Manual Tracker
20000.00
Auto Tracker
Drip Irrigation Sets for Given in the
5. Orchard Crops annexure

HDPE Sprinkler Sets of Given in the


6. various models annexure

2. Farm Mechanisation

S. No. Activity Specifications Unit cost (Rs)

Disc Dia- 22/24 inch No. of


1 Mounted Disc Harrow discs- 14/16/18 disc 27000.00

2 Tractor Rotavator 107250.00

3 Leveller 25000.00

4 Laser Leveller 251250.00

5 Seed Cum Fertilizer Drill 20950.00

6 Agriculture Sprayer Electric 3925.00

7 Agriculture Sprayer Tractor Mounted 33000.00

8 Multi Crop Cuter Thresher Motor Driven 266250.00

2|Page
Unit Cost for Investment Activities 2019-20

9 Multi Crop Cuter Thresher Tractor Mounted 105000.00

10 Combine Harvester 2400000.00

11 35 HP/ 3 Cylinders 556300.00

12 38 HP/ 3 Cylinders 534000.00


Tractors
13 24 HP/ 2 Cylinders 420200.00

14 42 HP/ 3 Cylinders 656000.00

15 30 HP/2 Cylinders 593000.00


16 Power Tiller

3. Land Development

S. No. Activity Specifications Unit cost (Rs)


2.00 Lakh Litre Approx.
(Size = 30'X40'X6')= 7200
1 Pucca Farm Pond (Hauz) Cubic Feet 180400.00

2 Kacha Farm Pond


4.00 Lakh Litres (14125.86
441400.00
Cubic feet)
8.00 Lakh Litres (28431.72
I. Pucca Diggy 816000.00
Cubic Feet)
12.00 Lakh Litres (42647.58
1095100.00
Cubic Feet)
4.00 Lakh Litres (14125.86
261400.00
Cubic feet)
8.00 Lakh Litres (28431.72
II. Diggy with Plastic Lining 416000.00
Cubic Feet)
12.00 Lakh Litres (42647.58
565100.00
Cubic Feet)
4.00 Lakh Litres (14125.86
485540.00
Cubic feet)
Pucca Diggy with
8.00 Lakh Litres (28431.72
III. Pumpset, Sprinkler 897600.00
Cubic Feet)
System & Fencing
12.00 Lakh Litres (42647.58
1204610.00
Cubic Feet)
Diggy with Plastic Lining 4.00 Lakh Litres (14125.86
IV. 287540.00
with Pumpset, Sprinkler Cubic feet)

3|Page
Unit Cost for Investment Activities 2019-20

System & Fencing 8.00 Lakh Litres (28431.72


457600.00
Cubic Feet)
12.00 Lakh Litres (42647.58
621610.00
Cubic Feet)
Vermi-Compost 25 MT - 1.50 ha 132880.00

Vermi-Compost 50 MT - 1.50 ha 218460.00

4. Plantation and Horticulture

4.1 Crops

S. No. Activity Unit Size Plant Spacing Unit Cost


(Rs.)
Mango (Dashehari /
1 1 Ha 10 m X 10 m 70000.00
Langra / Chausa / Keshar)
Mango Amrapali (High
2 1 Ha 4mX4m 171000.00
Density Plantation)

3 Ber (with drip) 1 Ha 6mX6m 87000.00

4 Ber ( Without drip) 1 Ha 6mX6m 54000.00

Ber ( high density with


5 1 Ha 4mX4m 103000.00
drip)

6 Pomegranate 1 Ha 5mX5m 81600.00

7 Aonla 1 Ha 6mX6m 78500.00

8 Aonla (High Density) 1 Ha 3mX3m 188300.00

9 Date palm (Tissue Culture


8mx8m 662000.00
Plants) 1 Ha

10 Orange 1 Ha 6mX6m 125000.00

Sweet Orange/
1 Ha 6mX6m 96000.00
11 Kinnow
Citrus
12 Lime/ Lemon 1 Ha 6mX6m 76000.00

Lemon High
13 1 Ha 4m x 4.5 m 90500.00
density planting

14 Guava 1 Ha 6mX6m 75000.00

4|Page
Unit Cost for Investment Activities 2019-20

15 Guava (High Density) 1 Ha 3mX3m 142000.00

16 Papaya 1 Ha 1.8 m X 1.8 m 120200.00

17 Rose 1 Ha 8 Plants/ Sq. mtr 125000.00

18 Mehandi 1 Ha 3mX3m 107500.00

19 Senna 1 Ha 4 Plants/ Sq. mtr 35000.00

20 Isabgol 1 Ha 25 Plants/ Sq. mtr 50000.00

21 Grapes (Perlette) 1 Ha 3mX3m 475000.00


Banana Suckers @ 2
22 Banana 1 Ha 123500.00
mx2m
Banana Tissue
23 Banana ( High Density) 1 Ha Culture @ 1.50 m x 221000.00
1.50 m
24 Custard Apple 1 Ha. 2.5 m x 2.5 m 160000.00

25 Sapota (Chiku) 1 Ha. 5m x 5m 79500.00

4.2. Other Activities- under Horticulture

S. No. Activity Unit Size Unit Cost


(Rs.)
26 Green House (Poly House) 1000 Sq. mtr 1250000.00
Vegetable cultivation with pumpset
27 (Single Crop & Single Row per meter
1 Ha 55000.00
bed) including cost of 3 HP pumpset Rs
23000.00

Vegetable Cultivation under Drip (03


28 Crops & Double Row per meter bed) 0.5 Acre 80600.00
including cost of Drip Rs 46000.00

29 Vegetable Cultivation (Shimla Mirch/


1000 Sq. mtr 159600.00
Tomato) under Poly House

30 Bee Keeping 10 Boxes 71600.00


31 Mushroom Cultivation - 60 Beds Bed Size @ 4 ft X 3 ft 60000.00
32 Nursery Raising 1 Ha 1500000.00

5|Page
Unit Cost for Investment Activities 2019-20

33 Refrigerated Transport Vehicle 9 MT 2600000.00


34 Zero Energy Coal Chamber 100 kg 4000.00
35 Low Cost Onion storage 10 MT 1750000.00
36* Green House ( Poly house) @ 844.00
4000 sq mtr 3376000.00
per sq mtr

5. Forestry

S. Activity Specification
Unit Cost
No. Area Spacing No. of
Plants/Ha.
(Rs.)
1 Teak 1 ha 2.5 m X 2.5 m 1600 98900.00

2 Neem 1 ha 5mX5m 400 39800.00


3 Bamboo 1 ha 5mX5m 400 57500.00

4 Jatropha 1 ha 3mX3m 1111 35800.00


5 Subabul 1 ha 2.5 m X 2.5 m 1600 39200.00

6. Animal Husbandry

Specifications Unit
S. No. Activity Unit Cost
Cost (Rs.)
Size
A Dairy Development:
1 Buffalo
Murrah/ Graded Murrah Buffalo 170000.
a 2 85000.00
(Average lactation yield 10 liters/ day) 00
Surti Buffalo (Average lactation yield 8 140000.
b 2 70000.00
liters / day) 00
Crossbred Cows
2 Crossbred Cow (Average lactation yield 140000.
2 70000.00
10 - 15 liters/ day) 00
3 Conservation of Indigenous Cattle Breeds
Rathi/ Tharparkar/ Gir/ Sahiwal 100000.
a 2 50000.00
(Average lactation yield 10 liters/ day) 00
Kankrej/ Malvi (Average lactation yield 80000.0
b 2 40000.00
7 liters/ day) 0
Shed for 02 Animals ( Buffalo or Cow ) 50000.0
4 100 500.00
- 100 sqft (Optional ) 0
Fodder Cultivation: Lucerne in One 35000.0
5 1 35000.00
Acre Area for Dairy Units 0

6|Page
Unit Cost for Investment Activities 2019-20

Azolla Cultivation (Size = 10'x4'x2'


6 1 5000.00 5000.00
depth)
Mobile Private Milk Collection Unit
750000.
7 with Mahindra Multi-Utility Vehicle, 1 750000.00
00
Milk-O-Tester & 25 Milk Cans
45000.0
8 Breeding bull 1 45000.00
0
B Poultry Development:
Poultry Development (Layers) under 400000.
a 500 800.00
Cage System (1:3) 00
Poultry Development (Broilers) under
250000.
b Deep Litter System - All In All Out 500 500.00
00
System
Sheep Rearing Unit (Unit Size 40+2) @
340000.
9 Rs. 8000 per Ewe & Rs. 10000 per 40+2
00
Ram
10 Goat Rearing:
Goat Unit (Unit size 10+1) @ Rs. 8000
90000.0
a per Doe & Rs.10000 per Buck 10+1
0
Goat Unit (Unit Size 20+1) @ Rs. 8000
170000.
b per Doe & Rs. 10000 per Buck 20+1
00
Piggery Unit - Large White Yorkshire/ Middle White
11
Yorkshire Breeds:
Piggery Unit (Unit Size - 3+1) @ Rs.
17000.0
a 4000 per Sow and Rs. 5000 per Boar 3+1
0
Piggery Unit (Unit Size - 5+1) @ Rs.
25000.0
b 4000 per Sow and Rs. 5000 per Boar 5+1
0
12 Indigenous Cattle Breeding Unit including Shed ** -
Cattle Breeding Unit (Unit Size 5+1) 550600.
a 1 550600.00
00
Cattle Breeding Unit (Unit Size 10+2) 1101200.
b 1 1101200.00
00
13 Work Animals:
Camel (Mixed Breed) 55000.0
a 1 55000.00
0
Camel (Mixed Breed) 110000.0
b 2 55000.00
0
Bullock (Mixed Breed - Haryana/
28000.0
c Kankrej) 1 28000.00
0
Bullocks (Mixed Breed) 56000.0
d 2 28000.00
0

7|Page
Unit Cost for Investment Activities 2019-20

He Buffaloes (Mixed Breed) 25000.0


e 1 25000.00
0
He Buffaloes (Mixed Breed) 50000.0
f 2 25000.00
0
Donkey Unit 160000.
g 4 40000.00
00
14 Animal Driven Carts:
Single Camel Cart with 02 Pneumatic
A 1 45000 45000
Tyres (5' 4 6") (Without Animal)
Two Bullocks Driven Cart with 02
B Pneumatic Tyres (5' 4'6") (Without 1 45000 45000
Animal)
15 Chaff - Cutters:
Chaff Cutter - Heavy Duty with 5 HP
40000.0
A Diesel Engine (Chaff Cutter - 10000; 1 40000.00
0
Engine - 30000)
B Chaff Cutter - Manually Operated 1 6000.00 6000.00
(**Care: All Breeding Animals should be of the same breed i.e. either Sahiwal or
Rathi or Tharparkar or Gir or Red Sindhi)

7. Fisheries and Aquaculture

S. No. Activity Unit cost (Rs)


New Fish Pond Construction and Composite Fish 700000.00
1
Culture in 1.0 Ha Pond
New Fish Pond Construction and Composite Fish 350000.00
2
Culture in 0.5 Ha pond
3 Composite Fish Culture in 1.0 Ha Leased Pond 90000.00

Renovation of Fish Pond cum Fish Culture in 1.0 Ha 350000.00


4
Pond
Unit cost of Fish Culture in 1.0 ha of Water logged 297000.00
5
areas
Poultry -cum- Fish Farming - 1.0 ha fish pond 180000.00
6
(existing) & 500 bird broiler unit
Fish cum Dairy farming - 1 ha Fish Pond area 180000.00
7
(existing) & 3 CB cows Dairy Unit
8 Fresh Water Prawn Farming - 1 ha 660000.00

8. Renewable Energy

S. No. Activity Specification Unit Cost (Rs.


Lakh/MW)
I. Small Hydro Power Plants & Bio Mass Power Plants

8|Page
Unit Cost for Investment Activities 2019-20

1. Small Hydro power Plants 5MW 779.00


5 MW to 25 MW 707.00
2. Bio mass power projects Water cooled other 559.03
than rice straw and
julifora
Air cooled other than 600.44
rice straw and julifora
Water cooled with rice 610.80
straw and julifora
Air cooled with rice 652.20
straw and julifora
Solar PV 168.40
Modules/MW
Land Cost 7.30
Civil and General 35.00
On Grid Solar Photovoltaic Works
Power Plant (5/10 Mw) Mounting Structure 35.00
II Power Conditioning 35.00
In Crores Unit
Operative expenses 45.00
Preliminary & others 10.00
Contigency 25.00
Evacuation and 30.00
Transmission costs@
Total cost 390.70
The above cost was derived by fixing solar module price at Rs. 0.25/W
@ considering 50lakh per km transmission lines

9. Other Activities - Seed Processing Unit

Amount
S. No. Items
(Rs)
Building
1 1800000.00
Machinery & Equipments
2 1500000.00
Electrification/ Office Furniture & Fixtures
3 200000.00
Unit Cost 3500000.00

9|Page
Unit Cost for Investment Activities 2019-20

ANNEXURE
WATER RESOURCES
a) Dug Wells / Dug-Cum – Bore Wells

Cost for beyond recommended


Hard Rock formation/ areas
Alluvial formation / depth (per meter) Recommen
S. Indicative Unit
District Areas Design ded HP of
No Cost (Rs.) Alluvial
parameter Approved Unit pumpset
Design area Hard rock area (Rs)
Cost (Rs.)
(Rs)
DW Dia -
DW with stone 4m x 5500.0
1 Ajmer masonary Dia - 3m x 99700.00 115200.00 5300.00 3 to 5
Depth 0
Depth 18m 18m

DW Dia -
i)DW (RCC) Dia -
4m x 5300.0
120400.00 107000.00 5200.00 3 to 5
3m x Depth 24m Depth 0
20m
ii)DCBW Dug
2 Alwar portion Dia 2.5m x
Depth 12m Boring 80000.00 -
Dia 100mm x Depth
20m
iii) Cavity Well
(Boring 100 mm Dia 19200.00 - - - - -
x 20 m Depth)
i)DW
(Comman
DW Dia - 3m x
5200.0
3 Banswara 86500.00 d area) 79700.00 4600.00 3 to 5
Depth 16m 0
Dia - 3m x
Depth 16m

10 | P a g e
Unit Cost for Investment Activities 2019-20

ii)DW
(Non
command 5200.00
- 106500.00
area) Dia -
4m x
Depth 16m
DW Dia -
i)DW Dia - 3m x
4m x 5300.0
126300.00 124000.00 5300.00 5
Depth 18m Depth 0
18m
4 Baran &
Kota ii)DCBW Dug
portion Dia 2m x
Depth 16m Boring 86500.00 - - - - -
Dia 100mm x Depth
20m

i)DW Dia -
i)DW Dia - 2.8m x
4m x 5200.0
126300.00 178500.00 5300.00 5 to 7.5
Depth 30m Depth 0
30m
5
Barmer
ii)DCBW Dug
portion Dia 2m x SIP -10
Depth 40m Boring 189800.00 - - - -
to12.5
Dia 100mm x Depth
30m

11 | P a g e
Unit Cost for Investment Activities 2019-20

i)DCBW Dug
portion Dia 2m x 10 to 12.5
Depth 45m 281400.00 - - - - SIP - 15 to
Boring(DTH) Dia 20
200mm x Depth
30m
6 Bikaner

ii)DCBW Dug
portion Dia 2m x
Depth 45m 298400.00 - - - - - do -
Boring(Percussion)
Dia 200mm x
Depth 30m

i)DW Dia
i) DW (RCC) Dia -
5200.0
95300.00 - 4m x 91000.00 5200.00 3 to 5
3m x Depth 17m 0
Depth 15m
7 Bharatpur
ii) Cavity Well Dia
100 mm x Depth 20 19200.00 - - - - -
m
i)DW Dia
i)DW Dia - 3m x
5500.0
8 Bhilwara 115200.00 - 4m x 120400.00 5300.00 5
Depth 19m 0
Depth 19m
i)DW Dia
i)DW Dia - 3m x 97500.00 - 4m x 105000.00 5471.00 5300.00 5
9 Bundi
Depth 16m Depth 16m

i)DW Dia - 3m x 115200.00 i)DW Dia 111500.00 5500.00 5


10 Chittorgarh
Depth 19m - 4m x

12 | P a g e
Unit Cost for Investment Activities 2019-20

Depth 19m

i)DCBW Dug
portion Dia 2m x 10 to12.5
Depth 45m 284400.00 - - - - SIP - 10
Boring(DTH) Dia TO15
200mm x Depth
30m
11 Churu
ii) DCBW Dug
portion Dia 2m x
Depth 10 to 12.5
298400.00 - - - -
45mBoring(Percussi SIP - 10 to15
on) Dia 200mm x
Depth 30m

i)DW Dia -
i)DW (RCC)Dia - 3m
4m x 5500.0
132200.00 123000.00 5300.00 5 to 7.5
x Depth 23m Depth 0
23m
Dausa &
12
Jaipur ii)DCBW Dug
portion Dia 2.5mx
Depth 16m Boring
90800.00 - -
Dia 100mm x Depth
20m

i)DW Dia
i)DW Dia - 3m x
5300.0
13 Dholpur 96800.00 - 4m x 97000.00 5300.00 3 to 5
Depth 17m 0
Depth 15m

13 | P a g e
Unit Cost for Investment Activities 2019-20

iii) Cavity Well Dia


100 mm x Depth 20 19200.00 - -
m

DW (Non command i)DW Dia


14 Dungarpur area) Dia - 4m x 86500.00 - 4m x 106700.00 5300.00 3 to 5
Depth 16m Depth 16m

i)DCBW Dug
portion Dia 2m x 10 to 12.5
Depth 45m 156900.00 - SIP - 12.5
Boring(DTH) Dia to 20
200mm x Depth
25m
15 Jaisalmer
ii)DCBW Dug
portion Dia 2m x 10 to12.5
Depth 45m 298400.00 - SIP - 12.5 to
Boring(Percussion) 20
Dia 200mm x
Depth 30m

i)DW Dia
i)DW Dia - 3m x
- 4m x 5300.0
16 Jalore 129300.00 136800.00 5300.00 5 to 7.5
Depth 23m Depth 0
23m
i)DW Dia
i)DW Dia - 3m x
5500.0
17 Jhalawar 112600.00 - 4m x 109500.00 5300.00 5
Depth 16m 0
Depth 16m
i)DW Dia 5300.0
Jhunjhunu i)DW (RCC) Dia - 132000.00 139500.00 5300.00 5 to 7.5
18 - 4m x 0
& Sikar 3m x depth 24m
Depth

14 | P a g e
Unit Cost for Investment Activities 2019-20

24m

ii)DCBW Dug
portion Dia 1.6m x
Depth 40m Boring 146200.00 - - - - -
Dia 100mm x Depth
20m

i)DCBW(Rotary) i)DW Dia


Dug portion Dia 2m - 4m x 5 to 10 SIP
x Depth 30m Boring 139200.00 131300.00 0.00 5300.00
Depth - 10 to 17.5
Dia 150mm x Depth 24m
25m

19 Jodhpur

ii) DCBW(DTH)
Dug portion Dia 2m
x Depth 30m Boring 193200.00 - - - - -
Dia 200mm x
Depth 40m

i)DW Dia -
5 to 10
i)DW Dia - 3m x
4m x 5300.0
20 Nagaur 168400.00 132800.00 5300.00 SIP-10 to
Depth 30m Depth 0
17.5
25m

15 | P a g e
Unit Cost for Investment Activities 2019-20

ii)DCBW(Rotary)
Dug portion Dia
1.6m x Depth 30m 142700.00 -
Boring Dia 100mm x
Depth 30m

ii)DCBW(DTH) Dug
portion Dia 2.5m x 193200.00 - - - - -
Depth 30m Boring Dia
200mm x Depth 40m

i)DW Dia -
i)DW Dia - 3m x 4m x 5300.0
21 Pali 123200.00 118700.00 5300.00 5 to 7.5
Depth 22m Depth 0
22m
Rajsaman i)DW Dia -
i)DW Dia - 3m x 5500.0
22 d& 117000.00 4m x 102500.00 5500.00 5 to 7.5
Depth 16m 0
Udaipur Depth 16m
i)DW Dia -
Sawai
i)DW Dia - 3m x 4m x 5300.0
23 Madhopur 108200.00 116300.00 5300.00 5
Depth 20m Depth 0
& Karauli
20m
i)DW Dia -
i)DW Dia - 3m x 4m x 5300.0
24 Sirohi 111700.00 119000.00 5300.00 5
Depth 20m Depth 0
20m

16 | P a g e
Unit Cost for Investment Activities 2019-20

i)DCBW Dug
portion Dia 2m x
Depth 20m Boring 158700.00 - - - - 5 to 7.5

Srigangan Dia 150mm x


agar & Depth 30m
25 Hanuman
garh
ii) Cavity Well
(Canal command
19200.00
areas) - - - - -
Dia 100mm x
Depth 20m

i)DW Dia -
i)DW Dia - 3m x 5300.0
26 Tonk 107200.00 4m x 112200.00 5300.00
Depth 19m 0
Depth 19m

D. HDPE Sprinkler Sets of various models viz. 1.0 ha, 1.5 ha , 2.0 ha , 3.0 ha & 4.0 ha.

S.
Unit 1.0 ha Model 1.5 ha Model 2.0 ha Model 3.0 ha Model 4.0 ha Model
No
Item of work rate Quantit Unit Quantit Unit Quantit Unit Quantit Unit Quantit Unit
.
(Rs) y cost y cost y cost y cost y cost
(Nos) (Rs) (Nos) (Rs) (Nos) (Rs) (Nos) (Rs) (Nos) (Rs)
1 75 mm dia x 6m 758 21.00 15918 25 18950 30 22740 37 28046 45 34110
long main line
HDPE pipe with
quick action
coupler (class I
pipe 2.5 kg/cm2).

17 | P a g e
Unit Cost for Investment Activities 2019-20

2 75 mm dia x 3m 478 1.00 478 1 478 1 478 1 478 1 478


long sprinkler
pipe
3 75 mm dia 478 6.00 2868 8 3824 10 4780 12 5736 15 7170
sprinkler coupler
with foot batton
4 Sprinkler nozzles 560 6.00 3360 8 4480 10 5600 12 6720 15 8400
(pressure 1.7 to
2.8 kg/cm2 )
5 20 mm dia x 76 120 6.00 720 8 960 10 1200 12 1440 15 1800
cm long riser pipe
(GI)
6 Connecting 330 1.00 330 1 330 1 330 1 330 1 330
nipple
7 Bend with 412 1.00 412 1 412 1 412 1 412 1 412
coupler
8 495 1.00 495 1 495 1 495 1 495 1 495
Tee with coupler
9 132 2.00 264 2 264 2 264 2 264 2 264
End plug (75 mm)
2484 30193 3629 43921 53459
Total 5 9
2500 3000 3630 4400 53500
say 0 0 0 0

The repayment period is 5 years without any gestation period. All component are subject to BIS
pecification.
E. Drip Irrigation Sets for Orchard Crops
S.No Spacing Lateral Size (mm) 0.2ha model 2.0 ha model 3.0 ha model
1mx0.3m 16 32674.00 298082.00 445243.00
(a)
1.2mx0.6m 16 31816.00 245357.00 371391.00
(b)

18 | P a g e
Unit Cost for Investment Activities 2019-20

1.8mx0.6m 16 24867.00 175396.00 264025.00


(c)
2.5mx0.6m 16 20445.00 133419.00 203902.00
(d)
3mx3m 12 15983.00 83655.00 128847.00
(e)
4.5mx4.5m 12 72215.00 117906.00
(f)
6mx6m 12 63830.00 105242.00
(g)
8mx8m 12 53562.00 88472.00
(h)
9mx9m 12 49113.00 86761.00
(i)
UNIT COST FOR GoI SPONSORED SCHEMES
Indicative subsidy ceilings under the component of “Entrepreneurship Development and Employment
Generation” (EDEG)
Sub-mission: Livestock Development.
Sub-component - Poultry Venture Capital Fund (PVCF)-EDEG
S. No. Component Unit Cost Ceiling of Subsidy
i Breeding Farms for Birds of alternate Not specified At 25% level subsidy- subsidy
species like turkey, ducks, Japanese ceiling Rs. 7.50 lakh Varies
quails, guinea fowl and geese depending on the species and unit
size.
ii Central Grower Units (CGU) – upto At 25% level subsidy- subsidy
16000 layer chicks per batch. ceiling Rs. 10 lakh for a unit of
16000 layer chicks per batch (three
batches a year) - Varies with size.
iii Hybrid Layer (chicken) Units – up to At 25% level subsidy- subsidy
20000 layers ceiling Rs. 2 lakh for 2000 layer
unit - Varies with the size.

19 | P a g e
Unit Cost for Investment Activities 2019-20

iv Hybrid Broiler (chicken) Units – up to At 25% level subsidy- subsidy


20000 birds. Can be weekly, ceiling Rs. 0.56 lakh for a batch of
fortnightly, monthly, all-in all-out 1000 broilers - Varies with unit size
batches. Bird strength at any point of
time should not exceed 20000 birds

v Rearing of Poultry like low input At 25% level subsidy- subsidy


technology variety of chicken and other ceiling Rs. 5 lakh Varies with the
alternative species like turkey, ducks, species and unit size
Japanese quails, guinea fowl and geese.
vi Feed Mixing units (FMU) - 1.0 ton per At 25% level subsidy- subsidy
hour Disease Investigation Lab (DIL) ceiling Rs. 4 lakh
vii Transport Vehicles – open cage At 25% level subsidy- subsidy
ceiling Rs. 2 lakh
viii Transport Vehicles – Refrigerated At 25% level subsidy- subsidy
ceiling Rs. 3.75 lakh
ix Retail outlets – Dressing units At 25% level subsidy- subsidy
ceiling Rs. 2.50 lakh
x Retail outlets – marketing units At 25% level subsidy- subsidy
ceiling Rs. 3.75 lakh
xi Mobile marketing units At 25% level subsidy- subsidy
ceiling Rs. 2.5 lakh
Xii Cold storage for poultry products At 25% level subsidy- subsidy
ceiling Rs. 5 lakh
Xiii Egg / Broiler Carts At 25% level subsidy- subsidy
ceiling Rs. 3750/-
xiv Large Processing Units 2000-4000 At 25% level subsidy- subsidy
birds per hour ceiling Rs. 125 lakh
Xv Emu Processing units At 25% level subsidy- subsidy
ceiling Rs. 250 lakh

20 | P a g e
Unit Cost for Investment Activities 2019-20

Xvi Feather Processing Units/ litter Varies with unit size. The subsidy
management ceiling is Rs. 125 lakh.
Xvii Technology upgradation/ innovations Varies with the component. The
including waste disposal/ incinerators, subsidy ceiling is Rs. 125 lakh. For
minihatchers, egg vending machines new/ innovative projects EC may
etc. decide the subsidy/ value cap
depending upon the scope and
importance of the project.

S. No. Component Ceiling of Subsidy


i Commercial Units of 10 ewe / does + 1 ram / buck At 25 % level subsidy ceiling Rs. 12,500/-

ii Breeding farms with 100 ewe / does + 5 ram / bucks At 25 % level subsidy ceiling Rs. 2,50,000/-

iii Commercial rabbit- Angora units At 25 % level subsidy ceiling Rs. 75,000/-

iv Rabbit- Angora breeding Farms Varies with unit size


Sub-component- Pig Development-EDEG
i Commercial rearing units (3 sows + 1 Boar) At 25% level subsidy- subsidy ceiling Rs.
25,000/-
ii Pig Breeding Farms (20 sows + 4 Boars) At 25% level subsidy- subsidy ceiling Rs.
2,00,000/-
iii Retail Pork Outlets with facility for chilling At 25% level subsidy- subsidy ceiling Rs.
3,00,000/-

Sub-component - Salvaging of Male Buffalo Calves-EDEG

i Mini Units: Rearing of male Buffalo calves upto 25 calves. At 25% level subsidy - subsidy ceiling Rs. 6,250/-
per calf. It would be implemented by the State

21 | P a g e
Unit Cost for Investment Activities 2019-20

Governments and subsidy would be channelized


through NABARD. The beneficiary will have to
avail bank loan to a tune of minimum 50% of
project cost minus subsidy and prescribed
beneficiary share.
ii Commercial Units: Rearing of male Buffalo calves, more At 25% level subsidy - subsidy ceiling Rs.
than 25 calves upto 200 calves at one location. 1,50,000/- per 25 calves (at the rate of
Rs.6,000/- per calf). It would be implemented by
the State Governments and subsidy would be
channelized through NABARD. The beneficiary
will have to avail bank loan to a tune of minimum
50% of project cost minus subsidy and prescribed
beneficiary share.
iii Retail Pork Outlets with facility for chilling At 25% level subsidy- subsidy ceiling Rs.
3,00,000/-
iii Industrial Rearing Units: more than 200 calves upto At 25% level subsidy - subsidy ceiling Rs.
2000 Buffalo calves at one location. 6,25,000/- per 200 calves (at the rate of
Rs.3,125/- per calf). It would be implemented by
the APEDA and subsidy would be channelized
through NABARD. The beneficiary will have to
avail bank loan to a tune of minimum 50% of
project cost minus subsidy and prescribed
beneficiary share.
Note:
(a) The ceiling on subsidy in general is at the rate of 25%. Pro-rata variable subsidy depending on category of beneficiary
and location of the project will be applicable. The unit cost assumed for calculation of ceiling of subsidy is indicative only
and SLSMC can revise or modify as per the prevailing market price in the area.
(b) Rearing of male buffalo calves for a minimum period of 24 months.
(c) All units under „Entrepreneurship Development and Employment Generation‟, include provisions for feed and fodder,
silage making, biosecurity and healthcare, insurance and other project activities etc.
(d) An entrepreneur may avail more than one unit (maximum 4 units) of Commercial Unit of 10 ewe / does+ 1 ram / buck
and; Commercial rearing units (3 sows + 1 Boar).
(e) No multiple unit will be allowed for other activities under the Component- EDEG.
22 | P a g e
Unit Cost for Investment Activities 2019-20

Proportion of Subsidy for various areas and various categories of beneficiaries (i) NORMAL AREAS:
Category Back ended subsidy Credit Beneficiary Share / Margin
Money
BPL / SC / ST 33.33% 56.67% 10%
APL 25% 65% 10%

23 | P a g e
राष्ट्रीय कृषि और ग्रामीण षिकास बैंक
National Bank for Agriculture and Rural Development