Bill of Qty (Labour Mgnrega)

dk;Z dk uke %& xzke& ds iwoZ ek/;fed fo|ky; dh ckmMªhoky fuekZ.k dk;ZA
S.no Items of Work Qty Unit Rate Amount
1 E/W Excavation in foundation in ordinary soil all complete as per S.I.
58.11 Cum 85.85 4988.74
No. 251
2 P/L Cement Conc. In 1:6:12 with cement F/sand, 40mm B/Ballast i/c all
13.02 Cum 508.00 6614.16
complete work as per S.I. No. 273
3 R.C.C. work in 1:2:4 with cement, C/sand and S/grit as per S.I. No. 288
30.16 Cum 448.00 13511.68
(Column & Beam )
4 M.S. Or iron work in plan work such as R.C.C. work I/c cutting and
23.68 Qtl 691.00 16362.88
banding etc. As per SI no 504
5 M-150 B/w in 1:4 with cement C/sand, Mortar complete work in super-
40.25 Cum 422.00 16985.50
structure.
6 M-150 B/w in 1:6 with cement C/sand, Mortar complete work in
16.90 Cum 338.00 5712.20
foundation.
7 12mm thick Plaster work in 1:4 with cement, C/sand, Mortar i/c all as
331.50 Sqm 26.00 8619.00
per NBO. 17.58 (Smooth phase)
8 12mm thick Plaster work in 1:4 with cement, C/sand, Mortar i/c all as
323.48 Sqm 30.00 9704.40
per NBO. 17.58 (Rought phase)
9 Finishing walls with water proofing cement paint of approved make
such as super snowcem,durrocem robiacem,guttucem,supercem qualit
of required shade on undecorated wall incl. curing and cost of 654.97 Sqm 7.00 4584.79
materials,labour and T&P etc. as SI No-660,661

10 Painting two coats on steel or other metal surface over one coat of
priming coat incl. material,labour and T&P etc. required for proper 13.60 Sqm 13.00 176.80
completion of work, as per SI No-641+642
Total 87260.15
Say 87260.00

J.E. G.P/V.A. PRADHAN