Академический Документы
Профессиональный Документы
Культура Документы
COMPANY:
ADDRESS:
CONTACT #:
Project
Location
Owner
Subject
Item
1.11
1.12
1.13
1.14
1.15
Sub-total
2.0 CIVIL WORKS
2.1
2.2
2.2.1
2.2.2
2.2.3
2.3
2.3.1
2.3.2
2.4
2.4.1
2.5
Sub-total
3.0 STRUCTURAL STEEL WORKS
3.1
3.2
Sub-total
4.0 ARCHITECTURAL WORKS/FINISHES
4.1
4.1.1
4.1.2
4.2
4.2.1
4.2.3
4.2.4
4.3
4.3.1
4.3.2
4.3.3
4.4
Sub-total
5.0 ELECTRICAL WORKS
5.1
5.2
5.3
5.4
Sub-total
6.0 PLUMBING & SANITARY WORKS
6.1
6.2
6.2.1
6.2.2
6.2.3
6.2.4
6.2.5
6.3
Sub-total
7.0 SEPTIC TANK
7.1
7.1.1
7.1.2
7.1.3
7.1.4
7.1.5
7.1.6
7.1.7
7.1.8
7.2
Sub-total
ADDRESS: LOT 10 BLK 1 SAN SEBASTIAN ST. SAN DIONISIO VILLAGE UPS 5
CONTACT #: 0997-807-97-00
: DESIGN AND CONSTRUCTION OF PROPOSED 444 MULTI-UNIT HOUSES
: BARANGAY CASTAÑAS, SARIAYA, QUEZON
: ARTHOCEM CONCRETE INDUSTRIES, INC.
: COMMERCIAL BID FORM
Description
ENERAL REQUIREMENTS/PRELIMINARIES
Mobilization / Demobilization
Site Maintenance
Working Drawings and As-built Plans (Signed and Sealed)
Materials lifting and handling
Temporary Facilities
Temporary Power
Temporary Water
Scaffolding
Warehousing/Storage
Provision of Quality Control Personnel & Testing Equipment
(Materials testing/Verification of Quality)
Provision for Safety, Security & Fire Fighting Facilities
Plans & Permits (Legworks only)
Final Clean-up
Contingencies
Others, Please Specify:
a.
VIL WORKS
EARTHWORKS/BASE PREPARATIONS
a. Lay-out & Staking
b. Excavation
c. Gravel Bedding
CONCRETE SLAB
Formworks
a. LC 100 x 50 x 15 x 3.0mm
b. 10mm Ø Reinforcing Bars
c. Welding Rod
d. Labor Cost
Reinforcement
a. 10mm Ø Reinforcing Bars
b. Tie Wire #16
c. Labor Cost
Concreting
a. 2500 psi Readymix Concrete
STRUCTURAL INSULATED PANELS
Exterior Wall
Interior Wall
WALL PARTITION
12mm thick Gypsum Board on Light Metal Framing
a. 12mm thick Gypsum Board
b. 76mm x 35mm x 0.60mm x 3.0mm Metal Studs
c. 76mm x 35mm x 0.60mm x 3.0mm Metal Tracks
d. Blind Rivets
e. 1" Black Screw
f. Mesh Tape
g. UB888 Boral Putty
h. Concrete Nail (1")
i. Labor Cost
Others, Please Specify:
a.
RCHITECTURAL WORKS/FINISHES
DOORS & WINDOWS
Doors
a. D-1 (2100mm x 800mm) Wood Panel Doors
b. D-2 (2100mm x 700mm) Wood Flush Doors
c. D-3 (2100mm x 600mm) PVC Doors
c. D-4 (2100mm x 800mm) Wood Flush
Windows
a. W-1 (1200mm x 600mm) Jalousie Glass Window
b. W-2 (600mm x 600mm) Jalousie Glass Window
TILE WORKS
T&B Floor Tiles
a. 300mm x 300mm Ceramic Floor Tiles
b. Tile Adhesive
c. Tile Grout
d. Readyfix
T&B Wall Tiles
a. 300mm x 300mm Ceramic Wall Tiles
b. Tile Adhesive
c. Tile Grout
Labor Cost
PAINTING WORKS
Exterior Wall
a. Flat Latex
b. Patching Compound
c. Roller Brush 7"
d. Paint Brush 2"
e. Elastomeric Paint
f. Sand Paper
Interior Wall
a. Flat Latex
b. Patching Compound
c. Roller Brush 7"
c. Paint Brush 2"
d. Semi-Gloss Latex
e. Sand Paper
Labor Cost
Others, Please Specify:
a.
LECTRICAL WORKS
Roughing-ins (Phelp Dodge Wire & Emerald PVC Conduit)
a. 2.2 sq.mm THHN Stranded Wire
b. 3.5 sq.mm THHN Stranded Wire
c. 3/4"PVC Conduit Pipe
d. 1/2" Flexible Conduit
e. Utility Box
f. Junction Box
g. Panel Boards & Circuit Breakers
Electrical Fixtures & Devices
a. One-Gang Switch
b. Two-Gang Switch
c. Duplex Convenience Outlet
d. Receptacle and LED Light
Labor Cost
Others, Please Specify:
a.
EPTIC TANK
Supply & Installation of Purifying Septic Tank (1.0 cu.m) and necessary accessories to complete the sy
1.0 cu.m Purifying Septic Tank (PE)
Excavation
Backfilling
100mm PVC Pipe Series 600
PVC Elbow 90˚ (100mm Diameter)
Solvent Cement (400cc)
Concrete Cover
Gravel & Charcoal
Others, Please Specify:
a.
ANDREA S . MARIN
LOT 10 BLK 1 SAN SEBASTIAN ST. SAN DIONISIO VILLAGE UPS 5 PARAÑAQUE CITY
0997-807-97-00
Material Cost Labor Cost Equipment
Quantity Unit
Unit Cost Unit Cost Unit Cost
15,149.20
1,905,2
5,000.00
400.00
528.00
450.00
176.00
501.60
501.60
200.00
704.00
308.00
0.00
880.00
0.00
500.00
5,000.00
15,149.20
9,992.40 9,992.40
3,014.00 3,014.00
9,250.00 9,250.00
6,370.00 6,370.00
4,452.00 4,452.00
600.00 600.00
5,000.00 5,000.00
34,980.00 34,980.00
5,100.00 5,100.00
5,000.00 5,000.00
57,630.00 57,630.00
2,150.00 516,000.00
2,150.00 150,500.00
32,400.00 32,400.00
20,400.00 20,400.00
4,560.00 4,560.00
1,500.00 1,500.00
3,600.00 3,600.00
750.00 750.00
2,040.00 2,040.00
450.00 450.00
22,239.00 22,239.00
895,827.40
27,300.00 27,300.00
14,160.00 14,160.00
750.00 750.00
18,000.00 18,000.00
26,750.00 26,750.00
120,240.00 120,240.00
21,375.00 21,375.00
50,100.00 50,100.00
278,675.00
36,000.00 36,000.00
24,300.00 24,300.00
12,900.00 12,900.00
25,500.00 25,500.00
0.00
27,000.00 27,000.00
4,500.00 4,500.00
0.00
0.00
4,500.00 4,500.00
1,350.00 1,350.00
390.00 390.00
8,400.00 8,400.00
0.00
18,480.00 18,480.00
2,700.00 2,700.00
1,560.00 1,560.00
28,170.00 28,170.00
0.00
0.00
11,856.00 11,856.00
1,800.00 1,800.00
960.00 960.00
360.00 360.00
38,000.00 38,000.00
7,500.00 7,500.00
0.00
16,640.00 16,640.00
3,600.00 3,600.00
3,600.00 3,600.00
960.00 960.00
38,400.00 38,400.00
3,600.00 3,600.00
94,162.00 94,162.00
417,188.00
20,400.00 20,400.00
24,000.00 24,000.00
13,728.00 13,728.00
2,520.00 2,520.00
1,200.00 1,200.00
1,050.00 1,050.00
24,000.00 24,000.00
1,620.00 1,620.00
810.00 810.00
7,584.00 7,584.00
2,700.00 2,700.00
12,000.00 12,000.00
111,612.00
12,000.00 12,000.00
1,260.00 1,260.00
3,600.00 3,600.00
360.00 360.00
288.00 288.00
4,200.00 4,200.00
5,100.00 5,100.00
14,400.00 14,400.00
1,320.00 1,320.00
1,140.00 1,140.00
780.00 780.00
5,280.00 5,280.00
1,680.00 1,680.00
1,176.00 1,176.00
540.00 540.00
30,000.00 30,000.00
11,100.00 11,100.00
2,100.00 2,100.00
1,020.00 1,020.00
11,100.00 11,100.00
25,200.00 25,200.00
133,644.00
33,000.00 33,000.00
3,360.00 3,360.00
1,548.00 1,548.00
10,080.00 10,080.00
1,320.00 1,320.00
1,200.00 1,200.00
1,800.00 1,800.00
800.00 800.00
53,108.00
1,905,203.60
VAT - EX