Project : DESIGN AND CONSTRUCTION OF PROPOSED 444 MULTI-UNIT HOUSES

Location : BARANGAY CASTAÑAS, SARIAYA, QUEZON


Owner : ARTHOCEM CONCRETE INDUSTRIES, INC.
Subject : TECHNICAL BID FORM

Item Description Quantity Unit

1.0 GENERAL REQUIREMENTS/PRELIMINARIES


1.1 Mobilization / Demobilization 1.00 lot
1.2 Site Maintenance 1.00 lot
1.3 Working Drawings and As-built Plans (Signed and Sealed) 1.00 lot
1.4 Materials lifting and handling 1.00 lot
1.5 Temporary Facilities 1.00 lot
1.6 Temporary Power 1.00 lot
1.7 Temporary Water 1.00 lot
1.8 Scaffolding 1.00 lot
1.9 Warehousing/Storage 1.00 lot
1.10 Provision of Quality Control Personnel & Testing Equipment 1.00 lot
(Materials testing/Verification of Quality)
1.11 Provision for Safety, Security & Fire Fighting Facilities 1.00 lot
1.12 Plans & Permits (Legworks only) 1.00 lot
1.13 Final Clean-up 1.00 lot
1.14 Contingencies 1.00 lot
1.15 Others, Please Specify:
a.
Sub-total
2.0 CIVIL WORKS
2.1 EARTHWORKS/BASE PREPARATIONS
a. Lay-out & Staking 166.54 sq.m
b. Excavation 11.00 cu.m
c. Gravel Bedding 9.25 cu.m
2.2 CONCRETE SLAB
2.2.1 Formworks
a. LC 100 x 50 x 15 x 3.0mm 14.00 pcs
b. 10mm Ø Reinforcing Bars 21.00 pcs
c. Welding Rod 5.00 kgs
d. Labor Cost 1.00 lot
2.2.2 Reinforcement
a. 10mm Ø Reinforcing Bars 165.00 pcs
b. Tie Wire #16 30.00 kgs
c. Labor Cost 1.00 lot
2.2.3 Concreting
a. 2500 psi Readymix Concrete 11.30 cu.m
2.3 STRUCTURAL INSULATED PANELS
2.3.1Exterior Wall 1.00 sq.m
2.3.2Interior Wall 1.00 sq.m
2.4WALL PARTITION
2.4.112mm thick Gypsum Board on Light Metal Framing
a. 12mm thick Gypsum Board 72.00 pcs
b. 76mm x 35mm x 0.60mm x 3.0mm Metal Studs 102.00 bags
c. 76mm x 35mm x 0.60mm x 3.0mm Metal Tracks 24.00 kgs
d. Blind Rivets 3.00 box
e. 1" Black Screw 3,600.00 pcs
f. Mesh Tape 3.00 roll
g. UB888 Boral Putty 3.00 bags
h. Concrete Nail (1") 3.00 kgs
i. Labor Cost 123.55 sq.m
2.5 Others, Please Specify:
a.
Sub-total
3.0 STRUCTURAL STEEL WORKS
3.1 ROOF FRAMING & ROOFING
a. 50mm x 100mm x 1.5mm thick C-Purlins 60.00 pcs
b. 50mm x 150mm x 3.0mm thick C-Purlins 24.00 pcs
c. 40mm x 40mm x 4.5mm Angle Bar 2.00 pcs
d. Welding Rod 120.00 kgs
e. Epoxy Primer 25.00 gals
f. Pre-painted Long Span Metal Roofing(T=0.60mm) 200.40 ln.m.
g. Pre-painted Metal Flashing (T=0.60mm) 15.00 pcs
h. Labor Cost 200.40 ln.m.
3.2 Others, Please Specify:
a.
Sub-total
4.0 ARCHITECTURAL WORKS/FINISHES
4.1 DOORS & WINDOWS
4.1.1 Doors
a. D-1 (2100mm x 800mm) Wood Panel Doors 6.00 set
b. D-2 (2100mm x 700mm) Wood Flush Doors 6.00 set
c. D-3 (2100mm x 600mm) PVC Doors 6.00 set
c. D-4 (2100mm x 800mm) Wood Flush 6.00 set
4.1.2 Windows
a. W-1 (1200mm x 600mm) Jalousie Glass Window 18.00 set
b. W-2 (600mm x 600mm) Jalousie Glass Window 6.00 set
4.2 TILE WORKS
4.2.1 T&B Floor Tiles
a. 300mm x 300mm Ceramic Floor Tiles 150.00 pcs
b. Tile Adhesive 6.00 bags
c. Tile Grout 6.00 kgs
d. Readyfix 14.00 box
4.2.3 T&B Wall Tiles
a. 300mm x 300mm Ceramic Wall Tiles 660.00 pcs
b. Tile Adhesive 12.00 bags
c. Tile Grout 24.00 kgs
4.2.4 Labor Cost 56.34 sq.m
4.3 PAINTING WORKS
4.3.1 Exterior Wall
a. Flat Latex 19.00 gals
b. Patching Compound 60.00 kgs
c. Roller Brush 7" 12.00 pcs
d. Paint Brush 2" 12.00 pcs
e. Elastomeric Paint 38.00 gals
f. Sand Paper 30.00 m
4.3.2 Interior Wall
a. Flat Latex 32.00 gals
b. Patching Compound 120.00 kgs
c. Roller Brush 7" 24.00 pcs
c. Paint Brush 2" 24.00 pcs
d. Semi-Gloss Latex 64.00 gals
e. Sand Paper 60.00 m
4.3.3 Labor Cost 941.62 sq.m
4.4 Others, Please Specify:
a.
Sub-total
5.0 ELECTRICAL WORKS
5.1 Roughing-ins (Phelp Dodge Wire & Emerald PVC Conduit)
a. 2.2 sq.mm THHN Stranded Wire 12.00 roll
b. 3.5 sq.mm THHN Stranded Wire 12.00 roll
c. 3/4"PVC Conduit Pipe 120.00 pcs
d. 1/2" Flexible Conduit 210.00 m
e. Utility Box 48.00 pcs
f. Junction Box 42.00 pcs
g. Panel Boards & Circuit Breakers 6.00 set
5.2 Electrical Fixtures & Devices
a. One-Gang Switch 18.00 set
b. Two-Gang Switch 6.00 set
c. Duplex Convenience Outlet 24.00 set
d. Receptacle and LED Light 36.00 set
5.3 Labor Cost 1.00 lot
5.4 Others, Please Specify:
a.
Sub-total
6.0 PLUMBING & SANITARY WORKS
6.1 Plumbing & Sanitary Rough-ins
a. PPR Pipe (1/2" Ø) 48.00 pcs
b. PPR Elbow (1/2" Ø) 84.00 pcs
c. PPR Female Threaded Elbow (1/2" Ø) 36.00 pcs
d. PPR Tee (1/2" Ø) 24.00 pcs
e. PPR Coupling (1/2" Ø) 24.00 pcs
f. PPR Union Patente (1/2" Ø) 12.00 pcs
g. Water Meter 6.00 set
h. Pvc Pipe 3" 36.00 pcs
i. Pvc Elbow 3" 24.00 pcs
j. Pvc Wye 3" 12.00 pcs
k. Pvc Clean-Out 3" 12.00 pcs
l. Pvc Pipe 2" 24.00 pcs
m. Pvc Elbow 2" 48.00 pcs
n. Pvc P-Trap 2" 12.00 pcs
o. Pvc Tee Reducer 2" 12.00 pcs
p. Labor Cost 6.00 units
6.2 Plumbing Fixtures & Accessories
6.2.1 Lavatory 6.00 set
6.2.2 Hosebibb 6.00 set
6.2.3 Floor Drain 6.00 set
6.2.4 Kitchen Sink w/ Faucet 6.00 set
6.2.5 Water Closet 6.00 set
6.3 Others, Please Specify:
a.
Sub-total
7.0 SEPTIC TANK
7.1 Supply & Installation of Purifying Septic Tank (1.0 cu.m) and necessary accessories to complete the system
7.1.1 1.0 cu.m Purifying Septic Tank (PE) 6.00 units
7.1.2 Excavation 9.60 cu.m
7.1.3 Backfilling 2.00 cu.m
7.1.4 100mm PVC Pipe Series 600 36.00 ln.m.
7.1.5 PVC Elbow 90˚ (100mm Diameter) 12.00 pcs
7.1.6 Solvent Cement (400cc) 6.00 pcs
7.1.7 Concrete Cover 6.00 units
7.1.8 Gravel & Charcoal 1.00 lot
7.2 Others, Please Specify:
a.
Sub-total
Grand
total

PREPARED BY: PROJECT DURATION:

COMPANY:

ADDRESS:

CONTACT #:
Project
Location
Owner
Subject

Item

1.0 GENERAL REQUIREMENTS/PRELIMINARIES


1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10

1.11
1.12
1.13
1.14
1.15

Sub-total
2.0 CIVIL WORKS
2.1

2.2
2.2.1

2.2.2
2.2.3

2.3
2.3.1
2.3.2
2.4
2.4.1

2.5

Sub-total
3.0 STRUCTURAL STEEL WORKS
3.1

3.2

Sub-total
4.0 ARCHITECTURAL WORKS/FINISHES
4.1
4.1.1
4.1.2

4.2
4.2.1

4.2.3

4.2.4
4.3
4.3.1

4.3.2

4.3.3
4.4

Sub-total
5.0 ELECTRICAL WORKS
5.1
5.2

5.3
5.4

Sub-total
6.0 PLUMBING & SANITARY WORKS
6.1

6.2
6.2.1
6.2.2
6.2.3
6.2.4
6.2.5
6.3

Sub-total
7.0 SEPTIC TANK
7.1
7.1.1
7.1.2
7.1.3
7.1.4
7.1.5
7.1.6
7.1.7
7.1.8
7.2

Sub-total

PREPARED BY: ANDREA S . MARIN

COMPANY: JJM STRONG ROOFING CONSTRUCTION AND GENERAL SE

ADDRESS: LOT 10 BLK 1 SAN SEBASTIAN ST. SAN DIONISIO VILLAGE UPS 5

CONTACT #: 0997-807-97-00
: DESIGN AND CONSTRUCTION OF PROPOSED 444 MULTI-UNIT HOUSES
: BARANGAY CASTAÑAS, SARIAYA, QUEZON
: ARTHOCEM CONCRETE INDUSTRIES, INC.
: COMMERCIAL BID FORM

Description

ENERAL REQUIREMENTS/PRELIMINARIES
Mobilization / Demobilization
Site Maintenance
Working Drawings and As-built Plans (Signed and Sealed)
Materials lifting and handling
Temporary Facilities
Temporary Power
Temporary Water
Scaffolding
Warehousing/Storage
Provision of Quality Control Personnel & Testing Equipment
(Materials testing/Verification of Quality)
Provision for Safety, Security & Fire Fighting Facilities
Plans & Permits (Legworks only)
Final Clean-up
Contingencies
Others, Please Specify:
a.

VIL WORKS
EARTHWORKS/BASE PREPARATIONS
a. Lay-out & Staking
b. Excavation
c. Gravel Bedding
CONCRETE SLAB
Formworks
a. LC 100 x 50 x 15 x 3.0mm
b. 10mm Ø Reinforcing Bars
c. Welding Rod
d. Labor Cost
Reinforcement
a. 10mm Ø Reinforcing Bars
b. Tie Wire #16
c. Labor Cost
Concreting
a. 2500 psi Readymix Concrete
STRUCTURAL INSULATED PANELS
Exterior Wall
Interior Wall
WALL PARTITION
12mm thick Gypsum Board on Light Metal Framing
a. 12mm thick Gypsum Board
b. 76mm x 35mm x 0.60mm x 3.0mm Metal Studs
c. 76mm x 35mm x 0.60mm x 3.0mm Metal Tracks
d. Blind Rivets
e. 1" Black Screw
f. Mesh Tape
g. UB888 Boral Putty
h. Concrete Nail (1")
i. Labor Cost
Others, Please Specify:
a.

TRUCTURAL STEEL WORKS


ROOF FRAMING & ROOFING
a. 50mm x 100mm x 1.5mm thick C-Purlins
b. 50mm x 150mm x 3.0mm thick C-Purlins
c. 40mm x 40mm x 4.5mm Angle Bar
d. Welding Rod
e. Epoxy Primer
f. Pre-painted Long Span Metal Roofing(T=0.60mm)
g. Pre-painted Metal Flashing (T=0.60mm)
h. Labor Cost
Others, Please Specify:
a.

RCHITECTURAL WORKS/FINISHES
DOORS & WINDOWS
Doors
a. D-1 (2100mm x 800mm) Wood Panel Doors
b. D-2 (2100mm x 700mm) Wood Flush Doors
c. D-3 (2100mm x 600mm) PVC Doors
c. D-4 (2100mm x 800mm) Wood Flush
Windows
a. W-1 (1200mm x 600mm) Jalousie Glass Window
b. W-2 (600mm x 600mm) Jalousie Glass Window
TILE WORKS
T&B Floor Tiles
a. 300mm x 300mm Ceramic Floor Tiles
b. Tile Adhesive
c. Tile Grout
d. Readyfix
T&B Wall Tiles
a. 300mm x 300mm Ceramic Wall Tiles
b. Tile Adhesive
c. Tile Grout
Labor Cost
PAINTING WORKS
Exterior Wall
a. Flat Latex
b. Patching Compound
c. Roller Brush 7"
d. Paint Brush 2"
e. Elastomeric Paint
f. Sand Paper
Interior Wall
a. Flat Latex
b. Patching Compound
c. Roller Brush 7"
c. Paint Brush 2"
d. Semi-Gloss Latex
e. Sand Paper
Labor Cost
Others, Please Specify:
a.

LECTRICAL WORKS
Roughing-ins (Phelp Dodge Wire & Emerald PVC Conduit)
a. 2.2 sq.mm THHN Stranded Wire
b. 3.5 sq.mm THHN Stranded Wire
c. 3/4"PVC Conduit Pipe
d. 1/2" Flexible Conduit
e. Utility Box
f. Junction Box
g. Panel Boards & Circuit Breakers
Electrical Fixtures & Devices
a. One-Gang Switch
b. Two-Gang Switch
c. Duplex Convenience Outlet
d. Receptacle and LED Light
Labor Cost
Others, Please Specify:
a.

LUMBING & SANITARY WORKS


Plumbing & Sanitary Rough-ins
a. PPR Pipe (1/2" Ø)
b. PPR Elbow (1/2" Ø)
c. PPR Female Threaded Elbow (1/2" Ø)
d. PPR Tee (1/2" Ø)
e. PPR Coupling (1/2" Ø)
f. PPR Union Patente (1/2" Ø)
g. Water Meter
h. Pvc Pipe 3"
i. Pvc Elbow 3"
j. Pvc Wye 3"
k. Pvc Clean-Out 3"
l. Pvc Pipe 2"
m. Pvc Elbow 2"
n. Pvc P-Trap 2"
o. Pvc Tee Reducer 2"
p. Labor Cost
Plumbing Fixtures & Accessories
Lavatory
Hosebibb
Floor Drain
Kitchen Sink w/ Faucet
Water Closet
Others, Please Specify:
a.

EPTIC TANK
Supply & Installation of Purifying Septic Tank (1.0 cu.m) and necessary accessories to complete the sy
1.0 cu.m Purifying Septic Tank (PE)
Excavation
Backfilling
100mm PVC Pipe Series 600
PVC Elbow 90˚ (100mm Diameter)
Solvent Cement (400cc)
Concrete Cover
Gravel & Charcoal
Others, Please Specify:
a.

ANDREA S . MARIN

JJM STRONG ROOFING CONSTRUCTION AND GENERAL SERVICES INC.

LOT 10 BLK 1 SAN SEBASTIAN ST. SAN DIONISIO VILLAGE UPS 5 PARAÑAQUE CITY

0997-807-97-00
Material Cost Labor Cost Equipment
Quantity Unit
Unit Cost Unit Cost Unit Cost

1.00 lot 5,000.00


1.00 lot 400.00
1.00 lot 528.00
1.00 lot 450.00
1.00 lot 176.00
1.00 lot 501.60
1.00 lot 501.60
1.00 lot 200.00
1.00 lot 704.00
1.00 lot 308.00

1.00 lot 880.00


1.00 lot
1.00 lot 500.00
1.00 lot 5,000.00

15,149.20

166.54 sq.m 60.00


11.00 cu.m 274.00
9.25 cu.m 800.00 200.00

14.00 pcs 455.00


21.00 pcs 130.00 82.00
5.00 kgs 120.00
1.00 lot 5,000.00
165.00 pcs 130.00 82.00
30.00 kgs 125.00 45.00
1.00 lot 5,000.00

11.30 cu.m 5,100.00

1.00 sq.m 1,850.00 300.00


1.00 sq.m 1,850.00 300.00
240.00
70.00
72.00 pcs 450.00
102.00 bags 200.00
24.00 kgs 190.00
3.00 box 500.00
3,600.00 pcs 3,600.00
3.00 roll 250.00
3.00 bags 680.00
3.00 kgs 150.00
123.55 sq.m 180.00

60.00 pcs 455.00


24.00 pcs 590.00
2.00 pcs 375.00
120.00 kgs 150.00
25.00 gals 1,070.00
200.40 ln.m. 600.00
15.00 pcs 1,425.00
200.40 ln.m. 250.00

6.00 set 5,000.00 1,000.00


6.00 set 3,200.00 850.00
6.00 set 1,300.00 850.00
6.00 set 3,400.00 850.00

18.00 set 1,500.00


6.00 set 750.00

150.00 pcs 30.00


6.00 bags 225.00
6.00 kgs 65.00
14.00 box 600.00

660.00 pcs 28.00


12.00 bags 225.00
24.00 kgs 65.00
56.34 sq.m 500.00

19.00 gals 624.00


60.00 kgs 30.00
12.00 pcs 80.00
12.00 pcs 30.00
38.00 gals 1,000.00
30.00 m 250.00

32.00 gals 520.00


120.00 kgs 30.00
24.00 pcs 150.00
24.00 pcs 40.00
64.00 gals 600.00
60.00 m 60.00
941.62 sq.m 100.00

12.00 roll 1,700.00


12.00 roll 2,000.00
120.00 pcs 114.40
210.00 m 12.00
48.00 pcs 25.00
42.00 pcs 25.00
6.00 set 4,000.00

18.00 set 90.00


6.00 set 135.00
24.00 set 316.00
36.00 set 75.00
1.00 lot 12,000.00

48.00 pcs 250.00


84.00 pcs 15.00
36.00 pcs 100.00
24.00 pcs 15.00
24.00 pcs 12.00
12.00 pcs 350.00
6.00 set 850.00
36.00 pcs 400.00
24.00 pcs 55.00
12.00 pcs 95.00
12.00 pcs 65.00
24.00 pcs 220.00
48.00 pcs 35.00
12.00 pcs 98.00
12.00 pcs 45.00
6.00 units 5,000.00

6.00 set 1,500.00 350.00


6.00 set 300.00 50.00
6.00 set 150.00 20.00
6.00 set 1,500.00 350.00
6.00 set 3,800.00 400.00

6.00 units 4,000.00 1,500.00


9.60 cu.m 350.00
2.00 cu.m 500.00 274.00
36.00 ln.m. 250.00 30.00
12.00 pcs 70.00 40.00
6.00 pcs 200.00
6.00 units 300.00
1.00 lot 800.00

1,905,2

PROJECT DURATION: 365 WORKING DAYS


Total Unit CostTotal Amount

5,000.00
400.00
528.00
450.00
176.00
501.60
501.60
200.00
704.00
308.00
0.00
880.00
0.00
500.00
5,000.00

15,149.20

9,992.40 9,992.40
3,014.00 3,014.00
9,250.00 9,250.00

6,370.00 6,370.00
4,452.00 4,452.00
600.00 600.00
5,000.00 5,000.00
34,980.00 34,980.00
5,100.00 5,100.00
5,000.00 5,000.00

57,630.00 57,630.00

2,150.00 516,000.00
2,150.00 150,500.00

32,400.00 32,400.00
20,400.00 20,400.00
4,560.00 4,560.00
1,500.00 1,500.00
3,600.00 3,600.00
750.00 750.00
2,040.00 2,040.00
450.00 450.00
22,239.00 22,239.00

895,827.40

27,300.00 27,300.00
14,160.00 14,160.00
750.00 750.00
18,000.00 18,000.00
26,750.00 26,750.00
120,240.00 120,240.00
21,375.00 21,375.00
50,100.00 50,100.00

278,675.00

36,000.00 36,000.00
24,300.00 24,300.00
12,900.00 12,900.00
25,500.00 25,500.00
0.00
27,000.00 27,000.00
4,500.00 4,500.00
0.00
0.00
4,500.00 4,500.00
1,350.00 1,350.00
390.00 390.00
8,400.00 8,400.00
0.00
18,480.00 18,480.00
2,700.00 2,700.00
1,560.00 1,560.00
28,170.00 28,170.00
0.00
0.00
11,856.00 11,856.00
1,800.00 1,800.00
960.00 960.00
360.00 360.00
38,000.00 38,000.00
7,500.00 7,500.00
0.00
16,640.00 16,640.00
3,600.00 3,600.00
3,600.00 3,600.00
960.00 960.00
38,400.00 38,400.00
3,600.00 3,600.00
94,162.00 94,162.00

417,188.00

20,400.00 20,400.00
24,000.00 24,000.00
13,728.00 13,728.00
2,520.00 2,520.00
1,200.00 1,200.00
1,050.00 1,050.00
24,000.00 24,000.00

1,620.00 1,620.00
810.00 810.00
7,584.00 7,584.00
2,700.00 2,700.00
12,000.00 12,000.00

111,612.00

12,000.00 12,000.00
1,260.00 1,260.00
3,600.00 3,600.00
360.00 360.00
288.00 288.00
4,200.00 4,200.00
5,100.00 5,100.00
14,400.00 14,400.00
1,320.00 1,320.00
1,140.00 1,140.00
780.00 780.00
5,280.00 5,280.00
1,680.00 1,680.00
1,176.00 1,176.00
540.00 540.00
30,000.00 30,000.00

11,100.00 11,100.00
2,100.00 2,100.00
1,020.00 1,020.00
11,100.00 11,100.00
25,200.00 25,200.00

133,644.00

33,000.00 33,000.00
3,360.00 3,360.00
1,548.00 1,548.00
10,080.00 10,080.00
1,320.00 1,320.00
1,200.00 1,200.00
1,800.00 1,800.00
800.00 800.00

53,108.00
1,905,203.60
VAT - EX