Engineer
REVISION
SUMMARY
PAGES 0 1
1 PURPOSE OF TESTS 2 X
2 REFERENCE DOCUMENT 2 X
3 SCOPE 2 X
4 RELAY TERMINLOGY 3 X
5 TEST EQUIPMENT 3 X
6 PRE-REQUISTES 3 X
7 PROCEDURES 4 X
8 RECORD TEST SHEET 5 X
8.1 RELAY INFORMATION
8.2 CT DATA:
8.3 PRODUCT CHECKS
8.4 MEASURMENT VALUE TEST:
8.5 87B HIGH IMPEDANCE DIFFERENTIAL PROTECTION
8.6 EXTERNAL STABILIZING RESITANCE MEASURMENT
8.7 EXTERNAL NON LINEAR RESITANCE MEASURMENT
8.8 CT SECONDARY RESISTANCE MEASURMENT :
8.9 BINARY INPUT TEST :
8.10 BINARY OUTPUT TEST:
8.11 FIXED LED INDICATIONS TEST:
8.12 LED INDICATIONS TEST:
8.13 FINAL CHECK
Name Name
Date Date
Doc. No. REV- 1 Page 1 of 9
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
1 PURPOSE OF TESTS
The purpose of the tests is to check the full functionality of the protection relay.
This procedure does not intend to check that all alarms and trips are correctly sent to the DCS or
SCADA level. This part is already developed into dedicated DCS or SCADA Commissioning
procedures.
2 REFERENCE DOCUMENTS
DOCUMENT VERSION/
DOCUMENT REMARKS
REFERENCE DATE
Protection Line Diagram
Schematic Drawing
Service Manual
Operation Manual
Protection Relay Coordination Principles
Relay setting Calculation
LED Display Configuration
3 SCOPE
Substation Name :-
Diameter:
Bay :
Panel Number :
Relay Denomination in Scheme
Scheme to be Checked Relay Functionality Test.
Name Name
Date Date
Doc. No. REV- 1 Page 2 of 9
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
4 TERMINOLOGY
3. Laptop NA
6 PRE - REQUISITES
PRE-REQUISITES REMARKS
All Safety Condition Are Ok
All Competent Personnel Available For The Test
Ac & Dc Supply Availability And Security
PPE Safety Available.
All Other Relevant Safety Instructions Been Followed
Coordination With Other Parties ( GIS, Transformer, Etc..)
Name Name
Date Date
Doc. No. REV- 1 Page 3 of 9
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
7 TEST PROCEDURES
The following procedures are written for demonstrating the main protection functions of the P821
relay using an Omicron test set or similar. The tests do not test the boundaries of all available function
characteristics. They do test that the function is operating at a point on one chosen characteristic. This
document is to be referred to when performing commissioning tests in association with the
commissioning section of the service manual.
NOTE :
All the Test are performed in the Test Switch.
Omicron CMC156 Test Equipment or Any Equivalent To Be Used
Name Name
Date Date
Doc. No. REV- 1 Page 4 of 9
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
8.2 CT DATA:
CT rated primary current set as
CT rated secondary current set as
Ignd-CT rated primary current set as
Ignd-CT rated secondary current set as
Name Name
Date Date
Doc. No. REV- 1 Page 5 of 9
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
L2-E 1.0 0 0
L3-E 1.0 0 0
L1-L2-L3 1.0 0
Y R121
B R131
Name Name
Date Date
Doc. No. REV- 1 Page 6 of 9
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
Y R2
B R3
R
Y
B
Name Name
Date Date
Doc. No. REV- 1 Page 7 of 9
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
Name Name
Date Date
Doc. No. REV- 1 Page 8 of 9
Gulf Cooperation Council
Interconnection Authority
GCCIA
Engineer
1 All test equipment, leads, shorts and test block removed safely?
2 Disturbed customer wiring re-checked?
3 All commissioning tests disabled?
4 Circuit breaker operations counter reset?
5 Current counters reset?
6 Event records reset?
7 Fault records reset?
8 Disturbance records reset?
9 Alarms reset?
10 LEDs reset?
11 Secondary front cover replaced? (If applicable)
REMARKS
………………………………………………………………………………………………………………
………………………………………………………………………………………………………………
………………………………………………………………………………………………………………
………………………………………………………………………………………………………………
END OF REPORT
Name Name
Date Date
Doc. No. REV- 1 Page 9 of 9