Вы находитесь на странице: 1из 7

Percentage BoQ

Tender Inviting Authority: EXECUTIVE ENGINEER RURAL WORKS DIVISION NO-II,KEONJHAR

Name of Work: Improvement to PWD Road to Talabaitarani road under Banspal Block for the year 2019-20 under DMF

Contract No: NCB 01 OF 2019-20

Bidder
Name :

PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is
liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )

NUMBE TEXT # NUMBER # TEXT # NUMBER NUMBER # TEXT #


R#
Sl. Item Description Quantity Units Estimated TOTAL AMOUNT TOTAL AMOUNT
No. Rate With Taxes In Words

1 2 4 5 6 54 55
1 Clearing grass and removal of rubbish up
to a distance of 30m outside the periphery
3000.000 SQM 1.74 #VALUE! #VALUE!
of the area as per Technical Specification
Clause 21
2 Loosering, levelling and compacting original
ground supporting embankment to facilitate
placement of first layer of embankment
scarified to a depth of 150mm. mixed with
water of OMC and then compacted by rolling 450.000 CUM 11.87 #VALUE! #VALUE!
so as to achieve minimum dry density as
given in Tables 300.1 and 300.2 for
embankment construction as per Technical
Specfication Clauser 301.4.1
3 Construction of emabnkment with approved
materials obtained from borrow pit with a lift
upto 1.5m transporting to site,
spreading,grading to required slope and
compacting to meet requirement of 4890.500 CUM 134.63 #VALUE! #VALUE!
tables300.1 and 300.2 with a lead upto
1000m & as per theTechnical specification
caluse 301.5 including royalty ect.complete as
per the direction of the Engineer-in-charge.
4 Construction of granular sub-base by
providing well graded material, spreading in
uniform layers with motor grader on prepared
surface, mixing by mix in place method with
495.000 CUM 814.06 #VALUE! #VALUE!
rotavator at OMC, and compacting with three
wheel 80-100 KN static roller capacity to
achieve the desired density, complete as per
Technical Specification Clause 402.
5 Providing ,laying ,spreading and compacting
stone aggregates of specific sizes to water
bound macadam specification including
spreading in uniform thickness, hand
packing ,rolling with three wheel 80-100 KN
static roller in stages to proper grade and
camber applying and brooming crushable
screening in Grading 'B' to fill up the
225.000 CUM 2254.72 #VALUE! #VALUE!
interstices of coarse aggregate,watering and
compacting to the required density including
cost,lead lift royality and taxes of all meterials
required for the work ,all labour & T&P
required as per Technical Specification
Clause 405 of MORD by manual means etc.
complete and as per the direction by the
Engineer-in-charge.WBM GR-II
6 Construction of un-reinforced, dowel jointed
at expansion and construction joint only, plain
cement concrete (Panneled concrete
0.5mx0.5) , thickness as per design, over a
prepared sub base, with 43 grade cement or
any other type as per Clause 1501.2.2 M30
(Grade), coarse and fine aggregates
conforming to IS:383, maximum size of
coarse aggregate not exceeding 25 mm,
mixed in a concrete mixer of not less than 0.2
cum capacity and appropriate weigh batcher
using approved mix design, laid in approved
fixed side formwork (steel channel, laying and 517.500 CUM 5338.95 #VALUE! #VALUE!
fixing of 125 micron thick polythene film,
wedges, steel plates including levelling the
formwork as per drawing), spreading the
concrete with shovels, rakes, compacted
using needle, screed and plate vibrators and
finished in continuous operation including
provision of contraction and expansion,
construction joints, applying debonding strips,
primer, sealant, dowel bars, near approaches
to bridge/culvert and construction joints,
admixtures as approved, curing of concrete
slabs for 14-days,
7 Fine dressing turfing including transportation
of turfs by mechanical means with all leads &
lifts and placing of turfs in postion and
1920.000 SQM 16.99 #VALUE! #VALUE!
ramming with thapies including water and
cost of labour & all materials etc. complete as
per direction of Engineer-in-charge
8 Earth work excavation of foundation in
hard soil within initial lead and lift
225.607 CUM 171.59 #VALUE! #VALUE!
including leveling the bed for laying
concrete
9 Providing and filling manually with selected
sand in layers not exceeding 150 mm. thick
including watering and compacting for 59.349 CUM 877.82 #VALUE! #VALUE!
finished itm of work as per clause 304/2900 of
MOST Specification
10 Providing C.C (1:3:6) Mix with 40 mm.
nominal size stone aggregates in foundations
upto a depth of 1.5 Mt below GL and upto a
37.626 CUM 4376.24 #VALUE! #VALUE!
height of 1.5 Mt. above GL/BL including cost
and conmveyance of all materials to the site
and all labour charges complete as pe
11 Providing and laying RCC Hume Pipe of
22.500 NOS 2216.51 #VALUE! #VALUE!
Diameter 600 mm Np3 type
12 Providing CC (1:2:4) Mix with 20mm nominal
size stone aggregates in sub structure upto a
depth of 1.5 Mt. below ground level and upto
110.370 CUM 5037.31 #VALUE! #VALUE!
a height of 1.5 Mt. above GL/BL including
Cost and conveyance of all materials to site
and all leabour charges complete as
13 Cutting,bending,binding,placing & tying the
grills(HYSD tor still) including cost of stel 5.000 QNTL 6395.03 #VALUE! #VALUE!
etc.complete
14 Brick masonry work in cement mortar in (1:4)
foundation complete excluding pointing and
1.172 CUM 4274.78 #VALUE! #VALUE!
plastering as per drawing and technical
specifications
15 Plastering with cement mortar (1:4), 16 mm
thick on brickwork in substructure as per 13.806 SQM 191.23 #VALUE! #VALUE!
technical specification Clauses 613.4 & 1205
16 Painting two coats on Display Board
4.600 SQM 187.50 #VALUE! #VALUE!
17 Fly Ash Brick masonry with CM (1:6) in
superstructure including watering, curing with
cost, conveyance, royalty and taxes of all
materials & labour (T&P) etc. complete as per 200.000 NOS 0.95 #VALUE! #VALUE!
the direction of Engineer-in- Charge.( ( FIRST
FLOOR )

Total in Figures
#VALUE! #VALUE!

Quoted Rate in Figures


Select
0.0000 #VALUE!

Quoted Rate in Words #VALUE!