Вы находитесь на странице: 1из 6

MR.

BISWAJIT PROJECT BOQ


Qty QTY
Si.No Description Nos L B D sft/cft sqm/cum
1 Earth Work Excuvation 11 6 6 6 2376.00 67.29
2 Pcc 1:5:10 11 6 6 0.5 198.00 5.61
3 Rcc Footing Concrete 11 5 5 1.5 412.50 11.68

Rcc Coloum Concrete


up to FFL From Footing Top Lvl 11 0.5 1.5 5.75 47.44 1.34
5 Back Filling For Footing Pit 11 6 6 3.5 1386.00
-648.75
737.25 20.88
6 Plinth Beam PCC 4 28.5 1 0.5 57.00

4 38.5 1 0.5 77.00


134.00 3.79
7 Rcc Plinth Beam Concrete 4 28.5 0.5 1.5 85.50
4 38.5 0.5 1.5 115.50
201.00 5.69
8 Above plinth Upto FFL Block work 4 28.5 1 114.00
4 38.5 1 154.00
268.00 24.90
9 Back Filling For Floor Area 1 36.5 26.5 2.5 2418.13 68.48
10 Flooring Pcc Concrete 1 36.5 26.5 0.5 483.63 13.70
11 Ground Floor
1.Rcc Coloum Concrete 12 0.5 1.5 10 90.00 2.55

2.Rcc Roof Slab 1 28.5 38.5 0.5 548.63


3.Rcc Roof Beam 4 38.5 0.5 1.5 115.50
4 28.5 0.5 1.5 85.50
749.63 21.23
4.Block work 3 38.5 8.5 981.75
3 28.5 8.5 726.75
2 6 8.5 102.00
2 4.25 8.5 72.25
Deduction 3 5 10 -150.00
1 3.5 7 -24.50
5 4 4 -80.00
4 8 8 -256.00
1 3 7 -21.00
1351.25 125.53
5.Rcc Lintel Beam 6 5 0.5 0.75 11.25
4 11 0.5 1 22.00
33.25 0.94
6.Rcc Sajja 5 4.5 1.5 0.25 8.44 0.24
7.Stair Case Waist Slab/ Steps 3.00
8.Plastering
Celling 1 36.5 26.5 967.25
Sajja Plastering 5 4.5 3.25 73.13
1040.38 96.65
Internal 3 38.5 9.5 1097.25
6 10.75 9.5 612.75
3 10.75 9.5 306.38
2 12.25 9.5 232.75
1 12.25 9.5 116.38
2 5 10 100.00
2 4.25 10 85.00
1 20.5 10 205.00
Deduction 5 4 4 -80
2 3.5 7 -49
4 8 8 -256
2370.50 220.22
External 2 38.5 10 770
2 28.5 10 570
1340 124.49
9.Flooring Tiles
Shop 1 1 10.75 12.25 131.69
Shop 2 1 10.75 12 129.00
Shop 3 1 10.75 12.25 131.69
Kitchen 1 10.75 12.25 131.69
Dining 1 16.75 13.25 221.94
Passage 1 25.25 5 126.25
872.25 81.03
10.Granite
Steps 21 3.5 1.5 110.25 10.24
12 Painting
Internal 3410
External 1340
13 Window UPVC
Grill 5 4.25 4.25 90.31
UPVC Frame/Shutter 5 4 4 80.00
14 Door Frame 1 3.25 7 22.75
15 Gate 1 5 7 35.00
16 Rolling Shutter 4 8 8 256
17 Shuttering 3000
18 Bar Bending work 4150
19 Electrical
20 Plumbing
22 UG Sump/ Septick Tank 1 16000
Rate Amount

250 16822.43
4300 24112.15
5500 64252.34

5500 7389.019

750 15659.52

4300 16318.32

5500 31308.41

875 21785.58
750 51362.04
4300 58895.14

6000 15293.12

6150 130563.4

875 109842.4
6150 5791.206
6250 1493.469
6500 19500

425 41077.61

400 88089.93

425 52907.84

950 76982.3

1850 18948.58

25 85250
27 36180

125 11289.06
450 36000
475 10806.25
250 8750
250 64000
40 120000
58 240700
100000
75000
12 192000
1848370