Inspected by : Date:
4 Year of manufacturing :
6 Before commissioning :
Test records,
a) Radiography,
b) Ultrasonic or
d) Hydtostatic test
(b) CP performance report
(i) Near miss accident
Page 1 of 4
INSPECTION OF PETROLEUM / GAS PIPELINES
(ii) Details of accident without loss of man-hour
(iii) Accident with loss of man-hour.
21 Quantum of patrolling :
(i) Ground/Aerial Pattroling of ROW/RoU shall be carried out
twice in a week
(ii) Line Walk by the official of the company at least once in a
year for entire length of the pipe line shall be carried out after
monsoon YES / NO
(i) For Valve, flanges
(ii) Corrosion protection for last five years.
30 Security arrangement
32 Earthing system
38 Mode of communication
(i) Internal or
(iii) Compliance of recommendations
(i) Road, Railway crossing – once in 03 months
(ii) Water body crossing, atleast twice in a year
Page 2 of 4
INSPECTION OF PETROLEUM / GAS PIPELINES
(iii) At Railway-Road Bridge – once in 03 months
(iii) Direction/Turning Point markers.
a) No. of ESDs.
b) Locations.
47 Provision of windsock
49 Abandonment of pipeline
ii) Pipeline patrolling records
iii) Encroachment records.
vi) CP monitoring report, test and survey reports
vii) Leak, burst and repair records
viii) Records pertaining to inspection such as external or internal
line conditions
ix) Pipeline repair records
54 Metering facilities
56 Pump Station
Page 3 of 4
INSPECTION OF PETROLEUM / GAS PIPELINES
58 Any other deviations/deficiencies.
Page 4 of 4