Академический Документы
Профессиональный Документы
Культура Документы
4. Current
Residential
Address:
Telephone No.:
Fax No.:
E-Mail Address:
5. Date of Birth:
Citizenship:
7. Membership in
Professional
Associations:
9. Countries of [List countries where expert has worked in the last 10 years]
Work
Experience:
10. Languages: [For each language indicate proficiency: good, fair, or poor in
speaking, reading, and writing]
11. Employme [Starting with present position, list in reverse order every employment
nt Record held by expert since graduation, providing for each employment (see
format here below): dates of employment, name of employing
organization, positions held.]
From [Month/Year]:
To [Month/Year]:
Employer:
Positions held:
Team leader will 1. Name of assignment or project: Consulting Services for VIPL
be responsible for Month and Year: AUG/2016
delivery of Location: Nigeria
assignment within Client: Kano Discom, Nigeria
decided time and Main project features: Review of existing Business process,
with expected Data Collection, develop effective strategies to reduce losses,
standard of quality. prioritize CAPEX schemes, plan and monitor maintenance
schedules and develop automation roadmap.
He will decide and Positions held: Team Leader
monitor the tasks
of other team Activities performed: The broad scope of the assignment was
experts while to:
aligning those Assisting WPG in AT&C Loss reduction of Kano Disco as
tasks with overall well as assistance in development of network roll out
project objective. plan considering reliability, AT&C loss reduction and
load growth.
He will formulate
the strategy for Assistance in formulation of appropriate strategies &
mechanism for improvement in reliability indices.
project
implementation Roll-out of Pre-paid metering system
along with other Preparation of Information technology and Operation
team members technology roadmap.
and UPPCL Other key area of operation:
officials. Revenue Cycle Management Services
Capacity Building and Change Management Services
He will review the Development of procurement processes and Preparation of
reports prepared technical specifications.
for various tasks
assigned to other
experts before 2. Name of assignment or project: Consulting Services for VIPL
submitting to Month and Year: March/ 2014
UPPCL/ ADB. Location: Nigeria
He will monitor the Client: Vigeo Holdings Limited
progress of work in Main project features: Review of existing Business process,
Data Collection, develop effective strategies to reduce losses,
the project area
prioritize CAPEX schemes, plan and monitor maintenance
against plan and
schedules and develop automation roadmap.
report to
Positions held: Team Leader
UPPCL/ADB Activities performed: As Team Leader looked after reducing
officials on monthly AT&C losses of Benin Disco, assisted in designing Standard
basis. Operating Procedure, assisted in formulation of strategies &
mechanism for improvement of reliability indices. Was
Preparation of responsible for developing Network re-designing and in
technical development of specifications and procedures. Also
specification conducted training sessions for Benin Disco staff on best
report. practices of operation and maintenance. The broad scope of
Preparing inception report the assignment was to:
detailing general Measurement of accurate Energy delivered to Benin
assessment of project Disco.
Reliable power supply to Sub-Transmission network.
Reduction of Technical Losses.
Reliable Power supply to Distribution Network.
Organizational Change management.
Network Study.
Reduction of commercial losses.
Assistance in regulatory approvals.
Preparation of IT and Automation Roadmap.
Developing Quality control and safety management.
Conducting Periodic Review meetings.
14. Certification:
I, the undersigned, certify to the best of my knowledge and belief that
(i) This CV correctly describes my qualifications and experience;
(ii) I am not a current employee of the Executing or the Implementing Agency;
(iii) In the absence of medical incapacity, I will undertake this assignment for the
duration and in terms of the inputs specified for me in Form TECH-6 provided
team mobilization takes place within the validity of this proposal;
(iv) I was not part of the team who wrote the terms of reference for this consulting
services assignment;
(v) I am not currently debarred by a multilateral development bank or temporarily
suspended by ADB;
(vi) I certify that I have been informed by the firm that it is including my CV in the
Proposal for the [insert name of project and contract]. I confirm that I will be
available to carry out the assignment for which my CV has been submitted
in accordance with the implementation arrangements and schedule set out
in the Proposal.
If the CV is signed by the firm’s authorized representative, insert:
(vii) I, as the authorized representative of the firm submitting this Proposal for the
[insert name of project and contract], certify that I have obtained the consent
of the named expert to submit his/her CV, and that s/he will be available to
carry out the assignment in accordance with the implementation
arrangements and schedule set out in the Proposal, and confirm his/her
compliance with paras (i) to (v) above.
Date: