Proposed Team Leader


Position:

2. Name of Firm: TATA Power Limited

3. Name of Expert: [Consultant Name]

4. Current
Residential
Address:

Telephone No.:

Fax No.:

E-Mail Address:

5. Date of Birth:

Citizenship:

6. Education: [Indicate college or university and other specialized education of


expert, giving names of institutions, degrees obtained, and dates
of obtainment]

7. Membership in
Professional
Associations:

8. Other Trainings: [Indicate significant training since degrees under 5 - Education


were obtained]

9. Countries of [List countries where expert has worked in the last 10 years]
Work
Experience:

10. Languages: [For each language indicate proficiency: good, fair, or poor in
speaking, reading, and writing]
11. Employme [Starting with present position, list in reverse order every employment
nt Record held by expert since graduation, providing for each employment (see
format here below): dates of employment, name of employing
organization, positions held.]
From [Month/Year]:
To [Month/Year]:
Employer:
Positions held:

12.Detailed Tasks 13. Work Undertaken that Best Illustrates Capability


Assigned to Handle the Tasks Assigned

 Team leader will 1. Name of assignment or project: Consulting Services for VIPL
be responsible for Month and Year: AUG/2016
delivery of Location: Nigeria
assignment within Client: Kano Discom, Nigeria
decided time and Main project features: Review of existing Business process,
with expected Data Collection, develop effective strategies to reduce losses,
standard of quality. prioritize CAPEX schemes, plan and monitor maintenance
schedules and develop automation roadmap.
 He will decide and Positions held: Team Leader
monitor the tasks
of other team Activities performed: The broad scope of the assignment was
experts while to:
aligning those  Assisting WPG in AT&C Loss reduction of Kano Disco as
tasks with overall well as assistance in development of network roll out
project objective. plan considering reliability, AT&C loss reduction and
load growth.
 He will formulate
the strategy for  Assistance in formulation of appropriate strategies &
mechanism for improvement in reliability indices.
project
implementation  Roll-out of Pre-paid metering system
along with other  Preparation of Information technology and Operation
team members technology roadmap.
and UPPCL  Other key area of operation:
officials.  Revenue Cycle Management Services
 Capacity Building and Change Management Services
 He will review the Development of procurement processes and Preparation of
reports prepared technical specifications.
for various tasks
assigned to other
experts before 2. Name of assignment or project: Consulting Services for VIPL
submitting to Month and Year: March/ 2014
UPPCL/ ADB. Location: Nigeria
 He will monitor the Client: Vigeo Holdings Limited
progress of work in Main project features: Review of existing Business process,
Data Collection, develop effective strategies to reduce losses,
the project area
prioritize CAPEX schemes, plan and monitor maintenance
against plan and
schedules and develop automation roadmap.
report to
Positions held: Team Leader
UPPCL/ADB Activities performed: As Team Leader looked after reducing
officials on monthly AT&C losses of Benin Disco, assisted in designing Standard
basis. Operating Procedure, assisted in formulation of strategies &
mechanism for improvement of reliability indices. Was
 Preparation of responsible for developing Network re-designing and in
technical development of specifications and procedures. Also
specification conducted training sessions for Benin Disco staff on best
report. practices of operation and maintenance. The broad scope of
Preparing inception report the assignment was to:
detailing general  Measurement of accurate Energy delivered to Benin
assessment of project Disco.
 Reliable power supply to Sub-Transmission network.
 Reduction of Technical Losses.
 Reliable Power supply to Distribution Network.
 Organizational Change management.
 Network Study.
 Reduction of commercial losses.
 Assistance in regulatory approvals.
 Preparation of IT and Automation Roadmap.
 Developing Quality control and safety management.
 Conducting Periodic Review meetings.

3. Name of assignment or project : Project Management


Consultancy Services under National Electricity Scheme
(NEF - Interest Subsidy) Scheme for Hisar, DHBVN (Haryana
Discom).
Month and Year: 2013
Location: Haryana
Client: Dakshin Haryana Bidyut Vitran Nigam, Haryana
Main project features. Government of India has approved
the NEF (Interest Subsidy) Scheme to promote the capital
investment in the distribution sector by providing interest
subsidy, linked with reform measures, on the loans taken by
public and private power utilities for various capital works
under Distribution projects.
Positions held: Team Member
Activities performed: Led a team of 2 Projects officers and 3
site engineers to assist in evaluation of technical bids and
Finalization of turnkey contractor, Supervision of Project
execution, Review & comment on GTP drawings, wiring
diagrams & subsystem layout submitted by the contractor;
Project Monitoring & Co-ordination. Also Reviewed plans and
specifications to determine electrical material requirements
(quantities and qualities), pricing of materials, onsite
inspection etc.

4. Name of assignment or project: Diagnostic study of


existing Energy Audit System, Load Management practices,
reviewing organizational structure at top management level
and conducting vision & mission workshops.
Month and Year: Nov/2008
Location: India
Client: Dakshin Haryana Bijli Vitran Nigam
Main project features: Review existing Energy Audit method,
reporting and monitoring process along with current load
management, load forecasting and power procurement
practices and suggests alternative approaches, and Business
process Engineering to improve utility performance.
Positions held: Technical Expert
Activities performed: Review current Energy Audit method,
reporting and monitoring process that may exist in the two
distribution companies and suggest appropriate methodology,
reporting and monitoring process for further improvements in
the same. In addition, to suggest the key enablers /
requirements for the proposed method. Review of current load
management, load forecasting and power procurement
practices and suggests alternative approaches.

5. Name of assignment or project: Implementation of


the Corporate Restructuring of Nigeria Electricity Power
Authority (NEPA) now PHCN (Power Holding Company of
Nigeria), Bureau of Public Enterprises (BPE), Abuja
Month and Year: May/2006
Location: Nigeria
Client: Power Holding Company of Nigeria.
Main project features: Restructuring of generation and
distribution sub-sectors of the Power Holding Company of
Nigeria (PHCN)
Positions held: Technical Expert
Activities performed: The Grid Code and Metering Code for
the distribution companies was developed that allowed the
companies to operate in the new Wholesale Electricity Market.
Also the transition strategy & guidelines for distribution
companies to implement Performance Standard Codes was
formulated. Training was provided on operational aspects of
distribution and generation companies through a technical
workshop at Nigeria.

6. Name of assignment or project: Assignment: O&M of EHV


Network-Transmission Network & Grids.
Month and Year: 2003
Location: New Delhi
Client: In-House (TATA Power Delhi Distribution Limited)
Main project features: Maintenance planning of sub
transmission line
Positions held: Project coordinator
Activities performed: Worked as Area Power System
Manager (APSM) and led a group of 15 engineers and 30
technicians for four years and looked after operation,
maintenance and project activities of sub-transmission system
consisting of 20 SCADA operated 66/33/11 kV Grid sub-
stations, 33 KV rail pole lines and U/G & transmission lines.

14. Certification:
I, the undersigned, certify to the best of my knowledge and belief that
(i) This CV correctly describes my qualifications and experience;
(ii) I am not a current employee of the Executing or the Implementing Agency;
(iii) In the absence of medical incapacity, I will undertake this assignment for the
duration and in terms of the inputs specified for me in Form TECH-6 provided
team mobilization takes place within the validity of this proposal;
(iv) I was not part of the team who wrote the terms of reference for this consulting
services assignment;
(v) I am not currently debarred by a multilateral development bank or temporarily
suspended by ADB;
(vi) I certify that I have been informed by the firm that it is including my CV in the
Proposal for the [insert name of project and contract]. I confirm that I will be
available to carry out the assignment for which my CV has been submitted
in accordance with the implementation arrangements and schedule set out
in the Proposal.
If the CV is signed by the firm’s authorized representative, insert:
(vii) I, as the authorized representative of the firm submitting this Proposal for the
[insert name of project and contract], certify that I have obtained the consent
of the named expert to submit his/her CV, and that s/he will be available to
carry out the assignment in accordance with the implementation
arrangements and schedule set out in the Proposal, and confirm his/her
compliance with paras (i) to (v) above.

I understand that any willful misstatement described herein may lead to my


disqualification or dismissal, if engaged.

Date:

[Signature of expert or authorized representative of the firm]5