Академический Документы
Профессиональный Документы
Культура Документы
At Plant No. 1
Orange County Sanitation District
HEI Project No. 181301
It is hereby certified that the equipment/material shown and Helix Electric, Inc.
marked in this submittal is that proposed to be incorporated Project No. 181301
into the project. It is in compliance with the contract drawings April 13, 2016
and specifications and can be installed in the allocated spaces. Revision 0
P.O. Box 85298 • San Diego, CA 92186-5298 • (858) 535-0505 • FAX (858) 535-0757
6795 Flanders Drive • San Diego, CA 92121-2903
April 13, 2016
Mike Munden
W.M. Lyles Co.
42142 Roick Drive
Temecula, CA 92590
Dear Mike,
Attached are the example NETA Test Forms, per Spec Section 16080-1.4.D as applicable to Spec Section
16080-3.3 “TESTS REQUIRED TO BE PERFORMED BY TESTING ORGANIZATION”.
Note 1: This testing plan includes an estimated schedule/duration and sequencing of the testing, as
previously reviewed with OCSD. As discussed in the 4/7/16 pre-submittal review meeting with OCSD,
tests performed by the Contractor, including Circuit and Cable Testing (600V and below) and Low-
Voltage Motor Testing will be submitted separately.
Note 2: As discussed in the 4/7/16 pre-submittal review meeting with OCSD, the VFD’s, UPS System,
and Motors (above 20HP) will be submitted separately, as there is overlap between the Vendor Startup
procedures and the steps outlined in the NETA Standards.
Please contact me at 310-318-4063 if any questions arise during the review of this submittal.
Sincerely,
Barrett Robinson
Project Manager
P.O. Box 85298 • San Diego, CA 92186-5298 • (858) 535-0505 • FAX (858) 535-0757
6795 Flanders Drive • San Diego, CA 92121-2903
Section 16080
ELECTRICAL TESTING
PART 1 - GENERAL
1.1 THE REQUIREMENT
A. This Specification defines electrical equipment testing responsibilities for the
CONTRACTOR.
B. The CONTRACTOR shall provide an independent, third-party InterNational Electrical
Testing Association (NETA) testing organization to perform electrical testing described
herein based on the 2009 Edition of the InterNational Electrical Testing Association
Standard for Acceptance Testing Specifications for Electrical Power Distribution
Equipment and Systems.
C. The CONTRACTOR is responsible for performing all tests listed herein that does not
require the use of the testing organization.
D. The CONTRACTOR shall furnish all tools, equipment, material, and supplies and
perform all labor required to perform electrical tests as indicated on the Contact
Documents and specified herein.
E. The CONTRACTOR shall include electrical testing in the construction schedule.
1.2 RELATED WORK SPECIFIED ELSEWHERE
A. The requirements of the following sections and divisions apply to the Work of this
section. Other sections and divisions, not referenced below, shall also apply to the extent
required for proper performance of this Work.
1. Section 01300, Contractor’s Construction Schedule and Reports
2. Section 01810, Commissioning
3. Division 11, Equipment, applicable sections
4. Division 16, Electrical, applicable sections
5. Division 17, Instrumentation and Control, applicable sections
1.3 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. All Work specified herein shall conform to or exceed the applicable requirements of
the referenced portions of the following publications to the extent that the provisions
thereof are not in conflict with other provisions of these Specifications.
B. Comply with the applicable editions of the following codes, regulations, and
standards:
1. Codes and Standards:
29 CFR 1910 Code of Federal Regulations, Title 29, Part 1910, U.S.
Occupational Safety and Health Standards (OSHA)
CCR California Code of Regulations, Title 8, Div. 1, Chap. 4,
Subchap. 5, Electrical Safety Orders
NFPA 70 National Electrical Code (NEC)
NFPA 70E Standard for Electrical Safety In the Workplace
Speed (RPM)
3600 1800 1200 900 600 300
Deflection
1.0 1.5 2.0 2.5 3.0 3.5
(Mils)
******
VOLTAGE L-L VOLTAGE L-N SUPPLY CURRENT SECTION CURRENT NEUTRAL CURRENT INDOOR
OUTDOOR
INSULATION RESISTANCE (1 MIN) A-GROUND B-GROUND C-GROUND A-B B-C C-A MEGOHMS
A PHASE B PHASE C PHASE NOTES: ALL PHASES NOT UNDER TEST WERE
DIELECTRIC WITHSTAND FOR GROUNDED
1 MIN AT 2300 VDC
PERFORM SECONDARY INJECTION TESTING AT 1 AMP AND VERIFY MAGNITUDE AT EACH DEVICE IN THE CIRCUIT
PERFORM PRIMARY INJECTION TESTING AT 1 AMP SECONDARY AND VERIFY MAGNITUDE AT EACH DEVICE IN THE CIRCUIT
PERFORM PHASING CHECKS ON DOUBLE-ENDED OR DUAL-SOURCE SWGR TO INSURE CORRECT PHASING FROM EACH SOURCE
NOTES
TRANSFORMER FULL LOADCURRENT
1. FAULT CURRENT CALCULATED USING THE FOLLOWING FORMULA: TRANSFORMER IMPEDANCE
VERIFY THE GROUND LEAD ON EACH DEVICE IS INDIVIDUALLY ATTACHED TO A GND BUS / GND ELECTRODE
FIELD DATA
HIPOT NOTES:
A-GROUND B-GROUND C-GROUND
44 KV (P = PASS, F = FAIL)
VALUES IN MICROHMS
NOTES:
CHECK ALL OUTPUT CONTACTS RO SCR'S, PREFERABLY BY OPERATING THE CONTROLLED DEVICE SUCH AS CB, AUX RELAY OR ALARM
VOLTAGE L-L VOLTAGE L-N SUPPLY CURRENT SECTION CURRENT NEUTRAL CURRENT INDOOR
OUTDOOR
INSULATION RESISTANCE (1 MIN) A-GROUND B-GROUND C-GROUND A-B B-C C-A MEGOHMS
A PHASE B PHASE C PHASE NOTES: ALL PHASES NOT UNDER TEST WERE
DIELECTRIC WITHSTAND FOR GROUNDED
1 MIN AT 2300 VDC
PERFORM SECONDARY INJECTION TESTING AT 1 AMP AND VERIFY MAGNITUDE AT EACH DEVICE IN THE CIRCUIT
PERFORM PRIMARY INJECTION TESTING AT 1 AMP SECONDARY AND VERIFY MAGNITUDE AT EACH DEVICE IN THE CIRCUIT
PERFORM PHASING CHECKS ON DOUBLE-ENDED OR DUAL-SOURCE SWGR TO INSURE CORRECT PHASING FROM EACH SOURCE
NOTES
TRANSFORMER FULL LOADCURRENT
1. FAULT CURRENT CALCULATED USING THE FOLLOWING FORMULA: TRANSFORMER IMPEDANCE
MINIMUM PICKUP VOLTAGE ON CLOSE COIL VAC VAC VAC VAC VAC
CABLE DATA
MANUFACTURER VOLTAGE RATING 15 KV OPERATING VOLTAGE CONDUCTOR SIZE & TYPE
General Cable GROUNDED UNGROUNDED 12 KV 2/0 AWG CU AL OTHER________
INSULATION TYPE INSULATION THICKNESS INSULATION RATING LENGTH MFG DATE INSTALLED IN
EPR 220 MILS 100% 133% 700 NA PVC Conduit
TERMINATION TYPES AND MAXIMUM RECOMMENDED TEST VOLTAGES NUMBER OF SPLICES
LINES: 200A Elastimold Elbow 54 KV LOAD: 200A Elastimold Elbow 54 KV 0 N/A
TEST EQUIPMENT
HIPOT MFR: VLF Inst MODEL: PTS Series S/N: 1775 ASSET: SAN0002 CALIBRATION: 8/5/2015
MEGGER MODEL: Megger S1-1052/2 S/N: ASSET: SAN0003 CALIBRATION: 8/5/2015
OTHER EQUIP MODEL: Fluke 87V S/N: 27080608 ASSET: ` CALIBRATION: 5/20/2015
TEST PROCEDURE
MAXIMUM TEST VOLTAGE VOLTAGE INCREMENTS STABILIZATION TIME TEST POWER VOLTAGE SOURCE STABLE
Leakage in Microamps
Ph C Ph C
0.80 0.80 0.8
Kilovolts
0.00 0.00 0
9 18 27 36 45 54 0.5 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.011.012.013.014.015.0
Voltage in KV Minutes Seconds
VOLTAGE L-L VOLTAGE L-N SUPPLY CURRENT SECTION CURRENT NEUTRAL CURRENT INDOOR
OUTDOOR
SHORT CIRCUIT INTERRUPTING CURRENT RATINGS
SWITCHBOARD MAIN PROTECTIVE DEVICE MINIMUM PROTECTIVE DEVICE
SYM ASYM SYM ASYM SYM ASYM
INSPECTION CHECK LIST
NETA SECTION 7.1 FOR MOTOR CONTROL CENTER BUS CONDITION
COMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONS
INSPECT PHYSICAL AND MECHANICAL CONDITION
INSPECT ANCHORAGE, ALIGNMENT, GROUNDING AND REQUIRED AREA CLEARANCES
VERIFY UNIT IS CLEAN AND ALL SHIPPING BRACING, LOOSE PARTS, AND DOCUMENTATION SHIPPED INSIDE CUBICLES REMOVED
VERIFY FUSE AND CIRCUIT BREAKER SIZES AND TYPES AGREE WITH DRAWINGS, COORDINATION STUDY AND COMM SCHEME
VERIFY THAT CURRENT AND VOLTAGE TRANSFORMER RATIOS CORRESPOND TO DRAWINGS
VERIFY WIRING CONNECTION ARE TIGHT AND SECURE TO PREVENT DAMAGE DURING ROUTINE OPERATION OF MOVING PARTS
INSPECT BOLTED CONNECTIONS VIA DUCTOR, TORQUE WRENCH OR THERMOGRAPHIC INSPECTION
VERIFY OPERATION AND SEQUENCING OF INTERLOCKING SYSTEMS
VERIFY APPROPRIATE LUBRICATION ON MOVING CURRENT-CARRYING PARTS AND ON MOVING AND SLIDING SURFACES
INSPECT INSULATORS FOR EVIDENCE OF PHYSICAL DAMAGE OR CONTAMINATED SURFACES
VERIFY CORRECT BARRIER AND SHUTTER INSTALLATION AND OPERATION
EXERCISE ALL ACTIVE COMPONENTS
INSPECT MECHANICAL INDICATING DEVICES FOR CORRECT OPERATION.
VERIFY THAT FILTERS ARE IN PLACE AND VENTS ARE CLEAR
PERFORM VISUAL AND MECHANICAL INSPECTION OF INSTRUMENT TRANSFORMERS IAW SECTION 7.10
PERFORM VISUAL AND MECHANICAL INSPECTION OF SURGE ARRESTORS IAW SECTION 7.19
INSPECT CPT'S FOR PHYSICAL DAMAGE, CRACKED INSULATION, BROKEN LEADS, CONNECTION TIGHTNESS, DEFECTIVE WIRING AND
OVERALL GENERAL CONDITION
VERIFY CPT'S PRIMARY AND SECONDARY FUSE / CIRCUIT BREAKER RATINGS MATCH DRAWINGS
FOR CPT'S VERIFY PROPER OPERATION OF DRAWOUT DISCONNECTING CONTACTS, GROUNDING CONTACTS AND INTERLOCKS
NETA SECTION 7.5.1.2 FOR MOTOR CONTROL CENTER SWITCHES CONDITION
COMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONS
INSPECT PHYSICAL AND MECHANICAL CONDITION
INSPECT ANCHORAGE, ALIGNMENT, GROUNDING AND REQUIRED CLEARANCES
VERIFY THE UNIT IS CLEAN
VERIFY CORRECT BLADE ALIGNMENT, PENETRATION, TRAVEL STOPS AND MECHANICAL OPERATION
VERIFY THAT FUSE SIZES AND TYPES ARE IAW DRAWINGS, SHORT-CIRCUIT STUDIES AND THE COORDINATION STUDY
VERIFY THAT EACH FUSE HAS ADEQUATE MECHANICAL SUPPORT AND CONTACT INTEGRITY
INSPECT BOLTED CONNECTIONS VIA DUCTOR, TORQUE WRENCH OR THERMOGRAPHIC INSPECTION
VERIFY OPERATION AND SEQUENCING OF INTERLOCKING SYSTEMS
VERIFY CORRECT PHASE BARRIER INSTALLATION
VERIFY CORRECT OPERATION OF ALL INDICATIING AND CONTROL DEVICES
VERIFY APPROPRIATE LUBRICATION ON MOVING CURRENT-CARRYING PARTS AND ON MOVING AND SLIDING SURFACES
FIELD DATA (NETA SECTION 7.1 TESTS)
A PHASE B PHASE C PHASE INSULATION RESISTANCE OF
DUCTOR (MILLIOHMS) CONTROL WIRING AT 1000 VOLTS
(GIGOHMS)
INSULATION RESISTANCE A-GROUND B-GROUND C-GROUND A-B B-C C-A MEGOHMS
A - ACCEPTABLE N - NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT C - CORRECTED NA - NOT APPLICABLE NS - NOT IN SCOPE
LIQUID FILLED 7925 Dunbrook Road,
Suite G
TRANSFORMER San Diego, CA 92126
TEST REPORT (858) 566-6317
CLIENT TESTING SPECIFICATIONS EPS JOB NUMBER
Acceptance Maintenance
LOCATION ENGINEER(S) DATE
TRANSFORMER DATA
MFR: JOB NO: SERIAL NO:
DATE MFD: STYLE: WINDING CONFIGURATION
MVA: CLASS: PHASE: 3 VOLTAGE: HV: LV: TV: N/A
Oil Samples YES DGA # GALLONS
AS-FOUND TAP: AS-LEFT TAP:
Drawn? NO OF OIL
MINERAL OIL ASKERAL OTHER:_________ HERTZ: 60 TEMP. RISE: O
C %IMPEDANCE: @ DEGREES C
SWITCHGEAR DESIGNATION: SECTION FEEDER IDENTIFICATION TEST EQUIPMENT CALIBRATION DUE DATES
TEST VOLTAGE 1000 VDC 500 VDC A-GROUND B-GROUND C-GROUND A-B B-C C-A A B C
UNITS OF MEASURE GIGOHMS MEGOHMS >2 >2 >2 >2 >2 >2 >2 >2 >2
NOTES: LOW VOLTAGE CIRCUIT BREAKER STATUS PASS FAIL
INSTRUMENT 7925 Dunbrook Rd
Suite G
POTENTIAL TRANSFORMER San Diego, CA 92126
(858)566‐6317
TEST REPORT
CLIENT: LOCATION: JOB #: ENGINEER:
TEST EQUIPMENT: CALIBRATION DATE: DATE:
NAMEPLATE DATA
SWITCHGEAR DESIGNATION: MANUFACTURER:
INSTRUMENT TRANSFORMER DESIGNATION:
MANUFACTURER
TYPE/CLASS
RATIO
VA
KV RATING
BURDEN CLASS
NETA SECTION 7.10.1 VISUAL AND MECHANICAL INSPECTION CONDITION CONDITION CONDITION
COMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONS
INSPECT PHYSICAL AND MECHANICAL CONDITION
VERIFY CORRECT CONNECTION OF TRANSFORMERS WITH SYSTEM REQUIREMENTS
VERIFY THAT ADEQUATE CLEARANCES EXIST BETWEEN PRI AND SEC CIRCUIT WIRING
VERIFY THE UNIT IS CLEAN
INSPECT BOLTED ELECTRICAL CONNECTIONS VIA DUCTOR, TORQUE WRENCH OR THERMOGRAPHIC SURVEY
VERIFY ALL REQUIRED GROUNDING AND SHORTING CONNECTIONS PROVIDE CONTACT
VERIFY CORRECT OPERATION OF TRANSFORMER WITHDRAWAL MECHANISM AND GROUNDING OPERATION
VERIFY CORRECT PRIMARY AND SECONDARY FUSE SIZES FOR VOLTAGE TRANSFORMERS
VERIFY APPROPRIATE LUBRICAITON ON MOVING CURRENT‐CARRYING PARTS AND ON MOVING AND SLIDING
SURFACES
VOLTAGE TRANSFORMER TESTS
HI ‐ LOW
INSULATION RESISTANCE
HI ‐ GND
(GIGOHMS)
LOW ‐ GND
POLARITY
H1 ‐ H4 : X1 ‐ X4
TURNS‐RATIO H1 ‐ H4 : X1 ‐ X2
H1 ‐ H4 : X3 ‐ X4
VOLTAGE CIRCUIT BURDEN AT TRANSFORMER TERMINALS (VAC)
PERFORM DIELECTRIC WITHSTAND ON PRIMAY WINDINGS AT 2300 VDC (1 MIN)
PERFORM POWER FACTOR OR DISSIPATION FACTOR TEST IAW MANUFACTURER'S
PUBLISHED DATA
TEST SINGLE POINT OF GROUND (GIGOHMS)
NOTES:
INSTRUMENT 7925 Dunbrook Rd
Suite G
CURRENT TRANSFORMER San Diego, CA 92126
(858)566‐6317
TEST REPORT
CLIENT: LOCATION: JOB #: ENGINEER:
TEST EQUIPMENT: CALIBRATION DATE: DATE:
NAMEPLATE DATA
SWITCHGEAR DESIGNATION: MANUFACTURER:
INSTRUMENT TRANSFORMER DESIGNATION:
MANUFACTURER
TYPE/CLASS
RATIO
VA
KV RATING
BURDEN CLASS
NETA SECTION 7.10.1 VISUAL AND MECHANICAL INSPECTION CONDITION CONDITION CONDITION
COMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONS
INSPECT PHYSICAL AND MECHANICAL CONDITION
VERIFY CORRECT CONNECTION OF TRANSFORMERS WITH SYSTEM REQUIREMENTS
VERIFY THAT ADEQUATE CLEARANCES EXIST BETWEEN PRI AND SEC CIRCUIT WIRING
VERIFY THE UNIT IS CLEAN
INSPECT BOLTED ELECTRICAL CONNECTIONS VIA DUCTOR, TORQUE WRENCH OR THERMOGRAPHIC SURVEY
VERIFY ALL REQUIRED GROUNDING AND SHORTING CONNECTIONS PROVIDE CONTACT
VERIFY CORRECT OPERATION OF TRANSFORMER WITHDRAWAL MECHANISM AND GROUNDING OPERATION
VERIFY CORRECT PRIMARY AND SECONDARY FUSE SIZES FOR VOLTAGE TRANSFORMERS
VERIFY APPROPRIATE LUBRICAITON ON MOVING CURRENT‐CARRYING PARTS AND ON MOVING AND SLIDING
SURFACES
CURRENT TRANSFORMER TESTS
INSULATION RESISTANCE SEC TO GND AT 1000 VDC (GIGOHMS)
PERFORM POLARITY TEST
PERFORM RATIO‐VERIFICATION TEST USING VOLTAGE OR CURRENT METHOD
PERFORM EXCITATION TEST
MEASURE CIRCUIT BURDENS (VAC)
WHEN APPLICABLE, PERFORM INSULATION RESISTANCE TESTS ON THE PRIMARY
WINDING W/SEC GROUNDED
PERFORM DIELECTRIC WITHSTAND TEST ON PRI WINDING W/SEC GROUNDED
(2300 VDC)
PERFORM POWER‐FACTOR DISSIPATION‐FACTOR TESTS IAW MANUFACTURER'S
PUBLISHED DATA
VERIFY THAT CURRENT TRANSFORMER SEC CIRCUITS ARE GROUNDED AND HAVE
ONLY ONE GROUNDING POINT
VERIFY THE SINGLE POINT OF GROUND IS LOCATED IAW DRAWINGS AND SPECS
NOTES:
GROUNDING RESISTOR 7925 Dunbrook Road, Suite G
TEST REPORT San Diego, CA 92126
(858) 566-6317
NOTES:
FIELD DATA
SWITCHBOARD MANUFACTURER SHOP ORDER / DRAWING NUMBER UL NUMBER
PICKUP PICKUP
AS FOUND TIME AS LEFT TIME SETTINGS PROVIDED BY
CURRENT CURRENT
SETTINGS SETTINGS
INSPECTION
SERVICE ENTRANCE CONDUCTORS MAIN BONDING JUMPER GROUNDING ELECTRODE CONDUCTOR
AL CU AL CU AL CU
NEUTRAL - GROUNDING LOCATIONS CONTROL POWER TRANSFORMER N/A
Correct Incorrect Corrected by Contractor Manufacturer VA
NETA SECTION 7.14.1 VISUAL AND MECHANICAL INSPECTION CONDITION
COMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONS
VERIFY THAT GROUND CONNECTION IS MADE ON THE SOURCE SIDE OF THE NEUTRAL DISCONNECT LINK AND ON
THE SOURCE SIDE OF ANY GROUND GAULT SENSOR
VERIFY THAT THE NEUTRAL SENSORS ARE CONNECTED WITH CORRECT POLARITY ON BOTH PRIMARY AND
SECONDARY
VERIFY THAT ALL PHASE CONDUCTORS AND THE NEUTRAL PASS THROUGH THE SENSOR IN THE SAME DIRECTION
FOR ZERO SEQUENCE SYSTEMS
VERIFY THAT GROUNDING CONDUCTORS DO N OT PASS THROUGH THE ZERO SEQUENCE SENSORS
VERIFY THAT THE GROUNDED CONDUCTOR IS SOLIDLY GROUNDED
VERIFY THE UNIT IS CLEAN
INSPECT BOLTED ELECTRICAL CONNECTIONS VIA DUCTOR, TORQUE WRENCH OR THERMOGRAPHIC SURVEY
VERIFY CORRECT OPERATION OF ALL FUNCTIONS OF THE SELF0TEST PANEL, IF APPLICABLE
VERIFY THAT THE CONTROL POWER TRANSFORMER HAS ADEQUATE CAPACITY FOR THE SYSTEM
SET PICKUP AND TIME-DELAY SETTINGS IAW THE SETTINGS PROVIDED IN THE OWNER'S SPECIFICATIONS
ELECTRICAL TESTS
GROUND FAULT SENSOR POLARITY SYSTEM NEUTRAL INSULATION RESISTANCE TO GROUND
Correct Incorrect Corrected N/A MEGOHMS GIGOHMS
TRANSFORMER DATA
MFR: JOB NO: SERIAL NO:
DATE MFD: STYLE: WINDING CONFIG.:
KVA/ MVA: CLASS: PHASE: 3 VOLTAGE: HV: LV: TV: N/A
60 TEMP. RISE: O
C %IMPEDANCE: @ DEGREES C
AF TAP: AL TAP: HERTZ:
NETA SECTION 7.2.2 TRANSFORMERS, LIQUID FILLED CONDITION
COMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND SPECIFICATIONS
INSPECT PHYSICAL AND MECHANICAL CONDITION
INSPECT ANCHORAGE, ALIGNMENT AND GROUNDING
VERIFY THAT RESILIENT MOUNTS ARE FREE AND THAT ANY SHIPPING BRACKETS HAVE BEEN REMOVED
VERIFY THE UNIT IS CLEAN
VERIFY THAT CONTROL AND ALARM SETTINGS ON TEMPERATURE INDICATORS ARE AS SPECIFIED
VERIFY THAT COOLING FANS OPERATE AND THAT FAN MOTORS HAVE CORRECT OVERCURRENT PROTECTION
INSPECT BOLTED ELECTRICAL CONNECTIONS BY DUCTOR, TORQUE WRENCH OR THERMOGRAPHIC SURVEY
PERFORM SPECIFIC INSPECTIONS AND MECHANICAL TESTS AS RECOMMENDED BY THE MANUFACTURER
VERIFY THAT AS-LEFT TAP CONNECTIONS ARE AS SPECIFIED
VERIFY THE PRESENCE OF SURGE ARRESTERS
NETA SECTION 7.2.2.2 ELECTRICAL TESTS
TAP POSITION:
PRIMARY SECONDARY TERTIARY
H1 - H0 N/A m H3 - H1 m X0 - X1 Y1-Y0 N/A
H2 - H0 N/A m H1 - H2 m X0 - X2 Y2-Y0 N/A
H3 - H0 N/A m H2 - H3 m X0 - X3 Y3-Y0 N/A
PRIMARY H3 - H1 H1 - H2 H2 - H3 TAP CALCULATED RATIO
SECONDARY X0 - X1 Y0-Y1 X0 - X2 Y0-Y2 X0 - X3 Y0-Y3 POSITION VOLTAGE H-X H-Y
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
DUCTOR AND INSULATION RESISTANCE
DUCTOR (HS/LS) (MICROHMS) HIGH TO LOW AND GND LOW TO HIGH AND GND HIGH TO LOW AT 1000 VDC (GIGOHMS)
A PHASE B PHASE C PHASE AT 1000 VDC (GIGOHMS) AT 1000 VDC (GIGOHMS) 1 MIN 10 MIN PI
LOCATION: DATE:
LOCATION: DATE:
GROUNDING RESISTANCE
N 1.20
1.00
0.80
OHMS
0.60 Series1
0.40
0.20
0.00
0 0.5 1 1.5
FEET
2 0
3 0
4 0
5 0
6 0
7 0
8 0
9 0
NOTES:
*DIRECT INDICATES TWO TERMINAL METHOD, F. O. P. INDICATES THREE TERMINAL "FALL OF POTENTIAL" METHOD
GROUND RESISTANCE TEST REPORT
7925 Dunbrook Road, Suite G
San Diego, CA 92126
858-566-6317
CLIENT: JOB NUMBER:
LOCATION: DATE:
TEST DATA
TEST METHOD
LAYOUT DIRECT
EQUIPMENT GROUND DESIGNATION MEASURED RESISTANCE
NO.
REFERENCE LEAD RESISTANCE
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25