Вы находитесь на странице: 1из 64

Memo No/YES/Bill/2017-18/18 Date:17/08/2018

To,
ALPS
PMR(PDMC Itanagar Amrut City
Papum Pare District
Sub: Topography Survey at Seijosa.

Sir/Madam.

As per the survey done and completed for your site. The bill is placed here for payment please
SL N Description No Qty Rate Per Amount Remarks
1
Total area of the Site Survey Using
Total Station of the site includiung
the road and all other parameters
that has been surveyed. Design 1 1 3000 Acres 3000
and Drafting of the Drawing by
AUTO CAD as per the actual in the
ground.

SH: Nitivihar Park , Area =1 Acre

Total area of the Site Survey Using


Total Station of the site includiung
the road and all other parameters
2 that has been surveyed. Design
and Drafting of the Drawing by
AUTO CAD as per the actual in the
ground.

SH: Road Survey from Circuit House


to Govt Secondary Itanagar Tinali 1 4 5000 km 20000

23000
Add CST 9% 1800
Add GST9% 1800
Total 26600
GST NO: 12ANUPT6804A1Z0 Say 26600
(Rupees Twenty six thousand Six hundred) only
Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank Branch
Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB
Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required


Date:- 03/08/2018
Memo No/YES/Bill/2017-18/19 Date:28/08/2018
To,
Er.Pawan Bhagang
Naharlagun
Papum Pare District
Sub: Bill for walk through and truss Design.
Sir/Madam.
As per your request for walkthrough and truss design here are our quotation for walk through.

SL N Description No Qty Rate Per Amount Remarks


1 Walkthrough video chared per
minute (charges depend upon 1 8 5000 min 40000
detailing and ghrapics)

2 Truss design for second floor roof 1 10 kg 0

40000
Add CST 9% 3600
Add GST9% 3600
Total 47200
GST NO: 12ANUPT6804A1Z0 Say 47200
(Rupees Twenty six thousand Six hundred) only
Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank Branch
Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required


Date:- 03/08/2018
Memo No/YES/Bill/2017-18/20 Date:08/09/2018
To,
Er.Talen Kitnya
Khonsa
District Khonsa,Arunachal Pradesh
Sub: Submission of bill for the C/O of multi storey parking lot at Khonsa.
Sir/Madam.
The bill for the above mentioned project is as follows. It includes Architectural plan,structural and 3D.

SL N Description No Qty Rate Per Amount Remarks


1 Area of ground floor plan 6832 33 sq.ft 225456
2 Area of first floor plan 6832 33 sq.ft 225456
3 Area of Second floor plan 6832 33 sq.ft 225456
4 Area of third floor plan 6832 33 sq.ft 225456
901824
Add CST 9% 81164.16
Add GST9% 81164.16
Total 1064152
Advance 23000
Due 1041152
GST NO: 12ANUPT6804A1Z0 Say 1040000
(Rupees Ten Lakhs Fourty Thousand) only
Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank Branch
Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required


Date:- 03/08/2018
Memo No/YES/Bill/2017-18/21 Date:13/09/2018
To,
Mrs.Bengia Yacha
Yazali
lower subansiri, Arunchal Pradesh
Sub: Submission of bill for the C/O of G+1 Residential Building at Yazali.
Sir/Madam.
The bill for the above mentioned project includes Architectural plan,structural, plumbing dwg and 3D.

SL N Description No Qty Rate Per Amount Remarks


1 Area of ground floor plan 1506 25 sq.ft 37650
2 Area of first floor plan 1614 25 sq.ft 40350
78000
Add CST 9% 7020
Add GST9% 7020
Total 92040
Advance 0
Due 92040
GST NO: 12ANUPT6804A1Z0 Say 92000
(Rupees Ninety two Thousand) only
Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank Branch
Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely

This is computer generated bill, so signature is not required


Date:- 03/08/2018
Memo No/YES/Bill/2017-18/22 Date:16/09/2018
To,
Mr.Takam James
Itanagar.
Arunachal Pradesh.
Name of work:Proposed Construction of Todo International Hotel at Itanagar.
Sir/Madam,
Please find herewith the bill for the above mentioned name.

SL N Description No Qty Rate Per Amount Remarks


1 Measurement of existing building
at construction site
2 Drafting of the measured details in
Autocad file.
3 Tentative detailed estimation of
the building in excel sheet
adopting APSR 2018 rate and
market rate.
4 Estimated cost 178,000,000
5 0.25% of estimated cost. 445,000
Add CST 9% 40,050
Add GST9% 40,050
Total 525,100
Advance 0
Due 525100
GST NO: 12ANUPT6804A1Z0 Say 525000
(Five lakhs twenty five thousand ) only
Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank Branch
Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely

This is computer generated bill, so signature is not required


Date:- 03/08/2018
Memo No/YES/Bill/2017-18/23 Date:16/09/2018
To,
Mr.Likha Jhon
Itanagar.
Arunachal Pradesh.
Name of work:Construction of commercial Building at Holongi along NH-415
Sir/Madam,
Please find herewith the bill for the above mentioned name.

SL N Description No Qty Rate Per Amount Remarks


1 Area of ground floor 4648.32 17 sq.ft 79021.44
2 Area of first floor 4648.32 17 sq.ft 79021.44
3 Area of second floor 5261.64 17 sq.ft 89447.88
247,491
Add CST 9% 44,548
Add GST9% 44,548
Total 336,587
Advance Nill
Due 336,587
GST NO: 12ANUPT6804A1Z0 Say 336,000
(Three lakhs thirty six thousand thousand ) only
Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank
Branch Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required


Date:- 03/08/2018
Memo No/YES/Bill/2017-18/24 Date:29/11/2018
To,
DrRaja Dodum
Jullang
Arunachal Pradesh.
Name of work:Construction of commercial Building at Jullang
Sir/Madam,
Please find herewith the bill for the above mentioned name.

SL N Description No Qty Rate Per Amount Remarks


1 Area of ground floor 3324.84 30 sq.ft 99745.2
2 Area of first floor 3862.84 30 sq.ft 115885.2
3 Area of second floor 4314.76 30 sq.ft 129442.8
4 Area of third floor 4314.76 30 sq.ft 129442.8
5 Area of fourth floor 4314.76 30 sq.ft 129442.8
603,959
Add CST 9% 44,548
Add GST9% 44,548
Total 693,055
Advance 150000
Due 543,055
GST NO: 12ANUPT6804A1Z0 Say 540,000
(Five lakhs fourty thousand ) only
Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank
Branch Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required


Memo No/YES/Bill/2017-18/25 Date:30/11/2018
To,
Executive Engineer
Enginnering wing, Deptt. of Education
Arunachal Pradesh.
Name of work:Construction of Administrative Block of Govt. College Doimukh.
Sir/Madam,
Please find herewith the bill for the above mentioned name.

SL N Description No Qty Rate Per Amount Remarks


1 Area of ground floor 8016.2 25 sq.ft 200405
2 Area of first floor 8016.2 25 sq.ft 200405
3 Area of second floor 8016.2 25 sq.ft 200405
4 Area of Third floor 8016.2 25 sq.ft 200405
801,620
Add CST 9% 72,000
Add GST9% 72,000
Total 945,620
Advance Nill
Due 945,620
GST NO: 12ANUPT6804A1Z0 Say 945,000
(Ten lakhs Fifty thousand ) only
Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank
Branch Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required


Date:- 03/08/2018
Memo No/YES/Bill/2017-18/27 Date:21/09/2018
To,
Mr.Mohan
Karsingsa
Arunachal Pradesh.
Name of work: Master plan for school at Karsingsa.
Sir/Madam,
Please find herewith the bill for the above mentioned name.

SL N Description No Qty Rate Per Amount Remarks


1 Master plan 50000
Add CST 9% 4,500
Add GST9% 4,500
Total 59,000
Advance Nill
Due 59,000
GST NO: 12ANUPT6804A1Z0 Say 59,000
(Fifty nine thousand thousand ) only
Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank
Branch Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required


Remarks
Memo No/YES/Bill/2017-18/24 Date:20/12/2018
To,
Er. Harang Sonam
Seepa
Arunachal Pradesh.
Name of work:Construction of Residential building at seepa.
Sir/Madam,
Please find herewith the bill for the above mentioned name.

SL N Description No Qty Rate Per Amount Remarks


1 Area of basement floor 1258.92 25 sq.ft 31473
2 Area of ground floor 1570.96 25 sq.ft 39274
3 Area of first floor 1624.76 25 sq.ft 40619
4 Area of second floor 1624.76 25 sq.ft 40619
5 Charges for site visit
Architecture charge 3 900 day 2700
For fooding, loading and 9190
transportation charge
6
Walk through 5 5000 min 25000

Total 188875

Add CST 9% 16,099


Add GST9% 16,099
Total 221,073
Advance 60000
Due 161,073
GST NO: 12ANUPT6804A1Z0 Say 161,000
(One lakhs sixty one thousand ) only
Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank
Branch Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required.


This bill doesnot include estimate charges,any further services provided will be chargable.
Memo No/YES/Bill/2017-18/27 Date:04/01/2019
To,
Tai Oping
Itanagar
Arunachal Pradesh.
Name of work:Construction of Residential building at Jullang
Sir/Madam,
Please find herewith the bill for the above mentioned name.

SL N Description No Qty Rate Per Amount Remarks


1 Area of basement floor 0 25 sq.ft 0
2 Area of ground floor 1775.4 20 sq.ft 35508
3 Area of first floor 1775.4 20 sq.ft 35508

Total 71016

Add CST 9% 6,391


Add GST9% 6,391
Total 83,799
Advance 0
Due 83,799
GST NO: 12ANUPT6804A1Z0 Say 83,700
(Eighty three thousand seven hundred ) only
Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank
Branch Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required.


This bill doesnot include estimate charges,any further services provided will be chargable.
Memo No/YES/Bill/2017-18/28 Date:5/1/2019
To,
The Executive Engineer
PWD Division,Doimukh
Arunachal Pradesh.
Name of work:Construction of Gymkhana at Doimukh/Yupia.
Sir/Madam,
Please find herewith the bill for the above mentioned name.

SL N Description No Qty Rate Per Amount Remarks


1 Area of ground floor 9963.76 30 sq.ft 298912.8
2 Area of first floor 11082.8 30 sq.ft 332484
4 Area of second floor 11082.8 30 sq.ft 332484
5 Truss design 5541.4 25 sq.ft 138535
6
Preparation of detail estimate
100000

Total 1202415.8

Add CST 9% 16,099


Add GST9% 16,099
Total 1,234,613
Advance 0
Due 1,234,613
GST NO: 12ANUPT6804A1Z0 Say 1,234,000
(Twelve lakhs thirty four thousand only ) only
Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank
Branch Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required.


Memo No/YES/Bill/2017-18/29 Date:16/2/2019
To,
The Executive Engineer
PHE & WS Department ,
Namsai Division.
Name of work:Lift water supply to Chongkham and enroute Habs.
Sir/Madam,
Architectural design and drawing and structural design and drawings for the following

SL NO Description Per Amount Remarks


1 Aerator
2 Sedimentation tank
3 Clariflocculator
4 Filter house with estimate
5 Chemical house
6 CWR
Total 200000/-
7
Mechanical dwg. For filter house 110000/-
and clariflocculator

Total 310,000
Add CST 9% 27900
Add GST9% 27900
Total 365,800
Advance 100000
Due 265,800
GST NO: 12ANUPT6804A1Z0 Say 265,800
(Two lakhs sixty five thousand eight hundred ) only
Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank
Branch Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required.


Memo No/YES/Bill/2017-18/30 Date:05/03/2019
To,
Mr. Ha Tatu
M/S Kenge construction Company
Itanagar.
Name of work: C/O of G+5 building at Itanagar.
Sir/Madam,
Following are the bill for above said project.

SL NO Description Qty Rate Amount Remarks


1 Plinth Beam 4554.92 0 0
2 First Floor 4554.92 3 13664.76
3 Second Floor 4554.92 3 13664.76
4 Third Floor 4554.92 3 13664.76
5 Fourth Floor 4554.92 3 13664.76
6 Fifth Floor 4554.92 3 13664.76
7 Terrace 4554.92 3 13664.76
8 Terrace and mumty 415 3 1245
Total 83,234
Add CST 9% 7491.06
Add GST9% 7491.06
Total 98,216
Advance 0
Due 98,216
GST NO: 12ANUPT6804A1Z0 Say 98,000
Rupees(Ninety eight Thousand ) only

Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank Branch
Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required.


e:05/03/2019

Rural Bank Branch


Memo No/YES/Bill/2017-18/31 Date:27/03/2019
To,
Mrs Rubu Meena
Itanagar.

Name of work: Residential project at Itanagar


Sir/Madam,
Following are the bill for above said project.

SL NO Description Qty Rate Amount Remarks


1 Plinth Beam 272 0 0
2 First floor 325 4 13988
3 Terrace 325 4 13988
4 Tower 35 4 1506.4
Total 29,482
Add CST 9% 2653.416
Add GST9% 2653.416
Total 34,789
Advance 0
Due 34,789
GST NO: 12ASSPG4180H2ZP Say 34,100
Rupees(thirty four thousand and one hundred ) only

Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank Branch
Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required.


e:27/03/2019

Rural Bank Branch


Memo No/YES/Bill/2017-18/31 Date:27/03/2019
To,
Mr.Tadar mangku
Pachin Colony
Naharlagun.
Name of work: C/O of Kaccha House at Nyapin.
Sir/Madam,
Following are the bill for above said project.

SL NO Description Qty Rate per Amount


1 Ground floor 487 15 Sq.ft 78601.8
2 First floor 394 15 Sq.ft 63591.6
Total 142,193
Add CST 9% 12797.406
Add GST9% 12797.406
Total 167,788
Advance 0
Due 167,788
GST NO: 12ASSPG4180H2ZP Say 167,000
Rupees(One lakhs and sixty seven thousand ) only

Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank Branch Itanagar,A/C
100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required.


Date:27/03/2019

Remarks

Rural Bank Branch Itanagar,A/C

Engineering Services
Memo No/YES/Bill/2017-18/33 Date:20/04/2019
To,
Mr. Arun Tiwari
Chandanagar, Arunachal pradesh.

Name of work: Proposal for B.Ed Colledge at Chandanagar .


Sir/Madam,
Following are the bill for above said project.

Rate per
SL NO Description Qty Amount Remarks
square feet
1 Ground floor 192 10 20659.2
2 First floor 192 10 20659.2
3 Second Floor 192 10 20659.2
Total 61,978
Add CST 9% 5577.984
Add GST9% 5577.984
Total 73,134
Advance 0
Due 73,134
GST NO: 12ASSPG4180H2ZP Say 73,100
Rupees(Seventy three thousand and one hundred ) only

Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank Branch
Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required.


e:20/04/2019

Rural Bank Branch


Memo No/YES/Bill/2018-19/34 Date:25/04/2019
To,
Mr. Tadar Nyler
Chimpu, Arunachal pradesh.

Name of work: Landscaping Project at Chimpu.


Sir/Madam,
Following are the bill for above said project.

Rate per
SL NO Description Qty Amount Remarks
square feet
Landscaping Dwg. 35000
Total 35,000
Add CST 9% 3150
Add GST9% 3150
Total 41,300
Advance 0
Due 41,300
GST NO: 12ASSPG4180H2ZP Say 41,000
Rupees(fourty one thousand ) only

Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank Branch
Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required.


e:25/04/2019

Rural Bank Branch


Memo No/YES/Bill/2018-19/35 Date:04/05/2019
To,
Mr.Rupesh Mathur
VKSPV, Arunachal pradesh.

Name of work: Master plan and survey work for VKV Liroboma.
Sir/Madam,
Following are the bill for above said project.

Rate per
SL NO Description No Qty square feet Amount
and Acres
1 Landscaping Dwg. 35000
2 Total Survey of the area /site
using Total station including
the road and all other
parameters that has been
surveyed. Design and
Drafting of the Drawing by
Auto CAD as per the actual in
the ground including site
plan of the Project area.

Area=8.885 acres 1 8.885 7000 62195


3 Transportation Charges
From Itanagar to Aloo to 3
a liroboma 1500 4500
b from liroboma to Itanagar 3 1500 4500
Total 106195
Add CST 9% 9557.55
Add gST 9% 9557.55
Total 125310.1
Say 125,000
Discount 25,000
GST NO: 12ASSPG4180H2ZP Total 100,000
Rupees(one lakhs ) only
Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank Branch Itanagar,A/C
100001735311 IFS Code:SBIN0RRARGB
Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required.


Date:04/05/2019

Remarks

ural Bank Branch Itanagar,A/C


Engineering Services
Memo No/YES/Bill/2017-18/36 Date:10/06/2019
To,
Mr. Dado Talom
Itanagar, Arunachal pradesh.

Name of work: Proposal for Arunachal artist village.


Sir/Madam,
Following are the bill for above said project.

Rate per
SL NO Description Qty Amount Remarks
square feet
1 Master Plan 1 50000
2 Walk through video 3 7000 21000
3 Floor plans 9684 20 193680
Total 264,680
Add CST 9% 23821.2
Add GST9% 2143.908
Total 290,645
Advance 0
Due 290,645
GST NO: 12ASSPG4180H2ZP Say 312,000
Rupees(Three lakhs and twelve thousand ) only

Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank Branch
Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required.


e:10/06/2019

Rural Bank Branch


Memo No/YES/Bill/2017-18/36 Date:10/06/2019
To,
Mr. Dado Talom
Itanagar, Arunachal pradesh.

Name of work: C/o of G+6 Structure at Nyokum lapang, Itanagar.


Sir/Madam,
Following are the bill for above said project.

Rate per
SL NO Description Qty Amount Remarks
square feet
1 Basement 1 1 50000
2 walk through video 3 7000 21000
3 floor plans 9684 20 193680
Total 264,680
Add CST 9% 23821.2
Add GST9% 2143.908
Total 290,645
Advance 0
Due 290,645
GST NO: 12ASSPG4180H2ZP Say 312,000
Rupees(Three lakhs and twelve thousand ) only

Payment to be made in favour of M/S Yield Engineering Services, Arunachal Pradesh Rural Bank Branch
Itanagar,A/C 100001735311 IFS Code:SBIN0RRARGB

Yours Sincerely
M/S Yield Engineering Services

This is computer generated bill, so signature is not required.


e:10/06/2019

Rural Bank Branch


Date:19/9/2019
To,
Dr.Jadav Nabam
Jullang,Itanagar
Arunachal Pradesh.
Name of work: Charges for reproducing dwg. for Horming Hospital,Jullang A.P.
Sir/Madam,
Please find herewith the bill for the above mentioned name.

SL Area for
Description Rate Per Amount
NO Building (m2)

1 Reproducing all dwg for


12314.84 0.875 sq.ft 115944.2186
existing building
2 Model and analysis in
12314.84 0.75 sq.ft 99380.7588
etab or staad
3 Producing structural
dwg with existing 12314.84 0.75 sq.ft 99380.7588
building.
4
Comparison of
reinforcement for 12314.84 0.5 sq.ft 66253.8392
existing and new
structural dwg.
5 Repairing measuress if
any and for producing 12314.84 0.625 sq.ft 82817.299
structural strengthning
dwg.
3.5 Total 463,777
ADD GST 9% 41,740
ADD CST 9% 41,740
Total 547,257
Advance 0
Due 547,257
Regards
Mangesh Saiwala
4th D Design

Sr.
PARTICULARS AREA(m2) Rate Per Amount
No.

1 BASEMENT1 246.330 3.5 sq.ft 9276.79


2 BASEMENT2 507.860 3.5 sq.ft 19126.01
3 BASEMENT3 539.380 3.5 sq.ft 20313.05
4 GROUND 1899.000 3.5 sq.ft 71516.34
5 FIRST FLOOR 1899.000 3.5 sq.ft 71516.34
6 SECOND FLOOR 1899.000 3.5 sq.ft 71516.34
7 THIRD FLOOR 1730.400 3.5 sq.ft 65166.86
8 FOURTH FLOOR 1730.400 3.5 sq.ft 65166.86
9 TERRACE FLOOR 1730.400 3.5 sq.ft 65166.86
10 TOWER & LIFT 133.070 3.5 sq.ft 5011.42
TOTAL 12314.840 463776.87
GST@18% 83479.84
Total= 547257

Scope of Work

STRUCTURAL ANALYSIS, DESIGN AND DETAILING


Prepare / carry out the following:
• Reproducing all dwg for existing building
• Analysis of Structure on STAAD/ETABS for all load cases as per IS Codes. Design all the structural
components including connections with proper consideration to the relevant IS Codes.
• Producing structural dwg with existing building.
• Comparison of reinforcement for existing and new structural dwg.
165 225 37125
165 200 33000 base 246.33
25 225 5625 base2 507.86
25 250 6250 base3 539.38
5000 ground 1899
87000 1st&2nd 1899
3rd&4th& t 1730.35
110 225 24750
110 200 22000 12181.62
30 225 6750 131074.2 1.75
30 250 7500 131074.2 1.5
40 800 32000 131074.2 1.5
5000 131074.2 1
98000 131074.2 1.25
246.33
507.86
539.38
1899
1899
1730.35

229379.9
196611.3
196611.3
131074.2
163842.8
917519.6

Вам также может понравиться