Вы находитесь на странице: 1из 1

CLIENT :

PROJECT : HYDRAULIC CALCULATION

IG100-TBS AGENT CALCULATION SHEET


Client: New Senate Building - Taguig City Calculated by: nasp

Date: November 8, 2019 Calculation No.


Protected Room Number 1 2

Ground Floor Control 2nd Floor Electrical Data


Protected Room Name Room Processing Room

1 Area of Floor ( m² ) 66.00 410.00


2 Volume ( m3 ) 330.00 1722.00
3 Flooding Factor ( m3 /m3 ) 0.4652 0.4652
4 N2 Volume ( m3 ) 153.52 801.07
5 Discharge Time (min.) 1 1
6 Minimum Flow Rate (m3/min.) 153.52 801.07
7 Design Flow Rate (m3/min.) 153.52 801.07
8 Agent Capacity per 80L Cylinder ( m3 ) 15.20 15.20
9 Number of Cylinders 10 53
10 Main Pipe Size (A) 65A 125A
11 Model
12 Numbers 0 0
Nozzle
Flow Rate per Nozzle
13 0.00 0.00
( m3/min. )

14 N2 Concentration (%) 37.20 37.20


15 O2 Concentration (%) 13.19 13.19
Allowable Strength of Protected Room
16 2000 2000
( Pa )
17 Length of Duct ( m ) 2 2
Area of Pressure Relief Opening
18 736.34 3842.38
( cm2)

The Formula of Pressure Relief Opening A = 134 x (Item 7) x 1.6 x 1/(P-Pd)½


The Formula of the N2 Concentration C (%) = {1 - e (-item 9 x W x 1/item 2 ) x 100} W=15.2m3
The Formula of the O2 Concentration 1
C (%) = {1 - item 14 / 100} x 21