1. SITE PREPARATION
1.1 SITE DEVELOPMENT
2.2 WATERPROOFING
2.2.1 FOUNDATION
2.2.1.2 Put layer of cement mortar base mixed with waterproofing compound
2.2.2.2 Put layer of cement mortar base mixed with waterproofing compound
2.4.3 Boring at the designated areas through shell and auger technique
2.6 BEAM
2.7 SLAB
3. SUPER STRUCTURE
3.1 IN-SITU CONSTRUCTION
3.1.3 Beams
3.1.4 Slabs
3.1.6 Walls
5.1.2.1.2 Point wiring (Wiring for light point /fan point/exhaust fan point )
5.1.2.2.3 Circuit /Sub Main Wiring with earth wire /MS cable trays/Raceways
5.1.2.2.4 Point wiring (Wiring for light point /fan point/exhaust fan point )
5.2 Plumbing
5.2.1.1 Basement
5.2.1.2 Level 1
5.2.1.2.5.2 Urinals
5.2.1.3.5.2 Urinals
5.2.1.4 Level 3
5.2.1.4.5.2 Urinals
5.2.1.5 Level 4
5.2.1.5.5.2 Urinals
5.3.2.1 Basement
5.3.2.1.1 Pipes for internal wet riser /Down comer system /Headers
5.3.2.1.2 Headerpipe
5.3.2.2 Level 1
5.3.2.2.1 Pipes for internal wet riser /Down comer system /Headers
5.3.2.2.2 Headerpipe
5.3.2.3 Level 2
5.3.2.3.1 Pipes for internal wet riser /Down comer system /Headers
5.3.2.3.2 Headerpipe
5.3.2.4 Level 3
5.3.2.4.1 Pipes for internal wet riser /Down comer system /Headers
5.3.2.4.2 Headerpipe
5.3.2.5 Level 5
5.3.2.5.1 Pipes for internal wet riser /Down comer system /Headers
5.3.2.5.2 Headerpipe
5.4 HVAC
5.4.1.1 Basement
5.4.1.2 Level 1
5.4.1.2.1 GI metal sheet ducting (Regular and Insulation)
5.4.1.3 Level 2
5.4.1.4 Level 3
5.4.1.5 Level 4
5.4.1.6 Level 5
5.4.2.3 Level 1
5.4.2.4 Level 3
5.4.2.5 Level 4
5.4.2.6 Level 5
5.1.1 FLOORING
IPS FLOORING (MEETING ROOMS & DINING ROOOM)
5.1.1.1
5.1.1.6.1 Laying of 20mm thick precut and prepolished granite with 2mm spacer
5.1.2.1.1 Placing of 600mmx600mm vitrified tiles with 2mm spacing upto 4ft ht
5.1.2.4.2 Plastering
5.1.2.4.3 Painting
ACOUSTIC TREATMENT
5.1.2.5
Installation of plain gypsum with glass wool infill
5.1.2.5.1
5.1.3 CEILING
GYPSUM BOARD CEILING
5.1.3.1
5.1.3.4.2 Align and fix the wooden panels onto the Aluminium framework
ALUMINIUM GRID CEILING
5.1.3.5
Fixing of hangers to the structure
5.1.3.5.1
5.1.3.7.2 Align and fix the wooden panels onto the Aluminium framework
MR GRADE GYPSUM GRADE CEILING
5.1.3.8
Installation of Aluminium framework
5.1.3.8.1
Align and fix the MR grade Gysum ceiling onto the Aluminium
5.1.3.8.2 framework
PLASTERING WITH OBD/ WHITE WASH
5.1.3.9
5.1.4 PARTITIONS
5.2.3 TERRACING
6.2 ROADS
6.2.1 Earthwork
6.3.1 Excavation
6.3.2 Foundation
6.3.3 Brickwork
6.3.4 Plastering
6.4 WALKWAYS
6.4.1 Brickwork
Nos./gang/
NOS 548 Beldar (6), Diesel Truck (1) 76 NOS 5
day
R.M./gang/
R.M 1700 1 Fitter, 2 helper 30 5
day
NOS 3
2. SUB STRUCTURE
sqm./gang/
sqm. 16353 2 Mason, 3 Beldar 20 14
day
sqm./gang/
sqm. 16353 2 Mason, 3 Beldar 20 14
day
sqm./gang/
sqm. 16353 2 Mason, 3 Beldar 20 14
day
cum./gang/
cum. 2433 1 Mason, 10 Beldar 15 9
day
sqm./gang/
sqm. 12453 1 Fitter, 2 Beldar 25 20
day
quintal 1075 1 Blacksmith, 2 Beldar 1 quintal/gan 25
g/day
cum./gang/
cum. 35833 5 Mason, 10 Beldar 10 55
day
cum./gang/
cum. 18392 1 Excavator, 2 Dumper 240 5
day
quintal 139 1 Blacksmith, 1 Beldar 1 quintal/gan 10
g/day
cum./gang/
cum. 4620 1 Mason, 15 Beldar 60 8
day
sqm./gang/
sqm. 22706 1 Fitter, 2 Beldar 25 25
day
quintal/gan
quintal 74 1 Blacksmith, 2 Beldar 1 8
g/day
cum./gang/
cum. 2453 5 Mason, 15 Beldar 6 12
day
sqm./gang/
sqm. 5435 1 Fitter, 2 Beldar 17.5 18
day
quintal/gan
quintal 33 1 Blacksmith, 1 Beldar 1 5
g/day
cum./gang/
cum. 1087 2 Mason, 12 Beldar 15 10
day
SQM/DAY/
SQM 22547 1 Fitter, 2 Beldar 25 GANG 30
QUINTAL/D
QUINTAL 12175 1 Blacksmith, 1 Beldar 1 AY/GANG 60
CUM/DAY/
CUM 9019 2 Mason, 12 Beldar 15 GANG 20
SQM/DAY/
SQM 14228 1 Fitter, 2 Beldar 25 GANG 15
QUINTAL 7682 1 Blacksmith, 1 Beldar QUINTAL/D
1 AY/GANG 50
CUM/DAY/
CUM 5691 2 Mason, 12 Beldar 15 GANG 12
SQM/DAY/
SQM 7924 1 Fitter, 2 Beldar 25 GANG 15
QUINTAL/D
QUINTAL 2674 1 Blacksmith, 1 Beldar 1 AY/GANG 50
CUM/DAY/
CUM 1981 2 Mason, 12 Beldar 15 GANG 12
SQM/DAY/
SQM 141 1 Fitter, 2 Beldar 25 GANG 5
QUINTAL/D
QUINTAL 95 1 Blacksmith, 1 Beldar 1 AY/GANG 20
CUM/DAY/
CUM 70 2 Mason, 12 Beldar 15 GANG 2
SQM/DAY/
SQM 2630 4 bhishti 40 GANG 6
1 Mason class 1, 1Mason class CUM/DAY/
CUM 1749 8 GANG 12
2, 4 Coolie
SQM/DAY/
SQM 268 1 Fitter, 2 Beldar 25 GANG 10
QUINTAL 145 1 Blacksmith, 1 Beldar QUINTAL/D
1 AY/GANG 25
CUM/DAY/
CUM 107 2 Mason, 12 Beldar 15 GANG 6
nos
nos
nos
nos 3
nos
Fitter 6,Welder2,Painter
m 813 1,Helper 7 19 m 5
no
no
Nos 4
Nos 10
Nos 6
PRODUCTIV NO. OF
UNITS QUANTITY RESOURCES ITY UNIT GANGS
11
87
10
94
94
94
58
58
58
18
25
43
65
15
14
10
36
27
17
122
56
175
25
9
10
39
15
30
203
30
38
154
32
21
53
11
11
18
1
5
13
13
3
6
12
10
11
10
1.25
8
7
12
12
12
10
13
6
11
1
5
10
11
3
13
13
14
13
10
12
12
8
16
15
10
13
14
10
15
20
14
27
4
2
DURATI
ON IN
DAYS.
64
24
48
21
25
24
45
45
62
10
33
48
12
27
36
27
40
27
158
90
32
42
62
50
52
42
33
27
32
26
37
30
25
20
29
23
20
17
48
48
18
15
22
17
32
26
19
16
27
22
19
16
62
82
123
7
2
11
1
INTERNATIONAL EXHIBITO
CONVENTION CENTRE,BASEMEN
S No. ACTIVITY
1. SITE P
1.1 SITE DEVELOPMENT
2.2 WATERPROOFING
2.2.1 FOUNDATION
2.2.1.2 Put layer of cement mortar base mixed with waterproofing compound
2.2.2.2 Put layer of cement mortar base mixed with waterproofing compound
2.4.3 Boring at the designated areas through shell and auger technique
2.6 BEAM
2.7 SLAB
3. SUPER STRUCTURE
3.1 IN-SITU CONSTRUCTION
3.1.3 Beams
3.1.4 Slabs
3.1.6 Walls
4.1.1.2 Wiring
Level 1
Level 2
Level 3
Level 4
4.1.1.3 Circuit /Sub Main Wiring with earth wire /MS cable trays/Raceways
4.1.1.4 Point wiring (Wiring for light point /fan point/exhaust fan point )
Level 1
Level 2
Level 3
Level 4
Level 5
Level 1
Level 2
Level 3
Level 4
Level 5
Façade lighting
Level 1
Level 2
Level 3
Level 4
Level 5
Level 1
Level 2
level 3
level 4
level 5
4.2 Plumbing
Level 1
Level 2
Level 3
Level 4
Level 1
Level 2
Level 3
Level 4
level 1
level 2
level 3
water closet
Urinals
Wash basin
4.3.1.1 Pipes for internal wet riser /Down comer system /Headers
basement
Ground floor
first floor
second floor
third floor
fifth floor
4.4 HVAC
Level 1
Level 2
Level 3
Level 4
Level 5
Level 1
Level 2
Level 3
Level 4
Level 5
Level 1
Level 2
Level 3
Level 4
Level 5
level 1
level 3
level 5
level 1
level 3
level 5
Level 1
Level 2
Level 3
Level 4
Level 5
5.1.1 FLOORING
IPS FLOORING (MEETING ROOMS & DINING ROOOM)
5.1.1.1
5.1.1.1.1 laying of 50 MM IPS flooring, 1:1.5:3
5.1.1.6.1 Laying of 20mm thick precut and prepolished granite with 2mm spacer
5.1.2.1.1 Placing of 600mmx600mm vitrified tiles with 2mm spacing upto 4ft ht
5.1.2.4.2 Plastering
5.1.2.4.3 Painting
ACOUSTIC TREATMENT
5.1.2.5
Installation of plain gypsum with glass wool infill
5.1.2.5.1
5.1.3 CEILING
GYPSUM BOARD CEILING
5.1.3.1
5.1.3.4.2 Align and fix the wooden panels onto the Aluminium framework
ALUMINIUM GRID CEILING
5.1.3.5
Fixing of hangers to the structure
5.1.3.5.1
5.1.3.7.2 Align and fix the wooden panels onto the Aluminium framework
MR GRADE GYPSUM GRADE CEILING
5.1.3.8
Installation of Aluminium framework
5.1.3.8.1
5.1.3.8.2 Align and fix the MR grade Gysum ceiling onto the Aluminium framework
PLASTERING WITH OBD/ WHITE WASH
5.1.3.9
5.1.4 PARTITIONS
5.2.3 TERRACING
6.2 ROADS
6.2.1 Earthwork
6.3.2 Foundation
6.3.3 Brickwork
6.3.4 Plastering
6.4 WALKWAYS
6.4.1 Brickwork
1. SITE PREPARATION
NOS 1
NOS 3
2. SUB STRUCTURE
no 90 Plumber 1 ,Majdoor 1 5
no 84 Plumber 1 ,Majdoor 1 5
no 75 Plumber 1 ,Majdoor 1 5
no 86 Plumber 1 ,Majdoor 1 5
sqm 30 1 beldar 3
sqm 15 1 beldar 3
sqm 35 1 beldar 3
CUM 980 Excavator (1), Loader (1), Mate(1), Coolie (10) 250
Nos./gang/day 5 2
R.M./gang/day 5 11
sqm./gang/day 30 5
Nos./gang/day 2 1
Nos./gang/day 1 2
sqm./gang/day 10 87
sqm./gang/day 20 10
sqm./gang/day 14 94
sqm./gang/day 14 94
sqm./gang/day 14 94
sqm./gang/day 14 58
sqm./gang/day 14 58
sqm./gang/day 14 58
cum./gang/day 9 18
sqm./gang/day 20 25
quintal/gang/day 25 43
cum./gang/day 55 65
cum./gang/day 5 15
quintal/gang/day 10 14
cum./gang/day 8 10
sqm./gang/day 25 36
quintal/gang/day 8 9
cum./gang/day 12 27
sqm./gang/day 18 17
quintal/gang/day 5 7
cum./gang/day 10 7
sqm./gang/day 72 122
quintal/gang/day 35 56
cum./gang/day 25 175
sqm./gang/day 18 25
quintal/gang/day 20 4
cum./gang/day 8 9
SQM/DAY/GANG 15 10
QUINTAL/DAY/GA
NG 30 39
CUM/DAY/GANG 5 15
SQM/DAY/GANG 30 30
QUINTAL/DAY/GA
NG 60 203
CUM/DAY/GANG 20 30
SQM/DAY/GANG 15 38
QUINTAL/DAY/GA
NG 50 154
CUM/DAY/GANG 12 32
SQM/DAY/GANG 15 21
QUINTAL/DAY/GA
NG 50 53
CUM/DAY/GANG 12 11
SQM/DAY/GANG 5 1
QUINTAL/DAY/GA
NG 20 5
CUM/DAY/GANG 2 2
SQM/DAY/GANG 6 11
CUM/DAY/GANG 12 18
SQM/DAY/GANG 10 1
QUINTAL/DAY/GA
NG 25 6
CUM/DAY/GANG 6 1
m 15 6
No 2 3
No 2 3
No 2 2
No 2 2
m 25 20
Nos 10 13
Nos 3 8
Nos 2 10
Nos 2 4
Nos 2 8
Nos 4 7
Nos 10 4
Nos 10 3.5
Nos 5 2
Nos 5 5
Nos 10 4
Nos 1 2.5
Nos 1 13
Nos 1 11
Nos 1 1.25
Nos 1 0.25
Nos 1 11
m 2 6
m 1 3
m 2 5
m 2 7
m 3 5
m 20 9
m 10 6
m 10 6
m 10 6
m 5 9
m 5 5
m 2 4
m 2 5
m 2 4
m 2 5
m 5 4
Nos 4 5
Nos 4 4
Nos 4 4
Nos 4 4
m 15 6
m 15 7
m 15 7
Nos 10 18
Nos 8 9
Nos 10 8
Nos 20 11
cum 1 4
cum 1 4
cum 2 5
cum 1 4
cum 1 4
no 2 1
m 10 19
m 40 21
m 10 13
m 30 19
m 5 4
m 25 7
m 30 7
m 40 22
Nos 10 13
m 400 24
m 300 20
m 250 12
m 250 21
m 300 11
m 350 23
sqm 15 16
sqm 30 15
sqm 20 14
sqm 20 15
sqm 45 20
m 5 9
m 10 8
m 10 5
m 10 5
m 10 14
m 10 8
m 10 13
m 10 8
m 10 8
m 10 27
no 1 6
no 1 4
no 1 2
nos 10 2
nos 10 2
nos 10 3
Nos 1 6
Nos 1 5
Nos 1 4
Nos 1 5
Nos 2 4
NO. OF DURATION
UNIT GANGS IN DAYS.
m2 / day/ gang 10 64
m2 / day/ gang 10 24
m2 / day/ gang 10 48
m2 / day/ gang 2 21
m2 / day/ gang 5 25
m2 / day/ gang 8 24
m2 / day/ gang 5 45
m2 / day/ gang 5 45
m2 / day/ gang 5 62
m2 / day/ gang 1 10
4 4 1
8 8 2
4 4 2
7 7 7
15 15 7
1 1 2
15 15 3
2 2 6
2 2 2
4 4 2
1 1 4
1 1 2
4 4 5
3 3 6
2 2 2
40 40 11
15 15 3
20 20 5
15 15 1
1 1 1
4 4 1
8 8 2
8 8 3
10 10 2
15 15 6
15 15 4
4 4 1
Compatibility Report for actvty_list_edited.xls
Run on 11/14/2019 0:27
The following features in this workbook are not supported by earlier versions
of Excel. These features may be lost or degraded when opening this workbook
in an earlier version of Excel or if you save this workbook in an earlier file
format.
This file originally contained features which were not recognized by this 1
version of Excel. These features will not be saved.
Some cells or styles in this workbook contain formatting that is not supported 86
by the selected file format. These formats will be converted to the closest
format available.
Version
Excel 97-2003
Excel 97-2003