INTERNATIONAL EXHIBITON CUM CO

CONVENTION CENTRE,BASEMENTS AND EXT


S No. ACTIVITY

1. SITE PREPARATION
1.1 SITE DEVELOPMENT

CLEARING OF VEGETATION-Marking of trees to be cut,removal of


1.1.1 shrubs,cutting of trees and removal of stumps and root from soil
SITE BARRICADING-Demarcation of the area to be barricaded,setting up
1.1.2 frame structure and Installation of barricading/corrugated sheets

1.2 SETTING UP TEMPORARY SERVICES


Setting up ready made Guard rooms, Site offices,Labour mess and
canteen,Mobile toilets,Medical and safety office,Workshop & material
1.2.1 testing lab

1.2.2 RO Plant Installation

1.2.3 Setting up D.G sets(150 kva)

1.2.4 Temporary Access Road

1.3 RESOURCE MOBILISATION

1.3.1 Setting up Material Storage area

1.3.2 Batching plant installation(2400 sqm)

1.3.3 Tower crane installation


2. SUB STRUCTURE
2.1 EARTHWORK

2.1.2 Driving of sheet piles inside the soil

2.1.4 Excavate the designated areas

2.1.6 Dewatering through Well Point Dewatering system

2.2 WATERPROOFING

2.2.1 FOUNDATION

2.2.1.2 Put layer of cement mortar base mixed with waterproofing compound

2.2.1.3 Application of twin tape over the waterproofing coat

2.2.1.4 Place 8mm HDPE Self-Adhessive Membrane

2.2.2 RETAINING WALL

2.2.2.2 Put layer of cement mortar base mixed with waterproofing compound

2.2.2.3 Application of twin tape over the waterproofing coat


2.2.2.4 Place 8mm HDPE Self-Adhessive Membrane

2.3 RAFT FOUNDATION (BASEMENT)

2.3.1 Concreting for PCC

2.3.2 Installation of Formwork

2.3.3 Preparing Reinforcement Cage

2.3.5 Pouring Concrete

2.4 PILE FOUNDATION (CONVENTION CENTRE)

2.4.3 Boring at the designated areas through shell and auger technique

2.4.4 Reinforcement Cage

2.4.5 Pouring Concrete

2.5 RETAINING WALL

2.5.1 Installation of Formwork

2.5.2 Preparing Reinforcement Cage

2.5.4 Pouring Concrete

2.6 BEAM

2.6.1 Installation of Formwork

2.6.2 Preparing Reinforcement Cage

2.6.3 Pouring Concrete

2.7 SLAB

2.7.1 Installation of Formwork

2.7.2 Preparing Reinforcement Cage

2.7.3 Pouring Concrete

2.8 COLUMNS AND SHEAR WALLS

2.8.1 Installation of Formwork

2.8.2 Preparing Reinforcement Cage

2.8.3 Pouring Concrete

3. SUPER STRUCTURE
3.1 IN-SITU CONSTRUCTION

3.1.1 Columns (Tree Column)


3.1.1.1 Installation of Formwork
Preparing Reinforcement Cage
3.1.1.2
Pouring Concrete & Its compaction
3.1.1.3

3.1.2 Columns (Vertical Column)

3.1.2.1 Installation of Formwork


Preparing Reinforcement Cage
3.1.2.2
Pouring Concrete & Its compaction
3.1.2.3

3.1.3 Beams

3.1.3.1 Installation of Formwork


Preparing Reinforcement Cage
3.1.3.2
Pouring Concrete & Its compaction
3.1.3.3

3.1.4 Slabs

3.1.4.1 Installation of Formwork


Preparing Reinforcement Cage
3.1.4.2
Pouring Concrete & Its compaction
3.1.4.3

3.1.5 Racked Slab

3.1.5.1 Installation of Formwork


Preparing Reinforcement Cage
3.1.5.2
Pouring Concrete & Its compaction
3.1.5.3

3.1.6 Walls

3.1.6.1 Demarcation of the Wall layout & Cleaning the surface


Laying of bricks with mortar using alternate successive courses
3.1.6.2

3.1.7 Staircases & Ramps

3.1.7.1 Installation of Formwork

Preparing Reinforcement Cage


3.1.7.2
Pouring Concrete & Its compaction
3.1.7.3
5. SERVICES
5.1 Electrical

5.1.1 High Side


Installation of HT panels
5.1.1.1
Installation of DG Sets
5.1.1.2
Installation of LT panels
5.1.1.3
Installation of Transformers
5.1.1.4
installation of earthing plate
5.1.1.5

5.1.2 Low Side


5.1.2.1
Basement

5.1.2.1.1 Wall Chiselling and Conduiting (Steel and PVC)

5.1.2.1.2 Point wiring (Wiring for light point /fan point/exhaust fan point )

5.1.2.1.3 Junction boxes

5.1.2.1.4 Switches / sockets

5.1.2.1.5 Installation of Light fixtures

5.1.2.1.6 public addressal system fixtures

5.1.2.1.7 CCTV and Data Wiring and conduiting

5.1.2.1.8 Installation of AV systemsand LAN


5.1.2.2
Level 1

5.1.2.2.1 Wall Chiselling and Conduiting (Steel and PVC)

5.1.2.2.2 Installation of Electrical Rooms (Lighting MDB ,UPS MDB ,LPDB)

5.1.2.2.3 Circuit /Sub Main Wiring with earth wire /MS cable trays/Raceways

5.1.2.2.4 Point wiring (Wiring for light point /fan point/exhaust fan point )

5.1.2.2.5 Junction boxes

5.1.2.2.6 Switches / sockets

5.1.2.2.7 Light fixtures

5.1.2.2.8 public addressal system fixtures

5.1.2.2.9 CCTV and Data Wiring and conduiting

5.1.2.2.10 Installation of AV systemsand LAN


5.1.2.3
Level 2
5.1.2.3.1
Wall Chiselling and Conduiting (Steel and PVC)
5.1.2.3.2
Installation of Electrical Rooms (Lighting MDB ,UPS MDB ,LPDB)
5.1.2.3.3
Circuit /Sub Main Wiring with earth wire /MS cable trays/Raceways
5.1.2.3.4
Point wiring (Wiring for light point /fan point/exhaust fan point )
5.1.2.3.5
Junction boxes
5.1.2.3.6
Switches / sockets
5.1.2.3.7
Light fixtures
5.1.2.3.8
public addressal system fixtures
5.1.2.3.9
CCTV and Data Wiring and conduiting
5.1.2.3.10
Installation of AV systemsand LAN
5.1.2.4
Level 3
5.1.2.4.1
Wall Chiselling and Conduiting (Steel and PVC)
5.1.2.4.2
Installation of Electrical Rooms (Lighting MDB ,UPS MDB ,LPDB)
5.1.2.4.3
Circuit /Sub Main Wiring with earth wire /MS cable trays/Raceways
5.1.2.4.4
Point wiring (Wiring for light point /fan point/exhaust fan point )
5.1.2.4.5
Junction boxes
5.1.2.4.6
Switches / sockets
5.1.2.4.7
Light fixtures
5.1.2.4.8
public addressal system fixtures
5.1.2.4.9 CCTV and Data Wiring and conduiting
5.1.2.4.10
Installation of AV systemsand LAN
5.1.2.5
Level 4
5.1.2.5.1
Wall Chiselling and Conduiting (Steel and PVC)
5.1.2.5.2
Installation of Electrical Rooms (Lighting MDB ,UPS MDB ,LPDB)
5.1.2.5.3
Circuit /Sub Main Wiring with earth wire /MS cable trays/Raceways
5.1.2.5.4
Point wiring (Wiring for light point /fan point/exhaust fan point )
5.1.2.5.5
Junction boxes
5.1.2.5.6
Switches / sockets
5.1.2.5.7
Light fixtures
5.1.2.5.8
public addressal system fixtures
5.1.2.5.9
CCTV and Data Wiring and conduiting
5.1.2.5.10 Installation of AV systemsand LAN
5.1.2.6
Level 5
5.1.2.6.1
Wall Chiselling and Conduiting (Steel and PVC)
5.1.2.6.2
Circuit /Sub Main Wiring with earth wire /MS cable trays/Raceways
5.1.2.6.3
Point wiring (Wiring for light point /fan point/exhaust fan point )
5.1.2.6.4
Junction boxes
5.1.2.6.5
Switches / sockets
5.1.2.6.6
Light fixtures
5.1.2.6.7
public addressal system fixtures
5.1.2.6.8
CCTV and Data Wiring and conduiting
5.1.2.6.9
Installation of AV systemsand LAN
5.1.2.6.10
Façade lighting

5.2 Plumbing

5.2.1 Low Side

5.2.1.1 Basement

5.2.1.1.1 External piping (From main lineto a particular area)

5.2.1.1.2 Installation of water meters

5.2.1.1.3 Installation of floor drains

5.2.1.1.4 Installation of drainag pipes

5.2.1.2 Level 1

5.2.1.2.1 Domestic water pipes

5.2.1.2.2 Pvc pipes for drinking water -Level 1

5.2.1.2.3 Gratings,drains and traps

5.2.1.2.4 SWR pipe 100mm dia

5.2.1.2.5 Sanitary fixture Installation

5.2.1.2.5.1 water closet

5.2.1.2.5.2 Urinals

5.2.1.2.5.3 Wash basin

5.2.1.2.5.4 Pillar Taps ,Valves and heaters


5.2.1.3 Level 2

5.2.1.3.1 Domestic water pipes

5.2.1.3.2 Pvc pipes for drinking water -Level 1

5.2.1.3.3 Gratings,drains and traps

5.2.1.3.4 SWR pipe 100mm dia

5.2.1.3.5 Sanitary fixture Installation

5.2.1.3.5.1 water closet

5.2.1.3.5.2 Urinals

5.2.1.3.5.3 Wash basin

5.2.1.3.5.4 Pillar Taps ,Valves and heaters

5.2.1.4 Level 3

5.2.1.4.1 Domestic water pipes

5.2.1.4.2 Pvc pipes for drinking water -Level 1

5.2.1.4.3 Gratings,drains and traps

5.2.1.4.4 SWR pipe 100mm dia

5.2.1.4.5 Sanitary fixture Installation

5.2.1.4.5.1 water closet

5.2.1.4.5.2 Urinals

5.2.1.4.5.3 Wash basin

5.2.1.4.5.4 Pillar Taps ,Valves and heaters

5.2.1.5 Level 4

5.2.1.5.1 Domestic water pipes

5.2.1.5.2 Pvc pipes for drinking water -Level 1

5.2.1.5.3 Gratings,drains and traps

5.2.1.5.4 SWR pipe 100mm dia

5.2.1.5.5 Sanitary fixture Installation

5.2.1.5.5.1 water closet

5.2.1.5.5.2 Urinals

5.2.1.5.5.3 Wash basin


5.2.1.5.5.4 Pillar Taps ,Valves and heaters

5.2.1.5.5.5 Pvc pipes exposed in ducts and terrace

5.2.2 High Side

5.2.2.1 Treated Water Tank (4x200KL)

5.2.2.2 Installation of Sump Tanks-Rainwater tank(4 X100KL)

5.2.2.3 Installation of Overhead-Rainwater tank(10 X100KL)

5.2.2.4 Installation of Overhead Domestic Water tank (5Kl)

5.2.2.5 Installation of Overhead Water tank for AHU (5Kl)

5.2.2.6 Installation of Pumps

5.3 Fire Fighting

5.3.1 High side

5.3.1.1 Installation of basement tanks

5.3.1.2 Installation of overhead tanks

5.3.2 Low side

5.3.2.1 Basement

5.3.2.1.1 Pipes for internal wet riser /Down comer system /Headers

5.3.2.1.2 Headerpipe

5.3.2.1.3 Branch pipe

5.3.2.1.4 External and Internal Hydrant system

5.3.2.1.5 Hose Reel ,Axe ,Cabinet

5.3.2.1.6 Automatic Sprinkler system

5.3.2.2 Level 1

5.3.2.2.1 Pipes for internal wet riser /Down comer system /Headers

5.3.2.2.2 Headerpipe

5.3.2.2.3 Branch pipe

5.3.2.2.4 External and Internal Hydrant system

5.3.2.2.5 Hose Reel ,Axe ,Cabinet


5.3.2.2.6 Automatic Sprinkler system

5.3.2.3 Level 2

5.3.2.3.1 Pipes for internal wet riser /Down comer system /Headers

5.3.2.3.2 Headerpipe

5.3.2.3.3 Branch pipe

5.3.2.3.4 External and Internal Hydrant system

5.3.2.3.5 Hose Reel ,Axe ,Cabinet

5.3.2.3.6 Automatic Sprinkler system

5.3.2.4 Level 3

5.3.2.4.1 Pipes for internal wet riser /Down comer system /Headers

5.3.2.4.2 Headerpipe

5.3.2.4.3 Branch pipe

5.3.2.4.4 External and Internal Hydrant system

5.3.2.4.5 Hose Reel ,Axe ,Cabinet

5.3.2.4.6 Automatic Sprinkler system

5.3.2.5 Level 5

5.3.2.5.1 Pipes for internal wet riser /Down comer system /Headers

5.3.2.5.2 Headerpipe

5.3.2.5.3 Branch pipe

5.3.2.5.4 External and Internal Hydrant system

5.3.2.5.5 Hose Reel ,Axe ,Cabinet

5.3.2.5.6 Automatic Sprinkler system

5.4 HVAC

5.4.1 Low side

5.4.1.1 Basement

5.4.1.1.1 GI metal sheet ducting (Regular and Insulation)

5.4.1.1.2 Insulated Chilled water piping (200,150,125,100,80,65,50,40,32,25,20)

5.4.1.1.3 Drain Pipes

5.4.1.2 Level 1
5.4.1.2.1 GI metal sheet ducting (Regular and Insulation)

5.4.1.2.2 Insulated Chilled water piping (200,150,125,100,80,65,50,40,32,25,20)

5.4.1.2.3 Drain Pipes

5.4.1.3 Level 2

5.4.1.3.1 GI metal sheet ducting (Regular and Insulation)

5.4.1.3.2 Insulated Chilled water piping (200,150,125,100,80,65,50,40,32,25,20)

5.4.1.3.3 Drain Pipes

5.4.1.4 Level 3

5.4.1.4.1 GI metal sheet ducting (Regular and Insulation)

5.4.1.4.2 Insulated Chilled water piping (200,150,125,100,80,65,50,40,32,25,20)

5.4.1.4.3 Drain Pipes

5.4.1.5 Level 4

5.4.1.5.1 GI metal sheet ducting (Regular and Insulation)

5.4.1.5.2 Insulated Chilled water piping (200,150,125,100,80,65,50,40,32,25,20)

5.4.1.5.3 Drain Pipes

5.4.1.6 Level 5

5.4.1.6.1 GI metal sheet ducting (Regular and Insulation)

5.4.1.6.2 Insulated Chilled water piping (200,150,125,100,80,65,50,40,32,25,20)

5.4.1.6.3 Drain Pipes

5.4.2 High side

5.4.2.1 Installation of Chiller Plants

5.4.2.2 Installation of Cooling Towers

5.4.2.3 Level 1

5.4.2.3.1 Installation of AHU units

5.4.2.3.2 Fan coil Unit

5.4.2.3.3 Installation of fire dampers

5.4.2.4 Level 3

5.4.2.4.1 Installation of AHU units


5.4.2.4.2 Fan coil Unit

5.4.2.4.3 Installation of fire dampers

5.4.2.5 Level 4

5.4.2.5.1 Installation of fire dampers

5.4.2.6 Level 5

5.4.2.6.1 Installation of AHU units

5.4.2.6.2 Fan coil Unit

5.4.2.6.3 Installation of fire dampers

5.5 Mechanical Services

5.5.1 Installation of Lifts

5.5.1.1 installation of Service lifts

5.5.1.2 installation of passenger lifts

5.5.2 installation of escalators


5. FINISHES

5.1 INTERNAL FINISHES

5.1.1 FLOORING
IPS FLOORING (MEETING ROOMS & DINING ROOOM)
5.1.1.1

5.1.1.1.1 laying of 50 MM IPS flooring, 1:1.5:3

5.1.1.1.2 Laying Rubber overlay 10mm thick

5.1.1.1.4 Laying of carpet tiles


WOODEN PLANKS (STAGE)
5.1.1.2

5.1.1.2.1 installation of wooden planks over wooden battens


STONE FLOORING
5.1.1.3
KOTA STONE (SERVICE AREAS)
5.1.1.4
Preparation of floor with water proofing layer
5.1.1.4.1
Laying of 20mm thick prepolished Kota stone
5.1.1.4.2
ITALIAN MARBLE (LOUNGE AREAS ,RECEPTION and FOYERS)
5.1.1.5

5.1.1.5.1 Laying of 20mm thick italian marble over cement mortar


5.1.1.5.2 laying of 40mm thick polished dhaulpur sandstone
GRANITE (TOILETS)
5.1.1.6

5.1.1.6.1 Laying of 20mm thick precut and prepolished granite with 2mm spacer

5.1.1.6.2 Filling of spacing with epoxy grout


TILE FLOORING (GREEN ROOMS)
5.1.1.7

5.1.1.7.1 Laying of 600mmx600mm vitrified tiles with 2mm spacing

5.1.1.7.2 Filling of spacing with epoxy grout

5.1.2 WALL FINISH


VITRIFIED/CERAMIC TILE (TOILETS,GREEN ROOM)
5.1.2.1

5.1.2.1.1 Placing of 600mmx600mm vitrified tiles with 2mm spacing upto 4ft ht

5.1.2.1.2 Filling of spacing with epoxy grout


WALL CLADDING
5.1.2.2

5.1.2.2.1 Applying 20mm plaster over masonry wall

5.1.2.2.2 Placement of 12mm thick BWP plywood

5.1.2.2.3 Installation of Treated hardwood (50mmx75mm) with spacing 75mm


FABRIC PANELLING (4FT – 8FT)
5.1.2.3

5.1.2.3.1 Placement of wooden framework (40mmx25mm)

5.1.2.3.2 Installation of fabric panels


PLASTERING & PAINTING
5.1.2.4

5.1.2.4.2 Plastering

5.1.2.4.3 Painting
ACOUSTIC TREATMENT
5.1.2.5
Installation of plain gypsum with glass wool infill
5.1.2.5.1

5.1.2.5.3 Installation of Micro perforated wooden panelling

5.1.3 CEILING
GYPSUM BOARD CEILING
5.1.3.1

5.1.3.1.1 Installation of ceiling grid

5.1.3.1.2 Fixing of gypsum boards to the framework


POP FALSE CEILING
5.1.3.2
5.1.3.2.1 Fixing of struts from the gypsum board ceiling

5.1.3.2.2 Installation of POP ceiling


GRC PANELLING WITH COVE LIGHTS
5.1.3.3

5.1.3.3.1 Installation of ceiling grid

5.1.3.3.2 Fixing of GRC panels to the framework


VENEERED WOODEN FLOATED CEILING
5.1.3.4
Installation of Aluminium framework
5.1.3.4.1

5.1.3.4.2 Align and fix the wooden panels onto the Aluminium framework
ALUMINIUM GRID CEILING
5.1.3.5
Fixing of hangers to the structure
5.1.3.5.1

5.1.3.5.2 Fixing of GRC panels to the framework


0.7 NRC MICRO PERFORATED GYP BOARD CEILING
5.1.3.6

5.1.3.6.1 Installation of ceiling grid

5.1.3.6.2 Fixing of Gyp board panels to the framework


ACOUSTUCAL DESIGNER WOODEN CEILING
5.1.3.7
Installation of Aluminium framework
5.1.3.7.1

5.1.3.7.2 Align and fix the wooden panels onto the Aluminium framework
MR GRADE GYPSUM GRADE CEILING
5.1.3.8
Installation of Aluminium framework
5.1.3.8.1
Align and fix the MR grade Gysum ceiling onto the Aluminium
5.1.3.8.2 framework
PLASTERING WITH OBD/ WHITE WASH
5.1.3.9

5.1.3.9.1 Clean and preparation of surface

5.1.3.9.2 plaster with obd /white wash

5.1.4 PARTITIONS

5.1.4.1 INSTALLATION OF DOUBLE STUDD FRAMEWORK

5.1.4.1.2 Installationof studs leaving space for services

5.1.4.1.3 Screwing of gypsum panelson either sides of the framework


GYPSUM BOARD DRY WALL (STC 55)
5.1.4.2

5.1.4.2.1 Installation of Aluminium framework


5.1.4.2.2 Fixing of gypsum panels to the framework
ALUMINIUM CURTAIN WALLS
5.1.4.3

5.1.4.3.1 Fixing of metal framework to the structure

5.1.4.3.2 Fixing of Aluminium panels to the framework


TOILET PARTITIONS
5.1.4.4

5.1.4.4.1 Installation of metal framework to the structural members

5.1.4.4.2 Fixing of Toilet partitions to the metal framework

5.2 EXTERNAL FINISHES

5.2.1 GRC CLADDING

5.2.1.1 fastening of PTFE packing to the structure

5.2.1.3 Fixing of GRC cladding to the steel frame work

5.2.2 ALUMINIUM CLADDING

5.2.2.1 Installation of metal framework to the structural members

5.2.2.2 Fixing of Aluminium panels to the metal framework

5.2.3 TERRACING

5.2.3.1 laying Water proofing over structural metal deck slab

5.2.3.2 laying of 50mm thick protection cement screed

5.2.3.3 laying of 10mm thick vitrified tile on cement mortar


6.EXTERNAL DEVELOPMENT
6.1 LANDSCAPE WORKS

6.1.1 Construction of stepped areas

6.1.2.1 Excavation of earth

6.1.2.2 Doing RCC work

6.1.2.3 primary water proofing and protective plaster laying

6.1.2.4 30 MM thick stone laying

6.1.2 Laying of grass/Shurbs

6.1.2.1 Laying of grass/Shurbs

6.1.2.2 Spreading sludge or good manure

6.1.3 Landscape work for pathways


6.1.3.1 Excavation work

6.1.3.2 Laying of precast interlocking tiles/Stepping stones

6.1.4 External Lighting

6.1.4.1 Excavation for pedestal of light poles

6.1.4.2 Concreting RMC

6.1.4.3 Fixing the ligh pole to the top of pedestal

6.1.5 Insallation of fountain and water body

6.1.5.1 230mm thick brickwall for fountain

6.1.5.2 Waterproofing membranes for fountain

6.1.5.3 Plastering for fountain

6.1.5.4 Internal tiling for fountain

6.2 ROADS

6.2.1 Earthwork

6.2.2 Filling (3 layer Rolling)

6.2.3 RCC wok

6.2.4 Preparation of subgrade

6.2.5 laying Concrete Sub base over subgrade

6.3 BOUNDARY WALL

6.3.1 Excavation

6.3.2 Foundation

6.3.3 Brickwork

6.3.4 Plastering

6.4 WALKWAYS

6.4.1 Brickwork

6.4.2 60mm thk Paver block

6.4.3 60mm thk Paver block (grass)

6.4.4 Fixing Kerb stone cement mortar 1:3


EXHIBITON CUM CONVENTION CENTRE
RE,BASEMENTS AND EXTERNAL DEVELOPMENT
PRODUCTIVI NO. OF
UNIT QUANTITY RESOURCES UNIT
TY GANGS
1. SITE PREPARATION

Nos./gang/
NOS 548 Beldar (6), Diesel Truck (1) 76 NOS 5
day
R.M./gang/
R.M 1700 1 Fitter, 2 helper 30 5
day

Mason (1), Beldar (11), Bhisti sqm./gang/


SQ M 4500 30 30
(5) day
Nos./gang/
NOS 1 Beldar(2),Plumber(2) 0.5 2
day
NOS 2 Electrician (1), Helper (4) 1 Nos./gang/ 1
day
Mason (2), Coolie (3), Bhisti sqm./gang/
SQ M 25,998 30 10
(4) day

Mason (1), Beldar (11), Bhisti sqm./gang/


SQ M 6040 30 20
(5) day
NOS 1

NOS 3

2. SUB STRUCTURE

Excavator (1), Loader (1), Mate


(1), Coolie (1) 245

sqm. 65674 1 Mason, 2 Beldar 50 sqm./gang/ 14


day
sqm./gang/
sqm. 65674 1 Mason, 2 Beldar 50 14
day
sqm./gang/
sqm. 65674 1 Mason, 2 Beldar 50 14
day

sqm./gang/
sqm. 16353 2 Mason, 3 Beldar 20 14
day
sqm./gang/
sqm. 16353 2 Mason, 3 Beldar 20 14
day
sqm./gang/
sqm. 16353 2 Mason, 3 Beldar 20 14
day

cum./gang/
cum. 2433 1 Mason, 10 Beldar 15 9
day
sqm./gang/
sqm. 12453 1 Fitter, 2 Beldar 25 20
day
quintal 1075 1 Blacksmith, 2 Beldar 1 quintal/gan 25
g/day
cum./gang/
cum. 35833 5 Mason, 10 Beldar 10 55
day

cum./gang/
cum. 18392 1 Excavator, 2 Dumper 240 5
day
quintal 139 1 Blacksmith, 1 Beldar 1 quintal/gan 10
g/day
cum./gang/
cum. 4620 1 Mason, 15 Beldar 60 8
day

sqm./gang/
sqm. 22706 1 Fitter, 2 Beldar 25 25
day
quintal/gan
quintal 74 1 Blacksmith, 2 Beldar 1 8
g/day
cum./gang/
cum. 2453 5 Mason, 15 Beldar 6 12
day

sqm./gang/
sqm. 5435 1 Fitter, 2 Beldar 17.5 18
day
quintal/gan
quintal 33 1 Blacksmith, 1 Beldar 1 5
g/day
cum./gang/
cum. 1087 2 Mason, 12 Beldar 15 10
day

sqm. 218913 1 Fitter, 2 Beldar 25 sqm./gang/ 72


day
quintal/gan
quintal 1970 1 Blacksmith, 2 Beldar 1 35
g/day
cum. 65674 2 Mason, 12 Beldar 15 cum./gang/ 25
day

sqm. 7877 1 Fitter, 2 Beldar 17.5 sqm./gang/ 18


day
quintal/gan
quintal 89 1 Blacksmith, 1 Beldar 1 20
g/day
cum./gang/
cum. 2954 1 Mason, 10 Beldar 40 8
day
SQM/DAY/
SQM 2180 1 Fitter, 2 Beldar 14 GANG 15
QUINTAL/D
QUINTAL 1182 1 Blacksmith, 1 Beldar 1 AY/GANG 30
CUM/DAY/
CUM 876 2 Mason, 12 Beldar 12 GANG 5

SQM/DAY/
SQM 22547 1 Fitter, 2 Beldar 25 GANG 30
QUINTAL/D
QUINTAL 12175 1 Blacksmith, 1 Beldar 1 AY/GANG 60
CUM/DAY/
CUM 9019 2 Mason, 12 Beldar 15 GANG 20

SQM/DAY/
SQM 14228 1 Fitter, 2 Beldar 25 GANG 15
QUINTAL 7682 1 Blacksmith, 1 Beldar QUINTAL/D
1 AY/GANG 50
CUM/DAY/
CUM 5691 2 Mason, 12 Beldar 15 GANG 12

SQM/DAY/
SQM 7924 1 Fitter, 2 Beldar 25 GANG 15
QUINTAL/D
QUINTAL 2674 1 Blacksmith, 1 Beldar 1 AY/GANG 50
CUM/DAY/
CUM 1981 2 Mason, 12 Beldar 15 GANG 12

SQM/DAY/
SQM 141 1 Fitter, 2 Beldar 25 GANG 5
QUINTAL/D
QUINTAL 95 1 Blacksmith, 1 Beldar 1 AY/GANG 20
CUM/DAY/
CUM 70 2 Mason, 12 Beldar 15 GANG 2

SQM/DAY/
SQM 2630 4 bhishti 40 GANG 6
1 Mason class 1, 1Mason class CUM/DAY/
CUM 1749 8 GANG 12
2, 4 Coolie

SQM/DAY/
SQM 268 1 Fitter, 2 Beldar 25 GANG 10
QUINTAL 145 1 Blacksmith, 1 Beldar QUINTAL/D
1 AY/GANG 25
CUM/DAY/
CUM 107 2 Mason, 12 Beldar 15 GANG 6
nos

nos

nos

nos 3

nos

m 775 2 Wireman, 1 Khalasi 30 m 5

nos 1950 2 Wireman, 1 Khalasi 30 m 5

nos 110 2 Wireman, 1 Khalasi 15 Nos 5

nos 380 2 Wireman, 1 Khalasi 20 Nos 3

nos 1154 1 Electrician,2 Helper 25 Nos 5

nos 365 1 Electrician,2 Helper 20 Nos 5

m 856 2 Wireman, 1 Khalasi 30 m 5

m 110 2 Wireman ,1Khalsi 333 m 1

m 650 2 Wireman, 1 Khalasi 30 m 5

Nos 6 Wireman 3,Technician 6 1 No 2

m 3000 2 Wireman, 1 Khalasi 40 m 9

m 3500 2 Wireman, 1 Khalasi 40 m 7

nos 420 2 Wireman, 1 Khalasi 15 Nos 5

nos 460 2 Wireman, 1 Khalasi 20 Nos 5

nos 956 1 Electrician,2 Helper 25 Nos 5

nos 250 1 Electrician,2 Helper 20 Nos 2

m 1052 2 Wireman, 1 Khalasi 30 m 5

m 4056 2 Wireman ,1Khalsi 333 m 2

m 510 2 Wireman, 1 Khalasi 30 m 5

Nos 6 3Wireman ,6Technician 1 No 2


m 2080 2 Wireman, 1 Khalasi 40 m 9

m 2485 2 Wireman, 1 Khalasi 40 m 5

nos 380 2 Wireman, 1 Khalasi 15 Nos 5

nos 400 2 Wireman, 1 Khalasi 20 Nos 2

nos 884 1 Electrician,2 Helper 25 Nos 5

nos 220 1 Electrician,2 Helper 20 Nos 1

m 985 2 Wireman, 1 Khalasi 30 m 5

m 1053 2 Wireman ,1Khalsi 333 m 1

m 430 2 Wireman, 1 Khalasi 30 m 5

Nos 4 3Wireman ,6Technician 1 No 2

m 2963 2 Wireman, 1 Khalasi 40 m 9

nos 3200 2 Wireman, 1 Khalasi 40 m 8

nos 380 2 Wireman, 1 Khalasi 15 Nos 5

nos 150 2 Wireman, 1 Khalasi 20 Nos 2

nos 240 1 Electrician,2 Helper 25 Nos 5

nos 22 1 Electrician,2 Helper 20 Nos 1

m 1178 2 Wireman, 1 Khalasi 30 m 10

m 3635 2 Wireman ,1Khalsi 333 m 2

m 425 2 Wireman, 1 Khalasi 30 m 5

Nos 4 3Wireman ,6Technician 1 No 2

m 1256 2 Wireman, 1 Khalasi 40 m 5

nos 1454 2 Wireman, 1 Khalasi 40 m 8

nos 380 2 Wireman, 1 Khalasi 15 Nos 5

nos 300 2 Wireman, 1 Khalasi 20 Nos 2

nos 648 1 Electrician,2 Helper 25 Nos 5

nos 4 1 Electrician,2 Helper 20 Nos 1

m 1250 2 Wireman, 1 Khalasi 30 m 5


m 4564 2 Wireman ,1Khalsi 333 m 2

m 545 2 Wireman, 1 Khalasi 30 m 5

m 3562 2 Wireman, 1 Khalasi 40 m 10

nos 3861 2 Wireman, 1 Khalasi 40 m 8

nos 380 2 Wireman, 1 Khalasi 15 Nos 5

nos 450 2 Wireman, 1 Khalasi 20 Nos 4

nos 940 1 Electrician,2 Helper 25 Nos 5

nos 206 1 Electrician,2 Helper 20 Nos 2

m 5463 2 Wireman ,1Khalsi 333 m 3

m 1250 2 Wireman, 1 Khalasi 30 m 5

nos 60 1 Electrician,2 Helper 25 Nos 1

running metre 160 Plumber 1 ,Majdoor 1 9 m 5

no 30 Plumber 1 ,Majdoor 1 2 nos 2

no 40 Plumber 1 ,Majdoor 1 5 nos 2

running metre 450 Plumber 1 ,Majdoor 1 30 m 4

running metre 520 Plumber 1 ,Majdoor 1 9 m 5

running metre 65 Plumber 1 ,Majdoor 1 9 m 2

no 90 Plumber 1 ,Majdoor 1 5 Nos 4

running metre 447 Plumber 1 ,Majdoor 1 5 m 5

Nos 61 1 Plumber ,2 Majdoor 1 Nos 5

Nos 82 1 plumber,3Majdoor 1 Nos 8

Nos 39 1plumber,3 majdoor 2 Nos 5

Nos 390 1 Plumber ,2 Majdoor 2 Nos 15


running metre 502 Plumber 1 ,Majdoor 1 9 m 10

running metre 95 Plumber 1 ,Majdoor 1 9 m 2

no 84 Plumber 1 ,Majdoor 1 5 Nos 4

running metre 495 Plumber 1 ,Majdoor 1 5 m 15

Nos 20 1 Plumber ,2 Majdoor 1 Nos 5

Nos 28 1 plumber,3Majdoor 1 Nos 5

Nos 16 1plumber,3 majdoor 2 Nos 5

Nos 180 1 Plumber ,2 Majdoor 2 Nos 10

running metre 550 Plumber 1 ,Majdoor 1 9 m 10

running metre 68 Plumber 1 ,Majdoor 1 9 m 2

no 75 Plumber 1 ,Majdoor 1 5 Nos 4

running metre 520 Plumber 1 ,Majdoor 1 5 m 10

Nos 36 1 Plumber ,2 Majdoor 1 Nos 5

Nos 54 2 plumber,6 Majdoor 1 Nos 5

Nos 24 1plumber,3 majdoor 2 Nos 5

Nos 320 1 Plumber ,2 Majdoor 2 Nos 20

running metre 420 Plumber 1 ,Majdoor 1 9 m 5

running metre 95 Plumber 1 ,Majdoor 1 9 m 2

no 86 Plumber 1 ,Majdoor 1 5 Nos 4

running metre 415 Plumber 1 ,Majdoor 1 5 m 7

Nos 14 1 Plumber ,2 Majdoor 1 Nos 5

Nos 18 2 plumber,6 Majdoor 1 Nos 5

Nos 6 1plumber,3 majdoor 2 Nos 5


Nos 95 1 Plumber ,2 Majdoor 2 Nos 10

running metre 245 1 Plumber ,1 Majdoor 9 m 5

nos 4 1 Mason ,5CoolieA ,1Bhishtie 5 cum 1

nos 4 1 Mason ,5CoolieA ,1Bhishtie 5 cum 1

nos 10 1 Mason ,5CoolieA ,1Bhishtie 5 cum 2

nos 4 1 Mason ,5CoolieA ,1Bhishtie 5 cum 1

nos 4 1 Mason ,5CoolieA ,1Bhishtie 5 cum 1

nos 10 1 Mason ,5CoolieA ,1Bhishtie 1 no 2

nos 4 1 Mason ,5CoolieA ,1Bhishtie 5 cum 1

nos 10 1 Mason ,5CoolieA ,1Bhishtie 5 cum 2

running m 3125 1 Plumber ,1 Majdoor 20 m 15

running m 8569 1 Plumber ,1 Majdoor 20 m 40

nos 72 1 Plumber ,1 Majdoor 2 Nos 10

running m 2253 4Pipe layer4Plumber 4,Labour 60 m 10

running m 1711 1 Plumber ,1 Majdoor 20 m 10

running m 7497 1 Plumber ,1 Majdoor 20 m 40

nos 50 1 Plumber ,1 Majdoor 2 Nos 10


running m 15635 4Pipe layer4Plumber 4,Labour 60 m 20

running m 1141 1 Plumber ,1 Majdoor 9 m 10

running m 4998 1 Plumber ,1 Majdoor 9 m 40

nos 50 1 Plumber ,1 Majdoor 2 Nos 10

running m 7568 4Pipe layer4Plumber 4,Labour 60 m 10

running m 189 1 Plumber ,1 Majdoor 9 m 10

running m 1525 1 Plumber ,1 Majdoor 9 m 40

nos 50 1 Plumber ,1 Majdoor 2 Nos 10

running m 8659 4Pipe layer4Plumber 4,Labour 60 m 15

running m 1911 1 Plumber ,1 Majdoor 25 m 10

running m 7897 1 Plumber ,1 Majdoor 25 m 40

nos 50 1 Plumber ,1 Majdoor 2 Nos 10

running m 10562 4Pipe layer4Plumber 4,Labour 60 m 15

sqm 3565 1 Fitter, 1 Helper 10 sqm 30


Fitter 6,Welder2,Painter
m 760 1,Helper 7 19 m 5

m 750 Plumber 1,Mazdoor 1 9 m 10


sqm 2439 1 Fitter, 1 Helper 10 sqm 15

Fitter 6,Welder2,Painter
m 813 1,Helper 7 19 m 5

m 675 Plumber 1,Mazdoor 1 9 m 10

sqm 4608 1 Fitter, 1 Helper 10 sqm 30


Fitter 6,Welder2,Painter
m 1536 1,Helper 7 15 m 10

m 1156 Plumber 1,Mazdoor 1 9 m 10

sqm 2805 1 Fitter, 1 Helper 10 sqm 20


Fitter 6,Welder2,Painter
m 935 1,Helper 7 19 m 5

m 720 Plumber 1,Mazdoor 1 9 m 10

sqm 2985 1 Fitter, 1 Helper 10 sqm 20


Fitter 6,Welder2,Painter
m 900 1,Helper 7 19 m 10

m 750 Plumber 1,Mazdoor 1 9 m 10

sqm 8925 1 Fitter, 1 Helper 10 sqm 45


Fitter 6,Welder2,Painter
m 2600 1,Helper 7 19 m 10

m 2450 Plumber 1,Mazdoor 1 9 m 10

no

no

Nos 6 2 Fitter , 2 Helper 1 no 1

Nos 65 1 Fitter ,1 Welder,1Helper 3 nos 10

nos 25 1 Fitter , 1 Helper 4 Nos 1

Nos 4 2 Fitter , 2 Helper 1 no 1


Nos 60 1 Fitter ,1 Welder,1Helper 3 nos 10

nos 15 1 Fitter , 1 Helper 4 Nos 1

nos 20 1 Fitter , 1 Helper 4 Nos 1

Nos 2 2 Fitter , 2 Helper 1 no 1

Nos 80 1 Fitter ,1 Welder,1Helper 3 nos 10

nos 35 1 Fitter , 1 Helper 4 Nos 1

Nos 4

Nos 10

Nos 6

PRODUCTIV NO. OF
UNITS QUANTITY RESOURCES ITY UNIT GANGS

sqm 9600 1 Mason, 2 beldar 15 m2 / day/ gang 10

sqm 9600 1 Mason, 2 beldar 40 m2 / day/ gang 10

sqm 9600 2 Mason, 2 beldar 20 m2 / day/ gang 10

sqm 840 3 fitter, 1 Carpenter, 3 labour 20 m2 / day/ gang 2

sqm 1860 1 Mason, 1 beldar 15 m2 / day/ gang 5


1 Mason, 5 Skilled Beldar, 4
sqm 1860 Machines for polishing 10 m2 / day/ gang 8

sqm 2320 1 mason, 3 beldar, 2 machine for 5


10 m2 / day/ gang
rubbing
sqm 2320 1 mason, 3 beldar, 2 machine for 10 5
m2 / day/ gang
rubbing

sqm 3120 1 mason, 3 beldar, 2 machine for 5


10 m2 / day/ gang
rubbing
sqm 30 1 beldar 3 m2 / day/ gang 1

sqm 1650 1 mason, 1 beldar 5 m2/ day/ gang 10

sqm 15 1 beldar 3 m2/ day/ gang 1

sqm 3528 1 mason, 1 beldar 5 m2/ day/ gang 15

sqm 35 1 beldar 3 m2/ day/ gang 1

sqm 5320 1 Mason, 2 beldar 20 m2/ day/ gang 10

sqm 5320 1 carpenter, 1 beldar 15 m2/ day/ gang 10

sqm 5320 1 carpenter, 1 beldar 20 m2/ day/ gang 10

sqm 4040 1 carpenter, 1 beldar 15 m2/ day/ gang 10

sqm 4040 1 carpenter, 1 beldar 20 m2/ day/ gang 10

sqm 31680 1 Mason, 2 beldar 20 m2/ day/ gang 10

sqm 31680 2 Painter, 1 beldar 35 m2/ day/ gang 10

sqm 5020 1 Mason, 2 fitter 20 m2/ day/ gang 8

sqm 5020 1 carpenter, 2 fitter. 15 m2/ day/ gang 8

sqm 12343 1 beldar, 3 fitter. 20 m2/ day/ gang 10

sqm 12343 2 mason, 2 beldar,1 fitter 25 m2/ day/ gang 10


sqm 8452 1 beldar, 3 fitter. 20 m2/ day/ gang 8

sqm 8452 3 fitter, 1 Carpenter, 3 labour 25 m2/ day/ gang 8

sqm 3320 1 beldar, 3 fitter. 20 m2/ day/ gang 5

sqm 3320 3 fitter, 1 Carpenter, 3 labour 25 m2/ day/ gang 5

sqm 3258 1 beldar, 3 fitter. 20 m2/ day/ gang 5

sqm 3258 3 fitter, 1 Carpenter, 3 labour 25 m2/ day/ gang 5

sqm 3680 1 beldar, 3 fitter. 20 m2/ day/ gang 5

sqm 3680 3 fitter, 1 Carpenter, 3 labour 25 m2/ day/ gang 5

sqm 1520 1 beldar, 3 fitter. 20 m2/ day/ gang 3

sqm 1520 3 fitter, 1 Carpenter, 3 labour 25 m2/ day/ gang 3

sqm 5672 1 beldar, 3 fitter. 20 m2/ day/ gang 10

sqm 5672 3 fitter, 1 Carpenter, 3 labour 25 m2/ day/ gang 10

sqm 3250 1 beldar, 3 fitter. 20 m2/ day/ gang 8

sqm 3250 3 fitter, 1 Carpenter, 3 labour 25 m2/ day/ gang 8

sqm 11432 2 beldar 30 m2/ day/ gang 8

sqm 11432 1 painter, 1 beldar 30 m2/ day/ gang 8

sqm 1800 3 fitter , 2 labour 20 m2/ day/ gang 5

sqm 1800 3 fitter, 1 Carpenter, 3 labour 25 m2/ day/ gang 5

sqm 2120 3 fitter , 2 labour 20 m2/ day/ gang 5


sqm 2120 3 fitter, 1 Carpenter, 3 labour 25 m2/ day/ gang 5

sqm 3250 3 fitter , 2 labour 20 m2/ day/ gang 5

sqm 3250 3 fitter, 1 Carpenter, 3 labour 25 m2/ day/ gang 5

sqm 3682 3 fitter , 2 labour 25 m2/ day/ gang 8

sqm 3682 3 fitter, 1 Carpenter, 3 labour 30 m2/ day/ gang 8

sqm 4250 3 fitter , 2 labour 20 m2/ day/ gang 8

sqm 4250 2 Mason, 3 labour 25 m2/ day/ gang 8

sqm 3026 3 fitter , 2 labour 20 m2/ day/ gang 8

sqm 3026 2 Mason, 3 labour 25 m2/ day/ gang 8

sqm 12264 2 beldar 20 m2/ day/ gang 10

sqm 12264 1 Mason, 1 beldar 15 m2/ day/ gang 10

sqm 12264 1 mason, 1 beldar 5 m2/ day/ gang 20

1 hydraulic excavator, 1 dumper,


CUM 882 8 mate, 30 coolie 243 5 5
3 Mason (avg), 29 Beldar, 13
CUM 44 Bhisti, 1 Needle Vibrator 14 4 4
8 Beldar, 8 Coolie, 8 Bhisti, 1
SQM 440 Roller, 1 Chowkidar 30 8 8
2 Mason (1st class), 2 Mason
RM 495 (2nd class), 2 Beldar, 1 Coolie 61 4 4

SQM 5000 1 Beldar/ Mali, 2 Coolie 100 7 7


Gardener (1), Beldar (1),
SQM 2000 20 15 15
Helper (1)
1 hydraulic excavator, 1 dumper,
CUM 515 8 mate, 30 coolie 243 1 1
1 Mason (1st class), 1 Mason
SQM 990 (2nd class), 2 Beldar, 1 Coolie 20 15 15

CUM 72.49 2 Beldar, 1 coolie 6 2 2


3 Mason (avg), 29 Beldar, 13
CUM 50.331 Bhisti, 1 Needle Vibrator 14 2 2

NOS 28 1 Fitter, 1 Blacksmith, 2 Beldar 4 4 4

3 Mason (1st class), 3 Mason


20.152 (2nd class), 9 Coolie, 1 Bhisti 5 1 1

SQM 179.2 10 mason, 10 masdoor, 1 bhisti 100 1 1

SQM 374.4 2 Mason (avg), 2 Coolie, 4 Bhisti 20 4 4

SQM 269.6 1 Mason, 1 Beldar, 1 Bhisti 15 3 3

CUM 980 Excavator (1), Loader (1), Mate(1), Coolie (10)250 2 2

CUM 9000 Mason (4), Beldar (8),Needle vibrator (1) 20 40 40

CUM 900 Mason (4), Beldar (8),Needle vibrator (1) 20 15 15

CUM 5000 Beldar (1) , Coolie (2) 55 20 20

CUM 730 Beldar (1) , Coolie (2) 55 15 15

CUM 150 Excavator (1), Loader (1), Mate(1), Coolie (10)250 1 1

CUM 70 Mason (4), Beldar (8),Needle vibrator (1) 20 4 4

CUM 62 Mason (4), Coolie (8), Bhisti (1) 5 8 8

SQM 800 Mason (2), Coolie (3), Bhisti (4) 30 8 8

CUM 90 Mason (4), Coolie (8), Bhisti (1) 5 10 10

SQM 422 Mason (1), Beldar (1) 5 15 15

SQM 300 Mason (1), Beldar (1) 5 15 15

CUM 75 Mason (1), Beldar (5) 20 4 4


DURATI
ON
IN DAYS

11

87

10

94

94

94

58

58
58

18

25

43

65

15

14

10

36

27

17

122

56

175

25

9
10

39

15

30

203

30

38

154

32

21

53

11

11

18

1
5

13

13

3
6

12

10

11

10

1.25

8
7

12

12

12

10

13
6

11

1
5

10

11

3
13

13

14

13

10

12

12

8
16

15

10

13

14

10

15

20

14

27

4
2

DURATI
ON IN
DAYS.

64

24

48

21

25

24

45
45

62

10

33

48

12

27

36

27

40

27

158

90

32

42

62

50
52

42

33

27

32

26

37

30

25

20

29

23

20

17

48

48

18

15

22
17

32

26

19

16

27

22

19

16

62

82

123

7
2

11

1
INTERNATIONAL EXHIBITO
CONVENTION CENTRE,BASEMEN
S No. ACTIVITY

1. SITE P
1.1 SITE DEVELOPMENT

CLEARING OF VEGETATION-Marking of trees to be cut,removal of shrubs,cutting of


1.1.1 trees and removal of stumps and root from soil
SITE BARRICADING-Demarcation of the area to be barricaded,setting up frame
1.1.2 structure and Installation of barricading/corrugated sheets

1.2 SETTING UP TEMPORARY SERVICES


Setting up ready made Guard rooms, Site offices,Labour mess and canteen,Mobile
1.2.1 toilets,Medical and safety office,Workshop & material testing lab

1.2.2 RO Plant Installation

1.2.3 Setting up D.G sets(150 kva)

1.2.4 Temporary Access Road

1.3 RESOURCE MOBILISATION

1.3.1 Setting up Material Storage area

1.3.2 Batching plant installation(2400 sqm)

1.3.3 Tower crane installation


2. SUB S
2.1 EARTHWORK

2.1.2 Driving of sheet piles inside the soil

2.1.4 Excavate the designated areas

2.1.6 Dewatering through Well Point Dewatering system

2.2 WATERPROOFING

2.2.1 FOUNDATION

2.2.1.2 Put layer of cement mortar base mixed with waterproofing compound

2.2.1.3 Application of twin tape over the waterproofing coat

2.2.1.4 Place 8mm HDPE Self-Adhessive Membrane

2.2.2 RETAINING WALL

2.2.2.2 Put layer of cement mortar base mixed with waterproofing compound

2.2.2.3 Application of twin tape over the waterproofing coat


2.2.2.4 Place 8mm HDPE Self-Adhessive Membrane

2.3 RAFT FOUNDATION (BASEMENT)

2.3.1 Concreting for PCC

2.3.2 Installation of Formwork

2.3.3 Preparing Reinforcement Cage

2.3.5 Pouring Concrete

2.4 PILE FOUNDATION (CONVENTION CENTRE)

2.4.3 Boring at the designated areas through shell and auger technique

2.4.4 Reinforcement Cage

2.4.5 Pouring Concrete

2.5 RETAINING WALL

2.5.1 Installation of Formwork

2.5.2 Preparing Reinforcement Cage

2.5.4 Pouring Concrete

2.6 BEAM

2.6.1 Installation of Formwork

2.6.2 Preparing Reinforcement Cage

2.6.3 Pouring Concrete

2.7 SLAB

2.7.1 Installation of Formwork

2.7.2 Preparing Reinforcement Cage

2.7.3 Pouring Concrete

2.8 COLUMNS AND SHEAR WALLS

2.8.1 Installation of Formwork

2.8.2 Preparing Reinforcement Cage

2.8.3 Pouring Concrete

3. SUPER STRUCTURE
3.1 IN-SITU CONSTRUCTION

3.1.1 Columns (Tree Column)


3.1.1.1 Installation of Formwork
Preparing Reinforcement Cage
3.1.1.2
Pouring Concrete & Its compaction
3.1.1.3

3.1.2 Columns (Vertical Column)

3.1.2.1 Installation of Formwork


Preparing Reinforcement Cage
3.1.2.2
Pouring Concrete & Its compaction
3.1.2.3

3.1.3 Beams

3.1.3.1 Installation of Formwork


Preparing Reinforcement Cage
3.1.3.2
Pouring Concrete & Its compaction
3.1.3.3

3.1.4 Slabs

3.1.4.1 Installation of Formwork


Preparing Reinforcement Cage
3.1.4.2
Pouring Concrete & Its compaction
3.1.4.3

3.1.5 Racked Slab

3.1.5.1 Installation of Formwork


Preparing Reinforcement Cage
3.1.5.2
Pouring Concrete & Its compaction
3.1.5.3

3.1.6 Walls

3.1.6.1 Demarcation of the Wall layout & Cleaning the surface


Laying of bricks with mortar using alternate successive courses
3.1.6.2

3.1.7 Staircases & Ramps

3.1.7.1 Installation of Formwork

Preparing Reinforcement Cage


3.1.7.2
Pouring Concrete & Its compaction
3.1.7.3
4. SERVICES
4.1 Electrical

4.1.1 Low Side


4.1.1.1 Wall Chiselling and Conduiting (Steel and PVC)

4.1.1.2 Wiring

Level 1

Installation of Electrical Rooms (Lighting MDB ,UPS MDB ,LPDB)

Level 2

Installation of Electrical Rooms (Lighting MDB ,UPS MDB ,LPDB)

Level 3

Installation of Electrical Rooms (Lighting MDB ,UPS MDB ,LPDB)

Level 4

Installation of Electrical Rooms (Lighting MDB ,UPS MDB ,LPDB)

4.1.1.3 Circuit /Sub Main Wiring with earth wire /MS cable trays/Raceways

4.1.1.4 Point wiring (Wiring for light point /fan point/exhaust fan point )

4.1.1.5 Junction boxes

4.1.1.6 Switches / sockets

Level 1

Level 2

Level 3

Level 4

Level 5

4.1.1.7 Light fixtures

Level 1

Level 2

Level 3

Level 4

Level 5

Façade lighting

4.1.1.8 public addressal system fixtures

Level 1
Level 2

Level 3

Level 4

Level 5

4.1.1.9 Installation of AV systemsand LAN

Level 1

Level 2

level 3

level 4

level 5

4.1.1.10 CCTV and Data Wiring and conduiting

4.2 Plumbing

4.2.1 Low Side

4.2.1.1 Water supply pipes

Domestic water pipes

Level 1

Level 2

Level 3

Level 4

4.2.1.2 Pvc pipes exposed in ducts and terrace

Pvc pipes for drinking water -Level 1

Pvc pipes for drinking water -Level 2

Pvc pipes for drinking water -Level 3

Pvc pipes for drinking water -Level 4

4.2.1.3 External piping (From main lineto a particular area)

4.2.1.5 Gratings,Drains and Traps

Level 1

Level 2

Level 3
Level 4

4.2.1.6 SWR pipe 100mm dia

level 1

level 2

level 3

4.2.1.7 Sanitary fixture Installation

water closet

Urinals

Wash basin

4.2.1.8 Pillar Taps ,Valves and heaters

4.2.2 High Side

4.2.2.1 Treated Water Tank (4x200KL)

4.2.2.2 Installation of Sump Tanks-Rainwater tank(4 X100KL)

4.2.2.3 Installation of Overhead-Rainwater tank(10 X100KL)

4.2.2.4 Installation of Overhead Domestic Water tank (5Kl)

4.2.2.5 Installation of Overhead Water tank for AHU (5Kl)

4.2.2.6 Installation of Pumps

4.3 Fire Fighting

4.3.1 Low side

4.3.1.1 Pipes for internal wet riser /Down comer system /Headers

Headerpipe for level 1

Branch pipe for level 1

Headerpipe for level 2

Branch pipe for level 2

Headerpipe for level 3

Branch pipe for level 3

Headerpipe for level 5


Branch pipe for level 5

4.3.1.2 External and Internal Hydrant system

4.3.1.3 Hose Reel ,Axe ,Cabinet

4.3.1.4 Automatic Sprinkler system

basement

Ground floor

first floor

second floor

third floor

fifth floor

4.4 HVAC

4.4.1 Low side

4.4.1.1 GI metal sheet ducting (Regular and Insulation)

Level 1

Level 2

Level 3

Level 4

Level 5

4.4.1.2 Insulated Chilled water piping (200,150,125,100,80,65,50,40,32,25,20)

Level 1

Level 2

Level 3

Level 4

Level 5

4.4.1.3 Drain Pipes

Level 1
Level 2

Level 3

Level 4

Level 5

4.4.2 High side

4.4.2.1 Installation of AHU units

level 1

level 3

level 5

4.4.2.2 Fan coil Unit

level 1

level 3

level 5

4.4.2.3 Installation of fire dampers

Level 1

Level 2

Level 3

Level 4

Level 5

4.5 Foundations -basement

4.5.1 Construction of Lift pit and machine rooms

4.5.2 Installation of Lift equipments

4.5.3 Escaltors pit

4.5.4 Installation of Escalator equipments


5. FINISHES

5.1 INTERNAL FINISHES

5.1.1 FLOORING
IPS FLOORING (MEETING ROOMS & DINING ROOOM)
5.1.1.1
5.1.1.1.1 laying of 50 MM IPS flooring, 1:1.5:3

5.1.1.1.2 Laying Rubber overlay 10mm thick

5.1.1.1.4 Laying of carpet tiles


WOODEN PLANKS (STAGE)
5.1.1.2

5.1.1.2.1 installation of wooden planks over wooden battens


STONE FLOORING
5.1.1.3
KOTA STONE (SERVICE AREAS)
5.1.1.4
Preparation of floor with water proofing layer
5.1.1.4.1
Laying of 20mm thick prepolished Kota stone
5.1.1.4.2
ITALIAN MARBLE (LOUNGE AREAS ,RECEPTION and FOYERS)
5.1.1.5

5.1.1.5.1 Laying of 20mm thick italian marble over cement mortar

5.1.1.5.2 laying of 40mm thick polished dhaulpur sandstone


GRANITE (TOILETS)
5.1.1.6

5.1.1.6.1 Laying of 20mm thick precut and prepolished granite with 2mm spacer

5.1.1.6.2 Filling of spacing with epoxy grout


TILE FLOORING (GREEN ROOMS)
5.1.1.7

5.1.1.7.1 Laying of 600mmx600mm vitrified tiles with 2mm spacing

5.1.1.7.2 Filling of spacing with epoxy grout

5.1.2 WALL FINISH


VITRIFIED/CERAMIC TILE (TOILETS,GREEN ROOM)
5.1.2.1

5.1.2.1.1 Placing of 600mmx600mm vitrified tiles with 2mm spacing upto 4ft ht

5.1.2.1.2 Filling of spacing with epoxy grout


WALL CLADDING
5.1.2.2

5.1.2.2.1 Applying 20mm plaster over masonry wall

5.1.2.2.2 Placement of 12mm thick BWP plywood

5.1.2.2.3 Installation of Treated hardwood (50mmx75mm) with spacing 75mm


FABRIC PANELLING (4FT – 8FT)
5.1.2.3

5.1.2.3.1 Placement of wooden framework (40mmx25mm)

5.1.2.3.2 Installation of fabric panels


PLASTERING & PAINTING
5.1.2.4

5.1.2.4.2 Plastering

5.1.2.4.3 Painting
ACOUSTIC TREATMENT
5.1.2.5
Installation of plain gypsum with glass wool infill
5.1.2.5.1

5.1.2.5.3 Installation of Micro perforated wooden panelling

5.1.3 CEILING
GYPSUM BOARD CEILING
5.1.3.1

5.1.3.1.1 Installation of ceiling grid

5.1.3.1.2 Fixing of gypsum boards to the framework


POP FALSE CEILING
5.1.3.2

5.1.3.2.1 Fixing of struts from the gypsum board ceiling

5.1.3.2.2 Installation of POP ceiling


GRC PANELLING WITH COVE LIGHTS
5.1.3.3

5.1.3.3.1 Installation of ceiling grid

5.1.3.3.2 Fixing of GRC panels to the framework


VENEERED WOODEN FLOATED CEILING
5.1.3.4
Installation of Aluminium framework
5.1.3.4.1

5.1.3.4.2 Align and fix the wooden panels onto the Aluminium framework
ALUMINIUM GRID CEILING
5.1.3.5
Fixing of hangers to the structure
5.1.3.5.1

5.1.3.5.2 Fixing of GRC panels to the framework


0.7 NRC MICRO PERFORATED GYP BOARD CEILING
5.1.3.6

5.1.3.6.1 Installation of ceiling grid

5.1.3.6.2 Fixing of Gyp board panels to the framework


ACOUSTUCAL DESIGNER WOODEN CEILING
5.1.3.7
Installation of Aluminium framework
5.1.3.7.1

5.1.3.7.2 Align and fix the wooden panels onto the Aluminium framework
MR GRADE GYPSUM GRADE CEILING
5.1.3.8
Installation of Aluminium framework
5.1.3.8.1

5.1.3.8.2 Align and fix the MR grade Gysum ceiling onto the Aluminium framework
PLASTERING WITH OBD/ WHITE WASH
5.1.3.9

5.1.3.9.1 Clean and preparation of surface

5.1.3.9.2 plaster with obd /white wash

5.1.4 PARTITIONS

5.1.4.1 INSTALLATION OF DOUBLE STUDD FRAMEWORK

5.1.4.1.2 Installationof studs leaving space for services

5.1.4.1.3 Screwing of gypsum panelson either sides of the framework


GYPSUM BOARD DRY WALL (STC 55)
5.1.4.2

5.1.4.2.1 Installation of Aluminium framework

5.1.4.2.2 Fixing of gypsum panels to the framework


ALUMINIUM CURTAIN WALLS
5.1.4.3

5.1.4.3.1 Fixing of metal framework to the structure

5.1.4.3.2 Fixing of Aluminium panels to the framework


TOILET PARTITIONS
5.1.4.4

5.1.4.4.1 Installation of metal framework to the structural members

5.1.4.4.2 Fixing of Toilet partitions to the metal framework

5.2 EXTERNAL FINISHES

5.2.1 GRC CLADDING

5.2.1.1 fastening of PTFE packing to the structure

5.2.1.3 Fixing of GRC cladding to the steel frame work

5.2.2 ALUMINIUM CLADDING

5.2.2.1 Installation of metal framework to the structural members

5.2.2.2 Fixing of Aluminium panels to the metal framework

5.2.3 TERRACING

5.2.3.1 laying Water proofing over structural metal deck slab

5.2.3.2 laying of 50mm thick protection cement screed

5.2.3.3 laying of 10mm thick vitrified tile on cement mortar


6.EXTERNAL DEVELOPMENT
6.1 LANDSCAPE WORKS

6.1.1 Construction of stepped areas

6.1.2.1 Excavation of earth

6.1.2.2 Doing RCC work

6.1.2.3 primary water proofing and protective plaster laying

6.1.2.4 30 MM thick stone laying

6.1.2 Laying of grass/Shurbs

6.1.2.1 Laying of grass/Shurbs

6.1.2.2 Spreading sludge or good manure

6.1.3 Landscape work for pathways

6.1.3.1 Excavation work

6.1.3.2 Laying of precast interlocking tiles/Stepping stones

6.1.4 External Lighting

6.1.4.1 Excavation for pedestal of light poles

6.1.4.2 Concreting RMC

6.1.4.3 Fixing the ligh pole to the top of pedestal

6.1.5 Insallation of fountain and water body

6.1.5.1 230mm thick brickwall for fountain

6.1.5.2 Waterproofing membranes for fountain

6.1.5.3 Plastering for fountain

6.1.5.4 Internal tiling for fountain

6.2 ROADS

6.2.1 Earthwork

6.2.2 Filling (3 layer Rolling)

6.2.3 RCC wok

6.2.4 Preparation of subgrade

6.2.5 laying Concrete Sub base over subgrade

6.3 BOUNDARY WALL


6.3.1 Excavation

6.3.2 Foundation

6.3.3 Brickwork

6.3.4 Plastering

6.4 WALKWAYS

6.4.1 Brickwork

6.4.2 60mm thk Paver block

6.4.3 60mm thk Paver block (grass)

6.4.4 Fixing Kerb stone cement mortar 1:3


IONAL EXHIBITON CUM CONVENTION CENTRE
ON CENTRE,BASEMENTS AND EXTERNAL DEVELOPMENT
UNIT QUANTITY RESOURCES PRODUCTIVITY

1. SITE PREPARATION

NOS 548 Beldar (6), Diesel Truck (1) 76 NOS

R.M 1700 1 Fitter, 2 helper 30

SQ M 4500 Mason (1), Beldar (11), Bhisti (5) 30

NOS 1 Beldar(2),Plumber(2) 0.5

NOS 2 Electrician (1), Helper (4) 1

SQ M 25,998 Mason (2), Coolie (3), Bhisti (4) 30

SQ M 6040 Mason (1), Beldar (11), Bhisti (5) 30

NOS 1

NOS 3

2. SUB STRUCTURE

Excavator (1), Loader (1), Mate (1), Coolie


(1) 245

sqm. 65674 1 Mason, 2 Beldar 50

sqm. 65674 1 Mason, 2 Beldar 50

sqm. 65674 1 Mason, 2 Beldar 50

sqm. 16353 2 Mason, 3 Beldar 20

sqm. 16353 2 Mason, 3 Beldar 20


sqm. 16353 2 Mason, 3 Beldar 20

cum. 2433 1 Mason, 10 Beldar 15

sqm. 12453 1 Fitter, 2 Beldar 25

quintal 1075 1 Blacksmith, 2 Beldar 1

cum. 35833 5 Mason, 10 Beldar 10

cum. 18392 1 Excavator, 2 Dumper 240

quintal 139 1 Blacksmith, 1 Beldar 1

cum. 4620 1 Mason, 15 Beldar 60

sqm. 22706 1 Fitter, 2 Beldar 25

quintal 74 1 Blacksmith, 2 Beldar 1

cum. 2453 5 Mason, 15 Beldar 6

sqm. 5435 1 Fitter, 2 Beldar 17.5

quintal 33 1 Blacksmith, 1 Beldar 1

cum. 1087 2 Mason, 12 Beldar 15

sqm. 218913 1 Fitter, 2 Beldar 25

quintal 1970 1 Blacksmith, 2 Beldar 1

cum. 65674 2 Mason, 12 Beldar 15

sqm. 7877 1 Fitter, 2 Beldar 17.5

quintal 89 1 Blacksmith, 1 Beldar 1

cum. 2954 1 Mason, 10 Beldar 40


SQM 2180 1 Fitter, 2 Beldar 14
QUINTAL 1182 1 Blacksmith, 1 Beldar 1
CUM 876 2 Mason, 12 Beldar 12

SQM 22547 1 Fitter, 2 Beldar 25


QUINTAL 12175 1 Blacksmith, 1 Beldar 1
CUM 9019 2 Mason, 12 Beldar 15

SQM 14228 1 Fitter, 2 Beldar 25


QUINTAL 7682 1 Blacksmith, 1 Beldar
1
CUM 5691 2 Mason, 12 Beldar 15

SQM 7924 1 Fitter, 2 Beldar 25


QUINTAL 2674 1 Blacksmith, 1 Beldar 1
CUM 1981 2 Mason, 12 Beldar 15

SQM 141 1 Fitter, 2 Beldar 25


QUINTAL 95 1 Blacksmith, 1 Beldar 1
CUM 70 2 Mason, 12 Beldar 15

SQM 2630 4 bhishti 40


1 Mason class 1, 1Mason class 2, 4
CUM 1749 8
Coolie

SQM 268 1 Fitter, 2 Beldar 25


QUINTAL 145 1 Blacksmith, 1 Beldar
1
CUM 107 2 Mason, 12 Beldar 15
m 2560 2 Wireman, 1 Khalasi 30

Nos 6 Wireman 3,Technician 6 1

Nos 6 Wireman 3,Technician 6 1

Nos 4 Wireman 3,Technician 6 1

Nos 4 Wireman 3,Technician 6 1

m 14500 2 Wireman, 1 Khalasi 30

nos 1900 2 Wireman, 1 Khalasi 15

nos 460 2 Wireman, 1 Khalasi 20

nos 400 2 Wireman, 1 Khalasi 20

nos 150 2 Wireman, 1 Khalasi 20

nos 300 2 Wireman, 1 Khalasi 20

nos 450 2 Wireman, 1 Khalasi 20

nos 956 1 Electrician,2 Helper 25

nos 884 1 Electrician,2 Helper 25

nos 240 1 Electrician,2 Helper 25

nos 648 1 Electrician,2 Helper 25

nos 940 1 Electrician,2 Helper 25

nos 60 1 Electrician,2 Helper 25

nos 250 1 Electrician,2 Helper 20


nos 220 1 Electrician,2 Helper 20

nos 22 1 Electrician,2 Helper 20

nos 4 1 Electrician,2 Helper 20

nos 206 1 Electrician,2 Helper 20

m 4056 2 Wireman ,1Khalsi 333

m 1053 2 Wireman ,1Khalsi 333

m 3635 2 Wireman ,1Khalsi 333

m 4564 2 Wireman ,1Khalsi 333

m 5463 2 Wireman ,1Khalsi 333

m 5260 2 Wireman, 1 Khalasi 30

running metre 520 Plumber 1 ,Majdoor 1 9

running metre 502 Plumber 1 ,Majdoor 1 9

running metre 550 Plumber 1 ,Majdoor 1 9

running metre 420 Plumber 1 ,Majdoor 1 9

running metre 245 Plumber 1 ,Majdoor 1 9

running metre 65 Plumber 1 ,Majdoor 1 9

running metre 95 Plumber 1 ,Majdoor 1 9

running metre 68 Plumber 1 ,Majdoor 1 9

running metre 95 Plumber 1 ,Majdoor 1 9

running metre 160 Plumber 1 ,Majdoor 1 9

no 90 Plumber 1 ,Majdoor 1 5

no 84 Plumber 1 ,Majdoor 1 5

no 75 Plumber 1 ,Majdoor 1 5
no 86 Plumber 1 ,Majdoor 1 5

running metre 447 Plumber 1 ,Majdoor 1 5

running metre 495 Plumber 1 ,Majdoor 1 5

running metre 520 Plumber 1 ,Majdoor 1 5

No 182 1 Plumber ,2 Majdoor 1

No 85 1.75 plumber,6 Majdoor 1

No 131 1plumber,3 majdoor 2

Nos 450 1 Plumber ,2 Majdoor 2

nos 4 Mason 1,CoolieA 9,Bhishtie1,Coolieb 5 5

nos 4 Mason 1,CoolieA 9,Bhishtie1,Coolieb 5 5

nos 10 Mason 1,CoolieA 9,Bhishtie1,Coolieb 5 5

nos 4 Mason 1,CoolieA 9,Bhishtie1,Coolieb 5 5

nos 4 Mason 1,CoolieA 9,Bhishtie1,Coolieb 5 5

nos 10 Mason 1,CoolieA 9,Bhishtie1,Coolieb 6 1

running m 1711 1 Plumber ,1 Majdoor 9

running m 7497 1 Plumber ,1 Majdoor 9

running m 1141 1 Plumber ,1 Majdoor 9

running m 4998 1 Plumber ,1 Majdoor 9

running m 189 1 Plumber ,1 Majdoor 9

running m 1525 1 Plumber ,1 Majdoor 9

running m 1911 1 Plumber ,1 Majdoor 9


running m 7897 1 Plumber ,1 Majdoor 9

nos 250 1 Plumber ,1 Majdoor 2

running m 48159 Pipe layer1,Plumber 1,Labour 1 5

running m 30562 Pipe layer1,Plumber 1,Labour 1 5

running m 15365 Pipe layer1,Plumber 1,Labour 1 5

running m 26356 Pipe layer1,Plumber 1,Labour 1 5

running m 16895 Pipe layer1,Plumber 1,Labour 1 5

running m 40562 Pipe layer1,Plumber 1,Labour 1 5

sqm 2439 1 Fitter, 1 Helper 10

sqm 4608 1 Fitter, 1 Helper 10

sqm 2805 1 Fitter, 1 Helper 10

sqm 2985 1 Fitter, 1 Helper 10

sqm 8925 1 Fitter, 1 Helper 10

m 813 Fitter 6,Welder2,Painter 1,Helper 7 19

m 1536 Fitter 6,Welder2,Painter 1,Helper 7 19

m 935 Fitter 6,Welder2,Painter 1,Helper 7 19

m 900 Fitter 6,Welder2,Painter 1,Helper 7 19

m 2600 Fitter 6,Welder2,Painter 1,Helper 7 19

m 675 Plumber 1,Mazdoor 1 9


m 1156 Plumber 1,Mazdoor 1 9

m 720 Plumber 1,Mazdoor 1 9

m 750 Plumber 1,Mazdoor 1 9

m 2450 Plumber 1,Mazdoor 1 9

Nos 6 2 Fitter , 2 Helper 1

Nos 4 2 Fitter , 2 Helper 1

Nos 2 2 Fitter , 2 Helper 1

Nos 65 1 Fitter ,1 Welder,1Helper 3

Nos 60 1 Fitter ,1 Welder,1Helper 3

Nos 80 1 Fitter ,1 Welder,1Helper 3

nos 25 1 Fitter , 1 Helper 4

nos 20 1 Fitter , 1 Helper 4

nos 15 1 Fitter , 1 Helper 4

nos 20 1 Fitter , 1 Helper 4

nos 35 1 Fitter , 1 Helper 4

UNITS QUANTITY RESOURCES PRODUCTIVITY


sqm 9600 1 Mason, 2 beldar 15

sqm 9600 1 Mason, 2 beldar 40

sqm 9600 2 Mason, 2 beldar 20

sqm 840 3 fitter, 1 Carpenter, 3 labour 20

sqm 1860 1 Mason, 1 beldar 15


1 Mason, 5 Skilled Beldar, 4 Machines for
sqm 1860 polishing 10

sqm 2320 1 mason, 3 beldar, 2 machine for rubbing 10

sqm 2320 1 mason, 3 beldar, 2 machine for rubbing 10

sqm 3120 1 mason, 3 beldar, 2 machine for rubbing 10

sqm 30 1 beldar 3

sqm 1650 1 mason, 1 beldar 5

sqm 15 1 beldar 3

sqm 3528 1 mason, 1 beldar 5

sqm 35 1 beldar 3

sqm 5320 1 Mason, 2 beldar 20

sqm 5320 1 carpenter, 1 beldar 15

sqm 5320 1 carpenter, 1 beldar 20

sqm 4040 1 carpenter, 1 beldar 15

sqm 4040 1 carpenter, 1 beldar 20


sqm 31680 1 Mason, 2 beldar 20

sqm 31680 2 Painter, 1 beldar 35

sqm 5020 1 Mason, 2 fitter 20

sqm 5020 1 carpenter, 2 fitter. 15

sqm 12343 1 beldar, 3 fitter. 20

sqm 12343 2 mason, 2 beldar,1 fitter 25

sqm 8452 1 beldar, 3 fitter. 20

sqm 8452 3 fitter, 1 Carpenter, 3 labour 25

sqm 3320 1 beldar, 3 fitter. 20

sqm 3320 3 fitter, 1 Carpenter, 3 labour 25

sqm 3258 1 beldar, 3 fitter. 20

sqm 3258 3 fitter, 1 Carpenter, 3 labour 25

sqm 3680 1 beldar, 3 fitter. 20

sqm 3680 3 fitter, 1 Carpenter, 3 labour 25

sqm 1520 1 beldar, 3 fitter. 20

sqm 1520 3 fitter, 1 Carpenter, 3 labour 25

sqm 5672 1 beldar, 3 fitter. 20

sqm 5672 3 fitter, 1 Carpenter, 3 labour 25


sqm 3250 1 beldar, 3 fitter. 20

sqm 3250 3 fitter, 1 Carpenter, 3 labour 25

sqm 11432 2 beldar 30

sqm 11432 1 painter, 1 beldar 30

sqm 1800 3 fitter , 2 labour 20

sqm 1800 3 fitter, 1 Carpenter, 3 labour 25

sqm 2120 3 fitter , 2 labour 20

sqm 2120 3 fitter, 1 Carpenter, 3 labour 25

sqm 3250 3 fitter , 2 labour 20

sqm 3250 3 fitter, 1 Carpenter, 3 labour 25

sqm 3682 3 fitter , 2 labour 25

sqm 3682 3 fitter, 1 Carpenter, 3 labour 30

sqm 4250 3 fitter , 2 labour 20

sqm 4250 2 Mason, 3 labour 25

sqm 3026 3 fitter , 2 labour 20

sqm 3026 2 Mason, 3 labour 25

sqm 12264 2 beldar 20

sqm 12264 1 Mason, 1 beldar 15

sqm 12264 1 mason, 1 beldar 5


1 hydraulic excavator, 1 dumper, 8 mate, 30
CUM 882 coolie 243
3 Mason (avg), 29 Beldar, 13 Bhisti, 1
CUM 44 Needle Vibrator 14
8 Beldar, 8 Coolie, 8 Bhisti, 1 Roller, 1
SQM 440 Chowkidar 30
2 Mason (1st class), 2 Mason (2nd class), 2
RM 495 Beldar, 1 Coolie 61

SQM 5000 1 Beldar/ Mali, 2 Coolie 100

SQM 2000 Gardener (1), Beldar (1), Helper (1) 20

1 hydraulic excavator, 1 dumper, 8 mate, 30


CUM 515 coolie 243
1 Mason (1st class), 1 Mason (2nd class), 2
SQM 990 Beldar, 1 Coolie 20

CUM 72.49 2 Beldar, 1 coolie 6


3 Mason (avg), 29 Beldar, 13 Bhisti, 1
CUM 50.331 Needle Vibrator 14

NOS 28 1 Fitter, 1 Blacksmith, 2 Beldar 4

3 Mason (1st class), 3 Mason (2nd class), 9


20.152 Coolie, 1 Bhisti 5

SQM 179.2 10 mason, 10 masdoor, 1 bhisti 100

SQM 374.4 2 Mason (avg), 2 Coolie, 4 Bhisti 20

SQM 269.6 1 Mason, 1 Beldar, 1 Bhisti 15

CUM 980 Excavator (1), Loader (1), Mate(1), Coolie (10) 250

CUM 9000 Mason (4), Beldar (8),Needle vibrator (1) 20

CUM 900 Mason (4), Beldar (8),Needle vibrator (1) 20

CUM 5000 Beldar (1) , Coolie (2) 55

CUM 730 Beldar (1) , Coolie (2) 55


CUM 150 Excavator (1), Loader (1), Mate(1), Coolie (10) 250

CUM 70 Mason (4), Beldar (8),Needle vibrator (1) 20

CUM 62 Mason (4), Coolie (8), Bhisti (1) 5

SQM 800 Mason (2), Coolie (3), Bhisti (4) 30

CUM 90 Mason (4), Coolie (8), Bhisti (1) 5

SQM 422 Mason (1), Beldar (1) 5

SQM 300 Mason (1), Beldar (1) 5

CUM 75 Mason (1), Beldar (5) 20


NO. OF DURATION
UNIT GANGS IN DAYS

Nos./gang/day 5 2

R.M./gang/day 5 11

sqm./gang/day 30 5

Nos./gang/day 2 1

Nos./gang/day 1 2

sqm./gang/day 10 87

sqm./gang/day 20 10

sqm./gang/day 14 94

sqm./gang/day 14 94

sqm./gang/day 14 94

sqm./gang/day 14 58

sqm./gang/day 14 58
sqm./gang/day 14 58

cum./gang/day 9 18

sqm./gang/day 20 25

quintal/gang/day 25 43

cum./gang/day 55 65

cum./gang/day 5 15

quintal/gang/day 10 14

cum./gang/day 8 10

sqm./gang/day 25 36

quintal/gang/day 8 9

cum./gang/day 12 27

sqm./gang/day 18 17

quintal/gang/day 5 7

cum./gang/day 10 7

sqm./gang/day 72 122

quintal/gang/day 35 56

cum./gang/day 25 175

sqm./gang/day 18 25

quintal/gang/day 20 4

cum./gang/day 8 9
SQM/DAY/GANG 15 10
QUINTAL/DAY/GA
NG 30 39

CUM/DAY/GANG 5 15

SQM/DAY/GANG 30 30
QUINTAL/DAY/GA
NG 60 203

CUM/DAY/GANG 20 30

SQM/DAY/GANG 15 38
QUINTAL/DAY/GA
NG 50 154

CUM/DAY/GANG 12 32

SQM/DAY/GANG 15 21
QUINTAL/DAY/GA
NG 50 53

CUM/DAY/GANG 12 11

SQM/DAY/GANG 5 1
QUINTAL/DAY/GA
NG 20 5

CUM/DAY/GANG 2 2

SQM/DAY/GANG 6 11

CUM/DAY/GANG 12 18

SQM/DAY/GANG 10 1
QUINTAL/DAY/GA
NG 25 6

CUM/DAY/GANG 6 1
m 15 6

No 2 3

No 2 3

No 2 2

No 2 2

m 25 20

Nos 10 13

Nos 3 8

Nos 2 10

Nos 2 4

Nos 2 8

Nos 4 7

Nos 10 4

Nos 10 3.5

Nos 5 2

Nos 5 5

Nos 10 4

Nos 1 2.5

Nos 1 13
Nos 1 11

Nos 1 1.25

Nos 1 0.25

Nos 1 11

m 2 6

m 1 3

m 2 5

m 2 7

m 3 5

m 20 9

m 10 6

m 10 6

m 10 6

m 5 9

m 5 5

m 2 4

m 2 5

m 2 4

m 2 5

m 5 4

Nos 4 5

Nos 4 4

Nos 4 4
Nos 4 4

m 15 6

m 15 7

m 15 7

Nos 10 18

Nos 8 9

Nos 10 8

Nos 20 11

cum 1 4

cum 1 4

cum 2 5

cum 1 4

cum 1 4

no 2 1

m 10 19

m 40 21

m 10 13

m 30 19

m 5 4

m 25 7

m 30 7
m 40 22

Nos 10 13

m 400 24

m 300 20

m 250 12

m 250 21

m 300 11

m 350 23

sqm 15 16

sqm 30 15

sqm 20 14

sqm 20 15

sqm 45 20

m 5 9

m 10 8

m 10 5

m 10 5

m 10 14

m 10 8
m 10 13

m 10 8

m 10 8

m 10 27

no 1 6

no 1 4

no 1 2

nos 10 2

nos 10 2

nos 10 3

Nos 1 6

Nos 1 5

Nos 1 4

Nos 1 5

Nos 2 4

NO. OF DURATION
UNIT GANGS IN DAYS.
m2 / day/ gang 10 64

m2 / day/ gang 10 24

m2 / day/ gang 10 48

m2 / day/ gang 2 21

m2 / day/ gang 5 25

m2 / day/ gang 8 24

m2 / day/ gang 5 45

m2 / day/ gang 5 45

m2 / day/ gang 5 62

m2 / day/ gang 1 10

m2/ day/ gang 10 33

m2/ day/ gang 1 5

m2/ day/ gang 15 48

m2/ day/ gang 1 12

m2/ day/ gang 10 27

m2/ day/ gang 10 36

m2/ day/ gang 10 27

m2/ day/ gang 10 40

m2/ day/ gang 10 27


m2/ day/ gang 10 158

m2/ day/ gang 10 90

m2/ day/ gang 8 32

m2/ day/ gang 8 42

m2/ day/ gang 10 62

m2/ day/ gang 10 50

m2/ day/ gang 8 52

m2/ day/ gang 8 42

m2/ day/ gang 5 33

m2/ day/ gang 5 27

m2/ day/ gang 5 32

m2/ day/ gang 5 26

m2/ day/ gang 5 37

m2/ day/ gang 5 30

m2/ day/ gang 3 25

m2/ day/ gang 3 20

m2/ day/ gang 10 29

m2/ day/ gang 10 23


m2/ day/ gang 8 20

m2/ day/ gang 8 17

m2/ day/ gang 8 48

m2/ day/ gang 8 48

m2/ day/ gang 5 18

m2/ day/ gang 5 15

m2/ day/ gang 5 22

m2/ day/ gang 5 17

m2/ day/ gang 5 32

m2/ day/ gang 5 26

m2/ day/ gang 8 19

m2/ day/ gang 8 16

m2/ day/ gang 8 27

m2/ day/ gang 8 22

m2/ day/ gang 8 19

m2/ day/ gang 8 16

m2/ day/ gang 10 62

m2/ day/ gang 10 82

m2/ day/ gang 20 123


5 5 1

4 4 1

8 8 2

4 4 2

7 7 7

15 15 7

1 1 2

15 15 3

2 2 6

2 2 2

4 4 2

1 1 4

1 1 2

4 4 5

3 3 6

2 2 2

40 40 11

15 15 3

20 20 5

15 15 1
1 1 1

4 4 1

8 8 2

8 8 3

10 10 2

15 15 6

15 15 4

4 4 1
Compatibility Report for actvty_list_edited.xls
Run on 11/14/2019 0:27

The following features in this workbook are not supported by earlier versions
of Excel. These features may be lost or degraded when opening this workbook
in an earlier version of Excel or if you save this workbook in an earlier file
format.

Significant loss of functionality # of occurrences

This file originally contained features which were not recognized by this 1
version of Excel. These features will not be saved.

Minor loss of fidelity

Some cells or styles in this workbook contain formatting that is not supported 86
by the selected file format. These formats will be converted to the closest
format available.
Version

Excel 97-2003

Excel 97-2003