National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1
from km 190.000 to km 221.305 under NHDP-IVB in the State of Himachal Pradesh

Authority Engineer :M/s. TPF Getinsa Euroestudios, SL in association with Segmental


Consulting & Infrastructure Advisory (P) Ltd.
EPC Contractor : M/s. KMC Construction Limited, Hyderabad

Test Results Summary


(As per MoRT&H Clause 2504)

Source of Material :
Filter Media :
Material Percentiage Source

20 mm 40%

10 mm 40% : Km 558+300 RHS @ 4.0 km From NH -6, GHV Cruhser, Khandaly


Quarry
6 mm Down 20%

Base : Borrow Area No. 15 (Km 570+530 LHS @ 0.8 Km From NH-06)

Values from graph :

D15 Filter = 0.55 D15 Base = #REF!


D50 Filter = 8.2 D50 Base = #REF!
D85 Base = #REF!
Required Specifications :
D15 Filter 0.55
1. < 5 = = #REF! < 5
D85 Base #REF!

D15 Filter 0.55


2. 4 < < 20 = = #REF!
D15 Base #REF!

D50 Filter 8.2


3. < 25 = = #REF! < 25
D50 Base #REF!

Contractor's Concessionaire's Independent Engineer's


Representative Representative Representative
National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1
from km 190.000 to km 221.305 under NHDP-IVB in the State of Himachal Pradesh

Authority Engineer :M/s. TPF Getinsa Euroestudios, SL in association with Segmental


Consulting & Infrastructure Advisory (P) Ltd.
EPC Contractor : M/s. KMC Construction Limited, Hyderabad

Test Results Summary


(As per MoRT&H Clause 2504)

Source of Material :
Filter Media :
Material Percentiage Source

20 mm 40%

10 mm 40% : Km 558+300 RHS @ 4.0 km From NH -6, GHV Cruhser, Khandaly


Quarry
6 mm Down 20%

Base : Borrow Area No. 16 (Km 585+500 RHS @ 4.0 Km From NH-06)

Values from graph :

D15 Filter = 1.2 D15 Base = 0.15


D50 Filter = 8.0 D50 Base = 3.50
D85 Base = 15.00
Required Specifications :
D15 Filter 1.2
1. < 5 = = 0.080 < 5
D85 Base 15

D15 Filter 1.2


2. 4 < < 20 = = 8.00
D15 Base 0.15

D50 Filter 8.0


3. < 25 = = 2.29 < 25
D50 Base 3.5

Contractor's Concessionaire's Independent Engineer's


Representative Representative Representative
National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1
from km 190.000 to km 221.305 under NHDP-IVB in the State of Himachal Pradesh

Authority Engineer :M/s. TPF Getinsa Euroestudios, SL in association with Segmental


Consulting & Infrastructure Advisory (P) Ltd.
EPC Contractor : M/s. KMC Construction Limited, Hyderabad

Test Results Summary


(As per MoRT&H Clause 2504)

Source of Material : Maintalav Quarry


Filter Media :
Material Percentiage Source

20 mm 40%

10 mm 40% : Km 632+900 RHS @ .9 km From NH -6, GHV Cruhser, Maintalav


Quarry
6 mm Down 20%

Base : Borrow Area No. 17 (Km 579+840 RHS @ 2.0 Km From NH-06)

Values from graph :

D15 Filter = 1.2 D15 Base = 0.14


D50 Filter = 8.0 D50 Base = 3.20
D85 Base = 20.00
Required Specifications :
D15 Filter 1.2
1. < 5 = = 0.060 < 5
D85 Base 20

D15 Filter 1.2


2. 4 < < 20 = = 8.57
D15 Base 0.14

D50 Filter 8.0


3. < 25 = = 2.50 < 25
D50 Base 3.2

Contractor's Concessionaire's Independent Engineer's


Representative Representative Representative
National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1
from km 190.000 to km 221.305 under NHDP-IVB in the State of Himachal Pradesh

Authority Engineer :M/s. TPF Getinsa Euroestudios, SL in association with Segmental


Consulting & Infrastructure Advisory (P) Ltd.
EPC Contractor : M/s. KMC Construction Limited, Hyderabad

Test Results Summary


(As per MoRT&H Clause 2504)

Source of Material : Maintalav Quarry


Filter Media :
Material Percentiage Source

20 mm 40%

10 mm 40% : Km 632+900 RHS @ .9 km From NH -6, GHV Cruhser, Maintalav


Quarry
6 mm Down 20%

Base : Borrow Area No. 73 (Km 635+000 RHS @ 1.5 Km From NH-06)

Values from graph :

D15 Filter = 1.2 D15 Base = 0.14


D50 Filter = 8.0 D50 Base = 3.20
D85 Base = 15.00
Required Specifications :
D15 Filter 1.2
1. < 5 = = 0.080 < 5
D85 Base 15

D15 Filter 1.2


2. 4 < < 20 = = 8.57
D15 Base 0.14

D50 Filter 8.0


3. < 25 = = 2.50 < 25
D50 Base 3.2

Contractor's Concessionaire's Independent Engineer's


Representative Representative Representative
National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1
from km 190.000 to km 221.305 under NHDP-IVB in the State of Himachal Pradesh

Authority Engineer :M/s. TPF Getinsa Euroestudios, SL in association with Segmental


Consulting & Infrastructure Advisory (P) Ltd.
EPC Contractor : M/s. KMC Construction Limited, Hyderabad

Test Results Summary


(As per MoRT&H Clause 2504)

Source of Material : Mantav Quarry


Filter Media :
Material Percentiage Source

20 mm 40%

10 mm 40% : Km 632+900 RHS @ .9 km From NH -6, GHV Cruhser, Maintalav


Quarry
6 mm Down 20%

Base : Borrow Area No. 72 (Km 633+600 RHS @ 0.9 Km From NH-06)

Values from graph :

D15 Filter = 1.2 D15 Base = 0.14


D50 Filter = 8.0 D50 Base = 3.00
D85 Base = 14.00
Required Specifications :
D15 Filter 1.2
1. < 5 = = 0.086 < 5
D85 Base 14

D15 Filter 1.2


2. 4 < < 20 = = 8.89
D15 Base 0.14

D50 Filter 8.0


3. < 25 = = 2.67 < 25
D50 Base 3

Contractor's Concessionaire's Independent Engineer's


Representative Representative Representative
National Highways Authority of India
Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.000 t
km 221.305 under NHDP-IVB in the State of Himachal Pradesh
:M/s. TPF Getinsa Euroestudios, SL in association with Segmental Consulting
Authority Engineer Infrastructure Advisory (P) Ltd.
EPC Contractor : M/s. KMC Construction Limited, Hyderabad

SIEVE ANALYSIS OF FILTER MEDIA


As per MoRT&H TABLE 300-3
Location/Source : #REF!

20 mm 10 mm Dust
Proportions
40% 40% 20%

Specification Limi
IS Sieve Individual % of Passing 20 mm 10 mm Dust Table 300.3 Class -
% of
Size Passing Lower
(mm) 20 mm 10 mm Dust 40% 40% 20% Limit
26.5 100.00 100.00 100.00 40.00 40.00 20.00 100.00 100
22.4 99.20 100.00 100.00 39.68 40.00 20.00 99.68 95
11.2 4.51 98.03 100.00 1.80 39.21 20.00 61.02 48
5.6 0.18 38.40 100.00 0.07 15.36 20.00 35.43 28
2.8 0.00 6.88 99.15 0.00 2.75 19.83 22.58 20
0.71 0.00 4.10 46.86 0.00 1.64 9.37 11.01 6
0.355 0.00 4.02 24.56 0.00 1.61 4.91 6.52 2
0.09 0.00 2.71 10.00 0.00 1.08 2.00 3.08 0

100
90
80
70
% of Passing

60 Upper Limit
50
40 Lower Limit
30
20
% of Passing
10
0
0.01 0.1 1 10 D15100
= 1.2
D50 =
IS Sieve Size 8.0
Remarks:

Contractor's Concessionaire's Independent Engine


Representative Representative Representative
ighways Authority of India
Pandoh Bypass Section of NH-21 (Package-1 from km 190.000 to
DP-IVB in the State of Himachal Pradesh
nsa Euroestudios, SL in association with Segmental Consulting &
e Advisory (P) Ltd.
nstruction Limited, Hyderabad

ALYSIS OF FILTER MEDIA


MoRT&H TABLE 300-3

Dust
20%

Specification Limit
Table 300.3 Class -II
Upper
Limit
100
100
100
54
35
18
9
4

Upper Limit

Lower Limit

% of Passing

1 10 D15100
= 1.2
D50 =
Size 8.0

Independent Engineer's
Representative
National Highways Authority of India
Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km
190.000 to km 221.305 under NHDP-IVB in the State of Himachal Pradesh

:M/s. TPF Getinsa Euroestudios, SL in association with Segmental


Authority Engineer Consulting & Infrastructure Advisory (P) Ltd.
EPC Contractor : M/s. KMC Construction Limited, Hyderabad
SIEVE ANALYSIS OF FILTER MEDIA
As per MoRT&H TABLE 300-3

Laboratory No. : GHV Lab-01 Date Sampled 25.01.2017


: Km 558+300 RHS @ 4.0 km From NH -6, GHV
Location/Source Cruhser, Khandaly Quarry Sampled by Jointly

Type of Materials : Crushed Aggregate 20 mm Date of Test 25.01.2017


Proposed Use : Filter Media Tested by : Jointly
Sample I Weight 21423 gm Sample II Weight 24465 gm
IS Sieve IS Sieve
Size Weight of
Weight of Cumulative Cumulative Size Cumulative Cumulative
Passing Material Passing
Material weight Retained weight Retained
(%) Retained (%)
Retained (g) Retained (g) (%) Retained (g) (%)
(g)
(mm)
(mm)
26.5 0 0 0.00 100.00 26.5 0 0 0.00 100.00
22.40 205 205 0.96 99.04 22.4 109 109 0.45 99.55
11.20 20500 20705 96.65 3.35 11.2 22978 23087 94.37 5.63
5.60 683 21388 99.84 0.16 5.6 1343 24430 99.86 0.14
2.80 0 0 0.00 0.00 2.8 0 0 0.00 0.00
0.71 0 0 0.00 0.00 1.4 0 0 0.00 0.00
0.09 0 0 0.00 0.00 0.09 0 0 0.00 0.00

Sample III Weight 23110 gm


IS Sieve
IS Sieve
Size Weight of Cumulative Cumulative Size
Passing
Material weight Retained Sample I Sample II Sample III Average
(%)
Retained (g) Retained (g) (%)
(mm)
(mm)
26.5 0 0 0.00 100.00 26.5 100.00 100.00 100.00 100.00
22.40 228 228 0.99 99.01 22.40 99.04 99.55 99.01 99.20
11.20 21830 22058 95.45 4.55 11.20 3.35 5.63 4.55 4.51
5.60 997 23055 99.76 0.24 5.60 0.16 0.14 0.24 0.18
2.80 0 0 0.00 0.00 2.80 0.00 0.00 0.00 0.00
0.71 0 0 0.00 0.00 0.71 0.00 0.00 0.00 0.00
0.09 0 0 0.00 0.00 0.09 0.00 0.00 0.00 0.00
Remarks:

Contractor's Concessionaire's Independent Engineer's


Representative Representative Representative
National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km
190.000 to km 221.305 under NHDP-IVB in the State of Himachal Pradesh

:M/s. TPF Getinsa Euroestudios, SL in association with Segmental


Authority Engineer Consulting & Infrastructure Advisory (P) Ltd.
EPC Contractor : M/s. KMC Construction Limited, Hyderabad
SIEVE ANALYSIS OF FILTER MEDIA
As per MoRT&H TABLE 300-3

Laboratory No. : GHV Lab-01 Date Sampled 25.01.17


: Km 558+300 RHS @ 4.0 km From NH -6, GHV
Location/Source Cruhser, Khandaly Quarry Sampled by : Jointly

Type of Materials : Crushed Aggregate 10 mm Date of Test 25.01.17


Proposed Use : Filter Media Tested by : Jointly
Sample I Weight 16987 gm Sample II Weight 16157 gm
IS Sieve IS Sieve
Weight of
Size Weight of Cumulative Cumulative Size Cumulative Cumulative
Passing Material Passing
Material weight Retained weight Retained
(%) Retained (%)
Retained (g) Retained (g) (%) Retained (g) (%)
(g)
(mm)
(mm)
26.5 0 0 0.00 100.00 26.5 0 0 0.00 100.00
22.40 0 0 0.00 100.00 22.40 0 0 0.00 100.00
11.20 511 511 3.01 96.99 11.20 342 342 2.12 97.88
5.60 15065 15576 91.69 8.31 5.60 14629 14971 92.66 7.34
2.80 267 15843 93.27 6.73 2.80 213 15184 93.98 6.02
0.71 648 16491 97.08 2.92 0.71 329 15513 96.01 3.99
0.36 192 16035 94.40 5.60 0.36 271 15455 95.66 4.34
0.09 166 16201 95.37 4.63 0.09 258 15713 97.25 2.75

Sample III Weight 15490 gm


IS Sieve
IS Sieve
Size Weight of Cumulative Cumulative Size
Passing
Material weight Retained Sample I Sample II Sample III Average
(%)
Retained (g) Retained (g) (%)
(mm)
(mm)
26.5 0 0 0.00 100.00 26.5 100.00 100.00 100.00 100.00
22.40 0 0 0.00 100.00 22.40 100.00 100.00 100.00 100.00
11.20 448 448 2.89 97.11 11.20 96.99 100.00 97.11 98.03
5.60 13646 14094 90.99 9.01 5.60 8.31 97.88 9.01 38.40
2.80 381 14475 93.45 6.55 2.80 6.73 7.34 6.55 6.88
0.71 496 14971 96.65 3.35 0.71 2.92 6.02 3.35 4.10
0.36 192 15163 97.89 2.11 0.36 5.60 4.34 2.11 4.02
0.09 211 15374 99.25 0.75 0.09 4.63 2.75 0.75 2.71
Remarks:

Contractor's Concessionaire's Independent Engineer's


Representative Representative Representative
National Highways Authority of India
Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km
190.000 to km 221.305 under NHDP-IVB in the State of Himachal Pradesh
:M/s. TPF Getinsa Euroestudios, SL in association with Segmental
Authority Engineer Consulting & Infrastructure Advisory (P) Ltd.
EPC Contractor : M/s. KMC Construction Limited, Hyderabad
SIEVE ANALYSIS OF FILTER MEDIA
As per MoRT&H TABLE 300-3

Laboratory No. : GHV Lab-01 Date Sampled 25.01.2017


: Km 558+300 RHS @ 4.0 km From NH -6, GHV
Location/Source Cruhser, Khandaly Quarry Sampled by Jointly

Type of Materials : Crushed Aggregate Dust Date of Test 25.01.2017


Proposed Use : Filter Media Tested by : Jointly
Sample I Weight 1121 gm Sample II Weight 1051 gm
IS Sieve IS Sieve
Size Weight of
Weight of Cumulative Cumulative Size Cumulative Cumulative
Passing Material Passing
Material weight Retained weight Retained
(%) Retained (%)
Retained (g) Retained (g) (%) Retained (g) (%)
(g)
(mm)
(mm)
26.5 0 0 0.00 100.00 26.5 0 0 0.00 100.00
22.4 0 0 0.00 100.00 22.4 0 0 0.00 100.00
11.2 0 0 0.00 100.00 11.2 0 0 0.00 100.00
5.6 0 0 0.00 100.00 5.6 0 0 0.00 100.00
2.8 10 10 0.89 99.11 2.8 6 6 0.57 99.43
0.71 589 599 53.43 46.57 0.71 554 560 53.28 46.72
0.36 255 854 76.18 23.82 0.36 231 791 75.26 24.74
0.09 168 1022 91.17 8.83 0.09 154 945 89.91 10.09

Sample III Weight 1110 gm

IS Sieve IS Sieve
Size Weight of Cumulative Cumulative Size
Passing
Material weight Retained Sample I Sample II Sample III Average
(%)
Retained (g) Retained (g) (%)
(mm)
(mm)
26.5 0 0 0.00 100.00 26.5 100.00 100.00 100.00 100.00
22.4 0 0 0.00 100.00 22.4 100.00 100.00 100.00 100.00
11.2 0 0 0.00 100.00 11.2 100.00 100.00 100.00 100.00
5.6 0 0 0.00 100.00 5.6 100.00 100.00 100.00 100.00
2.8 12 12 1.08 98.92 2.8 99.11 99.43 98.92 99.15
0.71 573 585 52.70 47.30 0.71 46.57 46.72 47.30 46.86
0.36 246 831 74.86 25.14 0.36 23.82 24.74 25.14 24.56
0.09 156 987 88.92 11.08 0.09 8.83 10.09 11.08 10.00
Remarks:

Contractor's Concessionaire's Independent Engineer's


Representative Representative Representative
National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
in the State of Himachal Pradesh

:M/s. TPF Getinsa Euroestudios, SL in association with Seg


Authority Engineer Infrastructure Advisory (P) Ltd.

EPC Contractor : M/s. KMC Construction Limited, Hyderabad

Back Filling Material


Borrow Area No 72
Location Km 633+600 RHS @ 0.9 Km From NH-06

Pint No/ % of Passing


IS Sieve Size
in mm 75 50 37.5 19 4.75

1 100 100 100 95.6 63.6

2 100 100 100 90.35 63.21

3 100 100 100 91.23 61.45

4 100 100 100 94.16 63.2

5 100 100 100 93.24 62.45

6 100 100 100 92.45 61.02

7 100 100 100 91.45 62.47

8 100 100 100 94.12 61.45

9 100 100 100 94.68 62.45

10 100 100 100 93.45 61.58

11 100 100 100 94.12 62.14

12 100 100 100 96.35 64.55

13 100 100 100 94.68 62.45

14 100 100 100 95.86 62.34


National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
in the State of Himachal Pradesh

:M/s. TPF Getinsa Euroestudios, SL in association with Seg


Authority Engineer Infrastructure Advisory (P) Ltd.

EPC Contractor : M/s. KMC Construction Limited, Hyderabad

Back Filling Material


Borrow Area No 72
Location Km 633+600 RHS @ 0.9 Km From NH-06
15 100 100 100 96.57 61.58

16 100 100 100 91.23 61.45

Average 100.00 100.00 100.00 93.72 62.34


National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
in the State of Himachal Pradesh

:M/s. TPF Getinsa Euroestudios, SL in association with Seg


Authority Engineer Infrastructure Advisory (P) Ltd.

EPC Contractor : M/s. KMC Construction Limited, Hyderabad

Back Filling Material


Borrow Area No 72
Location Km 633+600 RHS @ 0.9 Km From NH-06

100.00

90.00

80.00

70.00

60.00
%
50.00
o
f 40.00
P
a 30.00
s
s
i 20.00
n
g 10.00

0.00
0.01 0.10 1.00 10.00

IS Sieve Size in mm
90.00

80.00

70.00

60.00

50.00

40.00
National Highways Authority of India
30.00
Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
in the State of Himachal Pradesh
20.00
:M/s. TPF Getinsa Euroestudios, SL in association with Seg
Authority Engineer
10.00 Infrastructure Advisory (P) Ltd.

EPC Contractor 0.00 : M/s. KMC Construction Limited, Hyderabad


0.01 0.10 1.00 10.00
Back Filling Material
Borrow Area No 72
Location Km 633+600 RHS @ 0.9 Km From NH-06

Remarks: D15 = 0.14


D50 = 3
D85 = 14
.

Contractor's Concessionaire's
Representative Representative
al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction Limited, Hyderabad

ck Filling Material

% of Passing

2.00 0.425 0.075

31.40 7.4 4.8

34.63 12.13 7.65

38.64 15.24 6.47

41.25 11.36 5.86

39.85 15.46 7.25

42.57 13.24 7.45

40.16 12.58 6.58

42.57 12.45 5.64

41.15 13.54 5.62

43.57 14.55 7.45

34.63 12.13 5.36

38.64 15.24 6.47

41.15 13.54 5.62

39.85 13.75 7.25


al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction Limited, Hyderabad

ck Filling Material

42.61 14.57 6.34

38.64 15.24 6.47

39.46 13.28 6.39


al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction Limited, Hyderabad

ck Filling Material

1.00 10.00 100.00


al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction Limited, Hyderabad


1.00 10.00 100.00
ck Filling Material

Independent Engineer's
Representative
National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
in the State of Himachal Pradesh

:M/s. TPF Getinsa Euroestudios, SL in association with Seg


Authority Engineer Infrastructure Advisory (P) Ltd.

EPC Contractor : M/s. KMC Construction Limited, Hyderabad


Back Filling Material
Borrow Area No 73
Location Km 635+000 RHS @ 1.5 Km From NH-06

Pint No/ % of Passing


IS Sieve Size
in mm 75 50 37.5 19 4.75

1 100 100 100 89.63 59.45

2 100 100 100 91.23 58.45

3 100 100 100 90.58 60.35

4 100 100 100 91.65 61.24

5 100 100 100 91.25 60.24

6 100 100 100 92.56 61.54

7 100 100 100 88.48 60.58

8 100 100 100 90.65 61.58

9 100 100 100 91.25 59.45

10 100 100 100 90.66 61.58

11 100 100 100 94.53 61.23

12 100 100 100 96.43 63.54

13 100 100 100 93.54 62.48

14 100 100 100 94.52 61.34

15 100 100 100 92.65 58.72


National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
in the State of Himachal Pradesh

:M/s. TPF Getinsa Euroestudios, SL in association with Seg


Authority Engineer Infrastructure Advisory (P) Ltd.

EPC Contractor : M/s. KMC Construction Limited, Hyderabad


Back Filling Material
Borrow Area No 73
Location Km 635+000 RHS @ 1.5 Km From NH-06
16 100 100 100 91.22 60.31

17 100 100 100 93.21 62.15

18 100 100 100 89.57 60.24

19 100 100 100 90.88 62.17

20 100 100 100 90.21 60.31

21 100 100 100 93.21 58.47

22 100 100 100 91.23 59.86

23 100 100 100 91.54 60.28

24 100 100 100 91.63 60.3

25 100 100 100 90.87 62.47

26 100 100 100 91.45 64.15

27 100 100 100 91.36 60.55

28 100 100 100 92.52 61.58

29 100 100 100 91.24 60.35

30 100 100 100 90.63 61.58

31 100 100 100 91.53 60.24

32 100 100 100 90.5 60.14


National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
in the State of Himachal Pradesh

:M/s. TPF Getinsa Euroestudios, SL in association with Seg


Authority Engineer Infrastructure Advisory (P) Ltd.

EPC Contractor : M/s. KMC Construction Limited, Hyderabad


Back Filling Material
Borrow Area No 73
Location Km 635+000 RHS @ 1.5 Km From NH-06
33 100 100 100 92.56 59.72

34 100 100 100 93.52 61.24

35 100 100 100 92.65 60.21

36 100 100 100 92.35 61.44

37 100 100 100 92.53 58.45

38 100 100 100 91.45 59.47

Average 100.00 100.00 100.00 91.78 60.72


National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
in the State of Himachal Pradesh

:M/s. TPF Getinsa Euroestudios, SL in association with Seg


Authority Engineer Infrastructure Advisory (P) Ltd.

EPC Contractor : M/s. KMC Construction Limited, Hyderabad


Back Filling Material
Borrow Area No 73
Location Km 635+000 RHS @ 1.5 Km From NH-06

100.00

90.00

80.00

70.00

60.00
%
50.00
o
f 40.00
P
a 30.00
s
s
i 20.00
n
g 10.00

0.00
0.01 0.10 1.00 10.00

IS Sieve Size in mm
90.00

80.00

70.00

60.00

50.00

40.00
National Highways Authority of India
30.00
Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
20.00 in the State of Himachal Pradesh

10.00 :M/s. TPF Getinsa Euroestudios, SL in association with Seg


Authority Engineer Infrastructure Advisory (P) Ltd.
0.00
EPC Contractor 0.01 0.10
: M/s. KMC Construction1.00
Limited, Hyderabad 10.00
Back Filling Material
Borrow Area No 73
Location Km 635+000 RHS @ 1.5 Km From NH-06

Remarks: D15 = 0.14


D50 = 3.2
D85 = 15

Contractor's Concessionaire's
Representative Representative
al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction Limited, Hyderabad


ck Filling Material

% of Passing

2.00 0.425 0.075

32.14 12.13 7.89

35.64 14.35 6.58

34.25 15.64 8.25

35.7 13.44 5.68

33.62 14.56 6.69

35.16 12.58 5.96

34.16 14.52 5.87

32.16 15.54 6.45

31.61 13.54 6.1

32.57 14.57 7.24

38.42 15.46 9.24

39.31 14.35 7.56

37.49 14.21 7.25

32.15 12.89 6.34

35.47 13.75 7.54


al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction Limited, Hyderabad


ck Filling Material

36.24 14.94 8.24

38.42 12.45 4.56

34.56 13.24 5.64

35.49 12.54 5.86

34.85 11.64 4.92

37.45 15.42 7.64

34.12 13.25 5.42

36.42 12.54 6.31

34.25 11.24 5.42

34.15 13.56 6.54

32.16 12.58 5.55

32.45 14.56 5.76

37.45 12.54 5.24

34.15 11.64 4.78

35.78 12.54 4.67

34.56 12.85 5.47

31.25 11.42 4.67


al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction Limited, Hyderabad


ck Filling Material

33.57 13.45 5.46

35.64 15.24 4.89

31.45 15.42 7.5

35.64 14.26 4.67

34.15 12.55 4.95

34.71 13.64 6.57

34.70 13.55 6.19


al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction Limited, Hyderabad


ck Filling Material

1.00 10.00 100.00


al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction1.00
Limited, Hyderabad 10.00 100.00
ck Filling Material

Independent Engineer's
Representative
National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
in the State of Himachal Pradesh

:M/s. TPF Getinsa Euroestudios, SL in association with Seg


Authority Engineer Infrastructure Advisory (P) Ltd.

EPC Contractor : M/s. KMC Construction Limited, Hyderabad


Back Filling Material
Borrow Area No 74
Location Km 628+250 RHS @ .6 Km From NH-06

Pint No/ % of Passing


IS Sieve Size
in mm 75 50 37.5 19 4.75

1 100 100 100 89.65 59.47

2 100 100 100 91.65 58.79

3 100 100 100 90.23 60.32

4 100 100 100 90.26 58.44

5 100 100 100 91.66 59.33

6 100 100 100 89.22 58.36

7 100 100 100 89.16 59.33

8 100 100 100 91.55 62.52

9 100 100 100 91.56 62.15

10 100 100 100 90.4 61.24

11 100 100 100 90.35 63.35

12 100 100 100 90.53 62.54

13 100 100 100 95.18 59.88

14 100 100 100 91.25 62.54

15 100 100 100 92.35 60.17


National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
in the State of Himachal Pradesh

:M/s. TPF Getinsa Euroestudios, SL in association with Seg


Authority Engineer Infrastructure Advisory (P) Ltd.

EPC Contractor : M/s. KMC Construction Limited, Hyderabad


Back Filling Material
Borrow Area No 74
Location Km 628+250 RHS @ .6 Km From NH-06
16 100 100 100 92.65 62.45

17 100 100 100 92.53 62.57

18 100 100 100 93.57 60.54

19 100 100 100 91.45 61.24

20 100 100 100 90.63 60.51

21 100 100 100 92.54 61.75

22 100 100 100 93.7 62.48

23 100 100 100 92.55 64.15

24 100 100 100 93.57 61.5

25 100 100 100 91.24 62.57

26 100 100 100 90.12 61.34

27 100 100 100 91.84 63.45

28 100 100 100 92.58 61.47

29 100 100 100 92.56 62.54

30 100 100 100 91.68 63.45

31 100 100 100 90.66 63.54

32 100 100 100 90.78 61.35


National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
in the State of Himachal Pradesh

:M/s. TPF Getinsa Euroestudios, SL in association with Seg


Authority Engineer Infrastructure Advisory (P) Ltd.

EPC Contractor : M/s. KMC Construction Limited, Hyderabad


Back Filling Material
Borrow Area No 74
Location Km 628+250 RHS @ .6 Km From NH-06
33 100 100 100 91.86 61.45

34 100 100 100 91.52 60.24

Average 100.00 100.00 100.00 91.56 61.38


National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
in the State of Himachal Pradesh

:M/s. TPF Getinsa Euroestudios, SL in association with Seg


Authority Engineer Infrastructure Advisory (P) Ltd.

EPC Contractor : M/s. KMC Construction Limited, Hyderabad


Back Filling Material
Borrow Area No 74
Location Km 628+250 RHS @ .6 Km From NH-06

100.00

90.00

80.00

70.00

60.00
%
50.00
o
f 40.00
P
a 30.00
s
s
i 20.00
n
g 10.00

0.00
0.01 0.10 1.00 10.00

IS Sieve Size in mm
90.00

80.00

70.00

60.00

50.00

40.00
National Highways Authority of India
30.00
Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
20.00 in the State of Himachal Pradesh

10.00 :M/s. TPF Getinsa Euroestudios, SL in association with Seg


Authority Engineer Infrastructure Advisory (P) Ltd.
0.00
EPC Contractor 0.01 0.10
: M/s. KMC Construction1.00
Limited, Hyderabad 10.00
Back Filling Material
Borrow Area No 74
Location Km 628+250 RHS @ .6 Km From NH-06

Remarks: D15 = 0.14


D50 = 3.2
D85 = 20

Contractor's Concessionaire's
Representative Representative
al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction Limited, Hyderabad


ck Filling Material

% of Passing

2.00 0.425 0.075

32.15 12.16 7.88

35.26 14.34 6.46

34.55 15.85 8.16

33.78 13.16 6.38

33.26 14.19 7.44

31.14 13.66 7.79

32.89 12.66 7.78

34.51 13.42 6.25

31.02 12.34 8.65

33.53 11.85 6.79

45.56 15.42 7.68

33.46 13.53 10.02

44.02 21.7 9.86

31.42 12.52 5.86

32.42 14.25 5.63


al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction Limited, Hyderabad


ck Filling Material

33.46 12.54 7.85

35.65 12.75 6.89

31.42 14.58 7.98

43.56 18.45 9.56

30.24 12.04 8.26

33.45 11.54 9.68

31.45 12.45 10.21

30.15 14.54 9.57

29.47 13.72 7.86

33.65 13.24 6.86

31.64 14.95 8.95

31.47 15.42 10.21

33.24 13.42 6.98

32.56 17.34 10.56

30.24 14.32 9.24

34.52 14.54 8.43

30.24 14.57 7.86


al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction Limited, Hyderabad


ck Filling Material

32.74 13.42 8.54

33.24 14.25 6.89

33.57 14.09 8.09


al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction Limited, Hyderabad


ck Filling Material

1.00 10.00 100.00


al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction1.00
Limited, Hyderabad 10.00 100.00
ck Filling Material

Independent Engineer's
Representative
National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
in the State of Himachal Pradesh

:M/s. TPF Getinsa Euroestudios, SL in association with Seg


Authority Engineer Infrastructure Advisory (P) Ltd.

EPC Contractor : M/s. KMC Construction Limited, Hyderabad


Back Filling Material
Borrow Area No 76
Location Km 617+500 RHS @ 3.0 Km From NH-06

Pint No/ % of Passing


IS Sieve Size
in mm 75 50 37.5 19 4.75

1 100 100 100 92.14 61.52

2 100 100 100 91.52 62.47

3 100 100 100 92.53 62.34

4 100 100 100 91.26 60.54

5 100 100 100 91.63 61.58

6 100 100 100 93.54 60.24

7 100 100 100 92.85 60.24

8 100 100 100 92.45 63.15

9 100 100 100 90.58 62.42

10 100 100 100 90.45 62.57

11 100 100 100 91.86 62.45

12 100 100 100 92.57 62.1

13 100 100 100 93.64 61.42

14 100 100 100 92.43 64.15

Average 100.00 100.00 100.00 92.10 61.94


National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
in the State of Himachal Pradesh

:M/s. TPF Getinsa Euroestudios, SL in association with Seg


Authority Engineer Infrastructure Advisory (P) Ltd.

EPC Contractor : M/s. KMC Construction Limited, Hyderabad


Back Filling Material
Borrow Area No 76
Location Km 617+500 RHS @ 3.0 Km From NH-06

100.00

90.00

80.00

70.00

60.00
%
50.00
o
f 40.00
P
a 30.00
s
s
i 20.00
n
g 10.00

0.00
0.01 0.10 1.00 10.00

IS Sieve Size in mm
90.00

80.00

70.00

60.00

50.00

40.00
National Highways Authority of India
30.00
Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
20.00 in the State of Himachal Pradesh

10.00 :M/s. TPF Getinsa Euroestudios, SL in association with Seg


Authority Engineer Infrastructure Advisory (P) Ltd.
0.00
EPC Contractor 0.01 0.10
: M/s. KMC Construction1.00
Limited, Hyderabad 10.00
Back Filling Material
Borrow Area No 76
Location Km 617+500 RHS @ 3.0 Km From NH-06

Remarks: D15 = 0.15


D50 = 3.5
D85 = 15

Contractor's Concessionaire's
Representative Representative
al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction Limited, Hyderabad


ck Filling Material

% of Passing

2.00 0.425 0.075

31.24 14.25 7.56

32.58 13.42 9.26

32.41 13.24 9.78

31.02 14.21 9.99

30.55 13.52 8.25

32.45 12.42 7.54

31.42 13.42 6.54

30.24 13.44 8.89

33.12 14.52 9.26

31.10 12.85 10.45

30.42 12.54 8.86

33.52 14.16 10.85

31.02 15.24 11.12

33.51 12.15 9.65

31.76 13.53 9.14


al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction Limited, Hyderabad


ck Filling Material

1.00 10.00 100.00


al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction1.00
Limited, Hyderabad 10.00 100.00
ck Filling Material

Independent Engineer's
Representative
National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
in the State of Himachal Pradesh

:M/s. TPF Getinsa Euroestudios, SL in association with Seg


Authority Engineer Infrastructure Advisory (P) Ltd.

EPC Contractor : M/s. KMC Construction Limited, Hyderabad


Back Filling Material
Borrow Area No 9
Location Km 564+500 RHS @ 1.0 Km From NH-06

Pint No/ % of Passing


IS Sieve Size
in mm 75 50 37.5 19 4.75

1 100 100 100 87.83 61.08

2 100 100 100 88.72 62.33

3 100 100 100 87.59 60.39

4 100 100 100 88.83 59.61

5 100 100 100 89.18 60.05

6 100 100 100 88.57 59.71

7 100 100 100 87.57 62.68

8 100 100 100 86.85 58.94

Average 100.00 100.00 100.00 88.14 60.60


National Highways Authority of India

Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
in the State of Himachal Pradesh

:M/s. TPF Getinsa Euroestudios, SL in association with Seg


Authority Engineer Infrastructure Advisory (P) Ltd.

EPC Contractor : M/s. KMC Construction Limited, Hyderabad


Back Filling Material
Borrow Area No 9
Location Km 564+500 RHS @ 1.0 Km From NH-06

100.00

90.00

80.00

70.00

60.00
%
50.00
o
f 40.00
P
a
s 30.00
s
i 20.00
n
g 10.00

0.00
0.01 0.10 1.00 10.00

IS Sieve Size in mm
80.00

70.00

60.00

50.00

40.00

30.00
National Highways Authority of India
20.00
Four Laning of Ner Chowk – Pandoh including Pandoh Bypass Section of NH-21 (Package-1 from km 190.00
in the State of Himachal Pradesh
10.00
:M/s. TPF Getinsa Euroestudios, SL in association with Seg
Authority Engineer
0.00 Infrastructure Advisory (P) Ltd.
0.01 0.10 1.00 10.00
EPC Contractor : M/s. KMC Construction Limited, Hyderabad
Back Filling Material
Borrow Area No 9
Location Km 564+500 RHS @ 1.0 Km From NH-06

Remarks: D15 = 0.09


D50 = 2.6
D85 = 16.5

Contractor's Concessionaire's
Representative Representative
al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction Limited, Hyderabad


ck Filling Material

% of Passing

2.00 0.425 0.075

51.28 40.87 13.69

44.87 30.97 14.41

45.18 30.97 13.61

43.82 32.35 11.65

45.84 33.88 14.45

43.19 32.61 12.14

42.94 30.87 13.18

43.02 34.78 12.44

45.02 33.41 13.20


al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.

MC Construction Limited, Hyderabad


ck Filling Material

1.00 10.00 100.00


al Highways Authority of India

ass Section of NH-21 (Package-1 from km 190.000 to km 221.305 under NHDP-IVB


he State of Himachal Pradesh

F Getinsa Euroestudios, SL in association with Segmental Consulting &


cture Advisory (P) Ltd.
1.00 10.00 100.00
MC Construction Limited, Hyderabad
ck Filling Material

Independent Engineer's
Representative

Вам также может понравиться