ITEM MONTO
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL
DEL 08 AL 31 DEL 01 AL 31 DEL 01 AL 30 DEL 01 AL 31 DEL 01 AL 04
CASERIO DE PERINGOS, DISTRITO DE SAN IGNACIO – SAN IGNACIO - CAJAMARCA"
OE.2 ESTRUCTURAS
OE.2.1 MOVIMIENTO DE TIERRAS
OE.2.1.2.1 EXCAVACION DE CIMIENTOS CORRIDOS Y VIG. CONEX. 4,546.08 4,546.08
OE.2.1.6 ELIMINACION .MAT.EXCED. EN CARRETILLA D = 30 max. 4,364.68 4,364.68
OE.2.1.4.1 RELLENO COMPACATDO PARA ESTRUCTURAS CON MATERIAL PROPIO 435.85 435.85
OE.2.1.4.2 RELLENO Y COMPACTADO CON AFIRMADO H=0.30M EN PISOS Y ZAPATAS 7,613.48 7,613.48
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.3 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON 2,058.63 2,058.63
OE.2.2.1 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 6,731.23 6,731.23
OE.2.2.6.1 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. 1,326.36 1,326.36
OE.2.2.6.2 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO 1,615.44 1,615.44
OE.2.2.9 CONCRETO EN FALSO PISO MEZCLA 1:10 CEMENTO-HORMIGON E=4" 5,783.89 5,783.89
OE.2.2.9 CANALETA DE CONCRETO MEZCLA 1:10 CEMENTO-HORMIGON E=10CM 2,147.24 2,147.24
OE.2.2.6.1 ENCOFRADO Y DESENCOFRADO DE CANALETA 1,905.77 1,905.77
OE.2.3 OBRAS DE CONCRETO ARMADO
OE.2.3.2 ZAPATAS
OE.2.3.2.1 CONCRETO EN ZAPATAS F'c = 210 Kg/cm2 17,031.73 8515.87 8515.87
OE.2.3.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA ZAPATAS 8,970.55 4485.28 4485.28
OE.2.3.3 VIGAS DE CONEXION
OE.2.3.3.1 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 4,528.26 4,528.26
OE.2.3.3.2 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION 5,257.85 5,257.85
OE.2.3.3.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS DE CIMENTACION 7,200.90 7,200.90
OE.2.3.7 COLUMNAS
OE.2.3.7.1 CONCRETO EN COLUMNAS F´c = 210 Kg/cm2 8,676.89 8,676.89
OE.2.3.7.2 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 13,274.46 13,274.46
OE.2.3.7.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA COLUMNAS 35,153.65 35,153.65
OE.2.3.8 VIGAS
OE.2.3.8.1 CONCRETO EN VIGAS F'C=210 KG/CM2 21,256.13 21,256.13
OE.2.3.8.2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS 26,424.85 26,424.85
OE.2.3.8.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS 26,416.15 26,416.15
OE.2.3.9.2 LOSAS ALIGERADAS
OE.2.3.9.2.1 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 18,344.34 6,420.52 6,420.52 5,503.30
OE.2.3.9.2.2 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS 28,082.00 9,828.70 9,828.70 8,424.60
OE.2.3.9.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA LOSAS ALIGERADAS 13,822.19 4,837.77 4,837.77 4,146.66
OE.2.3.9.2.4 LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADO 5,971.32 2,089.96 2,089.96 1,791.40
OE.2.3.9.2.5 LADRILLO DE ARCILLA HUECO 7X30X30 PROV.Y COLOCADO 8,982.39 3,143.84 3,143.84 2,694.72
OE.3.1 ALBAÑILERIA
OE.3.1.1 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-ARENA 10,359.95 5179.98 5179.98
OE.3.1.1 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA 10,519.75 5259.88 5259.88
OE.3 ARQUITECTURA
OE.3.2 REVOQUES ENLUCIDOS Y MOLDURAS
OE.3.2.2 TARRAJEO PRIMARIO EN MURO INTERIOR C/MORTERO 1:5 14,698.16 11023.62 3674.54
OE.3.2.5 TARRAJEO PRIMARIO EN COLUMNA C/MORTERO 1:5 7,257.63 7,257.63
Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN
IGNACIO – SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %
OE.2 ESTRUCTURAS
OE.2.1 MOVIMIENTO DE TIERRAS
OE.2.1.2.1 EXCAVACION DE CIMIENTOS CORRIDOS Y VIG. CONEX. m3 246.40 18.45 4,546.08 246.40 4,546.08 246.40 4,546.08 0.00 0.00 0.00%
OE.2.1.6 ELIMINACION .MAT.EXCED. EN CARRETILLA D = 30 max. m3 285.46 15.29 4,364.68 285.46 4,364.68 285.46 4,364.68 0.00 0.00 0.00%
OE.2.1.4.1 RELLENO COMPACATDO PARA ESTRUCTURAS CON MATERIAL Pm3 18.04 24.16 435.85 14.43 348.68 14.43 348.68 3.61 87.17 20.00%
OE.2.1.4.2 RELLENO Y COMPACTADO CON AFIRMADO H=0.30M EN PISOS Y m3 62.58 121.66 7,613.48 50.06 6,090.78 50.06 6,090.78 12.52 1,522.70 20.00%
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.3 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 75.38 27.31 2,058.63 45.23 1,235.18 45.23 1,235.18 30.15 823.45 40.00%
OE.2.2.1 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% m3 28.55 235.77 6,731.23 17.13 4,038.74 17.13 4,038.74 11.42 2,692.50 40.00%
OE.2.2.6.1 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 4.18 317.31 1,326.36 0.00 0.00 0.00 0.00 4.18 1,326.36 100.00%
OE.2.2.6.2 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 43.09 37.49 1,615.44 0.00 0.00 0.00 0.00 43.09 1,615.44 100.00%
OE.2.2.9 CONCRETO EN FALSO PISO MEZCLA 1:10 CEMENTO-HORMIGONm2 152.73 37.87 5,783.89 0.00 0.00 0.00 0.00 152.73 5,783.89 100.00%
OE.2.2.9 CANALETA DE CONCRETO MEZCLA 1:10 CEMENTO-HORMIGON m3 4.71 455.89 2,147.24 0.00 0.00 0.00 0.00 4.71 2,147.24 100.00%
OE.2.2.6.1 ENCOFRADO Y DESENCOFRADO DE CANALETA m2 53.82 35.41 1,905.77 0.00 0.00 0.00 0.00 53.82 1,905.77 100.00%
OE.2.3 OBRAS DE CONCRETO ARMADO
OE.2.3.2 ZAPATAS
OE.2.3.2.1 CONCRETO EN ZAPATAS F'c = 210 Kg/cm2 m3 37.69 451.89 17,031.73 18.84 8,515.87 18.84 8,515.87 18.85 8,515.87 50.00%
OE.2.3.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA ZAPATAS kg 1,794.11 5.00 8,970.55 897.06 4,485.28 897.06 4,485.28 897.06 4,485.28 50.00%
4
VALORIZACION DE OBRA N° 01 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 08/07/2017 AL 31/07/2017
Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN
IGNACIO – SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %
OE.2.3.3 VIGAS DE CONEXION
OE.2.3.3.1 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 9.30 486.91 4,528.26 0.00 0.00 0.00 0.00 9.30 4,528.26 100.00%
OE.2.3.3.2 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 74.40 70.67 5,257.85 0.00 0.00 0.00 0.00 74.40 5,257.85 100.00%
OE.2.3.3.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS DE CIMENTACkg 1,440.18 5.00 7,200.90 0.00 0.00 0.00 0.00 1,440.18 7,200.90 100.00%
OE.2.3.7 COLUMNAS
OE.2.3.7.1 CONCRETO EN COLUMNAS F´c = 210 Kg/cm2 m3 18.40 471.57 8,676.89 0.00 0.00 0.00 0.00 18.40 8,676.89 100.00%
OE.2.3.7.2 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 166.43 79.76 13,274.46 0.00 0.00 0.00 0.00 166.43 13,274.46 100.00%
OE.2.3.7.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA COLUMNAS kg 7,030.73 5.00 35,153.65 0.00 0.00 0.00 0.00 7,030.73 35,153.65 100.00%
OE.2.3.8 VIGAS
OE.2.3.8.1 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 39.74 534.88 21,256.13 0.00 0.00 0.00 0.00 39.74 21,256.13 100.00%
OE.2.3.8.2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 325.71 81.13 26,424.85 0.00 0.00 0.00 0.00 325.71 26,424.85 100.00%
OE.2.3.8.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS kg 5,283.23 5.00 26,416.15 0.00 0.00 0.00 0.00 5,283.23 26,416.15 100.00%
OE.2.3.9.2 LOSAS ALIGERADAS
OE.2.3.9.2.1 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 34.58 530.49 18,344.34 0.00 0.00 0.00 0.00 34.58 18,344.34 100.00%
OE.2.3.9.2.2 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERA m2 475.00 59.12 28,082.00 0.00 0.00 0.00 0.00 475.00 28,082.00 100.00%
OE.2.3.9.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA LOSAS ALIGERADAS kg 2,607.96 5.30 13,822.19 0.00 0.00 0.00 0.00 2,607.96 13,822.19 100.00%
OE.2.3.9.2.4 LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADO und 2,117.49 2.82 5,971.32 0.00 0.00 0.00 0.00 2,117.49 5,971.32 100.00%
OE.2.3.9.2.5 LADRILLO DE ARCILLA HUECO 7X30X30 PROV.Y COLOCADO und 3,957.00 2.27 8,982.39 0.00 0.00 0.00 0.00 3,957.00 8,982.39 100.00%
OE.3.1 ALBAÑILERIA
OE.3.1.1 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-ARE m2 126.31 82.02 10,359.95 0.00 0.00 0.00 0.00 126.31 10,359.95 100.00%
OE.3.1.1 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENAm2 149.79 70.23 10,519.75 0.00 0.00 0.00 0.00 149.79 10,519.75 100.00%
COSTO DIRECTO 308,802.01 0.00 33,625.28 33,625.29 275,176.75
GASTOS GENERALES FIJOS (10.00% CD) 0.10000 30,880.20 - 3,362.53 3,362.53 27,517.68
UTILIDAD (6.00 % CD) 0.06000 18,528.12 - 2,017.52 2,017.52 16,510.61
SUB TOTAL 358,210.33 0.00 39,005.33 39,005.34 319,205.04
TOTAL (F.R.=1.00000) 1.00000 358,210.33 0.00 39,005.33 10.89% 39,005.34 319,205.04 89.11%
5
VALORIZACION DE OBRA N° 02 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 01/08/2017 AL 31/08/2017
Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN
IGNACIO – SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %
OE.2 ESTRUCTURAS
OE.2.1 MOVIMIENTO DE TIERRAS
OE.2.1.2.1 EXCAVACION DE CIMIENTOS CORRIDOS Y VIG. CONEX. m3 246.40 18.45 4,546.08 246.40 4,546.08 0.00 0.00 246.40 4,546.08 0.00 0.00 0.00%
OE.2.1.6 ELIMINACION .MAT.EXCED. EN CARRETILLA D = 30 max. m3 285.46 15.29 4,364.68 285.46 4,364.68 0.00 0.00 285.46 4,364.68 0.00 0.00 0.00%
OE.2.1.4.1 RELLENO COMPACATDO PARA ESTRUCTURAS CON MATERIAL Pm3 18.04 24.16 435.85 14.43 348.68 3.61 87.17 18.04 435.85 0.00 0.00 0.00%
OE.2.1.4.2 RELLENO Y COMPACTADO CON AFIRMADO H=0.30M EN PISOS Y m3 62.58 121.66 7,613.48 50.06 6,090.78 12.52 1,522.70 62.58 7,613.48 0.00 0.00 0.00%
OE.2.2 OBRAS DE CONCRETO SIMPLE 0.00 0.00
OE.2.2.3 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 75.38 27.31 2,058.63 45.23 1,235.18 30.15 823.45 75.38 2,058.63 0.00 0.00 0.00%
OE.2.2.1 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% m3 28.55 235.77 6,731.23 17.13 4,038.74 11.42 2,692.49 28.55 6,731.23 0.00 0.00 0.00%
OE.2.2.6.1 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 4.18 317.31 1,326.36 0.00 0.00 4.18 1,326.36 4.18 1,326.36 0.00 0.00 0.00%
OE.2.2.6.2 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 43.09 37.49 1,615.44 0.00 0.00 43.09 1,615.44 43.09 1,615.44 0.00 0.00 0.00%
OE.2.2.9 CONCRETO EN FALSO PISO MEZCLA 1:10 CEMENTO-HORMIGONm2 152.73 37.87 5,783.89 0.00 0.00 152.73 5,783.89 152.73 5,783.89 0.00 0.00 0.00%
OE.2.2.9 CANALETA DE CONCRETO MEZCLA 1:10 CEMENTO-HORMIGON m3 4.71 455.89 2,147.24 0.00 0.00 0.00 0.00 0.00 0.00 4.71 2,147.24 100.00%
OE.2.2.6.1 ENCOFRADO Y DESENCOFRADO DE CANALETA m2 53.82 35.41 1,905.77 0.00 0.00 0.00 0.00 0.00 0.00 53.82 1,905.77 100.00%
OE.2.3 OBRAS DE CONCRETO ARMADO 0.00 0.00
OE.2.3.2 ZAPATAS 0.00 0.00
OE.2.3.2.1 CONCRETO EN ZAPATAS F'c = 210 Kg/cm2 m3 37.69 451.89 17,031.73 18.84 8,515.87 18.84 8,515.87 37.69 17,031.73 0.00 0.00 0.00%
OE.2.3.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA ZAPATAS kg 1,794.11 5.00 8,970.55 897.06 4,485.28 897.06 4,485.28 1,794.11 8,970.55 0.00 0.00 0.00%
6
VALORIZACION DE OBRA N° 02 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 01/08/2017 AL 31/08/2017
Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN
IGNACIO – SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %
OE.2.3.3 VIGAS DE CONEXION 0.00 0.00
OE.2.3.3.1 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 9.30 486.91 4,528.26 0.00 0.00 9.30 4,528.26 9.30 4,528.26 0.00 0.00 0.00%
OE.2.3.3.2 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 74.40 70.67 5,257.85 0.00 0.00 74.40 5,257.85 74.40 5,257.85 0.00 0.00 0.00%
OE.2.3.3.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS DE CIMENTACkg 1,440.18 5.00 7,200.90 0.00 0.00 1,440.18 7,200.90 1,440.18 7,200.90 0.00 0.00 0.00%
OE.2.3.7 COLUMNAS 0.00 0.00
OE.2.3.7.1 CONCRETO EN COLUMNAS F´c = 210 Kg/cm2 m3 18.40 471.57 8,676.89 0.00 0.00 18.40 8,676.89 18.40 8,676.89 0.00 0.00 0.00%
OE.2.3.7.2 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 166.43 79.76 13,274.46 0.00 0.00 166.43 13,274.46 166.43 13,274.46 0.00 0.00 0.00%
OE.2.3.7.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA COLUMNAS kg 7,030.73 5.00 35,153.65 0.00 0.00 7,030.73 35,153.65 7,030.73 35,153.65 0.00 0.00 0.00%
OE.2.3.8 VIGAS 0.00 0.00
OE.2.3.8.1 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 39.74 534.88 21,256.13 0.00 0.00 13.91 7,439.65 13.91 7,439.65 25.83 13,816.49 65.00%
OE.2.3.8.2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 325.71 81.13 26,424.85 0.00 0.00 114.00 9,248.70 114.00 9,248.70 211.71 17,176.15 65.00%
OE.2.3.8.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS kg 5,283.23 5.00 26,416.15 0.00 0.00 1,849.13 9,245.65 1,849.13 9,245.65 3,434.10 17,170.50 65.00%
OE.2.3.9.2 LOSAS ALIGERADAS 0.00 0.00
OE.2.3.9.2.1 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 34.58 530.49 18,344.34 0.00 0.00 12.10 6,420.52 12.10 6,420.52 22.48 11,923.83 65.00%
OE.2.3.9.2.2 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERA m2 475.00 59.12 28,082.00 0.00 0.00 166.25 9,828.70 166.25 9,828.70 308.75 18,253.30 65.00%
OE.2.3.9.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA LOSAS ALIGERADAS kg 2,607.96 5.30 13,822.19 0.00 0.00 912.79 4,837.77 912.79 4,837.77 1,695.17 8,984.42 65.00%
OE.2.3.9.2.4 LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADO und 2,117.49 2.82 5,971.32 0.00 0.00 741.12 2,089.96 741.12 2,089.96 1,376.37 3,881.36 65.00%
OE.2.3.9.2.5 LADRILLO DE ARCILLA HUECO 7X30X30 PROV.Y COLOCADO und 3,957.00 2.27 8,982.39 0.00 0.00 1,384.95 3,143.84 1,384.95 3,143.84 2,572.05 5,838.55 65.00%
OE.3.1 ALBAÑILERIA 0.00 0.00
OE.3.1.1 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-ARE m2 126.31 82.02 10,359.95 0.00 0.00 63.16 5,179.98 63.16 5,179.98 63.15 5,179.97 50.00%
OE.3.1.1 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENAm2 149.79 70.23 10,519.75 0.00 0.00 74.89 5,259.88 74.89 5,259.88 74.90 5,259.88 50.00%
COSTO DIRECTO 308,802.01 33,625.29 163,639.28 197,264.58 111,537.46
GASTOS GENERALES FIJOS (10.00% CD) 0.10000 30,880.20 3,362.53 16,363.93 19,726.46 11,153.75
UTILIDAD (6.00 % CD) 0.06000 18,528.12 2,017.52 9,818.36 11,835.87 6,692.25
SUB TOTAL 358,210.33 39,005.34 189,821.57 228,826.91 129,383.46
TOTAL (F.R.=1.00000) 1.00000 358,210.33 39,005.34 189,821.57 52.99% 228,826.91 129,383.46 36.12%
7
VALORIZACION DE OBRA N° 03 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 01/09/2017 AL 30/09/2017
Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN IGNACIO –
SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %
OE.2 ESTRUCTURAS
OE.2.1 MOVIMIENTO DE TIERRAS
OE.2.1.2.1 EXCAVACION DE CIMIENTOS CORRIDOS Y VIG. CONEX. m3 246.40 18.45 4,546.08 246.40 4,546.08 0.00 0.00 246.40 4,546.08 0.00 0.00 0.00%
OE.2.1.6 ELIMINACION .MAT.EXCED. EN CARRETILLA D = 30 max. m3 285.46 15.29 4,364.68 285.46 4,364.68 0.00 0.00 285.46 4,364.68 0.00 0.00 0.00%
OE.2.1.4.1 RELLENO COMPACATDO PARA ESTRUCTURAS CON MATERIAL P m3 18.04 24.16 435.85 18.04 435.85 0.00 0.00 18.04 435.85 0.00 0.00 0.00%
OE.2.1.4.2 RELLENO Y COMPACTADO CON AFIRMADO H=0.30M EN PISOS Y m3 62.58 121.66 7,613.48 62.58 7,613.48 0.00 0.00 62.58 7,613.48 0.00 0.00 0.00%
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.3 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 75.38 27.31 2,058.63 75.38 2,058.63 0.00 0.00 75.38 2,058.63 0.00 0.00 0.00%
OE.2.2.1 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% m3 28.55 235.77 6,731.23 28.55 6,731.23 0.00 0.00 28.55 6,731.23 0.00 0.00 0.00%
OE.2.2.6.1 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 4.18 317.31 1,326.36 4.18 1,326.36 0.00 0.00 4.18 1,326.36 0.00 0.00 0.00%
OE.2.2.6.2 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 43.09 37.49 1,615.44 43.09 1,615.44 0.00 0.00 43.09 1,615.44 0.00 0.00 0.00%
OE.2.2.9 CONCRETO EN FALSO PISO MEZCLA 1:10 CEMENTO-HORMIGONm2 152.73 37.87 5,783.89 152.73 5,783.89 0.00 0.00 152.73 5,783.89 0.00 0.00 0.00%
OE.2.2.9 CANALETA DE CONCRETO MEZCLA 1:10 CEMENTO-HORMIGON m3 4.71 455.89 2,147.24 0.00 0.00 0.00 0.00 0.00 0.00 4.71 2,147.24 100.00%
OE.2.2.6.1 ENCOFRADO Y DESENCOFRADO DE CANALETA m2 53.82 35.41 1,905.77 0.00 0.00 0.00 0.00 0.00 0.00 53.82 1,905.77 100.00%
OE.2.3 OBRAS DE CONCRETO ARMADO
OE.2.3.2 ZAPATAS
OE.2.3.2.1 CONCRETO EN ZAPATAS F'c = 210 Kg/cm2 m3 37.69 451.89 17,031.73 37.69 17,031.73 0.00 0.00 37.69 17,031.73 0.00 0.00 0.00%
OE.2.3.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA ZAPATAS kg 1,794.11 5.00 8,970.55 1,794.11 8,970.55 0.00 0.00 1,794.11 8,970.55 0.00 0.00 0.00%
8
VALORIZACION DE OBRA N° 03 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 01/09/2017 AL 30/09/2017
Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN IGNACIO –
SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %
OE.2.3.3 VIGAS DE CONEXION
OE.2.3.3.1 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 9.30 486.91 4,528.26 9.30 4,528.26 0.00 0.00 9.30 4,528.26 0.00 0.00 0.00%
OE.2.3.3.2 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 74.40 70.67 5,257.85 74.40 5,257.85 0.00 0.00 74.40 5,257.85 0.00 0.00 0.00%
OE.2.3.3.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS DE CIMENTACkg 1,440.18 5.00 7,200.90 1,440.18 7,200.90 0.00 0.00 1,440.18 7,200.90 0.00 0.00 0.00%
OE.2.3.7 COLUMNAS
OE.2.3.7.1 CONCRETO EN COLUMNAS F´c = 210 Kg/cm2 m3 18.40 471.57 8,676.89 18.40 8,676.89 0.00 0.00 18.40 8,676.89 0.00 0.00 0.00%
OE.2.3.7.2 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 166.43 79.76 13,274.46 166.43 13,274.46 0.00 0.00 166.43 13,274.46 0.00 0.00 0.00%
OE.2.3.7.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA COLUMNAS kg 7,030.73 5.00 35,153.65 7,030.73 35,153.65 0.00 0.00 7,030.73 35,153.65 0.00 0.00 0.00%
OE.2.3.8 VIGAS
OE.2.3.8.1 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 39.74 534.88 21,256.13 13.91 7,439.65 13.91 7,439.65 27.82 14,879.29 11.92 6,376.84 30.00%
OE.2.3.8.2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 325.71 81.13 26,424.85 114.00 9,248.70 114.00 9,248.70 228.00 18,497.40 97.71 7,927.46 30.00%
OE.2.3.8.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS kg 5,283.23 5.00 26,416.15 1,849.13 9,245.65 1,849.13 9,245.65 3,698.26 18,491.31 1,584.97 7,924.85 30.00%
OE.2.3.9.2 LOSAS ALIGERADAS
OE.2.3.9.2.1 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 34.58 530.49 18,344.34 12.10 6,420.52 12.10 6,420.52 24.21 12,841.04 10.37 5,503.31 30.00%
OE.2.3.9.2.2 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERA m2 475.00 59.12 28,082.00 166.25 9,828.70 166.25 9,828.70 332.50 19,657.40 142.50 8,424.60 30.00%
OE.2.3.9.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA LOSAS ALIGERADAS kg 2,607.96 5.30 13,822.19 912.79 4,837.77 912.79 4,837.77 1,825.57 9,675.53 782.39 4,146.66 30.00%
OE.2.3.9.2.4 LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADO und 2,117.49 2.82 5,971.32 741.12 2,089.96 741.12 2,089.96 1,482.24 4,179.92 635.25 1,791.40 30.00%
OE.2.3.9.2.5 LADRILLO DE ARCILLA HUECO 7X30X30 PROV.Y COLOCADO und 3,957.00 2.27 8,982.39 1,384.95 3,143.84 1,384.95 3,143.84 2,769.90 6,287.67 1,187.10 2,694.72 30.00%
OE.3.1 ALBAÑILERIA
OE.3.1.1 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-ARE m2 126.31 82.02 10,359.95 63.16 5,179.98 63.16 5,179.98 126.31 10,359.95 0.00 0.00 0.00%
OE.3.1.1 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENAm2 149.79 70.23 10,519.75 74.89 5,259.88 74.89 5,259.88 149.79 10,519.75 0.00 0.00 0.00%
COSTO DIRECTO 308,802.01 197,264.58 62,694.63 259,959.19 48,842.85
GASTOS GENERALES FIJOS (10.00% CD) 0.10000 30,880.20 19,726.46 6,269.46 25,995.92 4,884.29
UTILIDAD (6.00 % CD) 0.06000 18,528.12 11,835.87 3,761.68 15,597.55 2,930.57
SUB TOTAL 358,210.33 228,826.91 72,725.77 301,552.66 56,657.71
TOTAL (F.R.=1.00000) 1.00000 358,210.33 228,826.91 72,725.77 20.30% 301,552.66 56,657.71 15.82%
9
VALORIZACION DE OBRA N° 04 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 01/10/2017 AL 31/10/2017
Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN IGNACIO –
SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %
OE.2 ESTRUCTURAS
OE.2.1 MOVIMIENTO DE TIERRAS
OE.2.1.2.1 EXCAVACION DE CIMIENTOS CORRIDOS Y VIG. CONEX. m3 246.40 18.45 4,546.08 246.40 4,546.08 0.00 0.00 246.40 4,546.08 0.00 0.00 0.00%
OE.2.1.6 ELIMINACION .MAT.EXCED. EN CARRETILLA D = 30 max. m3 285.46 15.29 4,364.68 285.46 4,364.68 0.00 0.00 285.46 4,364.68 0.00 0.00 0.00%
OE.2.1.4.1 RELLENO COMPACATDO PARA ESTRUCTURAS CON MATERIAL P m3 18.04 24.16 435.85 18.04 435.85 0.00 0.00 18.04 435.85 0.00 0.00 0.00%
OE.2.1.4.2 RELLENO Y COMPACTADO CON AFIRMADO H=0.30M EN PISOS Y m3 62.58 121.66 7,613.48 62.58 7,613.48 0.00 0.00 62.58 7,613.48 0.00 0.00 0.00%
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.3 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 75.38 27.31 2,058.63 75.38 2,058.63 0.00 0.00 75.38 2,058.63 0.00 0.00 0.00%
OE.2.2.1 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% m3 28.55 235.77 6,731.23 28.55 6,731.23 0.00 0.00 28.55 6,731.23 0.00 0.00 0.00%
OE.2.2.6.1 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 4.18 317.31 1,326.36 4.18 1,326.36 0.00 0.00 4.18 1,326.36 0.00 0.00 0.00%
OE.2.2.6.2 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 43.09 37.49 1,615.44 43.09 1,615.44 0.00 0.00 43.09 1,615.44 0.00 0.00 0.00%
OE.2.2.9 CONCRETO EN FALSO PISO MEZCLA 1:10 CEMENTO-HORMIGONm2 152.73 37.87 5,783.89 152.73 5,783.89 0.00 0.00 152.73 5,783.89 0.00 0.00 0.00%
OE.2.2.9 CANALETA DE CONCRETO MEZCLA 1:10 CEMENTO-HORMIGON m3 4.71 455.89 2,147.24 0.00 0.00 0.00 0.00 0.00 0.00 4.71 2,147.24 100.00%
OE.2.2.6.1 ENCOFRADO Y DESENCOFRADO DE CANALETA m2 53.82 35.41 1,905.77 0.00 0.00 0.00 0.00 0.00 0.00 53.82 1,905.77 100.00%
OE.2.3 OBRAS DE CONCRETO ARMADO
OE.2.3.2 ZAPATAS
OE.2.3.2.1 CONCRETO EN ZAPATAS F'c = 210 Kg/cm2 m3 37.69 451.89 17,031.73 37.69 17,031.73 0.00 0.00 37.69 17,031.73 0.00 0.00 0.00%
OE.2.3.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA ZAPATAS kg 1,794.11 5.00 8,970.55 1,794.11 8,970.55 0.00 0.00 1,794.11 8,970.55 0.00 0.00 0.00%
10
VALORIZACION DE OBRA N° 04 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 01/10/2017 AL 31/10/2017
Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN IGNACIO –
SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %
OE.2.3.3 VIGAS DE CONEXION
OE.2.3.3.1 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 9.30 486.91 4,528.26 9.30 4,528.26 0.00 0.00 9.30 4,528.26 0.00 0.00 0.00%
OE.2.3.3.2 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 74.40 70.67 5,257.85 74.40 5,257.85 0.00 0.00 74.40 5,257.85 0.00 0.00 0.00%
OE.2.3.3.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS DE CIMENTACkg 1,440.18 5.00 7,200.90 1,440.18 7,200.90 0.00 0.00 1,440.18 7,200.90 0.00 0.00 0.00%
OE.2.3.7 COLUMNAS
OE.2.3.7.1 CONCRETO EN COLUMNAS F´c = 210 Kg/cm2 m3 18.40 471.57 8,676.89 18.40 8,676.89 0.00 0.00 18.40 8,676.89 0.00 0.00 0.00%
OE.2.3.7.2 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 166.43 79.76 13,274.46 166.43 13,274.46 0.00 0.00 166.43 13,274.46 0.00 0.00 0.00%
OE.2.3.7.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA COLUMNAS kg 7,030.73 5.00 35,153.65 7,030.73 35,153.65 0.00 0.00 7,030.73 35,153.65 0.00 0.00 0.00%
OE.2.3.8 VIGAS
OE.2.3.8.1 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 39.74 534.88 21,256.13 27.82 14,879.29 11.92 6,376.84 39.74 21,256.13 0.00 0.00 0.00%
OE.2.3.8.2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 325.71 81.13 26,424.85 228.00 18,497.40 97.71 7,927.46 325.71 26,424.85 0.00 0.00 0.00%
OE.2.3.8.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS kg 5,283.23 5.00 26,416.15 3,698.26 18,491.31 1,584.97 7,924.85 5,283.23 26,416.15 0.00 0.00 0.00%
OE.2.3.9.2 LOSAS ALIGERADAS
OE.2.3.9.2.1 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 34.58 530.49 18,344.34 24.21 12,841.04 0.00 0.00 24.21 12,841.04 10.37 5,503.31 30.00%
OE.2.3.9.2.2 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERA m2 475.00 59.12 28,082.00 332.50 19,657.40 0.00 0.00 332.50 19,657.40 142.50 8,424.60 30.00%
OE.2.3.9.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA LOSAS ALIGERADAS kg 2,607.96 5.30 13,822.19 1,825.57 9,675.53 0.00 0.00 1,825.57 9,675.53 782.39 4,146.66 30.00%
OE.2.3.9.2.4 LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADO und 2,117.49 2.82 5,971.32 1,482.24 4,179.92 0.00 0.00 1,482.24 4,179.92 635.25 1,791.40 30.00%
OE.2.3.9.2.5 LADRILLO DE ARCILLA HUECO 7X30X30 PROV.Y COLOCADO und 3,957.00 2.27 8,982.39 2,769.90 6,287.67 0.00 0.00 2,769.90 6,287.67 1,187.10 2,694.72 30.00%
OE.3.1 ALBAÑILERIA
OE.3.1.1 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-ARE m2 126.31 82.02 10,359.95 126.31 10,359.95 0.00 0.00 126.31 10,359.95 0.00 0.00 0.00%
OE.3.1.1 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENAm2 149.79 70.23 10,519.75 149.79 10,519.75 0.00 0.00 149.79 10,519.75 0.00 0.00 0.00%
COSTO DIRECTO 308,802.01 259,959.19 22,229.14 282,188.32 26,613.70
GASTOS GENERALES FIJOS (10.00% CD) 0.10000 30,880.20 25,995.92 2,222.91 28,218.83 2,661.37
UTILIDAD (6.00 % CD) 0.06000 18,528.12 15,597.55 1,333.75 16,931.30 1,596.82
SUB TOTAL 358,210.33 301,552.66 25,785.80 327,338.45 30,871.89
TOTAL (F.R.=1.00000) 1.00000 358,210.33 301,552.66 25,785.80 7.20% 327,338.45 30,871.89 8.62%
11
VALORIZACION DE OBRA N° 05 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 01/11/2017 AL 30/11/2017
Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN IGNACIO –
SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %
OE.2 ESTRUCTURAS
OE.2.1 MOVIMIENTO DE TIERRAS
OE.2.1.2.1 EXCAVACION DE CIMIENTOS CORRIDOS Y VIG. CONEX. m3 246.40 18.45 4,546.08 246.40 4,546.08 0.00 0.00 246.40 4,546.08 0.00 0.00 0.00%
OE.2.1.6 ELIMINACION .MAT.EXCED. EN CARRETILLA D = 30 max. m3 285.46 15.29 4,364.68 285.46 4,364.68 0.00 0.00 285.46 4,364.68 0.00 0.00 0.00%
OE.2.1.4.1 RELLENO COMPACATDO PARA ESTRUCTURAS CON MATERIAL P m3 18.04 24.16 435.85 18.04 435.85 0.00 0.00 18.04 435.85 0.00 0.00 0.00%
OE.2.1.4.2 RELLENO Y COMPACTADO CON AFIRMADO H=0.30M EN PISOS Y m3 62.58 121.66 7,613.48 62.58 7,613.48 0.00 0.00 62.58 7,613.48 0.00 0.00 0.00%
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.3 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 75.38 27.31 2,058.63 75.38 2,058.63 0.00 0.00 75.38 2,058.63 0.00 0.00 0.00%
OE.2.2.1 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% m3 28.55 235.77 6,731.23 28.55 6,731.23 0.00 0.00 28.55 6,731.23 0.00 0.00 0.00%
OE.2.2.6.1 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M. m3 4.18 317.31 1,326.36 4.18 1,326.36 0.00 0.00 4.18 1,326.36 0.00 0.00 0.00%
OE.2.2.6.2 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 43.09 37.49 1,615.44 43.09 1,615.44 0.00 0.00 43.09 1,615.44 0.00 0.00 0.00%
OE.2.2.9 CONCRETO EN FALSO PISO MEZCLA 1:10 CEMENTO-HORMIGONm2 152.73 37.87 5,783.89 152.73 5,783.89 0.00 0.00 152.73 5,783.89 0.00 0.00 0.00%
OE.2.2.9 CANALETA DE CONCRETO MEZCLA 1:10 CEMENTO-HORMIGON m3 4.71 455.89 2,147.24 0.00 0.00 4.71 2,147.24 4.71 2,147.24 0.00 0.00 0.00%
OE.2.2.6.1 ENCOFRADO Y DESENCOFRADO DE CANALETA m2 53.82 35.41 1,905.77 0.00 0.00 53.82 1,905.77 53.82 1,905.77 0.00 0.00 0.00%
OE.2.3 OBRAS DE CONCRETO ARMADO
OE.2.3.2 ZAPATAS
OE.2.3.2.1 CONCRETO EN ZAPATAS F'c = 210 Kg/cm2 m3 37.69 451.89 17,031.73 37.69 17,031.73 0.00 0.00 37.69 17,031.73 0.00 0.00 0.00%
OE.2.3.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA ZAPATAS kg 1,794.11 5.00 8,970.55 1,794.11 8,970.55 0.00 0.00 1,794.11 8,970.55 0.00 0.00 0.00%
12
VALORIZACION DE OBRA N° 05 - BLOQUE 01
FÓRMULA 1: ESTRUCTURAS
PERÍODO DEL 01/11/2017 AL 30/11/2017
Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN IGNACIO –
SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado S/IGV: S/. 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO
Item DESCRIPCIÓN Unidad
Metrado Precio Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial %
OE.2.3.3 VIGAS DE CONEXION
OE.2.3.3.1 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 9.30 486.91 4,528.26 9.30 4,528.26 0.00 0.00 9.30 4,528.26 0.00 0.00 0.00%
OE.2.3.3.2 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 74.40 70.67 5,257.85 74.40 5,257.85 0.00 0.00 74.40 5,257.85 0.00 0.00 0.00%
OE.2.3.3.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS DE CIMENTACkg 1,440.18 5.00 7,200.90 1,440.18 7,200.90 0.00 0.00 1,440.18 7,200.90 0.00 0.00 0.00%
OE.2.3.7 COLUMNAS
OE.2.3.7.1 CONCRETO EN COLUMNAS F´c = 210 Kg/cm2 m3 18.40 471.57 8,676.89 18.40 8,676.89 0.00 0.00 18.40 8,676.89 0.00 0.00 0.00%
OE.2.3.7.2 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 166.43 79.76 13,274.46 166.43 13,274.46 0.00 0.00 166.43 13,274.46 0.00 0.00 0.00%
OE.2.3.7.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA COLUMNAS kg 7,030.73 5.00 35,153.65 7,030.73 35,153.65 0.00 0.00 7,030.73 35,153.65 0.00 0.00 0.00%
OE.2.3.8 VIGAS
OE.2.3.8.1 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 39.74 534.88 21,256.13 27.82 14,879.29 0.00 0.00 27.82 14,879.29 11.92 6,376.84 30.00%
OE.2.3.8.2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 325.71 81.13 26,424.85 228.00 18,497.40 0.00 0.00 228.00 18,497.40 97.71 7,927.46 30.00%
OE.2.3.8.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA VIGAS kg 5,283.23 5.00 26,416.15 3,698.26 18,491.31 0.00 0.00 3,698.26 18,491.31 1,584.97 7,924.85 30.00%
OE.2.3.9.2 LOSAS ALIGERADAS
OE.2.3.9.2.1 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 34.58 530.49 18,344.34 24.21 12,841.04 10.37 5,503.30 34.58 18,344.34 0.00 0.00 0.00%
OE.2.3.9.2.2 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERA m2 475.00 59.12 28,082.00 332.50 19,657.40 142.50 8,424.60 475.00 28,082.00 0.00 0.00 0.00%
OE.2.3.9.2.3 ACERO Fy=4200 KG/CM2 GRADO 60 PARA LOSAS ALIGERADAS kg 2,607.96 5.30 13,822.19 1,825.57 9,675.53 782.39 4,146.66 2,607.96 13,822.19 0.00 0.00 0.00%
OE.2.3.9.2.4 LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADO und 2,117.49 2.82 5,971.32 1,482.24 4,179.92 635.25 1,791.40 2,117.49 5,971.32 0.00 0.00 0.00%
OE.2.3.9.2.5 LADRILLO DE ARCILLA HUECO 7X30X30 PROV.Y COLOCADO und 3,957.00 2.27 8,982.39 2,769.90 6,287.67 1,187.10 2,694.72 3,957.00 8,982.39 0.00 0.00 0.00%
OE.3.1 ALBAÑILERIA
OE.3.1.1 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-ARE m2 126.31 82.02 10,359.95 126.31 10,359.95 0.00 0.00 126.31 10,359.95 0.00 0.00 0.00%
OE.3.1.1 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENAm2 149.79 70.23 10,519.75 149.79 10,519.75 0.00 0.00 149.79 10,519.75 0.00 0.00 0.00%
COSTO DIRECTO 308,802.01 259,959.19 26,613.68 286,572.88 22,229.15
GASTOS GENERALES FIJOS (10.00% CD) 0.10000 30,880.20 25,995.92 2,661.37 28,657.29 2,222.92
UTILIDAD (6.00 % CD) 0.06000 18,528.12 15,597.55 1,596.82 17,194.37 1,333.75
SUB TOTAL 358,210.33 301,552.66 30,871.87 332,424.54 25,785.82
TOTAL (F.R.=1.00000) 1.00000 358,210.33 301,552.66 30,871.87 8.62% 332,424.54 25,785.82 7.20%
13
FÓRMULA POLINÓMICA
FÓRMULA 1: ESTRUCTURAS
Obra :
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS,
DISTRITO DE SAN IGNACIO – SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ Monto Contratado C/IGV: S/. 5,480,298.10
Contrato : N° 159-2015/GM Residente: ING. LUIS BAZAURI VALLEJO F.R.: 1.00000
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: 7/8/2017
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: 120 D.C.
Contratista : CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: 11/4/2017
K = 0.305*(MOr / MOo) + 0.198*(Ir / Io) + 0.176*(Ar / Ao) + 0.157*(Cr / Co) + 0.084*(AGr / AGo) + 0.080*(Mr / Mo)
INDICE
JULIO 2017 AGOSTO 2017 SEPT 2017 OCTUBRE 2017 NOVIEMBRE 2017 DIC 2017 ENE 2018
CODIGO DESCRIPCION ELEMENTO SIMB COEF. PORC. BASE
INCID. ENE. 2017 Indice Reajuste Indice Reajuste Indice Reajuste Indice Reajuste Indice Reajuste Indice Reajuste Indice Reajuste
47 MANO DE OBRA INC. LEYES SOCIALES MO 0.305 100% 563.25 563.25 0.305 580.90 0.315 580.90 0.315 580.90 0.315 580.90 0.315 580.90 0.315 582.52 0.315
39 INDICE GENERAL DE PRECIOS AL CONSUM I 0.198 100% 437.38 441.67 0.200 444.64 0.201 444.57 0.201 442.48 0.200 441.61 0.200 442.30 0.200 442.87 0.200
2 ACERO DE CONSTRUCCIÓN LISO A 0.176 100% 477.63 467.84 0.172 474.70 0.175 485.11 0.179 488.45 0.180 482.69 0.178 491.28 0.181 497.78 0.183
21 CEMENTO PORTLAND TIPO I C 0.157 100% 462.57 465.71 0.158 465.71 0.158 465.71 0.158 465.71 0.158 465.71 0.158 465.71 0.158 475.73 0.161
5 AGREGADO GRUESO AG 0.084 100% 441.11 446.20 0.085 448.18 0.085 450.52 0.086 449.54 0.086 449.82 0.086 450.15 0.086 450.09 0.086
43 MADERA NACIONAL PARA ENCOF. Y CARPIN M 0.080 100% 706.95 710.90 0.080 715.43 0.081 716.76 0.081 719.16 0.081 722.52 0.082 724.34 0.082 722.03 0.082
COEFICIENTE DE REAJUSTE ( K ) 1.000 1.000 1.015 1.020 1.020 1.019 1.022 1.027
15
CONTROL DE REAJUSTES
VALORIZACION DE OBRA N° 01 AL N°06 - BLOQUE 01
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE
Obra
### SAN IGNACIO – SAN IGNACIO - CAJAMARCA"
Proceso ###
LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Residente: ING. LUIS BAZAURI VALLEJO Monto Contratado C/IGV: : S/. 5,480,298.10
Contrato ###
N° 838-2017-MPSI/GM Supervisor: ING. ANDRES ABELARDO DELGADO PEREZ F.R.: : 1.00000
Entidad ###
MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Proyectista: ING. WILLIAM DELGADO PEREZ Fecha de Inicio: : 08/07/2017
Ubicación ###
PERINGOS - SAN IGNACIO - CAJAMARCA Monto Referencial C/IGV: S/. 5,480,298.10 Plazo de Ejecución: : 120 D.C.
Contratista ###
CONSORCIO SAN IGNACIO Monto Referencial S/IGV: S/. 4,644,320.42 Fecha de Término: : 11/4/2017
�=𝑽∗(𝑲−�)
PROGRAMADO EJECUTADO
VALORIZACIÓN V Kr R R V Kr R R REAJUSTE
RECONOCIDO
V*(K-1) ACUMULADO V*(K-1) ACUMULADO
1.- ESTRUCTURAS
Nº 01 - JUL. 2017 44,951.26 1.015 674.27 674.27 39,005.33 1.015 585.08 585.08 585.08
Nº 02 - AGOS. 2017 244,446.35 1.020 4,888.93 5,563.20 189,821.57 1.020 3,796.43 4,381.51 3,796.43
Nº 03 - SEPT. 2017 42,642.34 1.020 852.85 6,416.05 72,725.77 1.020 1,454.52 5,836.03 1,454.52
Nº 04 - OCT. 2017 26,170.38 1.019 497.24 6,913.29 25,785.80 1.019 489.93 6,325.96 489.93
Nº 05 - NOV. 2017 0.00 1.022 0.00 6,913.29 30,871.87 1.022 679.18 7,005.14 587.33
N° 06 - DIC. 2017 0.00 1.027 0.00 6,913.29 0.00 1.027 0.00 7,005.14 0.00
15
CÁLCULO DE DEDUCCIONES POR ADELANTO DIRECTO
VALORIZACION DE OBRA N° 01 AL N°06 - BLOQUE 01
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA
Obra DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN
: IGNACIO – SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Monto Referencial C/IGV: 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Monto Referencial S/IGV: 4,644,320.42
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Monto Contratado C/IGV: 5,480,298.10
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA F.R.: 1.00000
Contratista : CONSORCIO SAN IGNACIO Fecha de Inicio: 7/8/2017
Residente: : ING. LUIS BAZAURI VALLEJO Plazo de Ejecución: 120 D.C.
Supervisor: : ING. ANDRES ABELARDO DELGADO PEREZ Fecha de Término: 11/4/2017
D= V*A (Kr/Ka-1)/C
16
CÁLCULO DE DEDUCCIONES POR ADELANTO DIRECTO
VALORIZACION DE OBRA N° 01 AL N°06 - BLOQUE 01
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA
Obra DE LA I.E.P. N°16454 DEL CASERIO DE PERINGOS, DISTRITO DE SAN
: IGNACIO – SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Monto Referencial C/IGV: 5,480,298.10
Contrato : N° 838-2017-MPSI/GM Monto Referencial S/IGV: 4,644,320.42
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Monto Contratado C/IGV: 5,480,298.10
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA F.R.: 1.00000
Contratista : CONSORCIO SAN IGNACIO Fecha de Inicio: 7/8/2017
Residente: : ING. LUIS BAZAURI VALLEJO Plazo de Ejecución: 120 D.C.
Supervisor: : ING. ANDRES ABELARDO DELGADO PEREZ Fecha de Término: 11/4/2017
D= V*A (Kr/Ka-1)/C
17
AMORTIZACION POR ADELANTO DIRECTO
VALORIZACION DE OBRA N° 01 AL N°06 - BLOQUE 01
Porcentaje del
VAL Monto Val.. Amortizacion Amortizacion Acum.
Adelanto
A. Directo = 25,074.72
25,074.72 25,074.72
TOTAL ADEL. EN S/.
ION POR ADELANTO DIRECTO
N DE OBRA N° 01 AL N°06 - BLOQUE 01
S/. 5,480,298.10
S/. 4,644,320.42
S/. 5,480,298.10
1.00000000
7/8/2017
300 D.C.
11/4/2017
L DE ADELANTO DIRECTO
325102.4294
Saldo
S/.
22,344.35
9,056.84
3,966.04
2,161.03
0.00
0.00
RESUMEN DE VALORIZACIONES
VALORIZACION DE OBRA N° 01 AL N°06 - BLOQUE 01
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I.E.P. N°16454 DEL
Obra : CASERIO DE PERINGOS, DISTRITO DE SAN IGNACIO – SAN IGNACIO - CAJAMARCA"
Proceso : LICITACIÓN PÚBLICA N° 003-2017-MEPSI/CS Monto Referencial C/IGV: 5,480,298.10
Entidad : MUNICIPALIDAD PROVINCIAL DE SAN IGNACIO Monto Referencial S/IGV: 4,644,320.42
Ubicación : PERINGOS - SAN IGNACIO - CAJAMARCA Monto Contratado C/IGV: 5,480,298.10
Contratista : CONSORCIO SAN IGNACIO F.R.: 1.00000
Residente : ING. LUIS BAZAURI VALLEJO Fecha de Inicio: 7/8/2017
Supervisor : ING. ANDRES ABELARDO DELGADO PEREZ Plazo de Ejecución: 120 D.C.
Proyectista : ING. WILLIAM DELGADO PEREZ Fecha de Término: 11/4/2017
FORMULA 1: ESTRUCTURAS
Deduccion Amortizacion
N° V Reajuste ( R ) VB VN E IGV Monto A Fact.
A.D. A.M. D A.D. A.M. A
Nº 01 - JUL. 2017 39,005.33 585.08 40.96 40.96 39,549.45 2,730.37 2,730.37 36,819.08 36,819.08 6,627.43 43,446.52
Nº 02 - AGOS. 2017 189,821.57 3,796.43 265.75 265.75 193,352.25 13,287.51 13,287.51 180,064.74 180,064.74 32,411.65 212,476.39
Nº 03 - SEPT. 2017 72,725.77 1,454.52 101.82 101.82 74,078.47 5,090.80 5,090.80 68,987.67 68,987.67 12,417.78 81,405.45
Nº 04 - OCT. 2017 25,785.80 489.93 34.30 34.30 26,241.43 1,805.01 1,805.01 24,436.43 24,436.43 4,398.56 28,834.99
Nº 05 - NOV. 2017 30,871.87 587.33 47.54 47.54 31,411.66 2,161.03 2,161.03 29,250.63 29,250.63 5,265.11 34,515.74
N° 06 - DIC. 2017 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00