M . H A S Y E M, ST
PERSONNAL DATA :
OBJECTIVES
To advance my career and gain skillful experiences by utilizing my qualifications and by
contributing professional services in a growing prestigious organization
Key Qualification
Familiar with Standards and Codes: ASME, AWS D1.1, API 1104, API 650, ASME B3.1.3
Piping Processes and Codes / Standards other hand in knowledge in the Welding Process,
Welding Inspection,
Understand and implement WPS (Welding Procedure Specifications) to welder, and other
procedures both ITP and Client Spec.
I am experienced in various disciplines for Fabrication: Piping, Structural, Tank and Pressure
Vessel fabrication
Specific Responsibilities :
Quality Surveillance, Inspection and Sign off on Contractor Records
Monitoring of the works in accordance with approved method statements and inspection test
plans (ITP)
EDUCATION BACKGROUND :
1995 – 2000 Mechanical Engineering Department, University Mercu Buana- Jakarta
1992 – 1995 High School, STM Negeri Pangkalpinang – Bangka - Sumsel
1995 - 1992 Junior School, SMP Muhammadiyah Pangkal Pinang – Bangka - Sumsel
1
EXPERIENCE
PT. TRUBA JAYA ENGINEERING
April 07, 2018 - November 30, 2018 as Quality Control (QA/QC) Welding Inspector
Project : KalSel-1_2 x 100 MW Coal Fired Power Plant (CFPP) Tanjung Tabalong Kalimantan
Selatan.
Project : Blok A Gas Development Project PT. JGC Indonesia – PT Encona Consorsium,
and MEDCO E & P Malaka – Blang Nissam _ Aceh
Project : OKI Pulp and Paper Mills, Sei Baung, Palembang – Sumatera Selatan
Project : Pipe Line 6 inchi from Serang jaya to PPP Rantau & Pipie Line 4 inchi from Rantau
to Tanjung Sementok Kuala Simpang Aceh Taming, and Tanki Water Injection
(WIP) Pump 5000 M3 client Pertamina EP Asset 1 Field Rantau Aceh Tamieng-Aceh
Project : Arun LNG Receiving HUB & Regasification Terminal, Main Contractor Rekayasa
Industri and Client Pertamina Arun Gas and ISB.
Project : Banyu Urip EPC1 Production Processing Facilities, Tripatra Samsung Consortium
and Client Exxon Mobil Cepu Ltd
Project : Bengalon Coal Mine Conveyor and Crusher phase III, PT. Perkasa Inakakerta –
Kalimantan Timur
Project : Wahana Coal Mine Stock File Phase II, PT. Wahana Baratama Mining –
Kalimantan Selatan
Project : Pipe-lay Barge Leighton Eclipse. Owner Leighton Contractors Pte Ltd.
Project : PT. Foster Wheeler Parsons & PT. Punj Lioyd Singapore, SPT (Singapore Parallel
Train Project, Exxon Mobil Chemicals PAC and PESEK ”, with client Exxon Mobil.
Project : PT. Drako Shipping Pte.Ltd, New Building Project , 230’x70’x14’ Deck Cargo
Barge, Owner Drako Shipping Pte Ltd, Malaysia
Project : PT. Mc Dermott Indonesia, SU TU VANG Project Field Development, WITH
CLIENT CUU Long Joint Operation Company, Project Central Processing Plat form.
Project : PT. Mc Dermott Indonesia, North Belut, Project CPP top side contraction and
offshore Hook Up & commissioning and central processing plat form, with client Conoco
Phillips Indonesia.
Project : PT Acergy Jakarta, Kerisi Development Project, , “ Skid Manifold and Vessel Spool
& Top Side for Piping with client Conoco Phillips’
Project : Arthit, Arthit Field Development Central Facilities, with Client PT TEP, “Deck
Supports Frame”.
Project : PT PKR, Santos Oyong Development, “Skid Manifold and Vessel Spool for
Piping”, And Maleo field Development Santos Oyong Madura,“ EPCI for Maleo SPUR Pipe
Line EJGP Structural”, with main contractor PT. Petrosea.
Project :
Block Subsea Development Project 1B, Fabrication SSM Protection Frame & 14” Pipe
expansion Spool. PT. Conoco Phillip Indonesia.
Block B Subsea Development Project Phase II Fabrication wellhead IUT&UTA / Manifold
protection Frame, 8”&14” Flow line Expansion spool Conoco Phillips, PT. Technip
Indonesia.
4
Specific Responsibilities : PIPING
Patrol inspection and ensure at lay down areas segregated/stainless steel & carbon steel
Ensure welder qualification (Welder register)
Ensure procedure qualification (WPS register)
Verify correct equipment (validation of welding machines)
Ensure correct equipment (validation of welding machines)
Ensure correct consumables and WPS numbers
Check electrodes/flux oven calibration record at electrodes stores
Check fit up prior to weld (Root gap, face, alignment, bevel angle, included angle, materials)
Checks preheat temperature based on approved WPS prior to welding
Project : Fabrication of Boiler, Pressure Vessel and OSEIL Production Facilities Phase 1-
Seram, Main Contractor PT. Kuf Pec and with client PT. Istana Karang Laut
I here by certify that all statements in this data are true and correct to the best of my knowledge
and belief.
Best regards,
M. Hasyem. ST