Specification for Gear Pump Spec. No.

IDNHPT-PTT-EL-003

(PU-1202A)(PU-1203A) Revision No. 0


Page 1
PT.Hitachi Plant Technologies Indonesia

SPECIFICATION FOR GEAR PUMP


(PU-1202A)(PU-1203A)

Client: PT. TOYO INK INDONESIA


Project: EXPAND NEW FACILITY PROJECT

Site: Greenland International Industrial Center (GIIC), Block AB No.03,


Desa Nagasari, Serang Baru, Bekasi 17330, Jawa Barat, Indonesia

Contents
1. Items and Materials
2. Scope
3. Code and Standard
4. Guarantee
5. Installation
6. Paint
7. Packing and Protection
8. Delivery Terms and Point
9. Submission of Documents
10. Vendor Supervisor
11. Spare Parts
12. Special Notes
13. Specification

Attachments
1. Specification List for Gear Pump (Doc.No.IDNHPT-PTT-EL-003)
2. Engineering Specification For Painting

0 Originate 21-May-2014 M. Kuramoto M. Kuramoto M. Kuramoto

Rev Description Date Approved Checked Designed


Specification for Gear Pump Spec. No. IDNHPT-PTT-EL-003

(PU-1202A)(PU-1203A) Revision No. 0


Page 2
PT.Hitachi Plant Technologies Indonesia

1. Items and Materials


Refer to the attached Equipment LIST(Doc.No.: IDNHPT-PTT-EL-003).

2. Scope
□Basic design ■Spec. Sheet & DWG ■Detailed design ■Procurement ■Fabrication ■Painting
□Authority Application (If Necessary) ■Vendor’s Factory Inspection ■Attendance Inspection
■Transportation (at Site) □Installation at site

3. Code and Standard


International codes and standards specified in specification shall be applied as a part of this
Specification.
 Code and Standard: JIS, ASME, ASTM, ANSI, IEC, NEC, NEMA, NFPA, OSHA, UL.
 Unit: Basically, the SI unit shall be applied but Metric system shall be used for weight or
power.
(i.e. weight ; kg, t t ; metric ton)

4. Guarantee
If any failures are found before twelve (12) months from the date after completion of Performance
Tests, Vendor shall promptly make good or renew such Defects or remedy the Defects at its own cost
and expense to the satisfaction of the Client.
Vendor warrants and guarantees that all the Material supplied shall conform to the requirements of
all applicable laws and codes, product liability laws, safety measures and warning indication.
Warning shall be also shown on operation manual.

5. Installation
 Anchor bolts/nuts shall be provided by vendor, which will be installed in concrete foundation.
Bolt-dia., length and material shall be considered by vendor.

6. Paint
Carbon Steel Portion : Painting to be applied as per attached Engineering Specification For
Painting.
Vendor shall provide touch-up paint with the mentioned above.

7. Test and Inspection


Vendor shall perform test and inspections at his shop as specifi ed by Vendor’s standard. Vendor
shall submit their standard for Purchaser’s approval and report for result of test and inspection (Test
and Inspection Report).

Witness inspection  ■Required( by Owner, by Purchaser ) □Waved


■Visual Inspection (Outside, Inside) ■Dimension ■No. of quantity ■Performance test ■Noise
■Vibration ■Pressure test ■Ampere ■r.p.m □Main shaft driving power □Dye Penetrant test
□Leak check for Shaft seal □Instruments ■Protection device ■Cleaning
 Test and Inspection Report shall be submitted within 3days after the date of completion of
Test and Inspection.
Specification for Gear Pump Spec. No. IDNHPT-PTT-EL-003

(PU-1202A)(PU-1203A) Revision No. 0


Page 3
PT.Hitachi Plant Technologies Indonesia

8.  Packing and Protection


 Every equipment shall be marked clearly weight and dimensions, and lift up point (in case
of heavy weight).
 All Material shall be cleaned up, dry and free from all defects prior to packing.
Electrical device shall be protected by waterproof.
 Packing List (item No., item name, packing style, material and dimension of package,
weight, quantity) shall be submitted before shipment.
 Opening port shall be covered to prevent any foreign materials from entering to inside of
equipment.
 Preventive material inside of equipment (i.e. N2 seal, desiccant, etc) shall be indicated on
the equipment and list if provided.

9. Submission of Documents
1) Approval for Design
Vendor shall submit specification of supply equipment. Vendor shall not start fabrication at
their factory without approval by Customer and/or Purchaser.
2) The following number of copies shall be submitted in principle.
Supply Equipments Data 4 copies (Customer 2 copies, HPT 1 copy, Return to Vendor 1 copy)
Test and Inspection Report 4 copies (1 original and 3 copies)
Record Documents 4 copies (Customer 2 copies, HPT 2 copies)
1 Auto CAD data file for all drawings
3) Vendor shall submit Minute of Meeting in each Meeting between HPT and Vendor.
4) Lifetime for spare parts shall be mentioned on spare parts list.
5) Vendor shall submit any documents as specified in this Specification within the date HPT
required.
6) Operation manual shall be revised correctly and submit to HPT, if HPT find any conflict,
faults under pre-commissioning and commissioning.
7) Vendor shall submit additional documents where HPT and Vendor for discuss about additional
requirements and mutually agreed items are mentioned.
8) Language in all documents and drawings submitted shall be written in English.
9) Vendor shall submit deviation list.
Otherwise, all the Vendor’s specifications are deemed to meet the Purchaser’s specifications.

REGEND: “◎“ marked items shall be supplied before delivery. “○“ Applicable.
Specification for Gear Pump Spec. No. IDNHPT-PTT-EL-003

(PU-1202A)(PU-1203A) Revision No. 0


Page 4
PT.Hitachi Plant Technologies Indonesia

Type Submission Stage Type Submission Stage


Estimation Review Delivery Estimation Review Delivery
Overview Drawing ○ ○ ○ Operation Manual ○ ○
Detail(production) ○ ○ Layout drawing for
Drawing Electrical Cable
Fabrication Sch’le ○ ○ ○ Specification ○ ○ ○
Assembling ○ ○ ○ Strength Calculation ○ ○
Schedule Sheet
Detail Drawing of ○ ○ ○ Supply & ○ ○
Parts Components List
Accessories & ○ ○ ○ Test and Inspection ○ ◎
Spare Parts List Procedure and Report
for Equipment
Application for Test & Inspection
Government Report for
(when required) Instruments System
Loading Data ○ ○ ○ Instruction Manual ○
Performance Test ○ ○ Installation Procedure ◎
Report
Special Tool List ○ ○
& Catalog
Lubricant List ○ ◎

10. Vendor Supervisor


Vendor’s scope of supply shall include field supervision service during construction and pre-
commissioning. Vendor shall submit the breakdown the per day rate, anticipated number of
supervisor and duration.

11. Spare Parts


If spare parts shall be needed within pre-commissioning, Vendor shall submit the quotation with a
list. The spare parts shall be packed in an exclusive box with the parts list.

12. Special Note


 All sharp edges shall be rounded to 3mm minimum radius.
 Equipment design shall be considered the operability.
 Accessory: Item, description, number of quantity shall be shown in the list.
 Vendor shall submit the preservation procedure and/or plan, if required.
 In case that any products might be restricted subject to Regulation of origin country,
International Export Control Regime, vendor shall obtain properly authorized permission for
export materials by own responsibility.
 Vendor’ s scope of supply shall include ;
1 Lifting lugs
2 Earth lugs
3 Anchor bolts & nuts
4 Name plate

 Vendor shall provide the first filling of lubricant to be separately in a container.


Specification for Gear Pump Spec. No. IDNHPT-PTT-EL-003

(PU-1202A)(PU-1203A) Revision No. 0


Page 5
PT.Hitachi Plant Technologies Indonesia

 Safety cover for Pumps shall be designed and installed.

13. Specification
1) Vendor shall provide explosion-proof equipment/instruments/parts etc. which is applicable for the
following Hazardous Area Classification.
   Hazardous Area Classification.
NEC article 500,
ClassⅠ, Division1, Group D
→ PU-1202A,PU-1203A