A CORIDOR
11 Coating wood
kayu gording 5/12 6.25 m x 2
kayu klos 5/12 0.5 m x 3
Kayu gording 4/10 21 pcs x 3.6
12 Policarbonat 6.25 m x 4
C PENANGKAL PETIR
Flasshing atap m
1 Air Terminal (Sistem Elektrostatis)
Pipe galv 2" 5.44 kg/m x 2
Down Conductor, NYY 70 mm2 40 m + 10
Grounding Rod diameter 5/8"
Box rounding 300 x 300 0.6 m2
Material Bantu & Accessories
m x 6.25 m x 2 sisi
m x 2.2 m x 2 pcs
m x 6.25 m x 2 sisi
m x 2.2 m x 2 pcs
m x 6.25 m x 2 sisi
m x 2.2 m x 2 pcs
m x 6.25 m x 2 sisi
m x 2.2 m x 2 pcs
m x 0.8 m x 4 pcs
x 0.8 m x -4 pcs
m x 6.25 m
m x 2.65 m x 4 pcs
m x x 0.04 m x 0.1
m x 2.65 m x 4 pcs
m 1x 2 sisi
m x 0.5 x 2 sisi
x 9
m
m
m
m
m
m
m
pcs
pcs
pcs
pcs
m
m + 2m
vol sat
= 0.9375 m3
= 0.22 m3
1.1575 m3
= 0.625 m3
= 0.165 m3
0.79 m3
= 0.125 m3
= 0.033 m3
0.158 m3
= 0.875 m3
= 0.132 m3
= 0.74889 m3
1.75589 m3
= 0.648 m3
= -0.22608 m3
= 2.0625 m3
2.48442 m3
= 5.76 m2
= 13.75 m2
19.51 m2
= 0.795 m2
= 0.15 m3
= 0.018 m3
= 0.3024 m3
0.4704 m3
= 8.5 m2
= 1.02 m2
= 21.168 m2
30.688 m2
= 25 m2
= 9.9852 m2
= 59.28 m2
= 45.99 m2
=
105.27 m2
= 7.065 m2
= 10 m
= 10 m
= 8m
= 34 m
= 7.15 m
= 8.2 m
= 7.15 m
= 24.4 m
= 11 m
= 22 m
= 8m
149.9 m
= 2m
= 10.88 kg
= 52 m
= 6 titik
=
Project Coridor
Location MCTN
Brief Specification/Requirement/Scope
No. Description
(Detail will be provided in Exhibit A2)
A CORIDOR
Cut/excavate/trenching on rock, boulder - machine -
1 manual
2 Backfill (including compaction)
3 Soil/ asphalt disposal handling & spreading
4 Supply material and install lean concrete K-100
5 Supply material, fabricate re-bar & formwork, pour & Steel reinforcing max 125 Kg/m3
cure concrete concrete (exceed the value may add
supply & fabricate steel - unit rates),
include admixture if required
C LIGHTINING ARRESTER
1 Flashing atap Kirana
2 Air Terminal (Sistem Elektrostatis)
3 Supply, fabricate, and install structural steel painting included, include all type anchor bolts
4 Hot dip Galv Pipe
5 Down Conductor, NYY 70 mm2
6 Grounding Rod diameter 5/8" Panjang 2 m
7 Box grounding 200 x 200
8 Material Bantu & Accessories
9 instalation dan testing
note:
Size/Range/C Unit of
Unit Rate (IDR) Estimate Quantity Price (IDR)
lass Measure
TOTAL 123,669,552