JOB SAFETY ANALYSIS

Facility / Site: TATAOUINE Location within Site: TATAOUINE Permit No: Permit Type: Date:

Task Description: Electrical installation

REQUIRED REFERENCES JSA REVIEW


Have the relevant Procedures, Standards, Guidelines,
or Safe Work Practices been reviewed? Yes N/A Pending confirmation by the Task Leader of site conditions, I agree that the attached JSA identifies the
significant Task Steps, Hazards, and Controls.

JSA REVIEWER (Supervisor or Designate):


RISK ASSESSMENT
Must existing Procedures or Work Practices be
Yes No Name / Signature: RAOUANE AMINE Company: SOCOBAT
modified to perform this work?
After mitigation, are there any hazards that continue to WORK SITE VERIFICATION
present a potentially significant risk? (Scenario-Based Yes No
Risk Assessment required)
The Work Team has assessed the worksite conditions and confirms:
 The JSA addresses the applicable hazards and necessary controls.
PPE REQUIRED DURING THIS TASK
 The Team has the appropriate resources (people and equipment) to do the job safely.
HARD HAT SAFETY GLASSES
 Others that could be affected by the work have been informed.
FACE SHIELD TASK LEADER:
SAFETY SHOES / BOOTS
GOGGLES

Name / Signature: Company:


FALL PROTECTION GLOVES:
FALL RESTRAINT
COTTON COMPLETE THE SECTION BELOW IF THIS JSA IS NOT PART OF A PERMIT PACK
LEATHER
IMPACT PROTECTION
Work Team Declaration:
OTHER (specify): I acknowledge that I have reviewed the attached JSA, I understand my roles
and responsibilities, and I will comply with the instructions for this task.
Name (print): Name (print):
Dust mask
Work clothes

OTHER PPE (specify): High Vis Jacket


[Tapez ici]

TASK STEPS POTENTIAL HAZARDS HAZARDS CONTROLS HAZARD PORT


(Number) (What could go wrong?) (How can harm be prevented?) MITIGATION STATES
1. Electrical work: Slips trips and fall Check The Work Area to avoid Slips Trips Eni ERP
Approach the equipment Torsion /back injury /hernia Fall. First aider in the site
(electric panels, hand tool, Hand injury Two person at least to carry the heavy loads First aid kit available
cable power tools) to work PPE
spot (manual handling)
- Ensure work area is clear of other Eni ERP
workers. First aider in the site
- User shall wear a hard hat, eye First aid kit available
protection, and ear plugs.
- Use dust-free power tools in good
condition, and
- have dust masks available for
workers who might
- Falling/Flying Debris - want to use one in addition to the
- Harmful Dust (Silica) other hazard
- Tool Malfunction - Controls.
- Electric Shock - Plug into a protected outlet.
2. Work of Piercing
- Loss of Control Over Tool - Make sure that cords are not lying in
- Vibratory Fatigue water.
- Excessive Noise - The drill operator should use any
- Looseness Perforator bit auxiliary Handles that are on the drill
to maintain control.
- The drill operator should make sure
that he sets his feet properly before
beginning to drill or chip.
Take regular breaks from drilling or switch
with another worker (if drilling for a
prolonged period of time) to relieve fatigue.

3. Pulling the cable and Wrong posture while pulling Apply the right manual handling posture Eni ERP
connect with junction box Back injuries Full PPE First aider in the site
First aid kit available

Electrical failure, electric shocks Fire extinguishers / First aid kit Eni ERP
Injuries wounds Check the equipment prior to start the work First aider in the site
Fire Use appropriate PPE while using the drill First aid kit available
4. Lighting installation Burns machine
Falling from height Only qualified personal to carry out the task
Incompetent personal To ensure cables are positioned as per as
Noise and dust producing by drill machine electrical installation plan
[Tapez ici]

5. Electrical Panel erection Severe personnel injury, cutting finger, fatigue Use all PPE Eni ERP
and fixing: to the worker, fatality. Good supervision First aider in the site
Fixing the nuts and bolts. First aid kit First aid kit available
(Hand tools)
Connected the electrical Electric failure, electric shocks Use all PPE Eni ERP
cable, Panels, junction box Injuries wounds Good supervision First aider in the site
with Generator Fire and burns First aid kit First aid kit available
Only qualified personal to be onsite
Warning tapes to be installed to avoid
unauthorized personals entry
Ensure earthing is grounded and fire
extinguishers on place

6. Commissioning/ Energizing Equipment/ Asset damage Ensure equipment is certified Eni ERP
the installed electrical Electric shock/ Electrocution/ Fire/ Explosion Work shall be carried as per PTW procedure First aider in the site
equipment Unidentified or non certified equipment. Strictly follow electrical procedure First aid kit available
Hazardous area Follow Manufacturer instruction.
Incompetent person. Deploy qualified and competent electrical
person.

Slips, Trips Eni ERP


Good Housekeeping and keep all area free
Back injury First aider in the site
7. End Job and Housekeeping from hazard
First aid kit available

Position Date Signed


Prepared By Site supervisor

Checked By RAOUANE AMINE Area HSSE Supervisor


Approved By PTW Coordinator