DAILY PROGRESS REPORT

CHAMKANI DEPOT No. : DPR-CH-20200103


(DAY SHIFT)

PESHAWAR SUSTAINABLE BUS RAPID TRANSIT CORRIDOR PROJECT


1 Contractor: ANHUI-CALSONS (JV) 2 Weather Conditions: Sunny (Clear Sky)
3 Date: 03/01/2020 4 Start Time: 8:00 AM 5 End Time: 8:00 PM 6 Max Temp: 24°C 7 Min Temp: 15°C

MANPOWER (SITE SUPERVISION) MACHINERY / EQUIPMENT


No. Description Qty Remarks No. Description Serial Working Non-Work. Total Remarks
1 General Manager 1 1 Excavator 1 - 1
2 Deputy Project Manager 1 2 Concrete pump 1 - 1
3 Construction Manager 1 3 Concrete Batching Plant 1 - 1
4 Planning Engineer - 4 Loader 1 1 2
5 GM office support 3 5 Transit Mixer 1 3 4
6 Account office 3 6 Auto level / Total Station 2 - 2
7 Site Engineer 7 7 Generator 2 - 2
8 Site Supervisor+Asst 5 8 Crane 1 - 1
9 Quantity office 3 9 Grader 1 - 1
10 HSE Staf 2 10 Pickup 3 - 3
11 Social Mobilizer - 11 Water Bowser 2 1 3
12 First Aider 1 12 Steel Cutting Machine 2 - 2
13 Electrical Staf 1 13 Steel Bending Machine 2 - 2
14 Lab Technician/ Helper 3 14 Tractor Trolley 2 - 2
15 Store Keeper/ Helper 3 15 Welding Plant 3 1 4
16 Foreman 1 16 Roller 1 - 1
17 Surveyor + Assistants 5 17 Broomer 2 - 2
18 Mechanical Staf 9 18 Dewatering Pump 1 3 4
19 - - 19 Concrete Vibrator - 4 4
20 - - 20 Concrete breaker - 2 2
Total Site Supervision Staf 49 Total Machinery / Equipment 29 15 44

SKILLED / UN-SKILLED WORK FORCE SITE ACTIVITIES


No. Description Qty Remarks No. Location Chainage Activity Description
1 Scafolders 11 1 KPUMA Plumbing, Paint, electrical work, VRF
2 Painters 9 2 Workshop Paint, Electrical, Repair
3 Driver 11 3 Park & Ride Form work & Reinforcement, Brick Work
4 Plumber+welders 4 4 BS 00 & Roads Repair Works
5 Steel Fixer 15 5 Substation WAPDA Plaster Work
6 Carpenter 14 6 Rest areas CCTV & Repair Works
7 Labor 45 7 Internal B/Wall Electrical Works
8 HVAC Labor 4 8 External B/Wall Repair Works
9 Batching Plant staf 3 9 Septic Tank Depot -
10 Repair workers 9 10 Washbay 3 Plaster Work
11 Mason + Helpers 18 11 TireShop MS Columns
12 Electrician 21 12 WWTP Plant Instalaltion & Back Filling
13 Office Boy 4 13 Depot Parking Area Kerb Stone
14 Cleaner 4 14 Inspection Area Welding
Total Labour Force: ###
Total No of Personnel On-Site 221

Contractor (PM): Consultant (RE):

Name: M.Raees Ghazi Name: COL (R) Khan Bahadar


DAILY PROGRESS REPORT
CHAMKANI DEPOT No. : DPR-CH-20200103
(DAY SHIFT)

PESHAWAR SUSTAINABLE BUS RAPID TRANSIT CORRIDOR PROJECT

Figure 1: Park & Ride Slab Formwork & Reinforcement Figure 2: Park & Ride Slab Conduiting

Figure 3: Low Quality Brick Work Removed Park & Ride Figure 4:

Figure 5: Figure 6:

Contractor (PM): Consultant (RE):

Name: M.Raees Ghazi Name: COL (R) Khan Bahadar


DAILY PROGRESS REPORT
CHAMKANI DEPOT No. : DPR-CH-20200103
(NIGHT SHIFT)

PESHAWAR SUSTAINABLE BUS RAPID TRANSIT CORRIDOR PROJECT


1 Contractor: ANHUI-CALSONS (JV) 2 Weather Conditions: Clear Sky
3 Date: 03/01/2020 4 Start Time: 8:00 PM 5 End Time: 8:00 AM 6 Max Temp: 18°C 7 Min Temp: 10°C

MANPOWER (SITE SUPERVISION) MACHINERY / EQUIPMENT


No. Description Qty Remarks No. Description Serial Working Non-Work. Total Remarks
1 Project Manager/GM - 1 Excavator - 1 1
2 GM office support 1 2 Concrete pump - 1 1
3 Construction Manager - 3 Concrete Batching Plant 1 1 2
4 Accounts office 1 4 Loader 1 1 2
5 Surveyor + Helper 2 5 Transit Mixer - 5 5
6 Cad Operator - 6 Auto level 1 1 2
7 Site Engineer - 7 Generator 2 - 2
8 Site Supervisor 1 8 Tower light - - -
9 Quantity Surveyor - 9 Total Station - 1 1
10 HSE Staf 1 10 Pickup - - -
11 Office Boy 1 11 Water Bowser - 2 2
12 First Aider 1 12 Steel Cutting Machine - 2 2
13 Electrical Engineer - 13 Steel Bending Machine - 2 2
14 Lab Technician/ Helper 2 14 Tractor Trolley - 1 1
15 Store Keeper + Helper 1 15 Welding Plant - 1 1
16 Foreman - 16 Roller - 1 1
17 MEP Staf 1 17 Broomer - 1 1
18 - - 18 Concrete Cutting Machine - 2 2
19 - - 19 Concrete Vibrator - 3 3
20 - - 20 Concrete breaker - 2 2
Total Site Supervision Staf 12 Total Machinery / Equipment 5 28 33

SKILLED / UN-SKILLED WORK FORCE SITE ACTIVITIES


No. Description Qty Remarks No. Location Chainage Activity Description
1 Scafolders 3 1 Park & Ride -
2 Painters - 2 Depot Area Kerb Stone Lean
3 Driver 3 3 WashBay -
4 Plumber - 4 Drain 8 -
5 Steel Fixer 6 5 I.Roads & BS 00 -
6 Carpenter - 6 Drain 7 Walls Concrete
7 Labor 4 7 Docking Area -
8 Welder+HVAC -
9 Batching Plant staf 3
10 helpers 1
11 Mason -
12 Mason Helper -
13 Electrician 1
14 Office boy 1
Total Labour Force: 22
Total No of Personnel On-Site 34

Contractor (PM): Consultant (RE):

Name: M.Raees Ghazi Name: COL (R) Khan Bahadar


DAILY PROGRESS REPORT
CHAMKANI DEPOT No. : DPR-CH-20200103
(NIGHT SHIFT)

PESHAWAR SUSTAINABLE BUS RAPID TRANSIT CORRIDOR PROJECT

Figure 1: Manhole Slab Concrete Sewerage Line Near KPUMA Figure 2:

Figure 3:

Contractor (PM): Consultant (RE):

Name: M.Raees Ghazi Name: COL (R) Khan Bahadar