CLASS QUANTU
TYPE OF REFERENCE ACCEPTANCE FORMAT OF
S.No ACTIVITY CHARACTERISTICS OF M OF REMARKS
CHECK DOCUMENT NORMS RECORD
CHECK CHECK
1 2 3 4 5 6 7 8 9 D*
A Raw Materials and Consumables
Raw Materials
Client Approved
Drawings/ NDT
UT ( Plates 16 mm and above) Test C,A 100% ASTM 578 Level -B Insp. Report √
Procedure/
ASME SEC-V
Client Approved
UT Drawings/ NDT
Test C,A,E 100% ASTM - 388 Insp. Report √
( Rod dia 50 mm and above) Procedure/
ASME SEC-V
Project technical
Visual, Review Approved make: as per Project
A.3 Consumables- Paints Chemical properties C,A 100% specification/Client Manufacturer data sheet BTC √
of MTC/BTC technical specification.
Approved Drawings
Manufacture specification/
Project technical
Consumables- Chemical and Mechanical Visual, Review Project technical BTC/ Lab test
A.4 C,A 100% specification / Client √
Grouting Materials properties of MTC/BTC specification/ Client report
approved Drawing
approved Drawing
Project technical
Visual, Project technical In case of Lab test sample shall be
Consumables- Chemical and Mechanical specification / Client MTC/ Lab test
A.5 measurement, C , A,E 100% specification / Client √ selected by client and testing to be
fasteners properties approved Drawing / Report
testing approved Drawing done in client approved NABL LAB.
Relevant standards
Page 1 of 6
FIELD QUALITY PLAN
PROJECT: DEVELOPMENT OF DRY BULK TERMINAL OF TEKRA,TUNA
CLIENT: ADANI KANDLA BULK TERMINAL PVT LIMITED
CONTRACTOR: L&T Construction
FQP NO: AKBTPL/L&T/MHS/CON/FAB/QAP-001 REV No-00
ITEM: STRUCTURAL FABRICATION OF CONVEYING SYSTEM
CLASS QUANTU
TYPE OF REFERENCE ACCEPTANCE FORMAT OF
S.No ACTIVITY CHARACTERISTICS OF M OF REMARKS
CHECK DOCUMENT NORMS RECORD
CHECK CHECK
1 2 3 4 5 6 7 8 9 D*
B Procedures
Establishment of
B.1 Qualification Visual & Testing C,A,E 100% ASME SEC - IX ASME SEC - IX WPS,PQR √
WPS,PQR
B.2 Welder Qualification Qualification Visual & Testing C,B,A,E 100% ASME SEC - IX ASME SEC- IX Welder cards √
Project technical
spectification/Client
Approved Drawing/ISO
Project technical 12944/ ISO 8501/
Client Approved
B.3 Painting Procedure Approval Review C,A,E,F 100% spectification/Client ASTM-D-3359/ √
Procedure
Approved Drawing SSPC PA-2 /
ISO 8504/manufacturer
data sheet/ ISO 8502
Project technical
Client approved Drawing,
specification/Client Client Approved
B.5 NDT Procedure Approval Review C,A,E 100% AWS D1.1,Project technical √
approved Drawing, Procedure
specification, ASME SEC V
ASME SEC V
Page 2 of 6
FIELD QUALITY PLAN
PROJECT: DEVELOPMENT OF DRY BULK TERMINAL OF TEKRA,TUNA
CLIENT: ADANI KANDLA BULK TERMINAL PVT LIMITED
CONTRACTOR: L&T Construction
FQP NO: AKBTPL/L&T/MHS/CON/FAB/QAP-001 REV No-00
ITEM: STRUCTURAL FABRICATION OF CONVEYING SYSTEM
CLASS QUANTU
TYPE OF REFERENCE ACCEPTANCE FORMAT OF
S.No ACTIVITY CHARACTERISTICS OF M OF REMARKS
CHECK DOCUMENT NORMS RECORD
CHECK CHECK
1 2 3 4 5 6 7 8 9 D*
C Fabrication
Client Approved
Pre-fabrication fit up Visual Client Approved Drawing,
Visual and Dimensional ( Drawing,WPS, IS
C.3 and tack weld and C,B 100% WPS,IS 7215,AWS Inspection Report √
Size and Joint configuration) 7215,AWS D1.1,Client
wherever required Measurement D1.1,Client approved WPS
approved WPS
Client Approved
Visual and Dimensional Visual Client Approved Drawing,
Drawing, IS 7215,AWS
C.4 Inspection of welding ( Bead height, fillet and C , B , A,E,F 100% IS 7215,AWS D1.1,Client Inspection Report √
D1.1,Client approved
size,reinforcement etc) Measurement approved WPS
WPS
D NDT
Page 3 of 6
FIELD QUALITY PLAN
PROJECT: DEVELOPMENT OF DRY BULK TERMINAL OF TEKRA,TUNA
CLIENT: ADANI KANDLA BULK TERMINAL PVT LIMITED
CONTRACTOR: L&T Construction
FQP NO: AKBTPL/L&T/MHS/CON/FAB/QAP-001 REV No-00
ITEM: STRUCTURAL FABRICATION OF CONVEYING SYSTEM
CLASS QUANTU
TYPE OF REFERENCE ACCEPTANCE FORMAT OF
S.No ACTIVITY CHARACTERISTICS OF M OF REMARKS
CHECK DOCUMENT NORMS RECORD
CHECK CHECK
1 2 3 4 5 6 7 8 9 D*
F Surface preparation and Painting
Project technical
Project technical
specification/ Client
Visual specification/ Client Insp. Report/
Surface preparation -Visual and Approved Drawings/ Client
F.1 & C , B , A,E 100% Approved Drawings/ Painting Log √
surface profile approved painting
Measurement Client approved book
procedure/ Manufacturer
painting procedure
data sheet
Project technical
Project technical
specification/ Client As per recommendation of Client and
specification/ Client
F.2 Salt Deposition test Test C , A,E Random approved painting Inspection Report √ Random selection by Client as per JOB
approved painting
procedure/ Manufacturer and site condition.
procedure
data sheet
Project technical
Project technical
specification/Client
Visual specification/ Client Inspection
Approved Drawings/Client
F.3. Primer Coat & C ,B 100% Approved Drawings/ Report/Painting √
approved painting
Measurement Client approved log book
procedure/ Manufacturer
painting procedure
data sheet
Surface Preparation
and Painting. Project technical
Project technical
specification/Client
Visual specification/ Client Inspection
Approved Drawings/Client
F.4 Intermediate Coat & C ,B 100% Approved Drawings/ Report/Painting √
approved painting
Measurement Client approved log book
procedure/ Manufacturer
painting procedure
data sheet
Project technical
Project technical
specification/ Client
Visual specification/ Client Inspection
Approved Drawings/ Client F-2 Coat after Jet water wash cleaning
F.5 Final Coat & C,A 100% Approved Drawings/ Report/ Painting √
approved painting and erection.
Measurement Client approved log book
procedure/ Manufacturer
painting procedure
data sheet
Project technical
Project technical
specification/ Client
Adhesion Test specification/ Client Random test to be carried out as per
F.6 Test C,A Random approved painting Inspection Report √
( X Cut & Dolly) approved painting instruction of client engineer
procedure/ Manufacturer
procedure
data sheet
Page 4 of 6
FIELD QUALITY PLAN
PROJECT: DEVELOPMENT OF DRY BULK TERMINAL OF TEKRA,TUNA
CLIENT: ADANI KANDLA BULK TERMINAL PVT LIMITED
CONTRACTOR: L&T Construction
FQP NO: AKBTPL/L&T/MHS/CON/FAB/QAP-001 REV No-00
ITEM: STRUCTURAL FABRICATION OF CONVEYING SYSTEM
CLASS QUANTU
TYPE OF REFERENCE ACCEPTANCE FORMAT OF
S.No ACTIVITY CHARACTERISTICS OF M OF REMARKS
CHECK DOCUMENT NORMS RECORD
CHECK CHECK
1 2 3 4 5 6 7 8 9 D*
G Erection & Alignment
Visual,welding,painting and
Assembly of structure Dimensional Visual Inspection
Client Approved Client Approved Drawing
G.1 at ground before ( Elevation, orientation, and C,B,E Random Report/ √
Drawing and IS 7215
erection projection, level, Measurement REGISTER
alignment,straightness etc.)
Check for dimension, Level, Visual Client Approved Civil
Client Approved Civil and Joint Inspection joint inspection with civil, mechanical
G.2 Civil Foundation Alignment and Straightness and C,B,A 100% and Mechanical √
Mechanical Drawing protocol contractor and client
etc. measurement Drawing
After Erection Visual
Client Approved
(1) Verticality, Horizontality, ,mesurment,lev Client Approved drawing,
Visual drawing, IS Inspection report/
G.3 Elevation, C/C C,B,A 100% IS 7215/IS 12843/client √
and 7215/IS 12843/client Protocol
distance,alignment,level Approved procedure
Measurement Approved procedure
,straightness etc.
Page 5 of 6
FIELD QUALITY PLAN
PROJECT: DEVELOPMENT OF DRY BULK TERMINAL OF TEKRA,TUNA
CLIENT: ADANI KANDLA BULK TERMINAL PVT LIMITED
CONTRACTOR: L&T Construction
FQP NO: AKBTPL/L&T/MHS/CON/FAB/QAP-001 REV No-00
ITEM: STRUCTURAL FABRICATION OF CONVEYING SYSTEM
CLASS QUANTU
TYPE OF REFERENCE ACCEPTANCE FORMAT OF
S.No ACTIVITY CHARACTERISTICS OF M OF REMARKS
CHECK DOCUMENT NORMS RECORD
CHECK CHECK
1 2 3 4 5 6 7 8 9 D*
Project technical Project technical
Water mix ratio, Cleanliness of Visual &
specification/Client specification/ Client Insp.Report/ Lab
H Grouting pour, compressive strength, Compression C,B,A 100% √
approved drawings approved drawings test report
Curing test
/Manufacturer's spec. /Manufacturer's spec.
Align, Level, straightness, Visual and Client Approved Client Approved Drg/ Tech
I Sheeting C,B,A,F 100% Insp.Report √
Fastening,etc measurement Drg/Tech Spec Spec, IS 277
Align, Level, straightness, Visual and Client Approved Client Approved Drg/ Tech
J Final inspection C,B,A,E,F 100% Insp.Report √
Fastening,etc measurement Drg/Tech Spec Spec
NOTE:CORROSION PROTECTION SPECIFICATION NO:ADANI/P001 REV.00 SHALL BE REFERRED AND IMPLEMENTED WHEREVER APPLICABLE.
L&T AKBTPL IE
Sign. Sign. Sign.
Name : Name Name
Date Date Date
LEGEND :-
1) D*: Records identified with ‘TICK’ (p) shall essentially be included by Supplier in QA Documentation.
2) Legend used for Class of check are A, B ,C, E & F
• ‘A’ class of check shall be witnessed by Organization's FQA, Surveillance by Project Quality Manager Head Quality
• ‘B’ class of check shall be witnessed by Organization's Executing Dept and Surveillance by Organization's/ FQA Engineer
• ‘C’ class of check shall be witnessed by Contractor’s FQA and Surveillance by Concerned Executing Engineer of the organization for the respective work package.
D Document Review,E- Document Review by IE, F- Random Witness by IE
‘A’ and ’B’ class of checks shall be Organization's Customer Hold Points (H) stage.
H: “Customer Hold Point” to be witnessed and work shall not proceeded till it is witnessed and cleared by Organization.
TC: Manufacturer’s Test Certificate; SR: Site Register; TR: Test Report; LB: Lab Report,Organization:AKBTPL
All tests shall be carried out as per BIS or equivalent international standards as per Concession Agreement.All QAPs are to be signed by AKBTPL before submission to I.E.
Page 6 of 6