Академический Документы
Профессиональный Документы
Культура Документы
descriptio
referred
ns
to in the
provided
drawings
are
and
SUMMA
indicative
specificati
only.
RY OF
ons
PRICES in
Contracto
accordanc
r shall
e with the
verified
General
and
Condition
satisfied
sthemselvand
Preliminar
es by
ies
doing is
site
made
inspectio up
of
n the
and
complete
measure
ItemAny
Supply,
ment. Description Amount (RM)
Installatio
additional
n,
worksTesting
and 1 General and Preliminaries
where not
putting
specified
into
in 2 Fire Fighting Work
Commissi
anywhere
oning2.1 Hose Reel System
and
2.2
deemed Fire Alarm System
necessary
2.3 Fixed CO2 Extinguishing System
to 2.4 Automatic Sprinkler System
complete
the 2.5
whole Hydrant System
wor
3 Air-conditioning & Ventilation Work
4 Electrical Work
6.1 11kV System
6.2 LV Switch Board and Sub-main Cabling
6.3 Lighting and Small Power
6.4 Lightning Protection System (Option 1)
6.5 TNB Sub-station
Name
Signature
ofDuly
authorise
Witness
d toName
sign
Contract
of
Witness
Date SOP-1
I.C. No. of
Witness
for
and on
Date
behalf of
SCHE
DULE
OF
PRICE
Unit Rate
Item Description Qty Unit Amount (RM)
(RM)
1.16 Temporary toilet and sewerage treatment tank subject Lump Sum
to Engineer's approval.
1.17 Security services by employing guard person until the Lump Sum
completion of project
SOP-4
SCHE
DULE
OF
PRICE
Unit Rate
Item Description Qty Unit Amount (RM)
(RM)
1.16 Temporary toilet and sewerage treatment tank subject Lump Sum
to Engineer's approval.
1.17 Security services by employing guard person until the Lump Sum
completion of project
SOP-3
Item Description
Sub-total brought from previous page
1.22 Liaison with relevant Authorities for inspections and to obtain all approval and certifica
Notes:
b) Liaison with authorities as stipulated above implies the following:
i) For electrical work, arranging for TNB to install cables from the TNB sub-station to the site , to submit form for appl
b) For Telephone work, informing Telekom before starting work, arranging for inspection after completion, prepare &
c) For fire fighting work, liaison with Jabatan Bomba including arranging for Bomba inspection, and obtaining of suppo
d) For street lighting work, liaison with Majlis Perbandaran Nilai including arranging for Street Lighting inspection, and
e) For TNB work, liaison with Majlis Perbandarran Nilai including arranging for road excavation permit inspection for T
f) Signing of relevant CCC form are included in the scope of work
g) Fire barriers between floor slabs at M&E risers are included in the scope of work
Sub-total to be carried forward to Page SOP-1
Qty Unit Unit Rate (RMAmount (RM)
Lump Sum
on to the site , to submit form for application of permanent supply, and assist client to make relevant payment to TNB for meter deposit if
nspection after completion, prepare & submit of As-built drawings to Telekom, obtaining of Letter of Acceptance other work as necessary
mba inspection, and obtaining of supporting letters for application of CCC is included in the scope of work of this tender.
ging for Street Lighting inspection, and obtaining of supporting letters for application of CCC is included in the scope of work of this tender.
road excavation permit inspection for TNB cable laying, and obtaining of supporting letters for application of CCC is included in the scope of
o TNB for meter deposit if required and other work as necessary
other work as necessary
6 Nos
Lump Sum
Lump Sum
2 Nos
1 No
1 No
1 No
1 No
1 No
Lump Sum
Lump Sum
1 Lot
6 Nos
Lump Sum
Lump Sum
Item Description
Sub-total brought from previous page
c) Nozzles
d) Heat Detectors
e) Smoke Detectors
f) Manual pull station
g) Warning Light
h) Alarm Bell
i) Warning Sign
j) Wiring in conduits linking detectors, warning light, alarm bells, discharge valve assembly,
k) Fire curtain c/w tripping device and supports
0 Switch Gear Room
a) 45 kg CO2cylinders, pilot cylinders c/w gas, solenoid valves, installation of CO2, supports
b) Painted pipeworks schedule 40/80 c/w mounting brackets and supports for
i) 32mm
ii) 25mm
c) Nozzles
d) Heat Detectors
e) Smoke Detectors
f) Manual pull station
g) Warning Light
h) Alarm Bell
Sub-total to be carried forward to next page
Qty Unit Unit Rate (R Amount (RM)
2 Nos
1 No
1 No
1 No
1 No
1 No
Lump Sum
Lump Sum
1 Lot
5 Nos
Lump Sum
Lump Sum
2 Nos
1 No
1 No
1 No
1 No
1 No
Item Description
Sub-total brought from previous page
i) Warning Sign
j) Wiring in conduits linking detectors, warning light, alarm bells, discharge valve assembly,
k) Fire curtain c/w tripping device and supports
0 Control Board Room 1
a) 45 kg CO2cylinders, pilot cylinders c/w gas, solenoid valves, installation of CO2, supports
b) Painted pipeworks schedule 40/80 c/w mounting brackets and supports for
i) 50mm
ii) 40mm
iii) 32mm
iv) 25mm
c) Nozzles
d) Heat Detectors
e) Smoke Detectors
f) Manual pull station
g) Warning Light
h) Alarm Bell
i) Warning Sign
j) Wiring in conduits linking detectors, warning light, alarm bells, discharge valve assembly,
k) Fire curtain c/w tripping device and supports
Sub-total to be carried forward to next page
Qty Unit Unit Rate (R Amount (RM)
Lump Sum
Lump Sum
1 Lot
31 Nos
Lump Sum
Lump Sum
Lump Sum
Lump Sum
36 Nos
5 No
3 No
1 No
1 No
1 No
Lump Sum
Lump Sum
13 Lot
Item Description
Sub-total brought from previous page
0 Control Board Room 2
a) 45 kg CO2cylinders, pilot cylinders c/w gas, solenoid valves, installation of CO2, supports
b) Painted pipeworks schedule 40/80 c/w mounting brackets and supports for
i) 50mm
ii) 40mm
iii) 32mm
iv) 25mm
c) Nozzles
d) Heat Detectors
e) Smoke Detectors
f) Manual pull station
g) Warning Light
h) Alarm Bell
i) Warning Sign
j) Wiring in conduits linking detectors, warning light, alarm bells, discharge valve assembly,
k) Fire curtain c/w tripping device and supports
0 Testing & Commissioning
Sub-total to be carried forward to Page SOP-1
Qty Unit Unit Rate (R Amount (RM)
24 Nos
Lump Sum
Lump Sum
Lump Sum
Lump Sum
26 Nos
3 No
2 No
1 No
1 No
1 No
Lump Sum
Lump Sum
1 Lot
Lump Sum
Item Description
2.4 Sprinkler System (OH3 @30m)Supply and installation of complete system comprising of the major components.
a) Electric Sprinkler Pump OH3 @30m c/w orifice plate, check valves, gate valves, flexible join
b) Diesel Sprinkler Pump OH3 @30m c/w orifice plate, check valves, gate valves, flexible joints
c) Jockey Pump with Capacity : 250L/min @ 5.0 bars c/w flexible joints, y-strainers, anti-vibr
d) Pump Control Panel c/w all necessary wiring and accessories.
e) 250 mm ND black steel class 'C' pipe conforming to BS 1387 from water tank to pumps c/w v
f) Concrete sprinkler tank accessories c/w painting, level indicators, vent pipes, warning pi
g) Stainless Steel Electrode Sensor c/w all necessary wiring
h) 200 mm ND black steel class 'C' pipe conforming to BS 1387 from pumps to installation alar
i) Installation alarm valve(3 set) conforming to LPC requirement inclusive of stop valves, a
Sub-total to be carried forward to next page
Qty Unit Unit Rate (R Amount (RM)
prising of the major components.
1 Set
1 Set
1 No
1 Lot
Lump Sum
Lump Sum
Lump Sum
Lump Sum
1 Lot
Item Description
Sub-total brought from previous page
j) 4 way Breeching Inlets with cabinet and accessories including pipework to sprinkler tank
k) 200 mm ND black steel class 'C' pipe c/w bituminous wrapping conforming to BS 1387 from
l) Black steel class 'B' pipe conforming to BS 1387 from 200mm ND class 'C' pipe to zone butterfly valve FS1, FS2, FS3,
i) 200mm ND pipe
ii) 150mm ND pipe
iii) 100mm ND pipe
iv) 80mm ND pipe
m) Flow switches and butterfly valves c/w monitor switches, flow switches, test lines, drain v
n) Zone 1Sprinkler Black steel pipe (Class B) pipes c/w supports, fittings, reducers, tees, bends, drain pipe and valves a
i) 150mm ND pipe
ii) 100mm ND pipe
iii) 80mm ND pipe
iv) 65mm ND pipe
v) 50mm ND pipe
vi) 40mm ND pipe
vii) 32mm ND pipe
viii) 25mm ND pipeZone 2
i) 150mm ND pipe
ii) 100mm ND pipe
iii) 80mm ND pipe
iv) 65mm ND pipe
v) 50mm ND pipe
vi) 40mm ND pipe
vii) 32mm ND pipe
viii) 25mm ND pipe
Sub-total to be carried forward to next page
Qty Unit Unit Rate (R Amount (RM)
1 Lot
Lump Sum
to zone butterfly valve FS1, FS2, FS3, FS4, FS5, FS6, FS7, FS8 c/w supports, long bends, tees, fittings and accessories for the following pipe s
Lump Sum
Lump Sum
Lump Sum
Lump Sum
8 Lot
s, tees, bends, drain pipe and valves and accessories from the following subsidiary stop valve
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
ories for the following pipe size
Item Description
Sub-total brought from previous page
Zone 3
i) 150mm ND pipe
ii) 100mm ND pipe
iii) 80mm ND pipe
iv) 65mm ND pipe
v) 50mm ND pipe
vi) 40mm ND pipe
vii) 32mm ND pipe
viii) 25mm ND pipe
Zone 4
i) 150mm ND pipe
ii) 100mm ND pipe
iii) 80mm ND pipe
iv) 65mm ND pipe
v) 50mm ND pipe
vi) 40mm ND pipe
vii) 32mm ND pipe
viii) 25mm ND pipe
Zone 5
i) 150mm ND pipe
ii) 100mm ND pipe
iii) 80mm ND pipe
iv) 65mm ND pipe
v) 50mm ND pipe
vi) 40mm ND pipe
vii) 32mm ND pipe
viii) 25mm ND pipe
Zone 6
i) 150mm ND pipe
ii) 100mm ND pipe
iii) 80mm ND pipe
iv) 65mm ND pipe
v) 50mm ND pipe
vi) 40mm ND pipe
vii) 32mm ND pipe
viii) 25mm ND pipe
Sub-total to be carried forward to next page
Qty Unit Unit Rate (R Amount (RM)
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Item Description Qty Unit
Sub-total brought from previous page
i) ii) iii) iv) Zone 7150mm ND pipe 100mm ND pipe 80mm ND pipe 65mm ND pipeLump LumpSum Sum Sum Sum Sum Sum Su
Sub-total to be carried forward to Page SOP-1
Unit Rate (RM)Amount (RM)
um Sum Sum Sum Sum Sum Sum Sum Sum Sum Sum Sum Sum Sum Sum Sum No. No. No Sum
Item Description Qty Unit
2.5 I) j) k) i)Fire Hydrant SystemTesting & Commissioning Supply and installation o 3 Lump Set Sum
Sub-total to be carried forward to Page SOP-1
Unit Rate (RM)Amount (RM)
Item Description Qty
3 Air Cooled Conditioner Unit
3.1 Wall Mounted/Ceiling Cassette air-cooled split air conditioners c/w out-doors unit, filter, supports, bracket, frame, t
0 AC-1 (Nominal Capacity : 18,000 Btu/h) 1
0 AC-2 (Nominal Capacity : 9,500 Btu/h) 1
0 AC-3 (Nominal Capacity : 9,500 Btu/h) 1
0 AC-4 (Nominal Capacity : 9,500 Btu/h) 1
0 AC-5 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-6 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-7 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-8 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-9 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-10 (Nominal Capacity : 18,500 Btu/h) 1
0 AC-11 (Nominal Capacity : 18,500 Btu/h) 1
0 AC-12 (Nominal Capacity : 18,500 Btu/h) 1
0 AC-13 (Nominal Capacity : 18.500 Btu/h) 1
0 AC-14 (Nominal Capacity : 18,500 Btu/h) 1
0 AC-15 (Nominal Capacity : 18,500 Btu/h) 1
0 AC-16 (Nominal Capacity : 9,500 Btu/h) 1
0 AC-17 (Nominal Capacity : 9,500 Btu/h) 1
0 AC-18 (Nominal Capacity : 9,500 Btu/h) 1
0 AC-19 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-20 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-21 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-22 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-23 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-24 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-25 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-26 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-27 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-28 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-29 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-30 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-31 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-32 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-33 (Nominal Capacity : 12,500 Btu/h) 1
Sub-total to be carried forward to next page
Unit Unit Rate (RMAmount (RM)
supports, bracket, frame, thermostat, digital temperature setting, refrigerant R32 and control devices for the following
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Item Description Qty
Sub-total brought from previous page
0 AC-34 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-35 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-36 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-37 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-38 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-39 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-40 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-41 (Nominal Capacity : 12,500 Btu/h) 1
3.2 Wiring from indoor to outdoor air-conditioners, control wiring, insulated refrigerant pipes (0.61mm Min) in trunkin
0 AC-1 (Nominal Capacity : 18,000 Btu/h) 1
0 AC-2 (Nominal Capacity : 9,500 Btu/h) 1
0 AC-3 (Nominal Capacity : 9,500 Btu/h) 1
0 AC-4 (Nominal Capacity : 9,500 Btu/h) 1
0 AC-5 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-6 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-7 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-8 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-9 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-10 (Nominal Capacity : 18,500 Btu/h) 1
0 AC-11 (Nominal Capacity : 18,500 Btu/h) 1
0 AC-12 (Nominal Capacity : 18,500 Btu/h) 1
0 AC-13 (Nominal Capacity : 18.500 Btu/h) 1
0 AC-14 (Nominal Capacity : 18,500 Btu/h) 1
0 AC-15 (Nominal Capacity : 18,500 Btu/h) 1
0 AC-16 (Nominal Capacity : 9,500 Btu/h) 1
0 AC-17 (Nominal Capacity : 9,500 Btu/h) 1
0 AC-18 (Nominal Capacity : 9,500 Btu/h) 1
0 AC-19 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-20 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-21 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-22 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-23 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-24 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-25 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-26 (Nominal Capacity : 12,500 Btu/h) 1
0 AC-27 (Nominal Capacity : 12,500 Btu/h) 1
Sub-total to be carried forward to next page
Unit Unit Rate (RMAmount (RM)
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
s (0.61mm Min) in trunking and insulated drain pipe to complete for the following:
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Item Description Qty Unit
Sub-total brought from previous page
3.2.28 3.2. AC-28 (Nominal Capacity : 12,500 Btu/h) AC-29 (Nominal Capacity1 1 1 1 1 1 Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot L
3.4 3.5 Testing & Commissioning of Air-conditioning system Supply and ins1 Lump Lot Sum
3.6 Comprehensive Service and maintenance of Air-conditioning unit Ldump Sum
3.7 a) b) Other items not mentioned but deemed necessary for satisfactory completion of the works :
Sub-total to be carried forward to Page SOP-1
Unit Rate (RM) Amount (RM)
t Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot
of the works :
Item Description Qty Unit
4.0 4.1 4.1. Electrical work 11kV System 11kV SwitchgearSupply, deliver, install, test, commission and maintain of 11kV, 630A, 3
i) ii) b) c) d HVB1 (1 in 1 out) HVB2 (1 in 1 out) Supply, deliver, install, test, commi 1 1 2 1 Lu lot lot lot lot Sum Sum
f) i) ii) Other items not specifically stated above but deemed necessary for satisfactory completion of the works :
Sub-total to be carried forward to next page
Unit Rate (RM) Amount (RM)
and maintain of 11kV, 630A, 3-phase, 3 wire, 50Hz, 20kA, 3sec metalclad floor standing switchgear complete with vacuum circuit breaker (
t lot lot lot Sum Sum
pletion of the works :
with vacuum circuit breaker (VCB) with motorised spring charge
Item Description Qty Unit
Sub-total brought from previous page
0 TransformerSupply, deliver, install, test, commission and maintain of 1 1 Lump Lot set Sum
0 11kV CablingSupply, deliver, install, test, commission and maintain of Lump m m Sum
Sub-total to be carried forward to next page
Unit Rate (RM) Amount (RM)
Item Description
Sub-total brought from previous page
4.2 LV Switchboard and Sub-main Cabling
0 Supply and install LV Cable on cable ladder c/w supports and accessories from transformer TX1 to Mai
0 Supply and install the metalclad floor mounted 50kA Main Switchboard MSB-1 complete with ci
0 Supply and install Cable in underground/on cable tray including excavation, backfilling with sand & compaction c/w
a) SSB-F1 by using 1x4C-95mm2XLPE/SWA/PVC Cu. Cable
b) SSB-F2 by using 1x4C-150mm2XLPE/SWA/PVC Cu. Cable
c) SSB-O by using 1x4C-150mm2XLPE/SWA/PVC Cu. Cable
d) SSB-U by using 1x4C-240mm2XLPE/SWA/PVC Cu. Cable
e) DB-FGF by using 4x1C-10mm2PVC Cu. Cable
f) SSB-U by using 1x4C-240mm2XLPE/SWA/PVC Cu. Cable
0 Supply and install metalclad 35kA TPN wall mounted Sub-Switchboard c/w circuit breakers, IDMT Earth Fault/Earth
a) SSB-F1
b) SSB-F2
c) SSB-U
d) SSB-O
f) DB-FGF
Sub-total to be carried forward to next page
Qty Unit Unit Rate (RMAmount (RM)
with sand & compaction c/w supports and accessories from Sub-Switchboard SSB-F1 to the following:
m
m
m
m
m
B-F2 to the following:
m
m
m
m
B-O to the following:
m
m
m
m
m
m
m
m
Item Description
Sub-total brought from previous page
0 Supply and install Cable c/w supports and accessories from Sub-Switchboard SSB-U to the following:
a) DB-UGA by using 4x1C-25mm2PVC Cu. Cable in MS trunking
b) DB-UGB by using 4x1C-25mm2PVC Cu. Cable in MS trunking
c) DB-U1A by using 4x1C-10mm2PVC Cu. Cable in MS trunking
d) DB-U1B by using 4x1C-10mm2PVC Cu. Cable in MS trunking
d) SSB-U2 by using 4x1C-50mm2PVC Cu. Cable in MS trunking
0 Supply and install metalclad 10kA TPN wall mounted Sub-Switchboard c/w circuit breakers, IDMT Earth Fault/Earth
a) SSB-O2
b) SSB-U2
0 Supply and install Cable c/w supports and accessories from Sub-Switchboard SSB-O2 to the following:
a) DB-RA by using 2x1C-6mm2PVC Cu. Cable in MS trunking (Rest Room 1)
b) DB-R by using 2x1C-6mm2PVC Cu. Cable in MS trunking (Rest Room 2)
c) DB-R by using 2x1C-6mm2PVC Cu. Cable in MS trunking (Rest Room 3)
d) DB-R by using 2x1C-6mm2PVC Cu. Cable in MS trunking (Rest Room 4)
d) DB-R by using 2x1C-6mm2PVC Cu. Cable in MS trunking (Rest Room 5)
e) DB-R by using 2x1C-6mm2PVC Cu. Cable in MS trunking (Rest Room 6)
f) DB-R by using 2x1C-6mm2PVC Cu. Cable in MS trunking (Rest Room 7)
g) DB-O2C by using 2x1C-6mm2PVC Cu. Cable in MS trunking (Common)
Sub-total to be carried forward to next page
Qty Unit Unit Rate (RMAmount (RM)
w circuit breakers, Earth Leakage Relay/RCCB, current transformers, full size busbars, time switch, contactors, control wiring, earthing system
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
6 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
18 Lot
1 Lot
1 Lot
d & compaction c/w supports, necessary bend and accessories for the following:
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
trol wiring, earthing system, supports and accessories for the f
Item Description Qty Unit
Sub-total brought from previous page
4.2.12 4.2. To supply and install fire man switch c/w all necessary wiring and acce Lump LumpSum Sum Sum
4.2.15 a) b)Other items not mentioned but deemed necessary for satisfactory completion of the works :
Sub-total to be carried forward to Page SOP-1
Unit Rate (RM) Amount (RM)
um Sum Sum
Item Description
4.3 Lighting and Small Power
0 Supply and install LED tube/down light point by using 2x1C1.5mm2+E PVC Cu. Cable in concealed high impact UPV
a) DB-FGA
b) DB-FGB
c) DB-FGC
d) DB-FGD
e) DB-FGE
f) DB-FGF
g) DB-FGG
h) DB-FGH
i) DB-OGA
j) DB-O1A
k) DB-O2C
l) DB-R
m) DB-RA
n) DB-UGA
o) DB-UGB
p) DB-U1A
q) DB-U1B
r) DB-U2C
s) DB-RB
t) DB-GH
0 Supply and install emergency/keluar sign light point by using 2x1C-1.5mm2+E PVC Cu. cable in G.I. conduit/M.S. tru
a) DB-FGA
b) DB-FGB
c) DB-FGC
d) DB-FGD
e) DB-FGE
f) DB-FGF
g) DB-FGG
h) DB-FGH
i) DB-OGA
j) DB-O1A
k) DB-O2C
l) DB-R
m) DB-RA
n) DB-UGA
Sub-total to be carried forward to next page
Qty Unit Unit Rate (RMAmount (RM)
able in concealed high impact UPVC conduit/M.S. trunking c/w supports, 10A light switch and other accessories to complete from the follo
2 No.
2 No.
8 No.
2 No.
24 No.
30 No.
28 No.
37 No.
92 No.
62 No.
15 No.
24 No.
5 No.
28 No.
45 No.
23 No.
23 No.
13 No.
90 No.
7 No.
VC Cu. cable in G.I. conduit/M.S. trunking c/w supports and other accessories to complete from the following distribution boards.
19 No.
21 No.
15 No.
15 No.
8 No.
8 No.
2 No.
4 No.
21 No.
16 No.
11 No.
6 No.
1 No.
11 No.
to complete from the following distribution board
tribution boards.
Item Description
Sub-total brought from previous page
o) DB-UGB
p) DB-U1A
q) DB-U1B
r) DB-U2C
0 Supply and install fluorescent light point by using 1x3C1.5mm2+E PVC/SWA/PVC Cu. Cable underground c/w suppo
a) DB-FGE
b) DB-UGA
c) DB-GH
0 Supply and install ceiling fan point by using 2x1C-1.5mm2+E PVC Cu. Cable in concealed high impact UPVC conduit/
a) DB-O2C
b) DB-R
c) DB-RA
d) DB-UGA
e) DB-UGB
f) DB-U1A
g) DB-U1B
h) DB-RB
i) DB-GH
0 Supply and install high bay light point by using 2x1C4.0mm2+E PVC Cu. Cable in concealed high impact UPVC condu
a) DB-FGA
b) DB-FGB
c) DB-FGC
d) DB-FGD
0 Supply and install LED compound light point by using 1x2C16mm2PVC/SWA/PVC Cu. Cables underground incl
Sub-total to be carried forward to next page
Qty Unit Unit Rate (RMAmount (RM)
14 No.
8 No.
8 No.
10 No.
C Cu. Cable underground c/w supports, 10A light switch and other accessories to complete from the following
2 No.
3 No.
2 No.
ncealed high impact UPVC conduit/M.S. trunking c/w fan hook, supports, 10A light switch and other accessories to complete from the follo
4 No.
6 No.
2 No.
6 No.
12 No.
15 No.
10 No.
36 No.
1 No.
concealed high impact UPVC conduit/M.S. trunking c/w supports, 10A light switch and other accessories to complete from the following d
55 No.
56 No.
48 No.
33 No.
C Cu. Cables underground incl
m
to complete from the following distribution board
ables in concealed high impact UPVC conduit/M.S. trunking c/w supports and other accessories to complete from the following distribution
9 No.
9 No.
es in concealed high impact UPVC conduit/M.S. trunking c/w 13A switch socket outlet and other accessories to complete from the followin
38 No.
26 No.
56 No.
84 No.
10 No.
48 No.
8 No.
16 No.
15 No.
8 No.
12 No.
108 No.
4 No.
es in concealed high impact UPVC conduit/M.S. trunking c/w 13A metal clad switch socket outlet and other accessories to complete from t
24 No.
24 No.
VC Cu. Cables in underground c/w 13A metal clad switch socket outlet and other accessories to complete from the following distribution bo
1 No.
1 No.
m the following distribution boards.
s in concealed high impact UPVC conduit to 2 pole switch c/w 2 pole switch with neon light and from 2 pole switch to indoor air-conditione
10 No.
3 No.
14 No.
14 No.
1 No
in concealed high impact UPVC conduit to 2 pole switch c/w 2 pole switch with neon light and from 2 pole switch to water heater point inc
6 No
1 No
18 No
u. Cables in concealed high impact UPVC conduit/M.S. trunking c/w accessories to complete from the following distribution board
1 No.
1 No.
2 No.
1 No.
tch to indoor air-conditioner including supports, terminations and
distribution board
Item Description Qty Unit
Sub-total brought from previous page
4.3.18 a) b) 100mm HDPE pipe 150mm G.I. Pipe cable marker 230W LED high bay light
Lumpfi LumpSum Sum Sum Sum No. No. No.
4.3.18 a) b)Other items not mentioned but deemed necessary for satisfactory completion of the works :
Sub-total to be carried forward to Page SOP-1
Unit Rate (RM) Amount (RM)
um Sum Sum Sum No. No. No. No. No. No. No. No. No. No. No.
Item Description Qty Unit
0 Lightning Protection SystemFactory, Utility Factory, Utility Factory, Uti Lump LumpSum Sum Sum Sum Sum Sum Su
b)
Sub-total to be carried forward to Page SOP-1
Unit Rate (RM) Amount (RM)
um Sum Sum Sum Sum Sum Sum Sum Sum Sum Sum
Item Description
4.5 TNB Sub-station
a) To supply and install the Electrical Switchboard DB-SS c/w meter board and cut out fuse, ear
b) To wire one light point from DB-SS by using 2x1C-1.5mm2+ E PVC Cu. cable in G.I. conduit c
c) To wire one power point from DB-TNB by using 2x1C2.5mm2+E PVC Cu. cable in G.I. conduit
d) To supply and install the following light fitting c/w accessories
i) 1x36W bare channel fluorescent light fitting c/w low loss ballast, capacitor, starter and acce
ii) 1x60W bulk head light fitting c/w wire guard and accessories
iii) 150W HPSV compound light fitting c/w 1.5 meter arm bracket, control gear and accessories
e) Supply and install 3x25 mm copper tape c/w support, clamps, joint and accessories as per
f) Supply and install 6 way earth terminal c/w support, clamps and accessories as per drawin
g) To supply and install earth chamber, heavy duty concrete cover, earth rod and accessories t
h) Supply and install the following as per TNB requirement.
i) Warning Sign Board
ii) Artificial Respiration Chart (CPR)
iii) 150mm HDPE Pipe
iv) TNB Metal Logo Plate
v) To fill trenches with compact sand
vii) Epoxy Paint on sub-station floor
Sub-total to be carried forward to SOP-1
Qty Unit Unit Rate (RMAmount (RM)
1 Lot
10 Nos.
3 Nos.
5 Nos.
4 Nos.
1 Nos.
Lump Sum
Lump Sum
4 Lot
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Lump Sum
Item Description Qty
5.1 Telephone Work
0 To supply and install JRC7 precast Telekom Manhole c/w cable bearer, cover and acc 3
0 To construct 450x450x450 tel pit c/w removable concrete cover including excavation, 2
0 To supply, install the following 2 way 100mm duct, including pull wires, excavation, backfilling with sand, compactio
a) PVC duct Lump
b) Encased PVC duct for road crossings Lump
c) G.I. Duct for drain crossings Lump
0 To supply and install TM approved type DP box c/w terminal block and earthing system (Krone Type) for the followi
a) 100 pairs PABX Dp c/w tag 1
b) 10 pairs incoming MDF c/w lightning arrestor, jumpering cable and tag and 10 pairs o 1
c) 20 pairs Tel DP box c/w tag 2
d) 10 pairs Tel DP box c/w tag 2
0 To supply and install 50x100 M.S. trunking c/w chase work, pull wires and fixing acce Lump
0 To supply and install telephone cable from PABX Dp to the following
a) 10 pairs 0.63mm2 telephone cable to MDP at Server Room First Floor Lump
b) 20 pairs 0.63mm2 telephone cable to Tie DP at Office Ground Floor Lump
c) 20 pairs 0.63mm2 telephone cable to Tie DP at Office First Floor Lump
d) 10 pairs 0.63mm2 telephone cable to Tie DP at Production Office Ground Floor Lump
e) 10 pairs 0.63mm2 telephone cable to Tie DP at Factory Office Ground Floor Lump
Sub-total to be carried forward to next page
Unit Unit Rate (RMAmount (RM)
No
No
filling with sand, compaction and reinstate to original condition from existing manhole to telephone pits
Sum
Sum
Sum
Krone Type) for the following
No
No
No
No
Sum
Sum
Sum
Sum
Sum
Sum
Sub-total brought from previous page
5.1.7 5.1.8 Testing and commissioning Supply and install telephone outlet wi44 1 1 Lump Lump No No Lot Sum Sum
Sub-total to be carried forward to Page SOP-1
No Lot Sum Sum
Item Description Qty
5.2 Data Cabling WorkSupply, install, terminate, label, test & commission of LAN structure cabling system including floo
0 19" equipment rack wall mounted type capable to house the entire patch panel equi 4
0 24 ports cat 6e patch panel complete with termination accessories, termination, suppo 2
0 12 ports cat 6e patch panel complete with termination accessories, termination, suppo 2
0 Data point using 4 pair Cat6e Unshielded Twisted Pair (UTP) cable in MS trunking comp 44
0 Data point using 4 pair Cat6e Unshielded Twisted Pair (UTP) underground cable in GI 1
0 supply and install 2 nos 4 pair Cat6e Unshielded Twisted Pair (UTP) cable in MS trunking complete terminations, su
a) Patch Panel at Office Ground Floor 1
b) Patch Panel at Office First Floor 1
c) Patch Panel at Production Office Ground Floor 1
d) Patch Panel at Factory Office Ground Floor 1
0 supply and install 2 nos 4 pair armoured Cat6e Unshielded Twisted Pair (UTP) cable in 1
Sub-total to be carried forward to next page
Unit Unit Rate (RMAmount (RM)
bling system including floor/wall minor hacking and making good c/w labeling at both end of cable, terminations blocks, patch cord and fac
Lot
Lot
Lot
Lot
Lot
omplete terminations, supports, brackets, earthing and all other necessary accessories to server room from the following
Lot
Lot
Lot
Lot
Lot
tions blocks, patch cord and face plate for the following:
the following
Item Description Qty Unit
Sub-total brought from previous page
5.2.8 5.2.9 Testing and commissioning of Data Cabling System. Testing, commLump LumpSum Sum
Sub-total to be carried forward to Page SOP-1
Unit Rate (RM) Amount (RM)