PROPOSED 2M ZAMA BATANGAS FACTORY

FPIP, Sto. Tomas, Batangas

Item Description Unit Quantity


Masonry Works
Guarhouse
a.1 Exterior Plaster on 150mm thk CHB m2 62.00
a.2 Interior Plaster on 150mm thk CHB m2 39.00

Metering Vault
b.1 Exterior Plaster on 150mm thk CHB m2 48.00
b.2 Interior Plaster on 150mm thk CHB m2 59.00
b.3 Rubbed concrete finish to exposed slab soffit m2 25.00

Entrance Wall
c.1 Exterior Plaster on 200mm thk CHB m2 12.00
c.2 On exterior plaster cement wall m2 17.00

Production and Administrative Building


d.1 Level 1
1.1. Plaster to Interior Wall m2 2,988.00
CEILING FINISHES
1.2 Rubbed concrete finish to soffit of staircases/landings m2 179.00
1.3. Rubbed concrete finish to exposed slab soffit m2 7,661.00
d.2 Level 2
CEILING FINISHES
2.1. Rubbed concrete finish to soffit of staircases/landings m2 254.00
2.2. Rubbed concrete finish to exposed slab soffit m2 743.00
2.3. Plaster to Interior Wall m2 727.00
d.3 Level 3
Ceiling Finish
3.1 Rubbed concrete finish to soffit of staircases/landings m2 179.00
3.2 Rubbed concrete finish to exposed slab soffit m2 1,226.00
3.3 Plaster to Interior Wall m2 1,702.00
d.4 Level 4
4.1 Plaster to Interior Wall m2 917.00
4.2 Touch-up on RC Wall (Exterior Wall) m2 667.00
Utility Building
e.1 Level 1
1.1. Plaster to Interior Wall m2 1,122.00
1.2. Plaster to Exterior Wall m2 790.00
CEILING FINISHES
1.3. Rubbed concrete finish to soffit of staircases/landings m2 87.00
1.4. Rubbed concrete finish to exposed slab soffit m2 835.00
e.2 Level 2
2.1. Plaster to Interior Wall m2 971.00
2.2. Plaster to Exterior Wall m2 540.00
Ceiling Finish
2.3. Rubbed concrete finish to soffit of staircases/landings m2 41.00
2.4. Rubbed concrete finish to exposed slab soffit m2 212.00
Dangerous Goods Building
f.1 Plaster to Interior Wall m2 1,377.00
f.2 Touch-up on RC Wall (Exterior Wall) m2 126.00
Block Work
Guardhouse
a.1 150mm thk CHB Perimeter Wall m2 62.00
a.2 150mm thk CHB Interior Wall m2 39.00
Metering Vault
b.1 150mm CHB Wall Perimeter m2 54.00
Entrance Wall
c.1 200mm thk CHB Exterior Wall m2 6.00

Production and administration


d.1 Level 1
1.1. 150mm CHB Interior Wall m2 1,337.00
1.2. 200mm thk CHB Elevator Wall m2 80.00
level 2
2.1 150mm CHB Interior Wall m2 591.00
2.2. 200mm thk CHB Elevator Wall m2 80.00
Level 3
3.1 150mm CHB Interior Wall m2 1,079.00
3.2. 200mm thk CHB Elevator Wall m2 73.00
level 4
4.1. 150mm CHB Interior Wall m2 580.00
4.2 200mm thk CHB Elevator Wall m2 77.00

Utility Building
E.1 Level 1
1.1. 150mm CHB Perimeter Wall m2 529.00
1.2. 150mm CHB Interior Wall m2 363.00
E.2. Level 2
2.1. 150mm CHB Perimeter Wall m2 315.00
2.2. 150mm CHB Interior Wall m2 305.00

Dangerous Building
f.1 Level 1
1.1 150mm CHB Interior Wall m2 530.00
Unit Rate
Materials Labor Total Amount