Questions: consideration of the use, allocation and
interface of spaces for given activities.
Standards of Professional Practice of Architecture: “SPP A. Space Planning Document 201 – SPP Document 208” B. Site Planning 1. Identify the acronym of CEC? C. Space Allocation A. Codes of Ethical Conduct 13. Architectural research entails the conduct of B. Codes of Ethnical Conduct primary and secondary researches and C. Codes of Entity Conduct assembled facts used as basis for conclusion 2. Identify the acronym of MoP? A. Architectural Research A. Manual of Processing B. Architectural Programming B. Manual of Precaution C. Architectural Study C. Manual of Procedure 14. Detailed analysis of the project based on 3. Identify the acronym of AF? pre-feasibility studies will determine the A. Architectural Firm viability of a proposed development. B. Architect Firm A. Architectural Study C. Architecture Film B. Programming 4. Identify the acronym of ADR? C. Feasibility Study A. Alternative Dispute Resolution 15. This method of compensation is frequently used B. Alternative Discrepancy Resolution where there is continuing relationship involving C. Alternative Disagreement Resolution a series of projects 5. Identify the acronym of KPO? A. Professional Fee Plus Expense A. Knowledge Progress Outsourcing B. Professional Tax Plus Expense B. Knowledge Process Outsourcing C. Professional Income Plus Expenses C. Knowledge Procedure Outsourcing 16. The SPP provides for more than one method of 6. What is SPP 201? compensation on a project. Each project A. Regular Design Services should be examined to determine the most B. Pre- Design Services appropriate and equitable method of C. Design- Build Services compensation. 7. When a Client calls upon the Architect to give A. Mixed Methods of Compensation oral or written advice and direction. B. Mixed Methods of Expenses A. Study C. Mixed Methods of Fees B. Research 17. What is SPP 202? C. Consultation A. Design Build Services 8. An analysis of the space requirements of the B. Regular Design Services project based on organizational structure and C. Post Design Services functional set-up pinpoints linkages and 18. He translates the Owner's needs and interaction of spaces. requirements to spaces and forms in the best A. Space Management Studies manner of professional service B. Interior Design A. Regular Design Services of an Architect C. Space Planning B. Pre Design Services of an Architect 9. This method of compensation is frequently used C. Post Design Services of an Architect where there is continuing relationship involving 19. This phase involves the definition of the a series of projects requirements of the project by the Owner A. Lump Sum A. Project Design Phase B. Professional Fee Plus Expenses B. Project Definition Phase C. Fixed Fee C. Project Define Phase 10. Architect states the project terms of reference 20. This phase consists of the preparation of (ToR) including the concept, objectives and schematic design studies derived from the other necessary requirements to bid out Project Definition Phase, leading to architectural services conceptual plans A. Design Brief Preparation A. Project Design Phase B. Design Build Preparation B. Schematic Definition Phase C. Design Body Preparation C. Schematic Design Phase 11. This technique is applied in the cost 21. Based on approved schematics and management process to minimize the negative conceptual plans effect of simplified operations associated with A. Project Design Phase many cost-reduction programs. B. Design Development Phase A. Value Estimate C. Schematic Design Phase B. Value Management 22. Consisting of detailed designs and C. Value Cost Reduction construction drawings, setting forth in detail the 12. The Architect determines the adequate size work required for the architectural, structural, and appropriate configuration and electrical, plumbing/ sanitary, mechanical, assemblage for a proposed project in electronic and communication works prepared by the Architect and the respective C. Alternation of Dispute Resolution professionals involved. 34. In Post-Design Services, the Architect must have A. Design Document Phase much more knowledge in the ff.: B. Contract Document Phase A. Pre-Construction C. Schematic Document Phase B. Construction 23. In this phase, the Architect performs the C. All of the above following makes decisions on all claims of the 35. How many percentages of the total cost should Owner and Contractors on all matters relating the Architect get from a specialized to the execution and progress of work or the Architectural Services? interpretation of the Contract Documents. A. 10% A. Design Phase B. 15% B. Construction Phase C. 5% C. Schematic Phase 36. Shall be composed of the smallest reasonable 24. Buildings of the simplest utilization and number of persons and in any event should character be an odd number and should not exceed A. Group 1 seven (7). B. Group 3 A. The Jury C. Group 6 B. The Judges 25. Buildings of moderate complexity of plan/ C. The Panel design 37. The Owner shall insure the Competitors’ A. Group 2 plans / designs from the time when he B. Group 4 assumes responsibility for them and for the C. Group 6 duration of his responsibility 26. Buildings of exceptional character and A. Cost complexity of plan / design B. Liability A. Group 5 C. Insurance B. Group 4 38. Involves management activities over and C. Group 3 above the normal architectural and 27. The Architect is engaged to render opinion engineering (A&E) services carried out or give advice, clarifications or explanation during the pre-design, design and on technical matters pertaining to construction phase. architectural works. A. Construction Manager A. Group 9 B. Project Manager B. Group 8 C. Design Manager C. Group 10 39. Conduct regular consultations with the 28. Monumental buildings and other facilities Owner and with the Architects and Engineers A. Group 7 (for A&E services) on all aspects of planning for B. Group 6 the project. C. Group 5 A. Project Management 29. Housing Project involving the construction of B. Building Management several residential units on a single site with C. Architectural Management the use of one (1) set of plans / design, 40. Directly responsible to the Owner on all specifications and related document aspects of the construction work: programming, A. Group 7 coordination, quality and cost control and time B. Group 6 management C. Group 5 A. Project Manager 30. Which one of the following basic knowledge B. Construction Management must the Architect have in the Contract C. Construction Manager Documentation and Review Services? 41. The architect in this area of practice must have A. Specification Writing much more than the basic knowledge of the B. Estimation and Quantity Survey types of architectural office operations and C. Both A and B limitations of business process outsourcing (BPO) 31. In Post-Design Services, what Republic Act is and knowledge process outsourcing. also included in this Specialized Services? A. Architectural Interiors A. R.A. 9514 B. Building Components B. R.A. 9003 C. Management of Architectural Practice C. R.A. 9275 42. The architect in this area of practice must have 32. Who is responsible in the Post-Design Services? much more than the basic knowledge of the A. Civil Engineer various modes of alternative dispute resolution B. Consulting Architect prescribed under R.A. 9285. C. Contractor A. Dispute Resolution 33. What is the acronym ADR mean? B. Dispute Avoidance and Resolution A. Alternate Dispute Resolution C. Post-Design Services B. Alternative Dispute Resolution 43. Government Agency which regulates the practice of Architecture. A. UAP B. PRC C. SEC 44. Substantial completion shall mean the value of the work completed not less than? A. 98% B. 100% C. 95% 45. The _______________ are legal documents defining the relationship of architect and the owner. A. The Specifications B. The Contract C. The Memo. Of Agreement 46. At what Services is the Fire and Safety and Life Assessment Report (FALAR), is also included? A. Post-Design Services B. Contract Documentation and Review Services C. Building Components 47. Under the Dispute Avoidance and Resolution, it also includes: A. Appraisals and Adjustments and Expert Testimony B. Architectural Marketing C. Pre-Design 48. In Building Envelopes, it also includes? A. Cladding B. Roofing Systems C. Both A and B 49. Evaluate the initial design program vs. the actual use of the facility A. Post Construction Evaluation B. Post Construction Estimation C. Post Construction Appraisal 50. This method may be applied to government projects since they entail more paper work and time-consuming efforts. A. Lump Sum B. Fixed Fee C. A and B