A. EARTHWORKS
1.o Soil Excavation 282 m³
283 m³
284 m³
2.o Demolition 144 m³
144 m³
144 m³
3.o Soil Disposal 475 m³
4.o Clearing and Grubbing 49 m³
5.o Gravel Bedding 378 m²
378 m²
D. FORMWORKS
1.o Installation of Forms 265 m²
2.o Plywood Ordinary, 1/4" x 4' x 8' 15 sheets
3.o Coco Lumber 2x3@ 10ft. long 41 bd.ft.
4.o CW Nails Assorted 2.8 kgs
E. ROOFING WORKS
548 m²
1.o Installation
548 m²
3.o Polycarbonate Sheet 136 pcs
4.o Bolts 4200 pcs
F. ARCHITECTURAL WORKS
91 m³
1.o Steel Painting
91 m³
2.o Boysen Latex Flat 91 m³
3.o Paint Brush #4 6 pcs
4.o Sand Paper #100 8 m
5.o Paint Brush #2 4 pcs
UNIT COST
Material Cost Labor Cost Total Cost
₱48.56 ₱48.56
₱65.18 ₱65.18
₱211.76 ₱211.76
₱18.14 ₱18.14
₱24.35 ₱24.35
₱87.92 ₱87.92
₱71.54 ₱71.54
₱66.88 ₱66.88
₱22.07 ₱22.07
₱71.69 ₱71.69
₱156.42 ₱156.42
₱169.40 ₱169.40
₱260.00 ₱0.00 ₱260.00
₱260.00 ₱0.00 ₱260.00
₱65.00 ₱0.00 ₱65.00
₱310.00 ₱0.00 ₱310.00
₱240.00 ₱0.00 ₱240.00
₱1,743.00 ₱1,743.00
₱1,058.25 ₱1,058.25
₱533.00 ₱533.00
₱1,731.68 ₱1,731.68
₱485.33 ₱485.33
₱781.73 ₱781.73
₱1,693.20 ₱1,693.20
₱262.08 ₱262.08
₱351.78 ₱351.78
₱888.93 ₱888.93
₱703.56 ₱703.56
₱2,031.84 ₱2,031.84
₱1,048.32 ₱1,048.32
₱1,407.12 ₱1,407.12
₱1,015.92 ₱1,015.92
₱972.00 ₱0.00 ₱972.00
₱72.00 ₱0.00 ₱72.00
₱560.00 ₱0.00 ₱560.00
₱365.00 ₱0.00 ₱365.00
₱400.00 ₱0.00 ₱400.00
₱260.00 ₱0.00 ₱260.00
₱665.00 ₱0.00 ₱665.00
₱460.00 ₱0.00 ₱460.00
₱312.00 ₱0.00 ₱312.00
₱295.00 ₱0.00 ₱295.00
₱2,480.00 ₱0.00 ₱2,480.00
₱362.77 ₱362.77
₱1,384.00 ₱0.00 ₱1,384.00
₱260.00 ₱0.00 ₱260.00
₱1,450.00 ₱0.00 ₱1,450.00
₱1,600.00 ₱0.00 ₱1,600.00
₱251.23 ₱251.23
₱181.38 ₱181.38
₱296.31 ₱296.31
₱1,384.00 ₱0.00 ₱1,384.00
₱260.00 ₱0.00 ₱260.00
₱1,450.00 ₱0.00 ₱1,450.00
₱1,600.00 ₱0.00 ₱1,600.00
₱17.00 ₱0.00 ₱17.00
₱46.79 ₱46.79
₱62.81 ₱62.81
₱240.75 ₱240.75
₱260.00 ₱0.00 ₱260.00
₱1,450.00 ₱0.00 ₱1,450.00
₱74.87 ₱74.87
₱100.49 ₱100.49
₱253.94 ₱253.94
₱260.00 ₱0.00 ₱260.00
₱1,450.00 ₱0.00 ₱1,450.00
₱1,600.00 ₱0.00 ₱1,600.00
₱1,384.00 ₱0.00 ₱1,384.00
₱99.48 ₱99.48
₱310.00 ₱0.00 ₱310.00
₱270.00 ₱0.00 ₱270.00
₱60.00 ₱0.00 ₱60.00
₱58.63 ₱58.63
₱423.30 ₱423.30
₱1,700.00 ₱0.00 ₱1,700.00
₱1.75 ₱0.00 ₱1.75
₱3.52 ₱3.52
₱7.62 ₱7.62
₱600.00 ₱0.00 ₱600.00
₱70.00 ₱0.00 ₱70.00
₱85.00 ₱0.00 ₱85.00
₱40.00 ₱0.00 ₱40.00
Amount
Estimated Marks Up (%)
Material Labor Direct Cost OCM PROFIT
₱18,759.74
₱25,269.78
₱82,389.96
₱3,579.45
₱4,804.56
₱17,344.10
₱46,553.16
₱4,489.75
₱11,427.20
₱37,126.23
₱28,073.57
₱30,403.05
₱79,788.80
₱51,649.00
₱2,226.25
₱63,280.30
₱9,864.00
₱42,744.00
₱890.50
₱20,201.72
₱12,265.33
₱9,485.43
₱30,817.53
₱5,625.11
₱9,060.45
₱19,624.53
₱1,938.87
₱2,602.47
₱6,576.30
₱1,378.34
₱3,980.58
₱8,846.98
₱11,874.97
₱8,573.55
₱17,311.32
₱16,304.51
₱42,963.20
₱76,007.60
₱25,756.00
₱1,781.00
₱22,776.25
₱4,411.40
₱2,564.64
₱2,020.75
₱98,530.40
₱26,340.59
₱3,792.16
₱176,675.20
₱67,541.00
₱146,864.00
₱4,818.58
₱70,228.43
₱22,752.96
₱15,316.60
₱5,959.50
₱13,152.00
₱50,422.85
₱9,231.17
₱47,495.53
₱32,414.20
₱15,892.00
₱615.41
₱2,087.37
₱9,617.40
₱3,973.00
₱8,768.00
₱1,896.08
₱36,114.58
₱6,370.50
₱15,165.90
₱230.16
₱44,017.06
₱316,744.00
₱10,069.50
₱438.56
₱949.91
₱74,802.00
₱575.40
₱931.60
₱219.20
₱2,266,425.01
BREAKDOWN OF ESTIMATED EXPENDITURES
Program Cost (php) % of Total
(1) Labor (Mandays) P 514,897.73 22.72%
(2) Materials and Equipment P 1,139,427.10 50.27%
(4) Constit'n Contigencies P 0
(5) P.D.E P 0
(6) Overhead Cont. Misc P 248,148.72 10.95%
(7) Contractor's Profit P 165,432.48 7.30%
(8) VAT P 198,518.98 8.76%
(9) Eng'g. and Adm. Overhead P 0
P 2,266,425.01 100%
Item Description Hourly Rate Daily Rate
1 Foreman 87.36 698.88
2 Electrician 74.72 597.76
3 Leadman 74.72 597.76
4 Plumber 74.72 597.76
5 Heavy Equipment Operator 69.72 557.76
6 Highly Skilled Worker 69.72 557.76
7 Light Equipement Operator 65.81 526.48
8 Driver 58.63 469.04
9 Skilled Worker 58.63 469.04
10 Semi - Skilled Worker 50.46 403.68
11 Unskilled Worker 42.33 338.64
DESCRIPTION WORKER EQUIPME MH per Duration
ITEM NO.
DESCRIPTIONQuantity unit Laborer type No. NT Unit Days
PERMITS AND CLEARANCES
PERMITS - - - - - - 7
EARTHWORKS
DEMOLI
B *Concre 53 cu. meter foreman, 6 Sledge 2.7 3
2 skilled,
*Concret 91 cu. meter and 10 7 Sledge 2.7 4
C CLEARIN 49 cu. meter unskilled 3 1.58 3
1
foreman,
D EXCAVAT 282 cu. meter 2 skilled, 12 6.67 20
and 9
unskilled
BACKFI
LL OF
K 7 cu. meter unskilled 5 0.82 0.14
FOUND
ATIONS
2 skilled
F GRAVEL 378 sq. meter and 9 11 2.07 9
unskilled
FORMWORKS
1
foreman,
G FOOTIN 265 sq. meter 2 skilled, 9 2.35 9
and 6
unskilled
DRAINAGE SYSTEM
M HALLOW 173 sq. meter All Laborers 20 Shovel 7 8
N CONCRET 14 cu. meter
2 skilled and 2 unskilled4 Shovel 8.57 4
1
foreman,
O PLASTER 144 sq. meter 2 skilled, 16 Shovel 8 9
and 13
unskilled
CONCRETE
1
Foreman,
J FOOTIN 6 cu. meter 2 skilled, 10 mixer 8.57 1
and 7
unskilled
All
P PAVEME 53 cu. meter Laborers 20 mixer 5 2
REBARS WORKS
2 skilled
L FABRICA 131 kg. and 3 5 0.07 0.2
unskilled
STRUCTURAL STEEL
FABRICATION
*Steel Steelman,
Column Welder,
H s for 8.46 MT 4 Steelworks Tools 50 13
and 2-
walkwa unskilled
y
*Other
structu 2 skilled
Q ral 12.99 MT and 9 11 Steelworks Tools 50 7
membe unskilled
rs
INSTALLATION
*COLU 1
MNS Foreman,
I FOR 8.46 MT 2 skilled, 9 Steelworks Tools 60 7
WALK and 6
WAY unskilled
1
foreman,
R *Dome 5.4 MT 2 skilled 10 Steelworks Tools 30 2
and 7
unskilled
*Rafter 2 skilled
S sWalkw 1.43 MT and 8 10 Steelworks Tools 60 1
ay unskilled
1
foreman,
*PURLI
T 6.16 MT 2 skilled, 5 Steelworks Tools 60 9
NS and 2
unskilled
ROOFING
U INSTALL 548 sq. meter
1 skilled and 10 unskilled
11 Roofing Tools 1.51 9
PAINTING WORKS
V PAINTIN 91 sq. meter
1 skilled and 3 unskilled4 0.24 1