Вы находитесь на странице: 1из 7

 

Curriculum Vitae 
 
 

 
P​ERSONAL​ D​ETAILS
Name  Oki Ardian, Amd.
Gender  Male
Place & Date of Birth Jakarta , October 25​th​ 1983
Age  33
Religion Moslem
Nationality   Jakarta,Indonesian
Home Address  Jl. Halim Perdana Kusuma, komplek Perhubungan Udara Blok FF1, Jurumudi,
Benda , Tangerang
Ph ; +​62877 8648 2563 , +62 812 8532 4905
E-Mail  oki2510@gmail.com​ ; ardyoss.kamil@gmail.com 
 
E​DUCATIONAL​B​ACKGROUNDS 
Elementary School 06  1990 - 1996 (Jakarta)
Junior High School 275  1996 – 1999 (Jakarta)
Senior High School 9  1999 – 2002 (Jakarta)
Polytechnic Manufacture of Astra  2002 – 2003 (Jakarta) ​→​Diploma I (D1) Information System
Polytechnic University of Indonesia  2003 – 2006 (Depok)
(Politeknik UI/PNJ)  Diploma III (D3) ELectrical engineering

   
 
W​ORKING​ E​XPERIENCES 
PT.GSI Solution  As STS Performance Reporting 2G/3G/4G (Truebex Telkomsel-Ericsson 
(May 2016 – Desember 16th 2016)  Project – Sumatera & kalimantan area) 
   
Generating 2G 3G and 4G statistic KPI E// by Eniq-SQL base
  Providing data 2G 3G and 4G Capacity ericsson existing as
  consideration of capacity planning, such as utilization of TCH, CE/
  Code/Power, number of HS user, and kind of congestions.
  Providing daily contributor of worst performance cell per cluster.
  Providing configuration database E// both 2G (CDD & MO) and 3G
(KGET).
  Providing Recording Performing Management System such As GPEH,
  CTR, PM and CM All area
  Providing BSC,RNC Alarm active and hidtory wise.
  Providing CR to activation Feature.
 

 
As STS Performance Reporting 2G/3G (Modernization Telkomsel-Ericsson 
PT. Sinergi Aitikom  Project – Sumbagut/Sumbaguteng Area) 
(February 2016 – April 30th 2016)   
  Generating 2G 3G statistic KPI E// by Eniq-SQL base
  Providing flash peformance report after modernization of cluster/cell
Providing data 2G 3G Capacity ericsson existing as consideration of
  capacity planning, such as utilization of TCH, CE/ Code/Power,
  number of HS user, and kind of congestions.
Providing daily contributor of worst performance cell per cluster.
 
Providing configuration database E// both 2G (CDD & MO) and 3G
(KGET).
Providing BSC RNC alarm active and history wise.
 
PT. Nexwave Indonesia  As OSS Engineer (NOKIA) ​→​ GFR Refarming DCS 1800 MHz Tsel Project 
(Oktober 2015 – November 2015)  Jabo& WJ 
   
Execute to Lock BTS Step 2 From NetAct 8
 
  Update TRX BTS Step 2 , Unlock BTS Step 2 From NetAct 8
  Delete and Create Adjecence (ADCE) using TANG
  Making Dashboard KPI Monitoring Report Border and Cluster
  Hourly/Daily(DUMP,NGTINEM,TQM,ND,Alarm)after GFR/Refarming
  executed
  Excecute ChangeRequest for Performance usingNetAct 8 and TANG
 
PT. GCI Indonesia (JIESAI)  As Senior OSS 2G/3G Engineer (KAA Event / NPI Telkomsel-Huawei Jabo) 
(April 2015 – August 2015) 
 
  Make Huawei 2G/3G OSS database from Huawei Tools (U2000)
  Make KAA event Dashboard Monitoring Report 2G & 3G Hourly and
  Daily
Assist the RF Engineer/RNO in producing activity report for KPI
  calculation.
  Excecute ChangeRequest for Performance using m2000
  Collect data from U2000 to make Capacity Data All Regional
CJ,EJ,Jabo, WJ & SS (BSC &RNC) for Preparation Lebaran/iedul Fitri.
 
 
 
PT. Lintas Media  As OSS 2G 3G Ericsson Huawei Performance Engineer  
Telekomunikasi  ( HUAWEI – XL West Java Swap) 
(August 2014 – February 2015)   
 
  Generating 2G 3G statistic KPI E// by Eniq-SQL base
  Providing flash peformance report after swap of cluster/cell swap and
  the surrounding
  Providing data 2G 3G Capacity ericsson existing as consideration of
  capacity planning, such as utilization of TCH, CE/ Code/Power,
number of HS user, and kind of congestions
 
Responsible for implementation of defining external site and
  locking/halting ericsson sites/cells for pre-swap activity.
  Resposible execution of delete and add relation neighbors from E//
  side 2G -> 2G, 3G -> 2G, 3G – > 3G for post – swap activity.
  Supporting implementation of change parameter E// and HW base for
optimization purpose.
Providing daily contributor of worst performance cell per cluster.
Providing configuration database E// both 2G (CDD & MO) and 3G
(KGET), and HW CFGMML.
Providing BSC RNC alarm active and history wise.
Providing data interference FFT (Fast Fourier Transformation) NodeB
over LMT after swap.

 
PT. UCE International  As OSS 2G/3G Engineer ( VIP Complain T-Sel Jabo ) 
(March 2011 – Desember 2012)   
  Make Huawei 2G and 3G OSS database from Huawei Tools (m2000 ,LMT
  BSC6000,BSC6900)
  Make report Dailly Statistic Performance 
  Assist the RF Engineer/RNO in producing activity report for KPI
calculation.
 
Excecute ChangeRequest for Performance using m2000/ LMT
  BSC6900
  Collect Data Alarm, Dump Nokia, NGTINEM, TQM using Netact
 
 
 
PT. Lintas Media 
 
Telekomunikasi  As OSS 3G Engineer ( 3G XL Swap Project Semarang, Central Java ) 
(September 2010 – March2011)   
  Make Huawei 3G OSS database from HuaweiTools (m2000 ,LMT
  BSC6000,BSC6900)
  Make report Hourly and Daily Statistic Performance 
  Assist the RF Engineer/RNO in producing activity report for KPI
  calculation.
  Excecute ChangeRequest for Performance using m2000/ LMT
  BSC6900
 
   
  As 2G RAN Surveillance Engineer (HCPT – 3 Project Manado & Balikpapan) 
PT. ZTE INDONESIA   
(​January 2010 –September 2010)​   Scope of Work 
Plaza Kuningan 6​th​ floor, South   
Jakarta  Monitoring Network from the OMC client tools such us:
  BSC/BTS Power Supervision Client (ZXM10)
BSC/BTS Minos Client (Netnumen and iSMG)
 
MW Trnasmission Client (PNMS- NEC)
  NEC Pasolink Transmission Network Monitoring
  NOC Surveillance Initiated Fault Reporting.
  #Monitor and manage 2G/3G network alarm events, service outage, network
  performance deterioration, customer complaint from alarm panel, constant
  monitor and analyze network performance consistently.
#providing escalation and notification of Minor,
  Critical and Major incidents/outages.
  Monitor alarms and performance information on the 24x7 basis.
  #Perform initial analysis to identify issues follow by restoration if possible (1st line
  of Support).
  #Perform periodical network backups and health checks to determine network
status.
 
#Respond to Network Customer Support Team withinagreed SLA time frame.
  #Perform periodic content service testing such as loop testing, call testing, etc.
  #Create and update/manage trouble tickets for any detected problem.
  #Ensure all docket information are capture in activity log
  #Managing technical escalation to ensure faults is rectified within agreed SLAs.
#Perform Escalation and Notification to keep management and other business
 
units informed during system outages.
  #Assist the FO shift leader in producing activity report for KPI calculation.
  #Check and certified new network elements to be commissioned in operation
  environment within agreed KPI.
  #Assist the operation team in process improvement and ongoing development of
  tools and system​.
  As FIELD OPERATION ENGINEER / BSS 
  ( HUAWEI MS- NTS Axis Project Central Java) 
   
Scope of Work;​  
 
Supervise for New Site
 
 
  Operation and Maintenance Site For All Equipment ( BTS 2G & 3G/NODE B,
  Microwave from NEC , Rectifier module from EMERSON, CME/Civil,Mechanical
Electrical, ect)
 
PT. Huawei Tech. Investment  BSC 6000,
( ​Apri 2008 – Desember 2009 )​ - Create new Configuration of BSC 6000
BRI II lt. 20 , Central Jakarta - Creating BTS from BSC 6000 refer from RNP data.
- Trouble shooting and maintenance BSC 6000.
- Integration BTS from BSC 6000 including direct transmission
testing (cross connect).

DMR5000, NEC Transmission equipment (SDH / PDH).


- Commissioning The equipment.
- Supervision for the Hardware installation,Software setting, and pointing
  - Maintenance all microwave transmission refer as Link budget.
  - Troubleshoot the microwave transmission problem (include Cross
  connection, Odu, IDU, hardware and software and the installation).
  - Make report per week to operator​. 
   
Site Audit (for New Sites). 
 
Responsible to complete all the finishing (for new sites) with NTS/Axis
  (Natrindo Telepon Selular) representatives, such as clearing alarms, check
  installation and completing labels, in order for ​ATP (Acceptance Test 
  Procedure).   
  Do Drive test for Axis network in Central Java 
  Responsibility for Optimization, Drive Test Analysis 2G USING ​TEMS
  INVESTIGATIONS 8.0.4 DATA COLLECTIONSF ​ rom ​ERICSSON
  Scope of work :
  Drive test analysis
  - Evaluated connectivity , Coverage problem, call drop and voice quality
 
 
  As Field Telecomunication Engineer BTS Ultra Site / Flexi 
  hopperInstallation or Flexi EDGE 
   
  As BTS Ultra Site / Flexi hopper and Flexi EDGe Engineer 
  Doing Installation correctness BTS Ultra Site, transmition, indoor installation,
  outdoor installation according to nokia’s standart.
  - ​DoInstall BTS ultra Site step by step, from start until end, , according to lay out
  and nokias standart 
  Doing and check alarm BTS, Rectifier,omni in indoor installation.
  Do Out door installation consist of feeder installation, mounting installation,
  antenna installation, Grounding earth, grounding bushbar, Out door unit for
  transmition,
installation of antenna in height of tower, as according to plan
PT.Java*Cell ​Telecomunication
Make sure the anntena azimuth, and tilting antennas is right as according to
engineering Service ​(2007 –  plan.
2008)  Do pointing Outdoor unit to be getting point ​matching with the one which
Plaza Aminta  link budget
Lt.4 suite 405  Get wise to all activity of engineerand do it. 
Jl. TB simatupang 
Jakarta Selatan 
 
 
 
 
 
 
 
 
 
 
 
▪ Scope of works:​
Nokia BTS UltraSite / Transmission FlexyHopper Installation Supervisor. 
Integration BTS UltraSite with Nokia RIC (Remote Integration Centre). Or 
OSS (Operating support System). 
Troubleshooting BTS UltraSite and Transmission FlexyHopper.
Coordinate with Nokia RIC or OSS for doing alarm clearing and do necessary
troubleshooting at the site.
BTS UltraSite and Transmission FlexyHopper Commissioning and Testing. 
UpGrading BTS UltraSite Capacity. 
Responsible for bringing up the BTS UltraSite On-Air after upgrading / adding
modules into the BTS cabinet .
Working on Dual-Cabinet (High-Capacity) BTS UltraSite. 
Responsible for bringing up the Dual-Cabinet (High-Capacity) BTS UltraSite
On-Air after adding new cabinet to the existing cabinet in order to perform
high-capacity dual-cabinet at Night Upgrade activity .
Troubleshooting BTS UltraSite and Transmission FlexyHopper. 
-Responsible for clearing BTS UltraSite and Transmission FlexyHopper
Alarms (for new sites after integrated/on-air), coordinate with Nokia RIC, during
the period until Site Audit.
Sweep testter 
Make SweepTest with ANRITSU Sitemaster and collect data for VSWR and
DTF, return Loss, cable loss, of both 900MHz or 1800MHz.
Test Calland External Alarm Testing after BTS on air (Integration with RIC and
OSS) and monitoring approximately one hour with RIC for BTS and
Transmission Alarm.
Site Audit (for New Sites). 
Responsible to complete all the finishing (for new sites) with Nokia
representatives, such as clearing alarms, check installation and
completing labels, in order for ATP (Acceptance Test Procedure).

Project Experience
2007- 2008 
Telkomsel Project Jakarta inner (collocated)
Telkomsel Project Jakarta Outer (collocated&new coverage)
Telkomsel Project Banten (new coverage/RollOut)
Indosat Project Banten (new coverage/RollOut)
Indosat Project West Java(new coverage/RollOut)
Indosat Project West Java(new coverage&collocated)
Telkomsel Project jakarta Inner (High Capacity,up grade)

2008 - 2009 
NTS-axis Project Central Java​ (New coverage/RollOut)
 
 
2010 
HCPT-three Project Manado & Balikpapan
3G XL Swap CJ
 
2011 
Tsel Project Swap Jakarta inner
VIP Complain T-Sel Jabo
 
2014 
HUAWEI – XL West Java Swap 
 
2015 
KAA event
NPI Tsel Jabo
GFR Refarming DCS 1800 MHz Tsel Jabo & WJ
 
2016 
-​Modernization Telkomsel-Ericsson Project –
Sumbagut/Sumbaguteng Area
- Telkomsel – Ericsson Truebex All Area (National) 

 
 
T​RAININGS  
 
Nokia Ultra Site commissioning  As Participant at NOKIA SIEMENS NETWORK (at BRI TOWER BANDUNG)
Engineer 
Nokia Flexi Hopper    As Participant at NOKIA NOKIA SIEMENS NETWORK (at BRI TOWER
BANDUNG)
HUAWEI PRODUCT KNOWLEDGE  As Participant at HUAWEI to learn about (BTS,Microwave, Rectifier , ect)
(internal Training at BRI II) 
   

 
A​BILITIES
  GSM Base Station and Microwave Transmission (BTS/WCDMA 3900, 
HUAWEI Equipments  BSC6900, OSN) 
   
NOKIAEquipments   GSM Base Station and Microwave Transmission: 
  Nokia BTS UltraSite , Nokia Transmission Flexi Hopper and Flexi EDGE
  Commissioning Softwares : 
  Nokia BTS Manager, Nokia HW Configurator, Nokia UltraSite BTS Hub Manager,
  and Nokia Hopper Manager.
 
ERICSSON EQUIPMENT  Troubleshooting, Commissioning, Operation & Maintenance Ericsson RBS
2G / Node B / 3G
Transmisi / microwave
minilink e
minilinkhicap
TN ( TrafficNode)

Cellular Instruments  Net Monitor/FTD (Field Test Display), Site Master ANRITSU, Site Master
Software, BER Meter, PowerMeter, and Frequency Counter,

Computer Proficiences  Software : 


  Windows,VB6,Microsoft Office(Word, Excel, Power Point, Outlook), Visio
  Technical Draw, MySQL (Navicat, DbVisualizer, winFiol).
 
Languge  Spoken : Indonesia , English (GOOD).
  Written : Indonesia , English (GOOD).

P​ERSONAL​ A​TTITUDES  

  Proactiveandcreative

  Responsible

  Hardworker, abletowork as a team in multiculturalpeople

  Havegoodanalitycalmind

  Goodinterpersonalskills
Willing totravel
 
 
 

 
 

Вам также может понравиться