MARILYN T. CANAPI EDWIN E. GALANO JAIME P. CATOLOS, JR. ALEXANDER D. NOLA CESO IV
Engineering Assistant Engineer III Chief, Planning and Design Division Assistant Regional Director
Planning and Design Division Planning and Design Division
10/11/2019
(a) Road
(b) Bridge
(c) Others Four (4) Storey with Roof Deck Government Office Building
:
: C.D.
: C.D.
: C.D.
: 360 C.D.
AS EVALUATED
% TOTAL TOTAL DIRECT COST
- -
AS SUBMITTED AS EVALUATED
A. Total Direct Cost 91,790,942.08 -
B. OCM and Profit 16,174,772.21 -
C. Value Added Tax 5,398,285.71 -
D. Total Construction Cost 113,364,000.00 -
3.50% 1,743,490.04 -
F. RROW Acquisition including
Environmental Sustainability and Social -
Responsiveness Program
2,436,000.00
G. Physical Reserved (Contingency) -
Approved:
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-Regional Office II Building
Regional Government Center, Carig Sur, Tuguegarao City, Cagayan
FORM POW-2015-01-00
PROGRAM OF WORKS/BUDGET COST
AS SUBMITTED AS EVALUATED
DESCRIPTION OF WORKS TO BE DONE QUANTITY UNIT
% TOTAL TOTAL DIRECT COST % TOTAL TOTAL DIRECT COST
Part I Facilities for the Engineer 0.00% -
Part II Other General Requirements 1.35% 536,048.67
PART III Civil, Mechanical, Electrical, and Sanitary/Plumbing Works
PART A Earthworks 0.91% 360,540.62
PART B Plain and Reinforced Concrete Works (PLS. SEE FORM POW-2015-01C-00) 28.03% 11,155,889.72
PART C Finishing Works 30.13% 12,661,805.42
PART D Electrical Works 18.95% 7,540,470.49
PART E Mechanical Works 18.96% 7,545,093.98
Prepared by: Checked/Submitted by: Reviewed as to Unit Cost: Recommending Approval: Approved:
MARILYN T. CANAPI EDWIN E. GALANO JAIME P. CATOLOS, JR. ALEXANDER D. NOLA, CESO IV MELANIO C. BRIOSOS, CESO III
Engineering Assistant Engineer III Chief, Planning and Design Division Assistant Regional Director Regional Director
Planning and Design Division Planning and Design Division
FORM ABC-2015-02-00
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-Regional Office II Building
Regional Government Center, Carig Sur, Tuguegarao City, Cagayan
Prepared by: Checked/Submitted by: Reviewed as to Unit Cost: Recommending Approval: Approved:
MARILYN T. CANAPI EDWIN E. GALANO JAIME P. CATOLOS, JR. ALEXANDER D. NOLA, CESO IV MELANIO C. BRIOSOS, CESO III
Engineering Assistant Engineer III Chief, Planning and Design Division Assistant Regional Director Regional Director
Planning and Design Division Planning & Design Division
FORM ABC-2015-02A-00
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-Regional Office II Building
Regional Government Center, Carig Sur, Tuguegarao City, Cagayan
Prepared by: Checked/Submitted by: Reviewed as to Unit Cost: Recommending Approval: Approved:
MARILYN T. CANAPI EDWIN E. GALANO JAIME P. CATOLOS, JR. ALEXANDER D. NOLA, CESO IV MELANIO C. BRIOSOS, CESO III
Engineering Assistant Engineer III Chief, Planning and Design Div. Assistant Regional Director Regional Director
Planning and Design Division
FORM ABC-2015-02A-00
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-Regional Office II Building
Regional Government Center, Carig Sur, Tuguegarao City, Cagayan
Prepared by: Checked/Submitted by: Reviewed as to Unit Cost: Recommending Approval: Approved:
MARILYN T. CANAPI EDWIN E. GALANO JAIME P. CATOLOS, JR. ALEXANDER D. NOLA, CESO IV MELANIO C. BRIOSOS, CESO III
Engineering Assistant Engineer III Chief, Planning and Design Div. Assistant Regional Director Regional Director
Planning and Design Division
Planning and Design Division
FORM ABC-2015-02A-00
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-Regional Office II Building
Regional Government Center, Carig Sur, Tuguegarao City, Cagayan
Prepared by: Checked/Submitted by: Reviewed as to Unit Cost: Recommending Approval: Approved:
MARILYN T. CANAPI EDWIN E. GALANO JAIME P. CATOLOS, JR. ALEXANDER D. NOLA, CESO IV MELANIO C. BRIOSOS, CESO III
Engineering Assistant Engineer III Chief, Planning and Design Div. Assistant Regional Director Regional Director
Planning and Design Division
Planning and Design Division
FORM ABC-2015-02A-00
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-Regional Office II Building
Regional Government Center, Carig Sur, Tuguegarao City, Cagayan
Prepared by: Checked/Submitted by: Reviewed as to Unit Cost: Recommending Approval: Approved:
MARILYN T. CANAPI EDWIN E. GALANO JAIME P. CATOLOS, JR. ALEXANDER D. NOLA, CESO IV MELANIO C. BRIOSOS, CESO III
Engineering Assistant Engineer III Chief, Planning and Design Div. Assistant Regional Director Regional Director
Planning and Design Division
Planning and Design Division
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-Regional Office II Building
Regional Government Center, Carig Sur, Tuguegarao City, Cagayan
FORM POW-2015-01C-00
DETAILED BREAKDOWN OF COMPONENT COST FOR EACH ITEM
DIRECT COST TOTAL MARK-UP
ITEM NO. DESCRIPTION % QTY. UNIT 5% VAT TOTAL COST
MATERIAL LABOR EQUIPMENT TOTAL % VALUE
PART I FACILITIES FOR THE ENGINEER
A.1.1 Offices and Laboratory for the Engineer
As Submitted
TOTAL OF PART I
As Evaluated
PART II OTHER GENERAL REQUIREMENTS
As Submitted 0.05 4.00 ea 16,860.00 2,734.72 273.47 19,868.19 20% 3,973.64 1,192.09 25,033.92
B.5 Project Billboard/ Sign Board
As Evaluated - - - - - - -
As Submitted 0.31 12.00 mos 33,538.79 90,000.00 - 123,538.79 8% 9,883.10 6,671.09 140,092.98
B.7 Occupational Safety and Health
As Evaluated - - - - - - -
As Submitted 0.99 1.00 LS - - 392,641.69 392,641.69 0% - 19,632.08 412,273.77
B.9 Mobilization/ Demobilization
As Evaluated
As Submitted 1.35 50,398.79 92,734.72 392,915.16 536,048.67 13,856.74 27,495.26 577,400.67
TOTAL OF PART II
As Evaluated
(Project ID)
(Project Component ID - Description)
PART III CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMBING WORKS
PART A EARTHWORKS
As Submitted 0.18 1.00 LS 14,056.00 6,957.12 52,350.91 73,364.03 20% 14,672.81 4,401.84 92,438.68
801(1) Removal of Actual Structures and Obstruction
As Evaluated - - - - - - -
As Submitted 0.43 731.69 m3 - 9,133.48 161,768.10 170,901.58 20% 34,180.32 10,254.09 215,335.98
803(1)a Structure Excavation
As Evaluated - - - - - - -
As Submitted 0.23 609.82 m3 - 12,526.48 78,442.65 90,969.13 20% 18,193.83 5,458.15 114,621.10
804 (1)(a) Embankment(from Structure Excavation)
As Evaluated - - - - - - -
As Submitted 0.06 41.89 m3 15,374.84 7,071.40 2,859.64 25,305.88 20% 5,061.18 1,518.35 31,885.41
804 (4) Gravel Fill (CF, TB, WF, SOG, Ramps & Stair Footing)
As Evaluated - - -
As Submitted 0.91 29,430.84 35,688.48 295,421.30 360,540.62 72,108.12 21,632.43 454,281.17
TOTAL OF PART A
As Evaluated
PART B PLAIN AND REINFORCED CONCRETE WORKS
As Submitted 0.00 0.33 m3 771.26 367.60 208.76 1,347.62 20% 269.52 80.86 1,698.00
901 (1) Plain/ Lean Concrete
As Evaluated - - - - - - - -
As Submitted 7.57 664.16 m3 2,772,856.91 96,260.46 142,440.87 3,011,558.24 20% 602,311.65 180,693.49 3,794,563.38
900 (1)c1 Structural Concrete (Class A, 28 days)
As Evaluated - - - - - - - -
As Submitted 8.68 65,983.63 kgs 2,841,981.01 445,184.03 168,356.39 3,455,521.44 20% 691,104.29 207,331.29 4,353,957.01
902(1)a Reinforcing Steel (Deformed) Grade 40
As Evaluated - - - - - - - -
As Submitted 9.15 65,569.00 kgs 3,030,664.56 442,137.80 167,204.39 3,640,006.75 20% 728,001.35 218,400.41 4,586,408.51
902(1)b Reinforcing Steel (Deformed) Grade 60
As Evaluated - - - - - - - -
As Submitted 2.63 1,817.10 m2 399,508.48 344,512.94 303,434.25 1,047,455.67 20% 209,491.13 62,847.34 1,319,794.14
903(2) Formworks and Falseworks
As Evaluated - - -
As Submitted 28.03 9,045,782.23 1,328,462.83 781,644.66 11,155,889.72 2,231,177.94 669,353.38 14,056,421.04
TOTAL OF PART B
As Evaluated
PART C FINISHING AND OTHER CIVIL WORKS
C.1 Termite Control Works
As Submitted 0.03 33.00 L 8,250.00 1,649.39 164.94 10,064.33 20% 2,012.87 603.86 12,681.06
1000(1) Soil Poisoning
As Evaluated
As Submitted
Sub - Total C.1
As Evaluated 0.03 8,250.00 1,649.39 164.94 10,064.33 2,012.87 603.86 12,681.06
C.2. Masonry Works
As Submitted 2.12 1,405.72 m 2
644,305.08 123,656.41 75,575.64 843,537.13 20% 168,707.43 50,612.23 1,062,856.78
1046(2)a1 100mm CHB Non-Load Bearing(including Reinforcing Bar)
As Evaluated - - -
As Submitted 0.68 290.80 m 2
219,773.68 30,787.93 18,816.79 269,378.40 20% 53,875.68 16,162.70 339,416.78
1046(2)a2 150mm CHB Non-Load Bearing(including Reinforcing Bar)
As Evaluated
As Submitted
Sub - Total C.2
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-Regional Office II Building
Regional Government Center, Carig Sur, Tuguegarao City, Cagayan
FORM POW-2015-01C-00
DETAILED BREAKDOWN OF COMPONENT COST FOR EACH ITEM
DIRECT COST TOTAL MARK-UP
ITEM NO. DESCRIPTION % QTY. UNIT 5% VAT TOTAL COST
MATERIAL LABOR EQUIPMENT TOTAL % VALUE
Sub - Total C.2
As Evaluated 2.80 864,078.76 154,444.34 94,392.43 1,112,915.53 222,583.11 66,774.93 1,402,273.56
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-Regional Office II Building
Regional Government Center, Carig Sur, Tuguegarao City, Cagayan
FORM POW-2015-01C-00
DETAILED BREAKDOWN OF COMPONENT COST FOR EACH ITEM
DIRECT COST TOTAL MARK-UP
ITEM NO. DESCRIPTION % QTY. UNIT 5% VAT TOTAL COST
MATERIAL LABOR EQUIPMENT TOTAL % VALUE
C.3 Fabricated Materials
As Submitted 0.28 1.00 LS 110,565.00 - - 110,565.00 8% 8,845.20 5,970.51 125,380.71
1007(2) Aluminum Framed Glass Door
As Evaluated - - - - - - -
As Submitted 8.66 1.00 LS 3,445,041.00 - - 3,445,041.00 8% 275,603.28 186,032.21 3,906,676.49
1008(2) Aluminum Glass Windows
As Evaluated - - - - - - -
As Submitted 0.55 1.00 LS 217,304.00 - - 217,304.00 8% 17,384.32 11,734.42 246,422.74
1010(4) Wooden Doors And Windows
As Evaluated - - - - - - -
As Submitted 0.19 1.00 LS 75,168.80 - - 75,168.80 8% 6,013.50 4,059.12 85,241.42
1011(1)b Roll-Up Door (Aluminum)
As Evaluated - - - -
As Submitted 9.67 3,848,078.80 - - 3,848,078.80 307,846.30 207,796.26 4,363,721.36
Sub-Total C.3
As Evaluated
C.4 Finishing Works -
As Submitted 1.44 3,686.33 m2 363,546.00 189,114.03 18,911.40 571,571.43 20% 114,314.29 34,294.29 720,180.01
1027(1) Cement Plaster Finish
As Evaluated - - - - - - -
As Submitted 0.56 1.00 LS 144,333.00 29,886.69 50,056.78 224,276.47 20% 44,855.29 13,456.59 282,588.36
1051(6) Railing
As Evaluated - - - - - - -
As Submitted 2.29 1,344.00 m2 851,354.50 54,668.05 5,466.81 911,489.36 20% 182,297.87 54,689.36 1,148,476.59
1003(1)a1 Ceiling (FiCem Board on Metal Frame)
As Evaluated - - - - - - -
As Submitted 0.01 27.30 m2 4,299.75 329.89 32.99 4,662.63 20% 932.53 279.76 5,874.91
1038(1) Reflective Insulation
As Evaluated - - - -
As Submitted 0.05 255.60 lin.m 13,717.20 4,684.24 468.42 18,869.86 20% 3,773.97 1,132.19 23,776.03
1035 (1) Furring Channel
As Evaluated - - - -
c 0.50 155.38 m 2
187,995.00 8,246.89 824.69 197,066.58 20% 39,413.32 11,823.99 248,303.88
1039(1) Aluminum Cladding (4mm thick Aluminum Composite Panel)
As Evaluated - - - -
c 1.14 305.28 m 2
296,055.69 143,772.16 14,377.22 454,205.07 20% 90,841.01 27,252.30 572,298.38
1018(1) Glazed Tiles and Trims
As Evaluated - - - -
c 4.75 1,288.62 m 2
1,423,512.20 424,256.24 42,425.62 1,890,194.06 20% 378,038.81 113,411.64 2,381,644.51
1018(2) Unglazed Tiles
As Evaluated - - - -
c 1.76 380.00 m 2
682,290.00 16,965.66 1,696.57 700,952.23 20% 140,190.45 42,057.13 883,199.80
1016(1)a Water Proofing(4 Coats)
As Evaluated
As Submitted 12.50 3,967,103.34 871,923.85 134,260.50 4,973,287.69 994,657.54 298,397.25 6,266,342.47
Sub-Total C.4
As Evaluated
C.5 Painting Works
As Submitted 3.14 4,321.68 m2 827,687.20 383,384.82 38,338.48 1,249,410.50 20% 249,882.10 74,964.63 1,574,257.23
1032(1)a Painting Works (Masonry)
As Evaluated - - - -
As Submitted 0.48 896.00 m2 70,067.20 110,454.12 11,045.41 191,566.73 20% 38,313.35 11,494.00 241,374.07
1032(1)b Painting Works (Wood)
As Evaluated - - - -
As Submitted 0.04 53.92 m2 8,725.50 5,029.83 251.49 14,006.82 20% 2,801.36 840.41 17,648.60
1032(1)c Painting Works (Steel)
As Evaluated
As Submitted 3.66 906,479.90 498,868.77 49,635.39 1,454,984.05 290,996.81 87,299.04 1,833,279.90
Sub-Total C.5
As Evaluated
C.6 Roof Framing and Roofing Works
As Submitted 0.02 19.20 lin.m 7,414.51 331.12 33.11 7,778.74 20% 1,555.75 466.72 9,801.21
1013(2)b3 Fabricated Metal Roofing Accessory (GA 24-Valley Rolls/ Gutters)
As Evaluated - - - - - - -
As Submitted 0.05 27.30 m2 15,069.60 2,935.04 293.50 18,298.14 20% 3,659.63 1,097.89 23,055.66
1014(1)b2 Prepainted Metal Sheets ( Rib Type, Long Span,0.5mm thk)
As Evaluated - - - - - - -
As Submitted 1.42 1.00 LS 433,420.08 48,527.27 82,670.80 564,618.15 20% 112,923.63 33,877.09 711,418.87
1047(1) Structural steel
As Evaluated
As Submitted 1.48 455,904.19 51,793.43 82,997.42 590,695.03 118,139.01 35,441.70 744,275.74
Sub-Total C.6
As Evaluated
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-Regional Office II Building
Regional Government Center, Carig Sur, Tuguegarao City, Cagayan
FORM POW-2015-01C-00
DETAILED BREAKDOWN OF COMPONENT COST FOR EACH ITEM
DIRECT COST TOTAL MARK-UP
ITEM NO. DESCRIPTION % QTY. UNIT 5% VAT TOTAL COST
MATERIAL LABOR EQUIPMENT TOTAL % VALUE
C.7 Plumbing/ Sanitary Works
As Submitted 0.33 1.00 l.s. 61,704.00 61,961.85 6,196.19 129,862.04 20% 25,972.41 7,791.72 163,626.16
1001(8) Sewer Line Works
As Evaluated - - - - - - - -
As Submitted 0.13 1.00 l.s. 17,052.00 29,901.41 2,990.14 49,943.55 20% 9,988.71 2,996.61 62,928.87
1001(9) Storm Drainage and downspout
As Evaluated - - - - - - - -
As Submitted 0.21 1.00 l.s. 60,446.40 22,365.54 2,236.55 85,048.49 20% 17,009.70 5,102.91 107,161.10
1002(24) Cold Water Lines
As Evaluated - - - - - - - -
As Submitted 0.90 1.00 l.s. 316,831.20 37,996.03 3,799.60 358,626.83 20% 71,725.37 21,517.61 451,869.80
1002(4) Plumbing Fixtures
As Evaluated - - - - - - - -
As Submitted 0.02 9.00 each 7,710.57 1,908.45 190.85 9,809.87 20% 1,961.97 588.59 12,360.43
1001(5)b Catch Basin (CHB)
As Evaluated - - - - - - - -
As Submitted 0.10 1.00 LS 27,009.98 10,435.68 1,043.57 38,489.23 20% 7,697.85 2,309.35 48,496.43
1001(11) Septic Vault (CHB/ Concrete)
As Evaluated
As Submitted 1.69 490,754.15 164,568.95 16,456.90 671,780.00 134,356.00 40,306.80 846,442.79
Sub-Total C.7
As Evaluated
As Submitted 31.81 10,540,649.12 1,743,248.72 377,907.57 12,661,805.42 2,070,591.63 736,619.84 15,469,016.89
TOTAL OF PART C
As Evaluated
PART D ELECTRICAL WORKS
As Submitted 1.67 1.00 l.s. 603,068.00 55,911.58 5,591.16 664,570.73 20% 132,914.15 39,874.24 837,359.13
1100 (1) Conduit, Boxes & Fittings
As Evaluated - - - - - - - -
As Submitted 9.93 1.00 l.s. 3,899,094.00 49,496.81 4,949.68 3,953,540.49 20% 790,708.10 237,212.43 4,981,461.02
1101(33) Wires & Wiring Devices
As Evaluated - - - - - - - -
As Submitted 1.90 1.00 l.s. 749,966.00 7,391.94 739.19 758,097.13 20% 151,619.43 45,485.83 955,202.39
1102 (1) Panelboard with Main & Branch Breakers
As Evaluated - - - - - - - -
As Submitted 1.98 1.00 l.s. 786,000.00 1,425.06 142.51 787,567.57 20% 157,513.51 47,254.05 992,335.13
1102 (8) Pad Mounted Distribution Transformer (OISC) with Complete Accessories
As Evaluated - - - - - - - -
As Submitted 0.78 1.00 l.s. 294,204.00 16,036.16 1,603.62 311,843.78 20% 62,368.76 18,710.63 392,923.16
1103 (1) Lighting Fixtures and Lamps
As Evaluated - - - - - - - -
As Submitted 2.09 1.00 l.s. 826,045.00 4,222.40 422.24 830,689.64 20% 166,137.93 49,841.38 1,046,668.95
1105(20) Network Cabling
As Evaluated - - - -
As Submitted 0.50 1.00 l.s. 191,530.00 8,444.80 844.48 200,819.28 20% 40,163.86 12,049.16 253,032.29
1106(1) CCTV System
As Evaluated - - - -
As Submitted 0.08 1.00 l.s. 32,471.00 791.70 79.17 33,341.87 20% 6,668.37 2,000.51 42,010.76
1109(1) Grounding System
As Evaluated
As Submitted 18.95 7,382,378.00 143,720.45 14,372.04 7,540,470.49 1,508,094.10 452,428.23 9,500,992.82
TOTAL OF PART D
As Evaluated
PART E MECHANICAL WORKS
As Submitted 0.07 17.00 l.s. 25,500.00 901.21 90.12 26,491.33 20% 5,298.27 1,589.48 33,379.08
1200(5)b Exhaust Fan (Wall Mounted)
As Evaluated - - - - - - - -
As Submitted 9.43 1.00 l.s. 3,750,000.00 3,180.75 318.08 3,753,498.83 20% 750,699.77 225,209.93 4,729,408.52
1200(13)a Airconditioning (Package/ Split-Type)
As Evaluated - - - - - - - -
As Submitted 0.62 1.00 l.s. 245,000.00 1,166.28 116.63 246,282.90 20% 49,256.58 14,776.97 310,316.46
1201(1) Water Pumping System
As Evaluated - - - - - - - -
As Submitted 2.27 1.00 l.s. 889,916.00 13,677.23 1,367.72 904,960.95 20% 180,992.19 54,297.66 1,140,250.79
1202(1) Automatic Fire Sprinkler System
As Evaluated - - - - - - - -
As Submitted 5.82 1.00 l.s. 2,303,400.00 11,821.79 1,182.18 2,316,403.97 20% 463,280.79 138,984.24 2,918,669.00
1203(1)a Electric Elevator
As Evaluated - - - - - - - -
As Submitted 0.75 1.00 l.s. 276,638.00 18,925.46 1,892.55 297,456.01 20% 59,491.20 17,847.36 374,794.57
1208(1) Fire Alarm System
As Evaluated - - - -
As Submitted 18.96 7,490,454.00 49,672.71 4,967.27 7,545,093.98 1,509,018.80 452,705.64 9,506,818.42
TOTAL OF PART E
As Evaluated
As Submitted 98.65 34,488,694.19 3,300,793.19 1,474,312.85 39,263,800.23 - 7,390,990.59 2,332,739.52 48,987,530.34
TOTAL OF PART III
As Evaluated
As Submitted 100.00 34,539,092.98 3,393,527.91 1,867,228.01 39,799,848.90 7,404,847.33 2,360,234.78 49,564,931.01
GRAND TOTAL
As Evaluated
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-Regional Office II Building
Regional Government Center, Carig Sur, Tuguegarao City, Cagayan
FORM POW-2015-01A-00
ITEMIZED BREAKDOWN
DIRECT COST TOTAL UNIT COST
ITEM QUANTITY % DIRECT
DESCRIPTION UNIT TOTAL UNIT COST (DIRECT+INDIRECT)
NO. COST
AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED
B.5 Project Billboard/ Sign Board 4.00 ea 19,868.19 4,967.05 6,258.48 0.050
B.7 Occupational Safety and Health 12.00 mos 123,538.79 10,294.90 11,674.42 0.310
PART A EARTHWORKS
801(1) Removal of Actual Structures and Obstruction 1.00 LS 73,364.03 73,364.03 92,438.68 0.184
804 (1)(a) Embankment(from Structure Excavation) 609.82 m3 90,969.13 149.17 187.96 0.229
804 (4) Gravel Fill (CF, TB, WF, SOG, Ramps & Stair Footing) 41.89 m3 25,305.88 604.06 761.11 0.064
902(1)a Reinforcing Steel (Deformed) Grade 40 65,983.63 kgs 3,455,521.44 52.37 65.99
8.682
902(1)b Reinforcing Steel (Deformed) Grade 60 65,569.00 kgs 3,640,006.75 55.51 69.95
9.146
1046(2)a2 150mm CHB Non-Load Bearing(including Reinforcing Bar) 290.80 m2 269,378.40 926.34 1,167.18 0.677
[Autogenerated Code]
1010(4) Wooden Doors And Windows 1.00 LS 217,304.00 217,304.00 246,422.74 0.546
1003(1)a1 Ceiling (FiCem Board on Metal Frame) 1,344.00 m2 911,489.36 678.19 854.52 2.290
1035 (1) Furring Channel 255.60 lin.m 18,869.86 73.83 93.02 0.047
1018(1) Glazed Tiles and Trims 305.28 m2 454,205.07 1,487.83 1,874.67 1.141
1014(1)b2 Prepainted Metal Sheets ( Rib Type, Long Span,0.5mm thk) 27.30 m 2
18,298.14 670.26 844.53 0.046
1001(9) Storm Drainage and downspout 1.00 LS 49,943.55 49,943.55 62,928.87 0.125
1001(5)b Catch Basin (CHB) 9.00 each 9,809.87 1,089.99 1,373.38 0.025
1001(11) Septic Vault (CHB/ Concrete) 1.00 LS 38,489.23 38,489.23 48,496.43 0.097
1100 (1) Conduit, Boxes & Fittings 1.00 LS 664,570.73 664,570.73 837,359.13 1.670
1101(33) Wires & Wiring Devices 1.00 LS 3,953,540.49 3,953,540.49 4,981,461.02 9.934
1102 (1) Panelboard with Main & Branch Breakers 1.00 LS 758,097.13 758,097.13 955,202.39 1.905
1102 (8) Pad Mounted Distribution Transformer (OISC) with Complete Accessories 1.00 LS 787,567.57 787,567.57 992,335.13 1.979
1103 (1) Lighting Fixtures and Lamps 1.00 LS 311,843.78 311,843.78 392,923.16 0.784
[Autogenerated Code]
National Building Program: Construction/Extension of DPWH-Regional Office II Building
nter, Carig Sur, Tuguegarao City, Cagayan
FORM POW-2015-01B-00
QUIPMENT REQUIREMENT
Number of
Equipment
[Autogenerated Code]
20
[Autogenerated Code]
PROJECT DETAILS
Sec/Usec/Asec
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Project Description :
Construction/Extension of DPWH-Regional Office II Building
Project ID :
Project Component ID :
Project Location : REGIONAL GOVERNMENT CENTER, CARIG SUR, TUGUEGARAO CITY, CAGAYAN
Station Limits :
Fund Source :
Net Length
(a) Road :
(b) Bridge :
(c) Others :
No. of Pre-determined/ :
Unworkable Days
SIGNATORIES
NAME POSITION TITLE
Reviewed as to Unit Cost : JAIME P CATOLOS , JR. Chief, Planning and Design Division
CONTROLLER
Controller :
EVALUATOR
Evaluator :
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-
Regional Office II Building
Regional Government Center, Carig Sur, Tuguegarao City, Cagayan
SUMMARY OF QUANTITIES
1046(2)a1 100mm CHB Non-Load Bearing(including Reinforcing Bar) 1,444.24 sq.m. ###
1032(1)a 1.00 LS
###
foreman
Proposed Three Storey PSA R02 Building with Roof Deck, Transformer Ra
Regional Government Center, Carig Sur, Tuguegarao City, Cagay
SUMMARY OF QUANTITIES
UNIT REMARKS
mos.
mos.
each
mos.
LS
sq.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
kgs.
sq.m.
Liter
sq.m.
sq.m.
LS
LS
sq.m.
LS
LS
LS
sq.m.
LS
sq.m.
sq.m.
sq.m. Interior of Ground Floor painting
sq.m.
LS
LS
LS
LS
LS
each
LS
LS
LS
LS
LS
LS
LS
LS
LS
DETAILED UNIT PRICE ANALYSIS
--------------------------------------
A. SUB-TOTAL , EQUIPMENT P -
--------------------------------------
B. SUB-TOTAL, LABOR P -
Total Cost
C. Name and Description Qty Unit Unit Cost
(Pesos)
E OCM 0% of D -
PROFIT 8% of D 16,000.00
F VAT 5% (D+E) 10,800.00
G Total Cost (D+E+F) 226,800.00
H UNIT COST (G/Quantity) P 22,680.00
DETAILED UNIT PRICE ANALYSIS
--------------------------------------
A. SUB-TOTAL , EQUIPMENT P -
Total Cost
C. Name and Description Qty Unit Unit Cost
(Pesos)
E OCM 0% of D -
PROFIT 8% of D 13,199.84
F VAT 5% (D+E) 8,909.89
G Total Cost (D+E+F) 187,107.73
H UNIT COST (G/Quantity) P 18,710.77
DETAILED UNIT PRICE ANALYSIS
Total Cost
C. Name and Description Qty Unit Unit Cost
(Pesos)
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/E
Project: Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
Factor
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR - P
BASIC PPE
Safety Helmet 15,970.85 M-H P 0.06 P
Safety Shoes 15,970.85 M-H 0.58
Safety Gloves (Denim) 15,970.85 M-H 1.46
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 0% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
PRICE ANALYSIS
12.00
mos.
90,000.00
90,000.00
958.25
9,263.09
23,317.44
33,538.79
-
90,000.00
33,538.79
123,538.79
10,294.90
-
9,883.10
6,671.09
140,092.98
11,674.42
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Constr
Project: DPWH-Regional Office II Building
No. of Days:
No. of Hours:
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR - P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 0% of D
F PROFIT 0% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
AILED UNIT PRICE ANALYSIS
1.00
L.S.
392,641.69
392,641.69
392,641.69
-
-
392,641.69
392,641.69
-
-
19,632.08
412,273.77
412,273.77
DETAILED UNIT PRICE ANALYSIS
--------------------------------------
A. SUB-TOTAL , EQUIPMENT P -
--------------------------------------
B. SUB-TOTAL, LABOR P -
Total Cost
C. Name and Description Qty Unit Unit Cost
(Pesos)
E OCM 0% of D -
PROFIT 8% of D 10,800.00
F VAT 5% (D+E) 7,290.00
G Total Cost (D+E+F) 153,090.00
H UNIT COST (G/Quantity) P 153,090.00
COMPLETION OF PHILIPPINE DRUG ENFORCEMENT AGENCY REGIONAL OFF
#REF! #REF!
#REF! #REF!
OF PROPOSED WORK
Location Cagayan Valley Region, Tuguegarao City, Cagayan Date Submitted 10/8/2015
No. of Quantity /
Item Item Description Member Name Lenght (m.) Width (m.) Height (m.) Total Quantity Unit Measure
Member Member
Demolition & Replacement
1 Stair 1 1 2.6 1.2 0.6 Area = 3.12 sq.m. Volume = 1.872 cu.m. sq.m.
of Existing Structure
Stair 2 1 3.3 2 0.6 Area = 6.6 sq.m. Volume = 3.96 cu.m. sq.m.
Volume = 12.505
Volume Total = 18.337 cu.m. Wall 1 41 0.1 3.05 Area = 143.5 sq.m. sq.m.
cu.m.
Removal of Door 3 1 - - - 1 1 Set
Removal of Door 4 3 - - - 1 3 Sets
Removal of Door 5 1 - - - 1 1 Set
Removal of Door 6 5 - - - 5 5 Sets
Removal of Window 2 1 - - - 1 1 Set
Removal of Water Closet 5 - - - 5 5 Sets
Removal of Wash Basin 1 - - - 1 1 Set
Removal of Steel Grill 1 1 - - - 1 1 Set
Removal of Steel Grill 2 1 - - - 1 1 Set
Isolated Footing (RSB 16pcs. of 16mmø by 96pcs. of 16mmø by use 24pcs. of 16mmø
6 Reinforcing Steel Bar 6 - - -
Matting) 1.308m. 1.308m. by 6.0m.
8pcs. of 16mmø by 48pcs. of 16mmø by use 48pcs. of 16mmø
520.18kgs Collumn (RSB Vertical) 6 4.60 - -
5.25m. 5.25m. by 6.0m.
32pcs. of 10mmø by 192pcs. of 10mmø by use 38.4pcs. of
Collumn (RSB Ties) 6 - - -
1.03m. 1.03m. 10mmø by 6.0m.
57pcs. of 12mmø by 57pcs. of 12mmø by 57pcs. of 12mmø by
Wall Footing (Main Bars) 1 - - -
6.0m. 6.0m. 6.0m.
232pcs. of 10mmø by 232pcs. of 10mmø by use 15pcs. of 10mmø
Wall Footing (Ties) 1 - - -
0.36m. 0.36m. by 6.0m.
Reinforcing Steel for Masonry 124pcs. of 10mmø by 124pcs. of 10mmø by 65pcs. of 10mmø by
476 kgs. 1 74.00 3.36 -
(Vertical Bars) (60cm Spacing) 3.36m. 3.36m. 7.5m.
12 Carpenry Works Carpentry for Columns 6 4.25 0.30 0.30 Area = 5.1 Area = 30.6 sq.m.
Carpentry for Roof Beam 6 4.00 0.35 0.25 Area = 4.8 Area = 28.8 sq.m.
Carpentry for Roof Beam 1 20.00 0.35 0.25 Area = 24 Area = 24 sq.m.
Total 83.4 sq.m.
13 Masonry Painting Masonry 2 74.00 - 2.65 Area = 196.10 sq.m. Area = 392.2 sq.m. sq.m.
Roof Beam 1 20.00 1.20 - Area = 24 sq.m. Area = 24 sq.m. sq.m.
Roof Beam 6 4.00 1.20 - Area = 4.8 sq.m. Area = 28.4 sq.m. sq.m.
Column 6 1.20 - 2.65 Area = 3.18 sq.m. Area = 19.08 sq.m. sq.m.
Area Total = 463.68 sq.m.
***Nothing Fallows***
SUMMARY
Page 3
Page 4
Total
Prepared: Checked by: Reviewed and Submitted by:
1
VAT = Value Added Tax
2
VAT = Overhead, Contingencies and Miscellaneous
DPW-INFR-01-101005
Department of Public Works and Highways (DPWH)
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-Regional Office II Building
Regional Government Center, Carig Sur, Tuguegarao City, Cagayan
Project Name and Location
DPWH Regional Office No. 02
Tuguegarao City
803(1)a Structure Excavation 369.09 cu.m. 0.00 12% 8% 20% 34,180.32 10,254.09 44,434.41 215,335.99 294.30
804(1)a Embankment(from Structure Excavation) 274.27 cu.m. 0.00 12% 8% 20% 18,193.83 5,458.15 23,651.97 114,621.10 187.96
804 (4) Gravel Fill (CF, TB, WF, SOG, Ramps & Stair Footing)
47.35 cu.m. 0.00 12% 8% 20% 5,061.18 1,518.35 6,579.53 31,885.41 761.11
DPW-INFR-01-101005
Department of Public Works and Highways (DPWH)
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-Regional Office II Building
Err:509 Err:509
Err:509 Err:509 Err:509 12% 8% 20% Err:509 Err:509
100mm CHB Non-Load Bearing(including Reinforcing
1046(2)a1
Bar)
1,444.24 sq.m. 0.00 12% 8% 20% 168,707.43 50,612.23 219,319.65 1,062,856.78 756.09
150mm CHB Non-Load Bearing(including Reinforcing
1046(2)a2
Bar)
808.75 sq.m. 0.00 12% 8% 20% 53,875.68 16,162.70 70,038.38 339,416.79 1,167.18
Total, Page 2
Prepared: Checked by:
DPW-INFR-01-101005
Department of Public Works and Highways (DPWH)
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-Regional Office II Building
Total, Page 3
Prepared: Checked by:
1
VAT = Value Added Tax
VAT = Overhead, Contingencies and Miscellaneous
2
DPW-INFR-01-101005
Department of Public Works and Highways (DPWH)
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-Regional Office II Building
Total, Page 4
Prepared: Checked by:
DPW-INFR-01-101005
Department of Public Works and Highways (DPWH)
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-Regional Office II Building
DPW-INFR-01-101005
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- Natio
Project:
Construction/Extension of DPWH-Regional Office II Building
Location : REGIONAL GOVERNMENT CENTER, CARIG SUR, TUGUEGARAO CITY, CAGAYAN
A Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hour
A. SUB-TOTAL , EQUIPMENT
No. of
B Designation of Personnel No. of Men Hour
Hours
Foreman 1 1 16.00
Skilled Laborer 1 2 16.00
Unskilled Laborer 1 4 16.00
B. SUB-TOTAL, LABOR
C. SUB-TOTAL, MATERIAL
SUMMARY:
A Equipment
B Labor
C Materials
D TOTAL DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
PROFIT 8% of D
F VAT 5% (D+E)
G Total Cost (D+E+F)
H UNIT COST (G/Quantity)
NIT PRICE ANALYSIS
tures-Multipurpose/ Facilities- National Building Program:
al Office II Building
G SUR, TUGUEGARAO CITY, CAGAYAN
Quantity 1
Unit LS
8,000.00
kgs
hour(s) km 10.00
1,861.00 29,776.00
783.00 12,528.00
539.00 8,624.00
45.45 727.20
695.71
P 52,350.91
92.98 1,487.68
67.22 2,151.04
51.85 3,318.40
P 6,957.12
P 14,056.00
P 52,350.91
6,957.12
14,056.00
73,364.03
73,364.03
8,803.68
5,869.12
4,401.84
92,438.68
P 92,438.68
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Project : Construction/Extension of DPWH-Regional Office II Building
A Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
Factor
Payloader 1 154.00 1,733.00 266,882.00
Dump truck(12 cu. Yd.) 2 154.00 1,420.00 437,360.00
Bulldozer 1 154.00 3,379.00 520,366.00
B Designation of Personnel No. of Men No. of Hours Hourly Rate Total Cost (Pesos)
1.00 gang
a. Construction Foreman 1 1 154.00 P 92.98 P 14,318.92
b. Unskilled Labor 2 2 154.00 51.85 15,969.80
C. SUB-TOTAL, MATERIAL P -
SUMMARY
A Equipment P 1,224,608.00
B Labor 30,288.72
C Materials -
D TOTAL DIRECT COST (A+B+C) 1,254,896.72
DIRECT UNIT COST D/Quantity 1,254,896.72
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extensio
Project: Office II Building
A Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COST (A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
731.69
cu.m.
104,370.00
56,484.75
913.35
161,768.10
3,417.02
5,716.46
9,133.48
161,768.10
9,133.48
-
170,901.58
233.57
20,508.19
13,672.13
10,254.09
215,335.99
294.30
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extensio
Project: Office II Building
A Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
2 gang
Foreman 1 1 31.00 P 92.98 P
Un-Skilled Labor 3 6 31.00 51.85
B. SUB-TOTAL, LABOR P
NONE
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COST (A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
609.82
cu.m.
5,719.50
71,470.50
1,252.65
78,442.65
2,882.38
9,644.10
12,526.48
78,442.65
12,526.48
-
90,969.13
149.17
10,916.30
7,277.53
5,458.15
114,621.10
187.96
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construc
Project: DPWH-Regional Office II Building
A Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
2 gang
Foreman 1 8.25 P 92.98 P
Un-Skilled Labor 3 6 8.25 51.85
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COST (A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
UNIT PRICE ANALYSIS
160.41
cu.m.
761.06
9,510.19
333.37
10,604.62
767.09
2,566.58
3,333.67
24,061.24
24,061.24
10,604.62
3,333.67
24,061.24
37,999.52
236.89
4,559.94
3,039.96
2,279.97
47,879.40
298.48
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Constr
Project: DPWH-Regional Office II Building
A Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
2 gang
Foreman 1 17.50 P 92.98 P
Un-Skilled Labor 3 6 17.50 51.85
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COST (A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
41.89
cu.m.
707.14
2,152.50
2,859.64
1,627.15
5,444.25
7,071.40
15,374.84
15,374.84
2,859.64
7,071.40
15,374.84
25,305.88
604.06
3,036.71
2,024.47
1,518.35
31,885.41
761.11
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Constr
Project: DPWH-Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
Factor
One bagger mixer 1 1 1.00 P 172.00 P
Minor Tools (10% of Labor)
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
0.33
cu.m.
172.00
36.76
208.76
92.98
67.22
207.40
367.60
500.00
83.84
187.42
771.26
208.76
367.60
771.26
1,347.62
4,098.60
161.71
107.81
80.86
1,698.00
5,164.24
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Constr
Project: DPWH-Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
Factor
Pumpcrete 0.27 1 48.26 P 2,076.00 P
Concrete Vibrator 1 2 178.75 91.25
Minor Tools (10% of Labor)
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
664.16
cu.m.
100,192.95
32,621.88
9,626.05
142,440.87
16,620.18
24,031.15
55,609.13
96,260.46
2,772,856.91
2,772,856.91
142,440.87
96,260.46
2,772,856.91
3,011,558.24
4,534.40
361,386.99
240,924.66
180,693.49
3,794,563.38
5,713.35
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extensio
Project: Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
Factor
Pumpcrete 0.27 1 3.17 P 2,076.00 P
Concrete Vibrator 1 2 11.75 91.25
Minor Tools (10% of Labor)
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
NIT PRICE ANALYSIS
43.62
cu.m.
6,586.11
2,144.38
632.76
9,363.25
1,092.52
1,579.67
3,655.43
6,327.62
182,105.15
182,105.15
9,363.25
6,327.62
182,105.15
197,796.02
4,534.73
23,735.52
15,823.68
11,867.76
249,222.98
5,713.76
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construc
Project: DPWH-Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
Factor
Pumpcrete 0.27 1 4.19 P 2,076.00 P
Concrete Vibrator 1 4 15.50 91.25
Minor Tools (10% of Labor) P
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
UNIT PRICE ANALYSIS
114.57
cu. m
8,688.06
5,657.50
1,525.29
15,870.85
1,441.19
4,167.64
9,644.10
15,252.93
478,310.96
478,310.96
15,870.85
15,252.93
478,310.96
509,434.75
4,446.67
61,132.17
40,754.78
30,566.08
641,887.78
5,602.80
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Project: Construction/Extension of DPWH-Regional Office II Building
Location : REGIONAL GOVERNMENT CENTER, CARIG SUR, TUGUEGARAO CITY, CAGAYAN
Item No. : 900(1)c5 Quantity =
Description : Structural Concrete Suspended Slab Unit =
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COS(A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
AILED UNIT PRICE ANALYSIS
tructures-Multipurpose/ Facilities- National Building Program:
onal Office II Building
CARIG SUR, TUGUEGARAO CITY, CAGAYAN
192.23
cu.m.
14,573.52
9,490.00
2,558.56
26,622.08
2,417.48
6,990.88
16,177.20
25,585.56
802,576.95
802,576.95
26,622.08
25,585.56
802,576.95
854,784.59
4,446.58
102,574.15
68,382.77
51,287.08
1,077,028.58
5,602.70
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construc
Project: DPWH-Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
Factor
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COST (A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
UNIT PRICE ANALYSIS
128.17
cu.m.
9,668.97
6,296.25
1,697.50
17,662.72
1,603.91
4,638.18
10,732.95
16,975.04
535,102.44
535,102.44
17,662.72
16,975.04
535,102.44
569,740.21
4,445.25
68,368.82
45,579.22
34,184.41
717,872.66
5,601.02
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Constructi
Project: Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
Factor
A. SUB-TOTAL , EQUIPMENT
2 gang
Foreman 1 1 255.75 P 92.98
Steelman 3 6 255.75 67.22
Unskilled Laborer 12 24 255.75 51.85
B. SUB-TOTAL, LABOR
C. SUB-TOTAL, MATERIAL
SUMMARY
A Equipment
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity)
Prepared by: Checked/Submitted by:
Quantity = 65,983.63
Unit = kgs.
56,201.06
89,896.13
22,259.20
P 168,356.39
P 23,779.64
103,149.09
318,255.30
P 445,184.03
P 2,639,345.28
67,303.30
135,332.43
P 2,841,981.01
P 168,356.39
445,184.03
2,841,981.01
3,455,521.44
52.37
414,662.57
276,441.71
207,331.29
4,353,957.01
P 65.99
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Constructi
Project: Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
Factor
A. SUB-TOTAL , EQUIPMENT
2 gang
Foreman 1 1 254.00 P 92.98
Steelman 3 6 254.00 67.22
Unskilled Laborer 12 24 254.00 51.85
B. SUB-TOTAL, LABOR
C. SUB-TOTAL, MATERIAL
SUMMARY
A Equipment
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity)
Prepared by: Checked/Submitted by:
Quantity = 65,569.00
Unit = kgs.
55,816.50
89,281.00
22,106.89
P 167,204.39
P 23,616.92
102,443.28
316,077.60
P 442,137.80
P 2,819,466.83
66,880.38
144,317.36
P 3,030,664.56
P 167,204.39
442,137.80
3,030,664.56
3,640,006.75
55.51
436,800.81
291,200.54
218,400.41
4,586,408.51
P 69.95
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construc
Project: DPWH-Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Days Daily Rate
AREA= 1817.10
a. H-Frame 1.7 m x 1.2m, set 355.00 25.24 6.08
2 pcs H-frames
4 pcs diagonal cross braces
4 pcs horizontal braces
8 pcs joint pins
b. Shoring Jack, 3.8 m full extension 546.00 25.24 4.50
c. Adjustable U-head Jack, 0.6m 709.00 25.24 0.85
d. Adjustable Base Jack, 0.6m 709.00 25.24 0.85
e. 1-1/2" GI Pipe x 6.0 m 546.00 25.24 2.50
f. 1-1/2" GI Pipe x 3.0 m 142.00 25.24 1.25
g. 1-1/2" GI Pipe x 4.0 m 284.00 25.24 1.75
h. 1-1/2" GI Pipe x 1.0 m 1,915.00 25.24 0.50
i. Tie Rod x 0.60m 2,464.00 25.24 1.00
j. Round Wing Nut 4,943.00 25.24 0.15
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COST (A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
1,817.10
sq.m
54,472.62
62,008.54
15,209.38
15,209.38
34,449.19
4,479.66
12,543.04
24,164.91
62,185.20
18,712.34
303,434.25
18,781.96
108,627.52
125,684.40
21,035.80
70,383.26
344,512.94
151,746.77
228,737.50
19,024.21
399,508.48
303,434.25
344,512.94
399,508.48
1,047,455.67
576.44
125,694.68
83,796.45
62,847.34
1,319,794.14
726.32
DETAILED UNIT PRICE ANALYSIS
Project: Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Con
A Name and Capacity of Equipment (Operated) Factor No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY:
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COS(A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% (D+E)
H Total Cost (D+E+F)
I UNIT COST (G/Quantity) P
33.00
Liter
164.94
164.94
581.13
420.13
648.13
1,649.39
8,250.00
8,250.00
164.94
1,649.39
8,250.00
10,064.33
304.98
1,207.72
805.15
603.86
12,681.05
384.27
DETAILED UNIT PRICE ANALYSIS
Project: Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Con
A Name and Capacity of Equipment (Operated) Factor No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY:
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COS(A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% (D+E)
H Total Cost (D+E+F)
I UNIT COST (G/Quantity) P
1,405.72
sq.m.
12,365.64
63,210.00
75,575.64
17,085.08
49,406.70
57,164.63
123,656.41
644,305.08
75,575.64
123,656.41
644,305.08
843,537.13
600.07
101,224.46
67,482.97
50,612.23
1,062,856.78
756.09
DETAILED UNIT PRICE ANALYSIS
Project: Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Cons
A Name and Capacity of Equipment (Operated) Factor No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY:
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COS(A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% (D+E)
H Total Cost (D+E+F)
I UNIT COST (G/Quantity) P
Prepared by: Checked/Submitted by:
290.80
sq.m.
3,078.79
15,738.00
18,816.79
4,253.84
12,301.26
14,232.83
30,787.93
219,773.68
18,816.79
30,787.93
219,773.68
269,378.40
926.34
32,325.41
21,550.27
16,162.70
339,416.79
1,167.18
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construc
Project: of DPWH-Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COS(A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 0% of D
F PROFIT 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
1.00
LS
110,565.00
110,565.00
-
-
110,565.00
110,565.00
110,565.00
-
8,845.20
5,970.51
125,380.71
125,380.71
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction
Project: DPWH-Regional Office II Building
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
W-1b (6mm thick tempered tinted glass awning & fixed window on a mullion
type aluminum framing system in powder coated finish complete with 2 22.68 sq.m. 11,500.00
hardware & accessories)
W-1c (6mm thick tempered tinted glass awning & fixed window on a mullion
type aluminum framing system in powder coated finish complete with 4 6.30 sq.m. 11,500.00
hardware & accessories)
W-2 (6mm thick tempered tinted glass casement & fixed window on a
mullion type aluminum framing system in powder coated finish complete 6 34.65 sq.m. 12,500.00
with hardware & accessories)
W-3 (6mm thick tempered tinted glass casement & fixed window on a
mullion type aluminum framing system in powder coated finish complete 16 80.64 sq.m. 12,500.00
with hardware & accessories)
W-4 (6mm thick reflective tinted glass fixed window on a mullion type
aluminum framing system in powder coated finish complete with hardware & 8 14.40 sq.m. 4,825.00
accessories)
W-5 (6mm thick reflective tinted glass awning window on a mullion type
aluminum framing system in powder coated finish complete with hardware & 4 7.20 sq.m. 4,825.00
accessories) P P
W-6 (6mm thick reflective tinted glass awning window on a mullion type
aluminum framing system in powder coated finish complete with hardware & 4 3.60 sq.m. 4,825.00
accessories)
W-7 (6mm thick reflective tinted glass awning window on a mullion type
aluminum framing system in powder coated finish complete with hardware & 16 7.68 sq.m. 4,825.00
accessories)
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COS(A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 0% of D
F PROFIT 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
1.00
LS
850,500.00
661,500.00
260,820.00
72,450.00
433,125.00
1,008,000.00
69,480.00
34,740.00
17,370.00
37,056.00
3,445,041.00
-
-
3,445,041.00
3,445,041.00
3,445,041.00
-
275,603.28
186,032.21
3,906,676.49
3,906,676.49
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension
Project: II Building
A Name and Capacity of Equipment (Operated) Factor No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT
B. SUB-TOTAL, LABOR
C. SUB-TOTAL, MATERIAL
SUMMARY:
A Equipment
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COST (A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 0% of D
F PROFIT 8% of D
G VAT 5% (D+E)
H Total Cost (D+E+F)
I UNIT COST (G/Quantity)
Prepared by: Checked/Submitted by:
Quantity = 1.00
Unit = LS
P -
P -
P -
### 78,624.00
-
9,828.00
-
88,452.00
-
4,000.00
1,000.00
9,000.00
-
26,400.00
P 217,304.00
P -
-
217,304.00
217,304.00
217,304.00
-
17,384.32
11,734.42
246,422.74
P 246,422.74
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension
Project: II Building
Production Output:
Employing
No. of days : 0
No. of Hours :
A Name and Capacity of Equipment (Operated) Factor No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT
B. SUB-TOTAL, LABOR
C. SUB-TOTAL, MATERIAL
SUMMARY:
A Equipment
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COST (A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 0% of D
F PROFIT 8% of D
G VAT 5% (D+E)
H Total Cost (D+E+F)
I UNIT COST (G/Quantity)
NIT PRICE ANALYSIS
rpose/ Facilities- National Building Program: Construction/Extension of DPWH-Regional Office
Quantity = 1.00
Unit = LS
P -
P -
P -
### 140,400.00
P 140,400.00
P -
-
140,400.00
140,400.00
140,400.00
-
11,232.00
7,581.60
159,213.60
P 159,213.60
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension
Project: II Building
Production Output:
Employing
No. of days :
No. of Hours :
A Name and Capacity of Equipment (Operated) Factor No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT
B. SUB-TOTAL, LABOR
C. SUB-TOTAL, MATERIAL
SUMMARY:
A Equipment
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COST (A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 0% of D
F PROFIT 8% of D
G VAT 5% (D+E)
H Total Cost (D+E+F)
I UNIT COST (G/Quantity)
Prepared by: Checked/Submitted by:
Quantity = 1.00
Unit = LS
P -
P -
P -
### 44,788.80
30,380.00
P 75,168.80
P -
-
75,168.80
75,168.80
75,168.80
-
6,013.50
4,059.12
85,241.42
P 85,241.42
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construc
Project: of DPWH-Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
Factor
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COS(A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F Profit 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
MARILYN T. CANAPI EDWIN E. GALANO
Engineering Assistant Engineer III
Planning & Design Division Planning & Design Division
LED UNIT PRICE ANALYSIS
3,686.33
Sq.m.
18,911.40
18,911.40
12,040.91
69,639.92
107,433.20
189,114.03
8,500.00
304,250.00
50,796.00
363,546.00
18,911.40
189,114.03
363,546.00
571,571.43
155.05
68,588.57
45,725.71
34,294.29
720,180.01
195.37
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construc
Project: DPWH-Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
38mm Stainless Steel Stair and Ramp Railing 28.00 pcs 1,650.00
C. SUB-TOTAL, MATERIAL P
SUMMARY:
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COST (A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
1.00
LS
708.00
lin.m
45,781.31
1,286.80
2,988.67
50,056.78
10,529.99
7,612.67
11,744.03
29,886.69
44,400.00
46,200.00
46,860.00
6,873.00
144,333.00
50,056.78
29,886.69
144,333.00
224,276.47
224,276.47
26,913.18
17,942.12
13,456.59
282,588.36
282,588.36
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Project:
Construction/Extension of DPWH-Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
3 gang
Foreman 1 1 90.25 P 92.98 P
Carpenter 1 3 90.25 67.22
Unskilled Laborer 2 6 90.25 51.85
B. SUB-TOTAL, LABOR P
4.5mm thick-4' x 8' Fiber Cement Board 0.365 491 pcs P 397.50 P
Metal Furring 1.131 1,521 pcs 150.00
Carrying Channels 0.357 480 pcs 130.00
Hanger Bars/ Rods 1 1,344 pcs 100.00
Channel Clip 6 8,064 pcs 20.00
Wall Angle 0.238 320 pcs 80.00
rivets 14 18,816 pcs 1.50
1" metals screw 4 5,376 pcs 3.00
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F Profit 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
1,344.00
sq. m
5,466.81
5,466.81
8,391.45
18,199.82
28,076.78
54,668.05
195,172.50
228,150.00
62,400.00
134,400.00
161,280.00
25,600.00
28,224.00
16,128.00
851,354.50
5,466.81
54,668.05
851,354.50
911,489.36
678.19
109,378.72
72,919.15
54,689.36
1,148,476.59
854.52
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Project:
Construction/Extension of DPWH-Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
1 gang
Foreman 1 1 1.25 P 92.98 P
Skilled Labor 1 1 1.25 67.22
Unskilled Laborer 2 2 1.25 51.85
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F Profit 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
27.30
sq. m
32.99
32.99
116.23
84.03
129.63
329.89
4,095.00
204.75
4,299.75
32.99
329.89
4,299.75
4,662.63
170.79
559.52
373.01
279.76
5,874.91
215.20
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Project:
Construction/Extension of DPWH-Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
1 gang
Foreman 1 1 17.75 P 92.98 P
Carpenter 1 1 17.75 67.22
Unskilled Laborer 2 2 17.75 51.85
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F Profit 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
255.60
lin.m
468.42
468.42
1,650.40
1,193.16
1,840.68
4,684.24
10,650.00
3,067.20
13,717.20
468.42
4,684.24
13,717.20
18,869.86
73.83
2,264.38
1,509.59
1,132.19
23,776.03
93.02
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Project:
Construction/Extension of DPWH-Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
1 gang
Foreman 1 1 31.25 P 92.98 P
Carpenter 1 1 31.25 67.22
Unskilled Laborer 2 2 31.25 51.85
B. SUB-TOTAL, LABOR P
4mm thick Aluminum Composite Panel for false buttress 12 pcs P 2,400.00 P
4mm thick Aluminum Composite Panel for Canopy 33 pcs 2,400.00
4mm thick Aluminum Composite Panel (Blue Façade) 31 pcs 2,400.00
Rivets 12 1,865 pcs 3.00
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F Profit 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
155.38
sq. m
824.69
824.69
2,905.63
2,100.63
3,240.63
8,246.89
28,800.00
79,200.00
74,400.00
5,595.00
187,995.00
824.69
8,246.89
187,995.00
197,066.58
1,268.29
23,647.99
15,765.33
11,823.99
248,303.89
1,598.04
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension o
Project: Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total C
Factor
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
Glazed Ceramic Tiles (CR walls and working areas and public area) 305.28 sq.m P 760.00 P
Cement 0.325 100.00 bags 250.00
Sand 0.026 8.00 cu.m 510.00
ABC Tile Grout, 2kg/bag 0.125 39.0 bags 250.00
ABC Adhesive, 25 kg/bag 0.125 39.0 bags 285.00
Consumables (5% of Material Cost)
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F Profit 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
MARILYN T. CANAPI EDWIN E. GALANO
Engineering Assistant Engineer III
Planning & Design Division Planning & Design Division
UNIT PRICE ANALYSIS
ultipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-
305.28
Sq.m.
14,377.22
14,377.22
10,413.76
75,286.40
58,072.00
143,772.16
232,012.80
25,000.00
4,080.00
9,750.00
11,115.00
14,097.89
296,055.69
14,377.22
143,772.16
296,055.69
454,205.07
1,487.83
54,504.61
36,336.41
27,252.30
572,298.38
1,874.67
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension o
Project: Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total C
Factor
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F Profit 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
MARILYN T. CANAPI EDWIN E. GALANO
Engineering Assistant Engineer III
Planning & Design Division Planning & Design Division
UNIT PRICE ANALYSIS
ultipurpose/ Facilities- National Building Program: Construction/Extension of DPWH-
1,288.62
Sq.m.
42,425.62
42,425.62
30,729.89
222,162.10
171,364.25
424,256.24
953,578.80
193,640.00
104,750.00
17,087.10
40,500.00
46,170.00
67,786.30
1,423,512.20
42,425.62
424,256.24
1,423,512.20
1,890,194.06
1,466.84
226,823.29
151,215.52
113,411.64
2,381,644.51
1,848.21
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construc
Project: DPWH-Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY:
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COST (A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
380.00
sq.m.
1,696.57
1,696.57
5,648.54
8,167.23
3,149.89
16,965.66
22,800.00
627,000.00
32,490.00
682,290.00
1,696.57
16,965.66
682,290.00
700,952.23
1,844.61
84,114.27
56,076.18
42,057.13
883,199.80
2,324.21
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construc
Project: DPWH-Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F Profit 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
MARILYN T. CANAPI EDWIN E. GALANO
Engineering Assistant Engineer III
Planning & Design Division Planning & Design Division
UNIT PRICE ANALYSIS
4,321.68
sq.m
38,338.48
38,338.48
47,838.21
276,677.52
106,707.30
383,384.82
155,580.30
114,092.22
121,006.90
397,594.10
39,413.68
827,687.20
38,338.48
383,384.82
827,687.20
1,249,410.50
289.10
149,929.26
99,952.84
74,964.63
1,574,257.23
364.27
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extensio
Project: Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F Profit 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
896.00
sq.m
11,045.41
11,045.41
22,059.51
63,791.78
24,602.83
110,454.12
25,088.00
21,504.00
21,324.80
2,150.40
70,067.20
11,045.41
110,454.12
70,067.20
191,566.73
213.80
22,988.01
15,325.34
11,494.00
241,374.08
269.39
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extensio
Project: Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F Profit 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
53.92
sq.m
251.49
251.49
2,510.46
3,629.88
1,399.95
5,029.83
1,350.00
3,600.00
3,360.00
415.50
8,725.50
251.49
5,029.83
8,725.50
14,006.82
259.77
1,680.82
1,120.55
840.41
17,648.60
327.31
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of
Project: DPWH-Regional Office II Building
-
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
B. Designation of Personnel No. of Men No. of Hours Hourly Rate Total Cost (Pesos)
Factor
2 gang
Foreman 1 1 1.00 P 92.98 P 92.98
Tinsmith 1 2 1.00 67.22 134.44
Unskilled Labor 1 2 1.00 51.85 103.70
C. Material Name and Description Quantity Unit Unit Cost Total Cost (Pesos)
0.6mm thick Pre Painted-Pre Formed Gutter 8.00 pcs P 407.48 P 3,259.84
12"x1" Plain GI Strap 3.00 58 pcs 50.00 2,880.00
Blind Rivets 16 307.20 pcs 3.00 921.60
Consumables (3% of MC) 353.07
SUMMARY
A Equipment P 33.11
B Labor 331.12
C Materials 7,414.51
D TOTAL ESTIMATED DIRECT COST (A+B+C) 7,778.74
DIRECT UNIT COST D/Quantity 405.14
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of
Project: DPWH-Regional Office II Building
-
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
B. Designation of Personnel No. of Men No. of Hours Hourly Rate Total Cost (Pesos)
Factor
2 gang
Foreman 1 1 6.75 P 92.98 P 627.62
Tinsmith 1 2 6.75 67.22 907.47
Unskilled Labor 2 4 6.75 51.85 1,399.95
C. Material Name and Description Quantity Unit Unit Cost Total Cost (Pesos)
SUMMARY
A Equipment P 293.50
B Labor 2,935.04
C Materials 15,069.60
D TOTAL ESTIMATED DIRECT COST (A+B+C) 18,298.14
DIRECT UNIT COST D/Quantity 670.26
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construct
Project: Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
Erection
Welder 3 3 70.50 67.22
Un-Skilled Labor 3 3 70.50 51.85
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
1.00
l.s.
5,973.71
kg.
20,674.13
56,342.90
801.06
4,852.73
82,670.80
6,555.09
9,478.02
7,310.85
14,217.03
10,966.28
48,527.27
8,650.00
2,400.00
14,673.00
3,302.52
11,500.00
44,457.00
895.32
4,340.52
298.35
284.22
77,455.95
114,989.60
4,314.30
813.89
752.85
18,244.44
40,602.60
37,067.94
1,373.44
4,447.56
3,614.09
6,833.92
11,469.52
20,639.05
433,420.08
82,670.80
48,527.27
433,420.08
564,618.15
564,618.15
67,754.18
45,169.45
33,877.09
711,418.87
711,418.87
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Const
Project: of DPWH-Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
ED UNIT PRICE ANALYSIS
1.00
l.s.
13,081.67
kg.
283,866.00
211,234.54
32,996.70
528,097.24
22,501.16
97,603.44
150,572.40
270,677.00
294,751.80
193,372.20
288,540.00
12,593.63
56,977.18
30,675.84
6,850.20
5,920.00
4,926.48
729.34
3,626.70
10,512.56
7,500.00
5,432.50
4,760.25
4,950.00
126.00
3,200.00
935,444.68
528,097.24
270,677.00
935,444.68
1,734,218.92
1,734,218.92
208,106.27
138,737.51
104,053.14
2,185,115.84
2,185,115.84
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Con
Project: Regional Office II Building
A Name and Capacity of Equipment (Operated) Factor No. of Units No. of Hours Hourly R
A. SUB-TOTAL , EQUIPMENT
B. SUB-TOTAL, LABOR
C. SUB-TOTAL, MATERIAL
SUMMARY:
A Equipment
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COST (A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 0% of D
F PROFIT 8% of D
G VAT 5% (D+E)
H Total Cost (D+E+F)
I UNIT COST (G/Quantity)
LED UNIT PRICE ANALYSIS
Quantity = 5.00
Unit = sets
P -
P -
P -
17,595.00 P 17,595.00
7,650.00 P 15,300.00
11,475.00 P 11,475.00
17,595.00 P 17,595.00
P 61,965.00
P -
-
61,965.00
61,965.00
12,393.00
-
4,957.20
3,346.11
70,268.31
P 14,053.66
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of
Project: DPWH-Regional Office II Building
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate Total Cost (Pesos)
B. Designation of Personnel No. of Men No. of Hours Hourly Rate Total Cost (Pesos)
Factor
4 gang
Foreman 1 55.00 P 92.98 P 5,113.90
Tinsmith 2 8 55.00 67.22 29,576.80
Unskilled Labor 1 4 55.00 51.85 11,407.00
C. Material Name and Description Quantity Unit Unit Cost Total Cost (Pesos)
SUMMARY
A Equipment P 2,304.89
B Labor 46,097.70
C Materials 347,020.80
D TOTAL ESTIMATED DIRECT COST (A+B+C) 395,423.39
DIRECT UNIT COST D/Quantity 552.33
E OCM 12% of D 47,450.81
F Profit 8% of D 31,633.87
A. SUB-TOTAL , EQUIPMENT P
C. SUB-TOTAL, MATERIAL
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F Profit 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
O CITY, CAGAYAN
1.00
LS
246.00
lin.m.
6,196.19
6,196.19
13,249.65
19,157.70
29,554.50
61,961.85
14,140.00
18,180.00
7,232.00
3,024.00
1,680.00
4,368.00
1,464.00
1,386.00
1,184.00
624.00
1,105.00
2,448.00
960.00
1,955.00
150.00
84.00
1,120.00
600.00
61,704.00
6,196.19
61,961.85
61,704.00
129,862.04
129,862.04
15,583.44
10,388.96
7,791.72
163,626.16
163,626.16
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of D
Project: Building
A. SUB-TOTAL , EQUIPMENT P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F Profit 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
O CITY, CAGAYAN
1.00
LS
108.00
lin.m.
2,990.14
2,990.14
3,579.73
10,351.88
15,969.80
29,901.41
14,184.00
1,134.00
945.00
189.00
600.00
17,052.00
2,990.14
29,901.41
17,052.00
49,943.55
49,943.55
5,993.23
3,995.48
2,996.61
62,928.87
62,928.87
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/Extension of D
Project: Building
A. SUB-TOTAL , EQUIPMENT P
C. SUB-TOTAL, MATERIAL
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F Profit 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
O CITY, CAGAYAN
1.00
LS
220.00
lin.m.
2,236.55
2,236.55
7,880.06
5,696.90
8,788.58
22,365.54
6,720.00
13,120.00
44.00
2,064.00
150.00
52.00
720.00
11,178.00
1,672.00
280.00
528.00
-
940.00
10,200.00
9,200.00
700.00
2,878.40
60,446.40
2,236.55
22,365.54
60,446.40
85,048.49
85,048.49
10,205.82
6,803.88
5,102.91
107,161.10
107,161.10
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Construction/
Project: Office II Building
A. SUB-TOTAL , EQUIPMENT
B. SUB-TOTAL, LABOR
Fixtures
Water Closet 13 sets P
Wall hung Lavatory 1 sets
Counter top lavatory 16 sets
Faucet 22 sets
Lever type Faucet 17 sets
Floor Drain 17 sets
Urinal 12 sets
soap holder 12 sets
tissue holder 12 sets
Flip Down up Grab Bar 1 sets
L type Grab bar 1 sets
6mm thk. 1500 x 800 mirror 8 sets
6mm thk. 500 x 800 mirror 1 sets
300mmx1200mmx 50mm Phenolic Privacy Shield 2 sets
Consumables (5% of Material Cost)
C. SUB-TOTAL, MATERIAL
SUMMARY
A Equipment
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F Profit 8% of D
G VAT 5% (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity)
Prepared by: Checked/Submitted by:
Quantity = 1.00
Unit = LS
133.00
set
P 3,799.60
P 3,799.60
92.98 P 10,669.46
67.22 15,426.99
51.85 11,899.58
3.56 P 37,996.03
7,329.00 P 95,277.00
6,612.00 6,612.00
5,500.00 88,000.00
165.00 3,630.00
850.00 14,450.00
275.00 4,675.00
5,000.00 60,000.00
340.00 4,080.00
260.00 3,120.00
6,000.00 6,000.00
2,500.00 2,500.00
1,200.00 9,600.00
800.00 800.00
1,500.00 3,000.00
15,087.20
P 316,831.20
P 3,799.60
37,996.03
316,831.20
358,626.83
358,626.83
43,035.22
28,690.15
21,517.61
451,869.80
P 451,869.80
DETAILED UNIT PRICE ANALYSIS
Project: Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Con
A Name and Capacity of Equipment (Operated) Factor No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY:
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COS(A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% (D+E)
H Total Cost (D+E+F)
I UNIT COST (G/Quantity) P
9.00
each
190.85
190.85
836.82
604.98
466.65
1,908.45
2,189.25
3,106.80
1,080.00
1,334.52
7,710.57
190.85
1,908.45
7,710.57
9,809.87
1,089.99
1,177.18
784.79
588.59
12,360.43
1,373.38
DETAILED UNIT PRICE ANALYSIS
Project: Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Con
A Name and Capacity of Equipment (Operated) Factor No. of Units No. of Hours Hourly Rate
A. SUB-TOTAL , EQUIPMENT P
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY:
A Equipment P
B Labor
C Materials
D TOTAL ESTIMATED DIRECT COS(A+B+C)
ESTIMATED DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% (D+E)
H Total Cost (D+E+F)
I UNIT COST (G/Quantity) P
1.00
LS
1.00
SETS
1,043.57
1,043.57
2,231.52
3,226.56
4,977.60
10,435.68
204.00
27,009.98
1,043.57
10,435.68
27,009.98
38,489.23
38,489.23
4,618.71
3,079.14
2,309.35
48,496.43
48,496.43
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Const
Project: of DPWH-Regional Office II Building
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
1.00
LS
2,250.00
5,591.16
5,591.16
7,113.12
27,548.77
21,249.69
55,911.58
166,600.00
67,240.00
5,178.00
1,576.00
20,580.00
55,200.00
42,000.00
115,000.00
3,584.00
2,496.00
320.00
1,232.00
28,800.00
850.00
2,880.00
4,900.00
4,250.00
12,900.00
20,770.00
1,840.00
2,160.00
1,600.00
5,790.00
1,500.00
120.00
180.00
18,522.00
15,000.00
-
603,068.00
5,591.16
55,911.58
603,068.00
664,570.73
664,570.73
79,748.49
53,165.66
39,874.24
837,359.13
837,359.13
DETAILED UNIT PRICE ANALYSIS
Project: Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program: Const
DPWH-Regional Office II Building
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
1.00
LS
16,306.00
lin.m
4,949.68
4,949.68
8,353.36
23,227.20
17,916.25
49,496.81
4,949.68
49,496.81
3,899,094.00
3,953,540.49
3,953,540.49
474,424.86
316,283.24
237,212.43
4,981,461.02
4,981,461.02
DETAILED UNIT PRICE ANALYSIS
Project: Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Construction/Extension of DPWH-Regional Office II Building
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
Prepared by: Checked/Submitted by:
1.00
L.S.
14.00
sets
1,580.66
2,285.48
3,525.80
-
7,391.94
200,000.00
240,000.00
33,660.00
33,660.00
33,660.00
33,660.00
36,440.00
21,700.00
21,700.00
21,700.00
21,700.00
21,700.00
9,186.00
21,200.00
749,966.00
739.19
7,391.94
749,966.00
758,097.13
758,097.13
90,971.66
60,647.77
45,485.83
955,202.39
955,202.39
DETAILED UNIT PRICE ANALYSIS
Project: Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Construction/Extension of DPWH-Regional Office II Building
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
NIT PRICE ANALYSIS
1.00
L.S.
1.00
set
185.96
134.44
207.40
527.80
300,000.00
300,000.00
52.78
527.80
300,000.00
300,580.58
300,580.58
36,069.67
24,046.45
18,034.83
378,731.53
378,731.53
DETAILED UNIT PRICE ANALYSIS
Project: Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Construction/Extension of DPWH-Regional Office II Building
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
NIT PRICE ANALYSIS
1.00
L.S.
3.00
unit
502.09
362.99
559.98
1,425.06
750,000.00
36,000.00
786,000.00
142.51
1,425.06
786,000.00
787,567.57
787,567.57
94,508.11
63,005.41
47,254.05
992,335.13
992,335.13
DETAILED UNIT PRICE ANALYSIS
Project: Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Construction/Extension of DPWH-Regional Office II Building
B. SUB-TOTAL, LABOR P
300KVA Brand New Diesel Generator Set, 60Hz, Silent Type 1 set 1,300,000.00
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
NIT PRICE ANALYSIS
1.00
L.S.
1
set
47.13
47.13
166.04
120.04
185.18
471.25
1,300,000.00
1,300,000.00
47.13
471.25
1,300,000.00
1,300,518.38
1,300,518.38
156,062.21
104,041.47
78,031.10
1,638,653.15
1,638,653.15
DETAILED UNIT PRICE ANALYSIS
Project: Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Construction/Extension of DPWH-Regional Office II Building
B. SUB-TOTAL, LABOR P
Fluorescent lighting fixture with two (2) - 36W, 220V, T8 LED tube,
2 mirrorized aluminum louvre, troffer type, recessed mounted 300mm x 144 Sets 1,236.00
1200 mm
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
NIT PRICE ANALYSIS
1.00
L.S.
295
1,603.62
1,603.62
3,429.10
4,958.15
7,648.91
16,036.16
87,120.00
177,984.00
27,300.00
1,800.00
294,204.00
1,603.62
16,036.16
294,204.00
311,843.78
311,843.78
37,421.25
24,947.50
18,710.63
392,923.16
392,923.16
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Project: Construction/Extension of DPWH-Regional Office II Building
Location : REGIONAL GOVERNMENT CENTER, CARIG, TUGUEGARAO CITY, CAGAYAN
Item No. : 1105(20) Quantity =
Description : Network Cabling Unit =
Production Output: 47.19 linm/hr.
Employing 1 gang Quantity =
No. of Hours: 15.89 hour(s) say 16.00 hour(s) Unit =
No. of Days: 2.00 day(s)
A. Name and Capacity of Equipment (Operated) No. of Units No. of Hours Hourly Rate
Factor
Minor Tools (10% of Labor Cost)
A. SUB-TOTAL , EQUIPMENT P
B. Designation of Personnel No. of Men No. of Hours Hourly Rate
1 gang
Foreman 1 1 16.00 P 92.98 P
Electrician 1 1 16.00 67.22
Unskilled 2 2 16.00 51.85
B. SUB-TOTAL, LABOR P
C. Material Name and Description
Nexan upgradeable patch Quantity Unit Unit Cost
panel 24 port (loaded w/
Wall mounted cabinet 1 set 19,000.00
Nexan-EVO snap in
12RU w/ power strip,
connectors 4 sets 19,000.00
fan, 2"x3" closed cable
Patch guidemanager
for patchand
panel (1RU)
knock out 5 sets 2,500.00
F2TP cable 4 pairs @ 500m/roll (cat5e)holesG24 3 rolls 32,500.00
Alcatel-lucent OS6450-P24 data switch POE 24 ports 1 set 172,500.00
Analog phones 16 sets 2,000.00
I/O ports (Nexan-EVO snap in connector) 300 pcs 400.00
Faceplate (double) 150 pcs 300.00
Amco box 150 pcs 100.00
Alphet Cable (12 pairs-gauge 24, jelly filled) 250 Mts. 240.00
Krone MDF rack mounted back mount frame 4 sets 2,130.00
Krone MDF modules 4 sets 1,250.00
Krone MDF fuse modules 50 pcs 150.00
Pull box (8''x8") powdered coated 12 pcs 540.00
Pull box (6''x6") powdered coated 20 pcs 370.00
UPS 1.5KVA (rack mounted) 1 unit 60,000.00
Rigid Steel Conduit, 25mm (1") Ø 10 lengths 726.00
Rigid Steel Conduit elbow, 25mm (1") Ø x 90° 4 pcs 191.00
Rigid Steel Conduit coupling, 25mm (1") Ø 12 pcs 24.00
Rigid Steel Conduit locknut and bushing, 25mm (1") Ø 5 pcs 11.00
Rigid PVC conduit, 50mm (2") Ø x 3m, thick wall 60 lengths 245.00
Rigid PVC conduit, 40mm (1½") Ø x 3m, thick wall 16 lengths 215.00
Rigid PVC conduit, 25mm (1") Ø x 3m, thick wall 16 lengths 120.00
Rigid PVC conduit, 20mm (¾") Ø x 3m, thick wall 200 lengths 92.00
PVC elbow, 50mm (2") Ø x 90° 24 pcs 36.00
PVC elbow, 40mm (1½") Ø x 90° 8 pcs 30.00
PVC locknut and bushing, 50mm (2") Ø 4 pcs 36.00
PVC locknut and bushing, 40mm (1½") Ø 20 pcs 24.00
PVC locknut and bushing, 25mm (1") Ø 20 pcs 16.00
PVC locknut and bushing, 20mm (¾") Ø 540 pcs 14.00
Electrical junction box (4" x 4" x 2") 180 pcs 30.00
Utility box 160 pcs 45.00
Circuit breaker, 20AT, with Nema 3R enclosure 4 pc 1,350.00
Flat bar (⅛" x 1" x 20') (for hanger and support) 12 lengths 120.00
GI wire # 16 (for cable pulling) 10 kls 80.00
Sealant 8 tubes 180.00
Wire 5.5mm² THHN, copper stranded, 600V, (red) 30 Mts. 37.00
Wire 5.5mm² THHN, copper stranded, 600V, (black) 30 Mts. 37.00
Wire 2.0mm² THHN, copper stranded, 600V, (green) 30 Mts. 16.00
Wire 3.5mm² THHN, bare copper 20 Mts. 23.00
Electrical vinyl tape 10 Mts. 37.00
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
750.00
lin.m
422.24
422.24
Total Cost (Pesos)
1,487.68
1,075.52
1,659.20
4,222.40
Total Cost (Pesos)
19,000.00
76,000.00
12,500.00
97,500.00
172,500.00
32,000.00
120,000.00
45,000.00
15,000.00
60,000.00
8,520.00
5,000.00
7,500.00
6,480.00
7,400.00
60,000.00
7,260.00
764.00
288.00
55.00
14,700.00
3,440.00
1,920.00
18,400.00
864.00
240.00
144.00
480.00
320.00
7,560.00
5,400.00
7,200.00
5,400.00
1,440.00
800.00
1,440.00
1,110.00
1,110.00
480.00
460.00
-
370.00
826,045.00
422.24
4,222.40
826,045.00
830,689.64
830,689.64
99,682.76
66,455.17
49,841.38
1,046,668.95
1,046,668.95
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Project: Construction/Extension of DPWH-Regional Office II Building
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
1.00
LS
23.00
sets
844.48
844.48
2,975.36
2,151.04
3,318.40
8,444.80
77,600.00
3,800.00
10,830.00
25,800.00
5,500.00
16,000.00
2,500.00
49,500.00
-
191,530.00
844.48
8,444.80
191,530.00
200,819.28
200,819.28
24,098.31
16,065.54
12,049.16
253,032.29
253,032.29
DETAILED UNIT PRICE ANALYSIS
Project: Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Construction/Extension of DPWH-Regional Office II Building
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
NIT PRICE ANALYSIS
1.00
L.S.
134
lin.m
79.17
79.17
278.94
201.66
311.10
791.70
17,100.00
3,843.00
968.00
4,200.00
360.00
6,000.00
32,471.00
79.17
791.70
32,471.00
33,341.87
33,341.87
4,001.02
2,667.35
2,000.51
42,010.76
42,010.76
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Project: Construction/Extension of DPWH-Regional Office II Building
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
17.00
set
90.12
90.12
395.17
285.69
220.36
901.21
25,500.00
-
25,500.00
90.12
901.21
25,500.00
26,491.33
1,558.31
3,178.96
2,119.31
1,589.48
33,379.08
1,963.48
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Project: Construction/Extension of DPWH-Regional Office II Building
Split Type ACU, 5TR floor mounted, Inverter Aircon 15 set 250,000.00
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
1.00
LS
15.00
set
318.08
318.08
1,394.70
1,008.30
777.75
3,180.75
3,750,000.00
-
3,750,000.00
318.08
3,180.75
3,750,000.00
3,753,498.83
3,753,498.83
450,419.86
300,279.91
225,209.93
4,729,408.52
4,729,408.52
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Project: Construction/Extension of DPWH-Regional Office II Building
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
1.00
LS
3.00
set
116.63
116.63
511.39
369.71
285.18
1,166.28
130,000.00
115,000.00
-
245,000.00
116.63
1,166.28
245,000.00
246,282.90
246,282.90
29,553.95
19,702.63
14,776.97
310,316.46
310,316.46
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Project: Construction/Extension of DPWH-Regional Office II Building
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
1.00
LS
353.00
lin.m
1,367.72
1,367.72
5,997.21
4,335.69
3,344.33
13,677.23
-
889,916.00
1,367.72
13,677.23
889,916.00
904,960.95
904,960.95
108,595.31
72,396.88
54,297.66
1,140,250.79
1,140,250.79
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Project: Construction/Extension of DPWH-Regional Office II Building
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
1.00
LS
1.00
set
1,182.18
1,182.18
5,183.64
3,747.52
2,890.64
11,821.79
2,303,400.00
-
2,303,400.00
1,182.18
11,821.79
2,303,400.00
2,316,403.97
2,316,403.97
277,968.48
185,312.32
138,984.24
2,918,669.00
2,918,669.00
DETAILED UNIT PRICE ANALYSIS
Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Project: Construction/Extension of DPWH-Regional Office II Building
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
1.00
LS
49.00
set
1,892.55
1,892.55
8,298.47
5,999.39
4,627.61
18,925.46
80,000.00
20,000.00
42,150.00
20,000.00
9,900.00
7,600.00
20,000.00
24,000.00
20,000.00
9,840.00
8,464.00
384.00
920.00
600.00
700.00
625.00
300.00
1,395.00
1,920.00
1,600.00
1,600.00
1,280.00
1,680.00
1,680.00
-
276,638.00
1,892.55
18,925.46
276,638.00
297,456.01
297,456.01
35,694.72
23,796.48
17,847.36
374,794.57
374,794.57
DETAILED UNIT PRICE ANALYSIS
Project: Local Program: Buildings and Other Structures-Multipurpose/ Facilities- National Building Program:
Construction/Extension of DPWH-Regional Office II Building
B. SUB-TOTAL, LABOR P
C. SUB-TOTAL, MATERIAL P
SUMMARY
A Equipment P
B Labor
C Materials
D ESTIMATED DIRECT COST (A+B+C)
DIRECT UNIT COST D/Quantity
E OCM 12% of D
F PROFIT 8% of D
G VAT 5% of (D+E+F)
H Total Cost (D+E+F+G)
I UNIT COST (H/Quantity) P
NIT PRICE ANALYSIS
1.00
L.S.
117
set
773.23
773.23
2,724.31
1,969.55
3,038.41
7,732.27
2,457,000.00
1,200,000.00
352,000.00
92,400.00
30,360.00
1,664.00
672.00
200,000.00
600.00
650.00
4,335,346.00
773.23
7,732.27
4,335,346.00
4,343,851.50
4,343,851.50
521,262.18
347,508.12
260,631.09
5,473,252.89
5,473,252.89
SOIL POISONING
length width no. of fting lit/sq.m
f1 2.2 x 2.2 x 6 x 4.6 = 134
f2 2 x 2 x 33 x 4.6 = 608
f3 1 x 1 x 8 x 4.6 = 37
779
say 780 liters
WATER PROOFING
Length(plus 300mm high to wall width(plus 300mm high to wall
Roof Deck 28.6 x 16.6 = 474.76
Porch Roof 4.13 x 6.05 = 25.00
499.76465 sq.m.
CEILING
length x width
ground floor 28 x 16 = 448
second 28 x 16 = 448
third 28 x 16 = 448
1344 sq.m
SEPTIC TANK
RC CONCRETE
wall footing 16 x 0.4 x 0.2 = 1.28
lintel beam 16 x 0.15 x 0.25 = 0.6
suspended slab 2 x 6 x 0.125 = 1.5
sof 2 x 6 x 0.2 = 2.4
5.78
say 6 cu.m.
CHB
16 x 1.8 x = 28.8
2x 1.8 x = 3.6
32 sq.m
Back Up Computations
A.EARTHWORKS
a. EXCAVATION
width length depth quantity
f1 2.2 x 2.2 x 1.8 x 6 = 52.272
f2 2 x 2 x 1.8 x 33 = 237.6
f3(pwrhs) 1 x 1 x 1.2 x 8 = 9.6
wf-1 0.4 x 91.2 x 0.35 x 1 = 12.768
tb-1 0.3 x 255 x 0.4 x 1 = 30.6
Septic 2 x 6 x 2 x 1 = 24
CB 0.5 x 0.5 x 0.5 x 18 = 2.25
369.09
Embankment from structure excavation incl. compaction(80% of total structure excavation)= 274.272
(Note: excludes excavation for septic tank and chb)
column 2 10 x 12.95 ÷ 6 x 17 =
10 x 13.9 ÷ 6 x 6=
10 x 11.9 ÷ 6 x 8=
10 x 5.4 ÷ 6 x 2=
column 3 4 x 3.8 ÷ 6 x 8=
SUMMARY OF RSB
GRADE 40
TOTAL PCS of rsb LENGTH KG./M
12mm 6798 x 6 0.888 = 36219.74 KGS
10mm 5264 x 6 0.616 = 19455.74 KGS
16mm 114 x 6 1.579 = 1080.036 KGS
20mm 2175 x 6 2.466 = 32181.3 KGS
88936.82 kgs
ack Up Computations
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m
PCS 10mmø X6mRSB
PCS 10mmø X6mRSB
PCS 10mmø X6mRSB
PCS 10mmø X6mRSB
PCS 10mmø X6mRSB
PCS 10mmø X6mRSB
PCS 10mmø X6mRSB
cu.m.
no. of footing
= 53 20mmØ
= 242 20mmØ
= 19 16mmØ
295 20mmØ
19 16mmØ
9.7125 cu.m
8.925 cu.m
35.224 cu.m
13.344 cu.m
15.232 cu.m
1.728 cu.m
30.4 cu.m
114.5655 cu.m
78
72
150 pcs 20mmØx6m RSB
374
144
160
18
696 pcs 20mmØx6m RSB
24
24 pcs 16mmØx6m RSB
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
10mmØ RSB
cu.m.
40 16mmØ RSB
70 10mmØ RSB
60 10mmØ RSB
72 12mmØ RSB
A.Stringers
Length of stringer/flr quantity
7.5 x 12 x = 90
1 x 3 x = 3
93
÷ (length of steel to use) 6
15.5 pcs HD
total kilograms = 876.06 kgs
B. Diagonal Support HD
Length of support
1.5 x 12 = 18
÷ (length of steel to use) 6
3
total kilograms = 169.56 kgs
C. Landing
Area quantity
3.36 x 3 = 10.08
1.32 x 3 = 3.96
14.04
Total kgs of 5.2mm thick plate = 661.284 kgs
D. Landing Support
Angle Bar
7.6 x 3 = 22.8
4 x 3 = 12
34.8
÷ (length of steel to use) 6
6
total kgs of 2" x 2" x 6mm thick Angle bar = 160.92
Channel Steel
9.6 x 3 = 28.8
3 x 3 = 9
37.8
÷ (length of steel to use) 6
7
kgs of 2" x 4" x 6mm thick Channel bar = 395.64
E. Hanger
2 pcs 2"x4"x6mm thick Channel Bar
total kgs = 226.08 kgs
F. Steps
no. of steps area
53 x 0.36 = 19.08
Support
53 x 1.2 = 63.6
÷ (length of steel to use) 6
11
total kgs od 2"x2"x6mm = 295.02
II. Steel Trusses
A.Total length of bot. and top chord
90 ÷ 6 = 15
Total of L75mmx75mmx6mmx6m= 15 pcs
D. C steel Fascia
156 ÷ 6 = 26
Total of LC100mmx50mmx15mmxGA#18x6m= 26 pcs
E. Gusset Plates
Quantity kg/plate
36 x 1.884 = 67.824 kgs
F. Base plate
Quantity kg/plate
12 x 8.478 = 101.736 kgs
G. Steel Plate
12 x 3.768 = 45.216 kgs
e. SCHEDULE OF DOORS AND WINDOWS
HEIGHT WIDTH SETS
D-1 2.2 x 3 x 1 = 6.6 GLASS
D-2 2.2 x 2.5 x 2 = 11 GLASS
D-3 2.15 x 1.7 x 3 = 10.965 WOOD
D-4 2.15 x 1.5 x 5 = 16.125 WOOD
D-5 2.15 x 1 x 2 = 4.3 WOOD
D-6 2.15 x 0.9 x 27 = 52.245 WOOD
D-7 2.15 x 0.8 x 10 = 17.2 WOOD
D-8 2.15 x 0.7 x 8 = 12.04 pvc
D-9 2.2 x 4 x 2 = 17.6 GLASS
50mm
12 x 0.9 = 10.8 ÷ 6 = 1.8
6 x 0.3 = 1.8 ÷ 6 = 0.3
6 x 3 = 18 ÷ 6 = 3
6 x 3 = 18 ÷ 6 = 3
2 x 2.3 = 4.6 ÷ 6 = 0.9
2 x 0.9 = 1.8 ÷ 6 = 0.3
9.3
stair 2 and balcony and ladder
25mm
180 x 0.9 = 162 ÷ 6 = 27
126 x 0.9 = 113.4 ÷ 6 = 18.9
54 x 0.9 = 48.6 ÷ 6 = 8.1
54
50mm
6 x 3 = 18 ÷ 6 = 3
6 x 6 = 36 ÷ 6 = 6
6 x 6 = 36 ÷ 6 = 6
2 33.6 = 67.2 ÷ 6 = 11.4
2 x 12.6 = 25.2 ÷ 6 = 4.2
30.6
RAMP
38mm
4 x 18.5 = 74 ÷ 6 = 12.6
8 x 0.9 = 7.2 ÷ 6 = 1.2
13.8
kg/m
total 25mmØ gi pipe = 65 x 2.5 = 975
total 50mmØ gi pipe = 40 x 5.44 = 1305.6
total 38mmØ gi pipe = 14 x 4.05 = 340.2
2620.8 kgs
REGION II
FORM ABC-2015-02-00
Prepared by: Checked/Submitted by: Reviewed as to Unit Cost: Concurred by: Recommending Approval: Approved:
BENJAMIN G. CASIBANG EDWIN E. GALANO JAIME P CATOLOS , JR. Engr. NELSON C. DAQUIOAG ALEXANDER D NOLA, CESO IV MELANIO C BRIOSOS, CESO III
ARCHITECT II Engineer II OIC, Planning and Design Division OIC,Regional Director, NTC R02 Assistant Regional Director Regional Director
Planning and Design Division
REGION II
FORM POW-2015-02A-00
BENJAMIN G. CASIBANG EDWIN E. GALANO JAIME P. CATOLOS, JR. ENGR. NELSON C. DAQUIOAG ALEXANDER D. NOLA, CESO IV MELANIO C. BRIOSOS, CESO III
ARCHITECT II Engineer II OIC-Planning and Design Division Regional Director, NTC R02 Assistant Regional Director Regional Director
Planning and Design Division
REGION II
FORM POW-2015-02A-00
FORM POW-2015-01-00
PROGRAM OF WORK/BUDGET COST
Project Name : PROPOSED NATIONAL TELECOMMUNICATIONS COMMISSION REGIONAL OFFICE 02 Net Length : (a) Road
(b) Bridge 0
Project ID : (c) Others 3 Storey with Roof Deck
Project Compon : with 215.84 sq.m. Bldg. Footprint
Project Location : REGIONAL GOVERNMENT CENTER, CARIG, TUGUEGARAO CITY, CAGAYAN Target Start Date :
Work Location : Total Project Duration : 300 CD
Estimated Proj. : No. of Pre-determined :
Source of Fund : Unworkable Days
BENJAMIN G. CASIBANG EDWIN E. GALANO JAIME P CATOLOS , JR. ENGR. NELSON C. DAQUIOAG ALEXANDER D NOLA, CESO IV MELANIO C BRIOSOS, CESO III
ARCHITECT II Engineer II OIC, Planning and Design Division OIC,Regional Director, Assistant Regional Director Regional Director
Planning and Design Division NTC R02
PROPOSED NATIONAL TELECOMMUNICATIONS COMMISSION REGIONAL OFFICE 02
REGIONAL GOVERNMENT CENTER, CARIG SUR, TUGUEGARAO CITY, CAGAYAN
FORM POW-2015-01C-00
DETAILED BREAKDOWN OF COMPONENT FOR EACH ITEM
DIRECT COST TOTAL MARK-UP
ITEM NO. DESCRIPTION % QTY UNIT 5% VAT TOTAL COST
MATERIAL LABOR EQUIPMENT TOTAL % VALUE
PART I FACILITIES FOR THE ENGINEER
Provision of Combined Field office, Laboratory and AS EVALUATED
A.1.1(6) Living Quarters building for the engineer (Rental Basis) AS SUBMITTED 10.00 200,000.00 - - 200,000.00 0.08 16,000.00 10,800.00 226,800.00
Operation & Maintenance of Temporary field office, AS EVALUATED - - -
A.1.1(15) Laboratory and The Living Quarters Building for the
Engineers AS SUBMITTED 10.00 57,150.00 107,848.00 - 164,998.00 0.08 13,199.84 8,909.89 187,107.73
AS EVALUATED
TOTAL OF PART A
AS SUBMITTED 257,150.00 107,848.00 - 364,998.00 29,199.84 19,709.89 413,907.73
PART II OTHER GENERAL REQUIREMENTS
AS EVALUATED
B.5 Project Billboard
AS SUBMITTED 4.00 each 16,860.00 2,734.72 273.47 19,868.19 0.20 3,973.64 1,192.09 25,033.92
AS EVALUATED - - - - - - -
B.7 Health and Safety Program
AS SUBMITTED 12.00 mos. 33,538.79 90,000.00 - 123,538.79 0.08 9,883.10 6,671.09 140,092.98
AS EVALUATED - - - - - - -
B.9 Mobilization/ Demobilization
AS SUBMITTED 1.00 L.S. - - 392,641.69 392,641.69 0 - 19,632.08 412,273.77
AS EVALUATED - - - - - - -
Err:509 Err:509
AS SUBMITTED 1.00 L.S. 135,000.00 - - 135,000.00 0.08 10,800.00 7,290.00 153,090.00
AS EVALUATED
TOTAL OF PART B
AS SUBMITTED 185,398.79 92,734.72 392,915.16 671,048.67 24,656.74 34,785.27 730,490.67
PART III CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMBING WORKS
PART A EARTHWORKS
AS EVALUATED
801(1) Removal of Actual Structures and Obstruction
AS SUBMITTED 1.00 sq.m. - 30,288.72 1,224,608.00 1,254,896.72 0.20 250,979.34 75,293.80 1,581,169.88
AS EVALUATED - - - - - - -
803(1)a Structure Excavation
AS SUBMITTED 731.69 cu.m. - 9,133.48 161,768.10 170,901.58 0.20 34,180.32 10,254.09 215,335.99
AS EVALUATED - - - - - - -
804(1)a Embankment(from Structure Excavation)
AS SUBMITTED 609.82 cu.m. - 12,526.48 78,442.65 90,969.13 0.20 18,193.83 5,458.15 114,621.10
AS EVALUATED - - - - - - -
804 (1)(b) Embankment(From Borrow)
AS SUBMITTED 160.41 cu.m. 24,061.24 3,333.67 10,604.62 37,999.52 0.20 7,599.90 2,279.97 47,879.40
Gravel Fill (CF, TB, WF, SOG, Ramps & Stair AS EVALUATED - - - - - - -
804 (4)
Footing) AS SUBMITTED 41.89 cu.m. 15,374.84 7,071.40 2,859.64 25,305.88 0.20 5,061.18 1,518.35 31,885.41
AS EVALUATED
TOTAL OF PART A
AS SUBMITTED 39,436.08 62,353.75 1,478,283.00 1,580,072.83 316,014.57 94,804.37 1,990,891.78
PROPOSED NATIONAL TELECOMMUNICATIONS COMMISSION REGIONAL OFFICE 02
REGIONAL GOVERNMENT CENTER, CARIG SUR, TUGUEGARAO CITY, CAGAYAN
FORM POW-2015-01C-00
PART B PLAIN AND REINFORCED CONCRETE WORK
AS EVALUATED
900 (1)c1 Structural Concrete (Class A, 28 days)
AS SUBMITTED 664.16 cu.m. 2,772,856.91 96,260.46 142,440.87 3,011,558.24 0.20 602,311.65 180,693.49 3,794,563.38
AS EVALUATED 0.00
900(1)c3 Structural Concrete Footing Tie Beam
AS SUBMITTED 43.62 cu.m. 182,105.15 6,327.62 9,363.25 197,796.02 0.20 39,559.20 11,867.76 249,222.98
AS EVALUATED 0.00
900(1)c4 Structural Concrete Column
AS SUBMITTED 114.57 cu.m. 478,310.96 15,252.93 15,870.85 509,434.75 0.20 101,886.95 30,566.08 641,887.78
AS EVALUATED 0.00
900(1)c6 Structural Concrete Beams/Girders
AS SUBMITTED 128.17 cu.m. 535,102.44 16,975.04 17,662.72 569,740.21 0.20 113,948.04 34,184.41 717,872.66
AS EVALUATED
900(1)c5 Structural Concrete Suspended Slab
AS SUBMITTED 192.23 cu.m. 802,576.95 25,585.56 26,622.08 854,784.59 0.20 170,956.92 51,287.08 1,077,028.58
AS EVALUATED
902(1)a Reinforcing Steel (Deformed) Grade 40
AS SUBMITTED 65,983.63 kgs. 2,841,981.01 445,184.03 168,356.39 3,455,521.44 0.20 691,104.29 207,331.29 4,353,957.01
AS EVALUATED
Err:509 Err:509
AS SUBMITTED #REF! #REF! #REF! #REF! #REF! 0.20 #REF! #REF! #REF!
AS EVALUATED
TOTAL OF PART B
AS SUBMITTED
PART C FINISHINGS AND OTHER CIVIL WORKS
AS EVALUATED
1046(2)a1 100mm CHB Non-Load Bearing(including Reinforcing
AS SUBMITTED 1,405.72 sq.m. 644,305.08 123,656.41 75,575.64 843,537.13 0.20 168,707.43 50,612.23 1,062,856.78
AS EVALUATED
1046(2)a2 150mm CHB Non-Load Bearing(including Reinforcing
AS SUBMITTED 290.80 sq.m. 219,773.68 30,787.93 18,816.79 269,378.40 0.20 53,875.68 16,162.70 339,416.79
AS EVALUATED
1003(1)a1 Ceiling (FiCem Board on Metal Frame)
AS SUBMITTED 1,344.00 sq.m. 851,354.50 54,668.05 5,466.81 911,489.36 0.20 182,297.87 54,689.36 1,148,476.59
AS EVALUATED
AS SUBMITTED #REF! sq.m. #REF! #REF! #REF! #REF! 0.08 #REF! #REF! #REF!
AS EVALUATED
0.00 Aluminum Glass Windows
AS SUBMITTED #REF! L.S. #REF! #REF! #REF! #REF! 0.08 #REF! #REF! #REF!
AS EVALUATED
1032(1)b Doors (Wooden Panelled Doors)
AS SUBMITTED 1.00 LS 217,304.00 - - 217,304.00 0.20 17,384.32 11,734.42 246,422.74
AS EVALUATED
Err:509 Err:509
AS SUBMITTED #REF! sq.m. #REF! #REF! #REF! #REF! 0.20 #REF! #REF! #REF!
AS EVALUATED
0.00 PVC Doors and Frames
AS SUBMITTED 1.00 sq.m. 75,168.80 - - 75,168.80 0.08 6,013.50 4,059.12 85,241.42
AS EVALUATED
0.00 Cement Plaster Finish
AS SUBMITTED 3,686.33 sq.m. 363,546.00 189,114.03 18,911.40 571,571.43 0.20 114,314.29 34,294.29 720,180.01
AS EVALUATED
Err:509 Err:509
AS SUBMITTED 305.28 Err:509 296,055.69 143,772.16 14,377.22 454,205.07 0.20 90,841.01 27,252.30 572,298.38
AS EVALUATED
Err:509 Err:509
AS SUBMITTED 4,321.68 sq.m. 827,687.20 383,384.82 38,338.48 1,249,410.50 0.20 249,882.10 74,964.63 1,574,257.23
PROPOSED NATIONAL TELECOMMUNICATIONS COMMISSION REGIONAL OFFICE 02
REGIONAL GOVERNMENT CENTER, CARIG SUR, TUGUEGARAO CITY, CAGAYAN
FORM POW-2015-01C-00
AS EVALUATED
Err:509 Err:509
AS SUBMITTED 896.00 Err:509 70,067.20 110,454.12 11,045.41 191,566.73 0.20 38,313.35 11,494.00 241,374.08
AS EVALUATED
Err:509 Err:509
AS SUBMITTED 1.00 lin.m 144,333.00 29,886.69 50,056.78 224,276.47 0.20 44,855.29 13,456.59 282,588.36
AS EVALUATED
Err:509 Err:509
AS SUBMITTED 1.00 L.S. 60,446.40 22,365.54 2,236.55 85,048.49 0.20 17,009.70 5,102.91 107,161.10
AS EVALUATED
1001(8) Err:509
AS SUBMITTED 1.00 Err:509 61,704.00 61,961.85 6,196.19 129,862.04 0.20 25,972.41 7,791.72 163,626.16
AS EVALUATED
1002(24) Cold Water Lines
AS SUBMITTED 1.00 Err:509 316,831.20 37,996.03 3,799.60 358,626.83 0.20 71,725.37 21,517.61 451,869.80
AS EVALUATED 0.00
1016(1)a Water Proofing(4 Coats)
AS SUBMITTED 380.00 sq.m. 682,290.00 16,965.66 1,696.57 700,952.23 0.20 140,190.45 42,057.13 883,199.80
AS EVALUATED
TOTAL OF PART C
AS SUBMITTED #REF! #REF! #REF! #REF! #REF! #REF!
PART D ELECTRICAL WORKS
AS EVALUATED
Err:509 Err:509
AS SUBMITTED 1.00 LS 603,068.00 55,911.58 5,591.16 664,570.73 0.20 132,914.15 39,874.24 837,359.13
AS EVALUATED
1101(33) Err:509
AS SUBMITTED 1.00 LS 3,899,094.00 49,496.81 4,949.68 3,953,540.49 0.20 790,708.10 237,212.43 4,981,461.02
AS EVALUATED
1102 (1) Panelboard with Main & Branch Breakers
AS SUBMITTED 1.00 LS 749,966.00 7,391.94 739.19 758,097.13 0.20 151,619.43 45,485.83 955,202.39
AS EVALUATED
1103 (1) Lighting Fixtures and Lamps
AS SUBMITTED 1.00 LS 294,204.00 16,036.16 1,603.62 311,843.78 0.20 62,368.76 18,710.63 392,923.16
Pad Mounted Distribution Transformer (OISC) with AS EVALUATED
1102 (8)
Complete Accessories AS SUBMITTED 1.00 LS 786,000.00 1,425.06 142.51 787,567.57 0.20 157,513.51 47,254.05 992,335.13
AS EVALUATED
AS SUBMITTED #REF! LS #REF! #REF! #REF! #REF! 0.20 #REF! #REF!
AS EVALUATED
1105(20) Network Cabling
AS SUBMITTED 1.00 LS 826,045.00 4,222.40 422.24 830,689.64 0.20 166,137.93 49,841.38 1,046,668.95
AS EVALUATED
TOTAL OF PART D
AS SUBMITTED
AS EVALUATED
GRAND TOTAL
AS SUBMITTED
PROPOSED NATIONAL TELECOMMUNICATIONS COMMISSION REGION
ITEMIZED BREAKDOWN
DIRECT COST
ITEM QTY
DESCRIPTION UNIT TOTAL UNIT COST
NO.
AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED
PART I FACILITIES FOR THE ENGINEER
Provision of Combined Field office, Laboratory and Living
A.1.1(6) Quarters building for the engineer (Rental Basis)
7.00 mos. 200,000.00 20,000.00
Operation & Maintenance of Temporary field office, Laboratory
A.1.1(15) and The Living Quarters Building for the Engineers 7.00 mos. 164,998.00 16,499.80
TOTAL OF PART A 364,998.00
PART II OTHER GENERAL REQUIREMENTS
B.5 Project Billboard 19,868.19 4,967.05
B.7 Health and Safety Program 12.00 mos. 123,538.79 10,294.90
B.9 Mobilization/ Demobilization 1.00 L.S. 392,641.69 392,641.69
135,000.00 135,000.00
TOTAL OF PART B 671,048.67
PART III CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMBING WORKS
PART A EARTHWORKS
801(1) Removal of Actual Structures and Obstruction 1.00 sq.m. 1,254,896.72 1,254,896.72
803(1)a Structure Excavation 731.69 cu.m. 170,901.58 233.57
804(1)a Embankment(from Structure Excavation) 609.82 cu.m. 90,969.13 149.17
804 (1)(b) Embankment(From Borrow) 160.41 cu.m. 37,999.52 236.89
804 (4) Gravel Fill (CF, TB, WF, SOG, Ramps & Stair Footing) 41.89 cu.m. 25,305.88 604.06
TOTAL OF PART A 1,580,072.83
TOTAL OF PART B
PART C FINISHINGS AND OTHER CIVIL WORKS
1046(2)a1 100mm CHB Non-Load Bearing(including Reinforcing Bar) 1,444.24 sq.m. 843,537.13 600.07
1046(2)a2 150mm CHB Non-Load Bearing(including Reinforcing Bar) 808.75 sq.m. 269,378.40 926.34
1003(1)a1 Ceiling (FiCem Board on Metal Frame) 1,344.00 sq.m. 911,489.36 678.19
1.00 LS
0.00 Aluminum Glass Windows 1.00 LS
1032(1)b Doors (Wooden Panelled Doors) 63.02 sq.m. 217,304.00 217,304.00
Err:509 Err:509 Err:509 Err:509
0.00 PVC Doors and Frames 1.00 LS 75,168.80 75,168.80
0.00 Cement Plaster Finish 3,823.12 sq.m. 571,571.43 155.05
Err:509 Err:509 Err:509 Err:509 454,205.07 1,487.83
Err:509 Err:509 Err:509 Err:509 1,249,410.50 289.10
Err:509 Err:509 Err:509 Err:509 191,566.73 213.80
Err:509 Err:509 Err:509 Err:509 224,276.47 224,276.47
Err:509 Err:509 Err:509 Err:509 85,048.49 85,048.49
1001(8) Err:509 Err:509 Err:509 129,862.04 129,862.04
1002(24) Cold Water Lines 1.00 LS 358,626.83 358,626.83
1016(1)a Water Proofing(4 Coats) 380.00 sq.m. 700,952.23 1,844.61
-
TOTAL OF PART C
PART D ELECTRICAL WORKS
Err:509 Err:509 1.00 LS 664,570.73 664,570.73
1101(33) Err:509 1.00 LS 3,953,540.49 3,953,540.49
1102 (1) Panelboard with Main & Branch Breakers 1.00 LS 758,097.13 758,097.13
1103 (1) Lighting Fixtures and Lamps 1.00 LS 311,843.78 311,843.78
Pad Mounted Distribution Transformer (OISC) with
1102 (8) 1.00 LS 787,567.57 787,567.57
Complete Accessories
LS
1105(20) Network Cabling 1.00 LS 830,689.64 830,689.64
TOTAL OF PART D
GRAND TOTAL
COMMUNICATIONS COMMISSION REGIONAL OFFICE 02
22,680.00
18,710.77
6,258.48
11,674.42
412,273.77
153,090.00
1,581,169.87
294.30
187.96
298.48
761.11
5,713.35
5,713.76
5,602.80
5,601.02
5,602.70
65.99
756.09
1,167.18
854.52
246,422.74
85,241.42
195.37
1,874.67
364.27
269.39
282,588.36
107,161.10
163,626.16
451,869.80
2,324.21
837,359.13
4,981,461.02
955,202.39
392,923.16
992,335.13
1,046,668.95
PROPOSED NATIONAL TELECOMMUNICATIONS COMMISSION REGIONAL OFFICE 02
EQUIPMENT
DESCRIPTION OF WORKS TO BE DONE % OF TOTAL DESCRIPTION REQUIRED
COMPLIANCE TO THE NATIONAL BUILDING CODE OF THE PHILIPPINES (PD 1096) ON OPEN SPACES
Percentage of Site Maximum Allowable
Actual Unpaved
Building Use Actual Building Footprint (BF) Total Lot Area (TLA) Occupancy (PSO = Impervious Surface Remarks
Surface Area (USA)
BF/TLA) Area (ISA)
(SQ.M.) (SQ.M.) % (SQ.M.) (SQ.M.)
OFFICE BUILDING Complied
BREAKDOWN OF EXPENDITURE :
2. Materials B. Mark-Up
3. Rental of Equipment C. VAT(5%)
4. Mobilization/Demobilization(1% of Civil Works) D. Total (A+B+C)
5. Total Estimated Direct Cost E. Eng'g. & Administrative Overhead, (3.5%)
6. OCM (12% of EDC) F. Contingency
7. Profit (8% of EDC) G. Total Estimated Project Cost P
8. VAT 5% say P
9. Engineering and Administrative Overhead (3.5%)
10. Contingency -
11. Total Estimated Project Cost
say
Prepared by : Checked by : Reviewed and Submitted by: