Вы находитесь на странице: 1из 1

Engineering and Design of Underground Piping Network

for WEPCO Storage Tanks # 1,2,3&4

TRANSMITTAL
TRANSMISSION OF ( DOCUMENTS ) Trans.No. T-QUAD-1005-2019 Date 17/12/2019 Rev. 00

Process Piping Health, Safety &


Discipline: General Construction
Technology Engineering Enviromental

Drawing (SD) Safety & Environment (SE) Risk Assessment (RA) Material Specs (MS)

Sketch (SK) Prequalification (PQ) Take of Sheet (BM) Plan (PN

As Built Drawings (AB) Report (RP) Invoice (IN) Procedure (PR)

Non-Conformance (NCR) Schedule (SC) LIST (LI) QA/QC Document (QA)

From : EL-MAHD Engineering Company Submitted For : Notes


To : Egyptian Maintenenance Company (EMC) Information

Attachment : 200 Pages (Soft Copy ONLY) + 3D MODEL (Navisworks) Review/Comment

Document Status : 2nd Submission Approval/Construction

Subject Tramsittal No. 5 : T-QUAD-1005-2019

S/N Document No. Rev. DESCRIPTION Review Cycle


PIPING MATERIAL SPECIFICATION AND CLASSES FOR NEW DRAIN
1 QUAD-PIP-PS-012019 01 7 Days
NETWORK
WEPCO STORAGE TANKS DRAIN NETWORK FABRICATION AND
2 QUAD-HSE-RA-012019 01 7 Days
TESTING RISK ASSESSMENT
METHOD STATEMENT FOR DRAIN NETWORK REPLACEMENT
3 QUAD-CON-MS-012019 01 7 Days
CONSTRUCTION ACTIVITIES

PIPING ISOMETRIC DRAWINGS FOR THE NEW STORAGE TANKS


4 QUAD-PIP-IS-012019 01 7 Days
DRAIN NETWORK

COLLECTIVE MTO REPORT FOR THE NEW DRAIN NETWORK PIPING


5 QUAD-PIP-RP-012019 01 7 Days
COMPONENTS AND VALVES AND SUPPORTS DETAILS

WEPCO STORAGE TANKS NEW DRAIN NETWORK PIPING PLOT PLAN


6 QUAD-PIP-PL-012019 01 7 Days
AND SECTIONS

HYDRAULIC CALCULATION REPORT FOR


7 QUAD-PRO-RP-012019 01 7 Days
WEPCO STORAGE TANK DRAIN NETWORK

3D MODEL FOR WEPCO STORAGE TANKS NEW DRAIN NETWORK


8 QUAD-PIP-3D-012019 01 7 Days
LINES AND VALVES
Remarks:

EL-MAHD / Signature :
Eng. Mohamed Hassan Ahmed
Date : 17/12/2019
Position: Mechanical Project Engineer

REMARKS: :

Attention (EMC) : ………………Eng. Ashraf Kaoud…………………. Date : 17/12/2019