Chapter 14
Package Instrumentation System Checklist
Check List....................................................................................................................................... 3
Revision 1-30-2005
Chapter 14
Package Instrumentation System Checklist
2
Installation and Commissioning Manual
Chapter 14
Package Instrumentation System Checklist
Introduction
This chapter covers all the following areas and check points;
1. Combustion Air Intake System
2. Ventilation Air Intake System
3. Gas Turbine Package Combustion Dynamics (Acoustic) System
4. Gas Turbine Lubricating Oil Systems (including Driven Unit)
5. Gas Turbine Hydraulic Oil Systems (including Driven Unit where applicable)
6. Gas Turbine Seal and Breather Systems
7. Gas Fuel System
8. Liquid Fuel System
9. Driven Unit Seal and Breather Systems
10. Package Starter System
11. Package Water Wash System
12. Water Injection System
13. Steam Injection System
14. Vent and Drains System
15. Package DLE Exhaust Monitoring (if required).
Note: It is the intention of this chapter to cover the integrity of all systems listed
above.
Prior to dispatch all instrumentation listed above will have been check calibrated
and a certificate produced by the frame and systems department personnel (this
may not be applicable to sub-vendor supplied equipment). The calibration
certificate will accompany the turbine package to site including, where applicable,
the driven unit calibration certificate. If the calibration certificates are not on site,
copies can be obtained by contacting SIEMENS Houston location Quality
Department.
3
Chapter 14
Package Instrumentation System Checklist
Ensure that all associated drain valves are operational and are
2 left in the correct position as indicated by the contract specific
P & ID.
4
Installation and Commissioning Manual
Chapter 14
Package Instrumentation System Checklist
For
Item Equipment Reception / Site Installation Date
SIEMENS
Continued from previous page.
SIEMENS Instrument Tag # Title
5
Chapter 14
Package Instrumentation System Checklist
6
Installation and Commissioning Manual
Chapter 14
Package Instrumentation System Checklist
Ensure that all associated drain valves are operational and are
2 left in the correct position as indicated by the contract specific
P & ID.
7
Chapter 14
Package Instrumentation System Checklist
For
Item Equipment Reception / Site Installation Date
SIEMENS
Continued from previous page.
SIEMENS Instrument Tag # Title
8
Installation and Commissioning Manual
Chapter 14
Package Instrumentation System Checklist
Ensure that all associated drain valves are operational and are
2 left in the correct position as indicated by the contract specific
P & ID.
9
Chapter 14
Package Instrumentation System Checklist
10
Installation and Commissioning Manual
Chapter 14
Package Instrumentation System Checklist
Ensure that all associated drain valves are operational and are
2 left in the correct position as indicated by the contract specific
P & ID.
11
Chapter 14
Package Instrumentation System Checklist
12
Installation and Commissioning Manual
Chapter 14
Package Instrumentation System Checklist
Gas Turbine Hydraulic Oil Systems (Including Driven Unit Where Applicable)
For
Item Equipment Reception / Site Installation Date
SIEMENS
Check and make sure that safe access is adhering to local/site
and SIEMENS safety policies and instructions prior to any
inspections/checks taking place. Make sure assembly is
complete as per the contract specific P & ID. Note the
reference document below. Ensure all pipe work, valves,
1 plugs, and instrumentation and supports are complete and
sound.
Ensure that all associated drain valves are operational and are
2 left in the correct position as indicated by the contract specific
P & ID.
13
Chapter 14
Package Instrumentation System Checklist
14
Installation and Commissioning Manual
Chapter 14
Package Instrumentation System Checklist
Ensure that all associated drain valves are operational and are
2 left in the correct position as indicated by the contract specific
P & ID.
15
Chapter 14
Package Instrumentation System Checklist
16
Installation and Commissioning Manual
Chapter 14
Package Instrumentation System Checklist
Ensure that all associated drain valves are operational and are
2 left in the correct position as indicated by the contract specific
P & ID.
17
Chapter 14
Package Instrumentation System Checklist
18
Installation and Commissioning Manual
Chapter 14
Package Instrumentation System Checklist
Ensure that all associated drain valves are operational and are
2 left in the correct position as indicated by the contract specific
P & ID.
19
Chapter 14
Package Instrumentation System Checklist
20
Installation and Commissioning Manual
Chapter 14
Package Instrumentation System Checklist
For
Item Equipment Reception / Site Installation Date
SIEMENS
Check and make sure that safe access is adhering to local/site
and SIEMENS safety policies and instructions prior to any
inspections/checks taking place. Make sure assembly is
complete as per the contract specific P & ID. Note the
reference document below. Ensure all pipe work, valves,
1 plugs, and instrumentation and supports are complete and
sound.
Ensure that all associated drain valves are operational and are
2 left in the correct position as indicated by the contract specific
P & ID.
21
Chapter 14
Package Instrumentation System Checklist
22
Installation and Commissioning Manual
Chapter 14
Package Instrumentation System Checklist
For
Item Equipment Reception / Site Installation Date
SIEMENS
Check and make sure that safe access is adhering to local/site
and SIEMENS safety policies and instructions prior to any
inspections/checks taking place. Make sure assembly is
complete as per the contract specific P & ID. Note the
reference document below. Ensure all pipe work, valves,
plugs, and instrumentation and supports are complete and
1 sound. Ensure hydraulic system (where fitted) has been
primed and the hydraulic pump has been turned by hand.
Ensure that all associated drain valves are operational and are
2 left in the correct position as indicated by the contract specific
P & ID.
23
Chapter 14
Package Instrumentation System Checklist
24
Installation and Commissioning Manual
Chapter 14
Package Instrumentation System Checklist
Ensure that all associated drain valves are operational and are
3 left in the correct position as indicated by the contract specific
P & ID.
25
Chapter 14
Package Instrumentation System Checklist
26
Installation and Commissioning Manual
Chapter 14
Package Instrumentation System Checklist
Ensure that all associated drain valves are operational and are
2 left in the correct position as indicated by the contract specific
P & ID.
27
Chapter 14
Package Instrumentation System Checklist
28
Installation and Commissioning Manual
Chapter 14
Package Instrumentation System Checklist
Ensure that all associated drain valves are operational and are
2 left in the correct position as indicated by the contract specific
P & ID.
29
Chapter 14
Package Instrumentation System Checklist
30
Installation and Commissioning Manual
Chapter 14
Package Instrumentation System Checklist
Ensure that all associated drain valves are operational and are
2 left in the correct position as indicated by the contract specific
P & ID.
31
Chapter 14
Package Instrumentation System Checklist
32
Installation and Commissioning Manual
Chapter 14
Package Instrumentation System Checklist
Ensure that all associated drain valves are operational and are
2 left in the correct position as indicated by the contract specific
P & ID.