tw(lower) = 26 mm
Leg41 = 12 mm
Note: Per UW-16(b) minimum inside corner radius r = min [1 / 4*t , 3 mm] = 3 mm
1
Nozzle
Material specification: SA-266 4 (II-D Metric p. 18, ln. 9) (normalized)
Inside diameter, new: 581.05 mm
Wall thickness, tn: 95 mm
Minimum wall thickness: 14.27 mm
Corrosion allowance: 3.2 mm
Projection available outside vessel, Lpr: 197.95 mm
Heavy barrel length, Lhb: 60 mm
Projection available outside vessel to flange face, Lf: 350.35 mm
Local vessel minimum thickness: 26 mm
Liquid static head included: 0.208 bar
Longitudinal joint efficiency: 1
J05-D-0302 (MA)
Gasket Description: Flexitallic Spiral Wound CG 316 S.S.
PWHT performed: Yes
Circumferential joint radiography: Full UW-11(a) Type 1
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For P = 8.62 bar @ 165 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For P = 9.99 bar @ 17 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For Pe = 0.65 bar @ 149 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
Nozzle (N8)
tw(lower) = 26 mm
Leg41 = 12 mm
Note: Per UW-16(b) minimum inside corner radius r = min [1 / 4*t , 3 mm] = 3 mm
1
Nozzle
Material specification: SA-266 4 (II-D Metric p. 18, ln. 9) (normalized)
Inside diameter, new: 139.73 mm
Wall thickness, tn: 40 mm
Minimum wall thickness: 14.27 mm
Corrosion allowance: 3.2 mm
Projection available outside vessel, Lpr: 211.1 mm
Heavy barrel length, Lhb: 35 mm
Projection available outside vessel to flange face, Lf: 300 mm
Local vessel minimum thickness: 26 mm
Liquid static head included: 0 bar
Longitudinal joint efficiency: 1
J05-D-0302 (MA)
PWHT performed: Yes
Circumferential joint radiography: Full UW-11(a) Type 1
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For P = 8.7 bar @ 165 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
Applied Loads
Maximum stresses due to the applied loads at the nozzle OD (includes pressure)
Pressure stress intensity factor, I = 1 (derived from PVP-Vol. 399, pages 77-82)
The maximum local primary membrane stress (PL) is within allowable limits.
J05-D-0302 (MA)
Stresses at the nozzle OD per WRC Bulletin 107
Figure value β Au Al Bu Bl Cu Cl Du Dl
3C* 30.0338 0.0266 0 0 0 0 -44.575 -44.575 -44.575 -44.575
Pressure stress* 1,401.849 1,401.849 1,401.849 1,401.849 1,401.849 1,401.849 1,401.849 1,401.849
Total circumferential stress 740.543 1,857.579 1,536.698 1,297.373 607.03 2,083.897 1,520.738 1,217.434
Primary membrane
1,299.061 1,299.061 1,417.036 1,417.036 1,345.463 1,345.463 1,369.086 1,369.086
circumferential stress*
Pressure stress* 700.96 700.96 700.96 700.96 700.96 700.96 700.96 700.96
Total longitudinal stress -216.686 1,495.287 955.049 391.891 153.128 1,131.8 725.427 618.279
Primary membrane
639.301 639.301 673.47 673.47 642.464 642.464 671.853 671.853
longitudinal stress*
Shear from M t 31.849 31.849 31.849 31.849 31.849 31.849 31.849 31.849
Total Shear stress 43.52 43.52 20.178 20.178 16.311 16.311 47.387 47.387
Combined stress (P L+Pb+Q) 961.166 1,862.711 1,537.401 1,297.795 607.592 2,084.178 1,523.551 1,221.161
Longitudinal stress in the nozzle wall due to internal pressure + external loads (hot shut down condition
governs)
The average primary stress Pm (see Division 2 5.6.a.1) across the nozzle wall due to internal pressure + external
loads is acceptable ( ≤ S = 1,407.207 kgf/cm2)
Longitudinal stress in the nozzle wall due to external pressure + external loads
The average primary stress Pm (see Division 2 5.6.a.1) across the nozzle wall due to external pressure + external
J05-D-0302 (MA)
loads is acceptable ( ≤ S = 1,407.207 kgf/cm2)
σtorsion = Mt / (2*π*Ri2*tn)*100000
= 550.5 / (2*π*73.062*11.07)*100000
= 148.189 kgf/cm2
UG-45: The total combined shear stress (208.34 kgf/cm2) is below than the allowable (0.7*Sn = 0.7*1,407.207 =
985.045 kgf/cm2)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For P = 9.92 bar @ 17 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For Pe = 0.65 bar @ 149 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
Nozzle (N6)
tw(lower) = 26 mm
Leg41 = 10 mm
Nozzle
Material specification: SA-105 (II-D Metric p. 18, ln. 5) (normalized)
Inside diameter, new: 50.8 mm
Nominal wall thickness: 13.46 mm
Corrosion allowance: 3.2 mm
Projection available outside vessel, Lpr: 180.95 mm
Projection available outside vessel to flange face, Lf: 200 mm
Local vessel minimum thickness: 26 mm
Liquid static head included: 0 bar
Longitudinal joint efficiency: 1
J05-D-0302 (MA)
Reinforcement Calculations for MAWP
UG-45
Nozzle Wall
UG-37 Area Calculation Summary Thickness
(cm2) Summary
For P = 8.7 bar @ 165 °C
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
Applied Loads
Maximum stresses due to the applied loads at the nozzle OD (includes pressure)
Pressure stress intensity factor, I = 1.18007 (derived from PVP-Vol. 399, pages 77-82)
The maximum local primary membrane stress (PL) is within allowable limits.
J05-D-0302 (MA)
Stresses at the nozzle OD per WRC Bulletin 107
Figure value β Au Al Bu Bl Cu Cl Du Dl
3C* 35.5466 0.0094 0 0 0 0 -17.577 -17.577 -17.577 -17.577
Pressure stress* 1,654.251 1,654.251 1,654.251 1,654.251 1,401.849 1,401.849 1,401.849 1,401.849
Total circumferential stress 1,406.279 1,859.055 1,652.493 1,637.307 1,110.287 1,655.868 1,392.358 1,378.578
Primary membrane
1,632.667 1,632.667 1,644.9 1,644.9 1,383.077 1,383.077 1,385.468 1,385.468
circumferential stress*
Pressure stress* 700.96 700.96 700.96 700.96 827.161 827.161 827.161 827.161
Total longitudinal stress 346.191 1,016.357 746.378 624.607 615.256 1,005.74 794.82 830.957
Primary membrane
681.274 681.274 685.492 685.492 810.498 810.498 812.888 812.888
longitudinal stress*
Shear from M t 28.263 28.263 28.263 28.263 28.263 28.263 28.263 28.263
Total Shear stress 39.231 39.231 17.296 17.296 13.64 13.64 42.887 42.887
Combined stress (P L+Pb+Q) 1,407.755 1,860.883 1,652.845 1,637.588 1,110.638 1,656.149 1,395.451 1,381.882
Longitudinal stress in the nozzle wall due to internal pressure + external loads (hot shut down condition
governs)
The average primary stress Pm (see Division 2 5.6.a.1) across the nozzle wall due to internal pressure + external
loads is acceptable ( ≤ S = 1,407.207 kgf/cm2)
Longitudinal stress in the nozzle wall due to external pressure + external loads
The average primary stress Pm (see Division 2 5.6.a.1) across the nozzle wall due to external pressure + external
J05-D-0302 (MA)
loads is acceptable ( ≤ S = 1,407.207 kgf/cm2)
σtorsion = Mt / (2*π*Ri2*tn)*100000
= 61.2 / (2*π*28.62*10.26)*100000
= 116.008 kgf/cm2
UG-45: The total combined shear stress (171.304 kgf/cm2) is below than the allowable (0.7*Sn = 0.7*1,407.207 =
985.045 kgf/cm2)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary Thickness
(cm2) Summary
For P = 9.92 bar @ 17 °C
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary Thickness
(cm2) Summary
For Pe = 0.65 bar @ 149 °C
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
Nozzle (N2)
tw(lower) = 26 mm
Leg41 = 12 mm
Note: Per UW-16(b) minimum inside corner radius r = min [1 / 4*t , 3 mm] = 3 mm
1
Nozzle
Material specification: SA-266 4 (II-D Metric p. 18, ln. 9) (normalized)
Inside diameter, new: 295.3 mm
Wall thickness, tn: 60 mm
Minimum wall thickness: 14.27 mm
Corrosion allowance: 3.2 mm
Projection available outside vessel, Lpr: 185.7 mm
Heavy barrel length, Lhb: 50 mm
Projection available outside vessel to flange face, Lf: 300 mm
Local vessel minimum thickness: 26 mm
Liquid static head included: 0 bar
Longitudinal joint efficiency: 1
J05-D-0302 (MA)
PWHT performed: Yes
Circumferential joint radiography: Full UW-11(a) Type 1
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For P = 8.42 bar @ 165 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
Applied Loads
Maximum stresses due to the applied loads at the nozzle OD (includes pressure)
Pressure stress intensity factor, I = 1 (derived from PVP-Vol. 399, pages 77-82)
The maximum local primary membrane stress (PL) is within allowable limits.
J05-D-0302 (MA)
Stresses at the nozzle OD per WRC Bulletin 107
Figure value β Au Al Bu Bl Cu Cl Du Dl
3C* 23.795 0.0503 0 0 0 0 -70.658 -70.658 -70.658 -70.658
Pressure stress* 1,356.15 1,356.15 1,356.15 1,356.15 1,356.15 1,356.15 1,356.15 1,356.15
Total circumferential stress 237.989 1,908.621 1,787.834 1,169.837 -5.273 2,481.06 1,850.548 815.63
Primary membrane
1,073.305 1,073.305 1,478.835 1,478.835 1,237.894 1,237.894 1,333.089 1,333.089
circumferential stress*
Pressure stress* 678.04 678.04 678.04 678.04 678.04 678.04 678.04 678.04
Total longitudinal stress -729.997 1,823.55 1,165.899 170.072 -246.918 1,312.067 909.631 417.061
Primary membrane
546.777 546.777 667.986 667.986 532.575 532.575 663.346 663.346
longitudinal stress*
Shear from M t 35.646 35.646 35.646 35.646 35.646 35.646 35.646 35.646
Total Shear stress 47.949 47.949 23.342 23.342 19.194 19.194 52.097 52.097
Combined stress (P L+Pb+Q) 972.696 1,930.206 1,788.678 1,170.399 -248.465 2,481.341 1,853.431 822.31
Longitudinal stress in the nozzle wall due to internal pressure + external loads
The average primary stress Pm (see Division 2 5.6.a.1) across the nozzle wall due to internal pressure + external
loads is acceptable ( ≤ S = 1,407.207 kgf/cm2)
σtorsion = Mt / (2*π*Ri2*tn)*100000
= 2,201.8 / (2*π*150.852*11.07)*100000
J05-D-0302 (MA)
= 139.052 kgf/cm2
UG-45: The total combined shear stress (197.319 kgf/cm2) is below than the allowable (0.7*Sn = 0.7*1,407.207 =
985.045 kgf/cm2)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For P = 9.76 bar @ 17 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For Pe = 0.65 bar @ 149 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
Nozzle (N7)
tw(lower) = 26 mm
Leg41 = 10 mm
Nozzle
Material specification: SA-266 4 (II-D Metric p. 18, ln. 9) (normalized)
Inside diameter, new: 50.8 mm
Nominal wall thickness: 13.46 mm
Corrosion allowance: 3.2 mm
Opening chord length: 67.24 mm
Projection available outside vessel, Lpr: 269.03 mm
Projection available outside vessel to flange face, Lf: 288.08 mm
Local vessel minimum thickness: 26 mm
Liquid static head included: 0.3911 bar
Longitudinal joint efficiency: 1
J05-D-0302 (MA)
PWHT performed: Yes
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For P = 8.7 bar @ 165 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
Applied Loads
Maximum stresses due to the applied loads at the nozzle OD (includes pressure)
Pressure stress intensity factor, I = 1.18007 (derived from PVP-Vol. 399, pages 77-82)
The maximum local primary membrane stress (PL) is within allowable limits.
J05-D-0302 (MA)
Stresses at the nozzle OD per WRC Bulletin 107
Figure value β Au Al Bu Bl Cu Cl Du Dl
3C* 35.5466 0.0094 0 0 0 0 -17.577 -17.577 -17.577 -17.577
Pressure stress* 1,654.181 1,654.181 1,654.181 1,654.181 1,401.779 1,401.779 1,401.779 1,401.779
Total circumferential stress 1,406.208 1,858.985 1,652.423 1,637.237 1,110.216 1,655.798 1,392.288 1,378.507
Primary membrane
1,632.597 1,632.597 1,644.83 1,644.83 1,383.007 1,383.007 1,385.397 1,385.397
circumferential stress*
Pressure stress* 700.889 700.889 700.889 700.889 827.09 827.09 827.09 827.09
Total longitudinal stress 346.121 1,016.286 746.308 624.536 615.185 1,005.67 794.749 830.887
Primary membrane
681.204 681.204 685.422 685.422 810.428 810.428 812.818 812.818
longitudinal stress*
Shear from M t 28.263 28.263 28.263 28.263 28.263 28.263 28.263 28.263
Total Shear stress 39.231 39.231 17.296 17.296 13.64 13.64 42.887 42.887
Combined stress (P L+Pb+Q) 1,407.685 1,860.813 1,652.775 1,637.518 1,110.568 1,656.079 1,395.381 1,381.812
Longitudinal stress in the nozzle wall due to internal pressure + external loads (hot shut down condition
governs)
The average primary stress Pm (see Division 2 5.6.a.1) across the nozzle wall due to internal pressure + external
loads is acceptable ( ≤ S = 1,407.207 kgf/cm2)
Longitudinal stress in the nozzle wall due to external pressure + external loads
The average primary stress Pm (see Division 2 5.6.a.1) across the nozzle wall due to external pressure + external
J05-D-0302 (MA)
loads is acceptable ( ≤ S = 1,407.207 kgf/cm2)
σtorsion = Mt / (2*π*Ri2*tn)*100000
= 61.2 / (2*π*28.62*10.26)*100000
= 116.008 kgf/cm2
UG-45: The total combined shear stress (171.304 kgf/cm2) is below than the allowable (0.7*Sn = 0.7*1,407.207 =
985.045 kgf/cm2)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary Thickness
(cm2) Summary
For P = 8.7 bar @ 165 °C
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
UW-16 Weld Sizing Summary
Required weld Actual weld
Weld description Status
throat size (mm) throat size (mm)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary Thickness
(cm2) Summary
For P = 9.92 bar @ 17 °C
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary Thickness
(cm2) Summary
For P = 9.92 bar @ 17 °C
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For Pe = 0.55 bar @ 149 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
UW-16 Weld Sizing Summary
Required weld Actual weld
Weld description Status
throat size (mm) throat size (mm)
J05-D-0302 (MA)
Nozzle (N9)
tw(lower) = 26 mm
Leg41 = 12 mm
Note: Per UW-16(b) minimum inside corner radius r = min [1 / 4*t , 3 mm] = 3 mm
1
Nozzle
Material specification: SA-266 4 (II-D Metric p. 18, ln. 9) (normalized)
Inside diameter, new: 466.75 mm
Wall thickness, tn: 95 mm
Minimum wall thickness: 20.62 mm
Corrosion allowance: 3.2 mm
Projection available outside vessel, Lpr: 205.47 mm
Heavy barrel length, Lhb: 60 mm
Projection available outside vessel to flange face, Lf: 350 mm
Local vessel minimum thickness: 26 mm
Liquid static head included: 0 bar
Longitudinal joint efficiency: 1
J05-D-0302 (MA)
PWHT performed: Yes
Circumferential joint radiography: Full UW-11(a) Type 1
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For P = 8.56 bar @ 165 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
Applied Loads
Maximum stresses due to the applied loads at the nozzle OD (includes pressure)
Pressure stress intensity factor, I = 1 (derived from PVP-Vol. 399, pages 77-82)
The maximum local primary membrane stress (PL) is within allowable limits.
J05-D-0302 (MA)
Stresses at the nozzle OD per WRC Bulletin 107
Figure value β Au Al Bu Bl Cu Cl Du Dl
3C* 17.876 0.0795 0 0 0 0 -79.587 -79.587 -79.587 -79.587
Pressure stress* 1,379.421 1,379.421 1,379.421 1,379.421 1,379.421 1,379.421 1,379.421 1,379.421
Total circumferential stress 146.66 1,780.593 1,905.036 1,255.4 -289.454 2,723.338 2,110.543 654.909
Primary membrane
963.626 963.626 1,580.218 1,580.218 1,216.942 1,216.942 1,382.726 1,382.726
circumferential stress*
Pressure stress* 689.711 689.711 689.711 689.711 689.711 689.711 689.711 689.711
Total longitudinal stress -756.924 1,762.032 1,158.798 276.587 -404.897 1,288.374 1,075.485 369.885
Primary membrane
502.554 502.554 717.693 717.693 441.738 441.738 722.685 722.685
longitudinal stress*
Shear from M t 314.623 314.623 314.623 314.623 314.623 314.623 314.623 314.623
Total Shear stress 326.294 326.294 302.952 302.952 299.015 299.015 330.232 330.232
Combined stress (P L+Pb+Q) 1,114.575 2,097.747 2,012.535 1,341.596 -651.745 2,783.169 2,206.934 872.087
Longitudinal stress in the nozzle wall due to internal pressure + external loads
The average primary stress Pm (see Division 2 5.6.a.1) across the nozzle wall due to internal pressure + external
loads is acceptable ( ≤ S = 1,407.207 kgf/cm2)
σtorsion = Mt / (2*π*Ri2*tn)*100000
= 48,599.8 / (2*π*236.582*17.42)*100000
J05-D-0302 (MA)
= 793.14 kgf/cm2
UG-45: The total combined shear stress (828.561 kgf/cm2) is below than the allowable (0.7*Sn = 0.7*1,407.207 =
985.045 kgf/cm2)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For P = 9.92 bar @ 17 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For Pe = 0.65 bar @ 149 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
Nozzle (K3A)
tw(lower) = 26 mm
Leg41 = 10 mm
Nozzle
Material specification: SA-266 4 (II-D Metric p. 18, ln. 9) (normalized)
Inside diameter, new: 50.8 mm
Nominal wall thickness: 13.46 mm
Corrosion allowance: 3.2 mm
Opening chord length: 65.97 mm
Projection available outside vessel, Lpr: 211.37 mm
Projection available outside vessel to flange face, Lf: 230.42 mm
Local vessel minimum thickness: 26 mm
Liquid static head included: 0.0347 bar
Longitudinal joint efficiency: 1
J05-D-0302 (MA)
PWHT performed: Yes
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For P = 8.7 bar @ 165 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
Applied Loads
Maximum stresses due to the applied loads at the nozzle OD (includes pressure)
Pressure stress intensity factor, I = 1.18007 (derived from PVP-Vol. 399, pages 77-82)
The maximum local primary membrane stress (PL) is within allowable limits.
J05-D-0302 (MA)
Stresses at the nozzle OD per WRC Bulletin 107
Figure value β Au Al Bu Bl Cu Cl Du Dl
3C* 35.5466 0.0094 0 0 0 0 -17.577 -17.577 -17.577 -17.577
Pressure stress* 1,654.251 1,654.251 1,654.251 1,654.251 1,401.849 1,401.849 1,401.849 1,401.849
Total circumferential stress 1,406.279 1,859.055 1,652.493 1,637.307 1,110.287 1,655.868 1,392.358 1,378.578
Primary membrane
1,632.667 1,632.667 1,644.9 1,644.9 1,383.077 1,383.077 1,385.468 1,385.468
circumferential stress*
Pressure stress* 700.96 700.96 700.96 700.96 827.161 827.161 827.161 827.161
Total longitudinal stress 346.191 1,016.357 746.378 624.607 615.256 1,005.74 794.82 830.957
Primary membrane
681.274 681.274 685.492 685.492 810.498 810.498 812.888 812.888
longitudinal stress*
Shear from M t 28.263 28.263 28.263 28.263 28.263 28.263 28.263 28.263
Total Shear stress 39.231 39.231 17.296 17.296 13.64 13.64 42.887 42.887
Combined stress (P L+Pb+Q) 1,407.755 1,860.883 1,652.845 1,637.588 1,110.638 1,656.149 1,395.451 1,381.882
Longitudinal stress in the nozzle wall due to internal pressure + external loads (hot shut down condition
governs)
The average primary stress Pm (see Division 2 5.6.a.1) across the nozzle wall due to internal pressure + external
loads is acceptable ( ≤ S = 1,407.207 kgf/cm2)
Longitudinal stress in the nozzle wall due to external pressure + external loads
The average primary stress Pm (see Division 2 5.6.a.1) across the nozzle wall due to external pressure + external
J05-D-0302 (MA)
loads is acceptable ( ≤ S = 1,407.207 kgf/cm2)
σtorsion = Mt / (2*π*Ri2*tn)*100000
= 61.2 / (2*π*28.62*10.26)*100000
= 116.008 kgf/cm2
UG-45: The total combined shear stress (171.304 kgf/cm2) is below than the allowable (0.7*Sn = 0.7*1,407.207 =
985.045 kgf/cm2)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary Thickness
(cm2) Summary
For P = 8.7 bar @ 165 °C
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
UW-16 Weld Sizing Summary
Required weld Actual weld
Weld description Status
throat size (mm) throat size (mm)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary Thickness
(cm2) Summary
For P = 9.92 bar @ 17 °C
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary Thickness
(cm2) Summary
For P = 9.92 bar @ 17 °C
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For Pe = 0.56 bar @ 149 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
UW-16 Weld Sizing Summary
Required weld Actual weld
Weld description Status
throat size (mm) throat size (mm)
J05-D-0302 (MA)
Nozzle (BOOT)
tw(lower) = 26 mm
Leg41 = 12 mm
Note: Per UW-16(b) minimum inside corner radius r = min [1 / 4*t , 3 mm] = 3 mm
1
Nozzle
Material specification: SA-266 4 (II-D Metric p. 18, ln. 9) (normalized)
Inside diameter, new: 743.6 mm
Wall thickness, tn: 155 mm
Minimum wall thickness: 10 mm
Corrosion allowance: 0 mm
Projection available outside vessel, Lpr: 1,900 mm
Heavy barrel length, Lhb: 60 mm
Local vessel minimum thickness: 26 mm
Liquid static head included: 0.5573 bar
Longitudinal joint efficiency: 1
J05-D-0302 (MA)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For P = 8.7 bar @ 165 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For P = 9.92 bar @ 17 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For Pe = 0.65 bar @ 149 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
Nozzle (N3)
tw(lower) = 26 mm
Leg41 = 12 mm
Note: Per UW-16(b) minimum inside corner radius r = min [1 / 4*t , 3 mm] = 3 mm
1
Nozzle
Material specification: SA-266 4 (II-D Metric p. 18, ln. 9) (normalized)
Inside diameter, new: 581.05 mm
Wall thickness, tn: 130 mm
Minimum wall thickness: 14.27 mm
Corrosion allowance: 3.2 mm
Projection available outside vessel, Lpr: 197.6 mm
Heavy barrel length, Lhb: 60 mm
Projection available outside vessel to flange face, Lf: 350 mm
Local vessel minimum thickness: 26 mm
Liquid static head included: 0.5573 bar
Longitudinal joint efficiency: 1
J05-D-0302 (MA)
PWHT performed: Yes
Circumferential joint radiography: Full UW-11(a) Type 1
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For P = 8.7 bar @ 165 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
Applied Loads
Maximum stresses due to the applied loads at the nozzle OD (includes pressure)
Pressure stress intensity factor, I = 1 (derived from PVP-Vol. 399, pages 77-82)
The maximum local primary membrane stress (PL) is within allowable limits.
J05-D-0302 (MA)
Stresses at the nozzle OD per WRC Bulletin 107
Figure value β Au Al Bu Bl Cu Cl Du Dl
3C* 14.2785 0.1018 0 0 0 0 -84.79 -84.79 -84.79 -84.79
Pressure stress* 1,401.849 1,401.849 1,401.849 1,401.849 1,401.849 1,401.849 1,401.849 1,401.849
Total circumferential stress 31.919 1,701.989 2,051.415 1,298.428 -637.684 3,028.681 2,438.243 438.996
Primary membrane
866.954 866.954 1,674.921 1,674.921 1,195.499 1,195.499 1,438.62 1,438.62
circumferential stress*
Pressure stress* 700.96 700.96 700.96 700.96 700.96 700.96 700.96 700.96
Total longitudinal stress -793.202 1,711.692 1,191.983 354.206 -607.944 1,278.953 1,264.61 344.574
Primary membrane
459.245 459.245 773.095 773.095 335.505 335.505 804.592 804.592
longitudinal stress*
Shear from M t 34.732 34.732 34.732 34.732 34.732 34.732 34.732 34.732
Total Shear stress 46.895 46.895 22.569 22.569 18.491 18.491 50.973 50.973
Combined stress (P L+Pb+Q) 830.465 1,754.017 2,051.977 1,298.99 -646.542 3,028.892 2,440.423 461.284
Longitudinal stress in the nozzle wall due to internal pressure + external loads
The average primary stress Pm (see Division 2 5.6.a.1) across the nozzle wall due to internal pressure + external
loads is acceptable ( ≤ S = 1,407.207 kgf/cm2)
σtorsion = Mt / (2*π*Ri2*tn)*100000
= 8,807.3 / (2*π*293.732*11.07)*100000
J05-D-0302 (MA)
= 146.705 kgf/cm2
UG-45: The total combined shear stress (206.554 kgf/cm2) is below than the allowable (0.7*Sn = 0.7*1,407.207 =
985.045 kgf/cm2)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For P = 9.92 bar @ 17 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary (cm2) Thickness
For Pe = 0.65 bar @ 149 °C Summary
The opening is adequately reinforced
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
Nozzle (K2A)
tw(lower) = 26 mm
Leg41 = 10 mm
Nozzle
Material specification: SA-266 4 (II-D Metric p. 18, ln. 9) (normalized)
Inside diameter, new: 50.8 mm
Nominal wall thickness: 13.46 mm
Corrosion allowance: 3.2 mm
Opening chord length: 57.8 mm
Projection available outside vessel, Lpr: 270.27 mm
Projection available outside vessel to flange face, Lf: 289.32 mm
Local vessel minimum thickness: 26 mm
Liquid static head included: 0.3044 bar
Longitudinal joint efficiency: 1
J05-D-0302 (MA)
PWHT performed: Yes
UG-45
Nozzle Wall
UG-37 Area Calculation Summary Thickness
(cm2) Summary
For P = 9.7 bar @ 165 °C
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
Applied Loads
Maximum stresses due to the applied loads at the nozzle OD (includes pressure)
U = ro / Sqr(Rm*t) = 0.101
Pressure stress intensity factor, I = 1 (derived from PVP-Vol. 399, pages 77-82)
The maximum local primary membrane stress (PL) is within allowable limits.
J05-D-0302 (MA)
Stresses at the nozzle OD per WRC Bulletin 107
Figure value Au Al Bu Bl Cu Cl Du Dl
SR-2* 0.2745 -21.514 -21.514 -21.514 -21.514 -21.514 -21.514 -21.514 -21.514
SR-2 0.3086 -145.254 145.254 -145.254 145.254 -145.254 145.254 -145.254 145.254
Pressure stress* 1,413.872 1,413.872 1,413.872 1,413.872 1,413.872 1,413.872 1,413.872 1,413.872
Total Ox stress 991.819 1,786.287 1,502.388 1,288.936 1,050.737 1,728.917 1,443.471 1,346.307
Membrane O x
1,389.053 1,389.053 1,395.662 1,395.662 1,389.827 1,389.827 1,394.889 1,394.889
stress*
SR-2* 0.0838 -6.609 -6.609 -6.609 -6.609 -6.609 -6.609 -6.609 -6.609
SR-2 0.0896 -42.184 42.184 -42.184 42.184 -42.184 42.184 -42.184 42.184
Pressure stress* 1,413.872 1,413.872 1,413.872 1,413.872 1,413.872 1,413.872 1,413.872 1,413.872
Total Oy stress 1,285.351 1,527.206 1,444.807 1,371.688 1,303.771 1,509.208 1,426.386 1,389.686
Membrane O y
1,406.279 1,406.279 1,408.247 1,408.247 1,406.49 1,406.49 1,408.036 1,408.036
stress*
Shear from M t 28.263 28.263 28.263 28.263 28.263 28.263 28.263 28.263
Total Shear stress 39.231 39.231 17.296 17.296 13.64 13.64 42.887 42.887
Combined stress
1,290.483 1,792.123 1,507.169 1,375.133 1,304.474 1,729.761 1,478.624 1,416.051
(PL+Pb+Q)
Longitudinal stress in the nozzle wall due to internal pressure + external loads (hot shut down condition
governs)
The average primary stress Pm (see Division 2 5.6.a.1) across the nozzle wall due to internal pressure + external
loads is acceptable ( ≤ S = 1,407.207 kgf/cm2)
Longitudinal stress in the nozzle wall due to external pressure + external loads
The average primary stress Pm (see Division 2 5.6.a.1) across the nozzle wall due to external pressure + external
loads is acceptable ( ≤ S = 1,407.207 kgf/cm2)
J05-D-0302 (MA)
Shear stress in the nozzle wall due to external loads
σtorsion = Mt / (2*π*Ri2*tn)*100000
= 61.2 / (2*π*28.62*10.26)*100000
= 116.008 kgf/cm2
UG-45: The total combined shear stress (171.304 kgf/cm2) is below than the allowable (0.7*Sn = 0.7*1,407.207 =
985.045 kgf/cm2)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary Thickness
(cm2) Summary
For P = 11.07 bar @ 17 °C
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)
UG-45
Nozzle Wall
UG-37 Area Calculation Summary Thickness
(cm2) Summary
For Pe = 0.65 bar @ 149 °C
(mm)
The nozzle
passes UG-45
A A A
A1 A2 A3 A5 treq tmin
required available welds
J05-D-0302 (MA)