Operation Management
QUESTION BANK
in
so
Year 1 2 3 4 5 6 7 8
n.
Cycles sold during the
30 32 40 52 79 79 90 100
year (* 102)
io
6. The annual demand for the comp[any is 25,000 pcbs and each costing of pc bios
Rs 1000/- and ordering cost is of Rs 200/- and inventory cost is Rs 100/-.Calculate
Equivalent order quantity, no of order, duration of order, total annual cost of the
ut
inventory and total cost.
7. Calculate the forecasting for the month January and February from the given
below table
Month Jan Feb Mar April May June July August Sept Oct Nov Dec
ol
X Sales
90 111 99 89 87 54 104 102 95 114 103 113
in unit
us
Vtusolution.in
Vtusolution.in
13. The turner X and Y in a company produces 400 job/day and that no of defective
jobs is 40 find the jobs which are defective, Produced by turner Y, Defective and
produced by turner X
14. Explain historical approach of operation management
15. Using SES technique determine the forecast for period 2 through 12 for which the
actual figures are given below. Assume that the first period forecast is equal to actual
demand in that period given α=0.2
in
Period 1 2 3 4 5 6 7 8 9 10 11 12
Actual
200 211 190 198 210 230 195 200 215 198 200 212
Demand
n.
16. Write a note on classification on forecasting methods
17. A manufacturer of children’s cycle believes that the demand for the cycle is
Year
1
io
correlated to the birth of babies in the area during the previous year
No of Births in the
previous year
40,000
Cycles sold during
the year
3,000
ut
2 48,000 3,200
3 66,000 4,000
4 78,000 5,200
5 92,000 7,900
ol
6 1,05000 7,900
7 1,25000 9,000
8 1,40,000 1,0000
th
Compute the probable sales of cycles in the 9 year given the no of births in the
previous year as 1, 66, 000
us
19. What is material management and explain the major elements of Material
Management
vt
20. A television company uses 25,000 pcbs per year, each costing Rs 1000/-, it costs Rs
200/- for placing an order and the inventory costs is Rs 100/- per unit per year.
1. How many pcbs should be ordered at a time for maximum economy
2. How many orders should be placed per year
3. What is the duration between each order
Vtusolution.in
Vtusolution.in
21. The table below gives the sales record of a firm. Using regression analysis forecast
the sales in the month of January and February next year
Month Jan Feb Mar April May June July Aug Sept Oct Nov Dec
Sales in 90 111 99 89 87 84 104 102 95 114 103 113
units
in
n.
io
ut
ol
us
vt
CHAPTER 1
Vtusolution.in
Vtusolution.in
Operations Management
Operations Management
in
Create operational systems.
Manage (plan, organize, staff, direct and control) the activities relating to the
production of goods and/or services with maximum efficiency (at the lowest
n.
cost) and effectiveness (in the eyes of the customer). Improve those processes
continuously to create competitive advantage.
io
The operations system transforms inputs into desired goods and services.
ut
ol
us
vt
Vtusolution.in
Vtusolution.in
in
n.
io
ut
Operations Management
ol
us
vt
Vtusolution.in
Vtusolution.in
Types of Conversions
Physical
Chemical
Locational
Educational
Entertained
in
Competitive Priorities for the Operational Function
n.
Price or Cost
Quality Short Run: Conformance, Design
Long Run: Continuous Improvement Thru the Learning Organization
- Dependability
Speed of Delivery io
Flexibility Product Mix: make various
Time
ut
(Lead Time)
Speed to Market (New Product Development Time)
Service Delivering a comprehensive solution – products & augmenting
services – to the customer’s needs
ol
Vtusolution.in
Vtusolution.in
Interfunctional Strategies
in
n.
Where does price fit in this scenario?
io
Process Choice, Design, & Analysis
Vtusolution.in
Vtusolution.in
Process-Product Matrix
in
n.
Significant Developments
Division of Labor io
ut
Standardized Parts
Scientific Management
Time and Motion Study
Efficiency Improvement
ol
Wage Incentives
Assembly Lines
Motivation and Behavioral Issues
us
Operations Research
Computers and Information Technology
– Computer Aided Design (CAD)
– Computer Aided Manufacture (CAM)
vt
Vtusolution.in
Vtusolution.in
in
n.
io
Value-Added: The difference between the cost of inputs and the value or price of
ut
outputs.
ol
us
vt
Vtusolution.in
Vtusolution.in
in
Health care (doctors, dentists, hospitals, etc.).
Personal services (laundry, dry cleaning, hair/beauty, gardening, etc.).
Business services (data processing, e-business, delivery, employment
n.
agencies, etc.). Education (schools, colleges, etc.)
io
ut
ol
us
vt
10
Vtusolution.in
Vtusolution.in
in
n.
io
ut
ol
us
vt
11
Vtusolution.in
Vtusolution.in
Uniformity of output.
Measurement of productivity.
Production and delivery.
Quality assurance.
Amount of inventory.
Evaluation of work.
in
Ability to patent design.
n.
io
ut
ol
us
vt
12
Vtusolution.in
Vtusolution.in
in
n.
io
ut
ol
us
vt
13
Vtusolution.in
Vtusolution.in
in
n.
io
ut
ol
us
vt
14
Vtusolution.in
Vtusolution.in
CHAPTER 2
Operations Management models Decision making
Operations Management and Decision Making
Models
Quantitative Approaches
in
Analysis of Trade-Offs
Systems Approach
Establishing Priorities (Pareto phenomenon)
n.
Ethics
io
ut
ol
us
vt
15
Vtusolution.in
Vtusolution.in
in
Interchangeable parts
Division of labor
The Human Relations Movement
n.
Theory X and Theory Y
Theory Z
io
ut
ol
us
vt
Trends in Business
Vtusolution.in
Vtusolution.in
Globalization.
Management of supply chains.
Outsourcing.
Agility.
Ethical behavior.
Operations strategy.
in
Working with fewer resources.
Revenue management.
Process analysis and improvement, and quality improvement.
n.
Increased regulation and product liability issues.
Lean production
io
ut
Competitiveness
• Location
• Quality
• Quick response
17
Vtusolution.in
Vtusolution.in
• Flexibility
Why Some Organizations Fail
in
recognize competitive threats.
Neglecting operations strategy.
Strategy
n.
Mission: Live a good life.
Goal: Successful career, good income.
Strategy: Obtain a college education.
io
Tactics: Select a college and a major; decide how to finance college.
Operations: Register, buy books, take courses, study.
ut
ol
us
Low cost. Outsource operations to third-world countries that have low labor
vt
costs.
Scale-based strategies. Use capital-intensive methods to achieve high output
volume and low unit costs.
18
Vtusolution.in
Vtusolution.in
in
Economic conditions. These include the general health and direction of the
economy, inflation and deflation, interest rates, tax laws, and tariffs.
Political conditions. These include favorable or unfavorable attitudes toward
n.
business, political stability or instability, and wars.
Legal environment. This includes antitrust laws, government regulations, trade
restrictions, minimum wage laws, product liability laws and recent court
io
experience, labor laws, and patents.
Technology. This can include the rate at which product innovations are occurring,
current and future process technology (equipment, materials handling), and design
ut
technology.
Competition. This includes the number and strength of competitors, the basis of
competition (price, quality, special features), and the ease of market entry.
Markets. This includes size, location, brand loyalties, ease of entry, potential for
ol
Vtusolution.in
Vtusolution.in
in
image, distribution channels, relationships with distributors, maintenance
of facilities and equipment, access to resources, and access to markets.
n.
Operations Strategy
io
ut
ol
20
Vtusolution.in
Vtusolution.in
Productivity
in
n.
io
ut
ol
us
vt
21
Vtusolution.in
Vtusolution.in
Chapter 3
MPS, RCCP, MRP, CRP, & ERP
in
n.
io
ut
Core MRP
ol
22
Vtusolution.in
Vtusolution.in
• Suppose that Export TVs, Inc. has the following production plan for
the next six months:
in
Month J F M A M J
TVS 12000 12000 15000 15000 15000 18000
n.
• If they make three models, the MPS for January might look like:
MPS 1-Jan 8-Jan 15-Jan 22-Jan
31” 2000 1000 0 1000
Planning Horizon
33”
36”
io 1000
0
1000
1000
0
3000
2000
0
ut
ol
us
vt
23
Vtusolution.in
Vtusolution.in
Period 1 2 3 4 5 6
Product X
Forecast 5 10 8 5 6 8
in
Projected Available Balance 20
Net Requirements
MPS
n.
Planned Order Release
Period 1 2 3 4 5 6
Product Y
Forecast
io
Projected Available Balance 12
7 2 10 13 5 5
ut
Net Requirements
MPS
Period 1 2 3 4 5 6
Product X
Forecast 5 10 8 5 6 8
Projected Available Balance 20 15 5
vt
Net Requirements 3
MPS
Planned Order Release
24
Vtusolution.in
Vtusolution.in
Period 1 2 3 4 5 6
Product Y
Forecast 7 2 10 13 5 5
Projected Available Balance 12
Net Requirements
MPS
in
Planned Order Release
n.
Period 1 2 3 4 5 6
Product X
Forecast 5 10 8 5 6 8
Net Requirements
MPS
io
Projected Available Balance 20 15 5 5
8
ut
Planned Order Release
Period 1 2 3 4 5 6
ol
Product Y
Forecast 7 2 10 13 5 5
Net Requirements
MPS
25
Vtusolution.in
Vtusolution.in
Period 1 2 3 4 5 6
Product X
Forecast 5 10 8 5 6 8
in
Net Requirements 3
MPS 8
n.
Period 1 2 3 4 5 6
Product Y
Forecast
io
Projected Available Balance 12
7 2 10 13 5 5
ut
Net Requirements
MPS
ol
Planned Order Release
Period 1 2 3 4 5 6
us
Product X
Forecast 5 10 8 5 6 8
Net Requirements 3 6
vt
MPS 8 14
26
Vtusolution.in
Vtusolution.in
Period 1 2 3 4 5 6
Product Y
Forecast 7 2 10 13 5 5
Net Requirements
MPS
in
Planned Order Release
n.
Period 1 2 3 4 5 6
Product X
Forecast 5 10 8 5 6 8
Net Requirements io
Projected Available Balance 20 15 5 5
3
0 8
6
0
ut
MPS 8 14
Period 1 2 3 4 5 6
ol
Product Y
Forecast 7 2 10 13 5 5
Net Requirements 7 5
MPS 20 10
27
Vtusolution.in
Vtusolution.in
Period 1 2 3 4 5 6
Product X
Forecast 5 10 8 5 6 8
Projected Available Balance 20 15 5 5 0 8 0
Net Requirements 3 6
MPS 8 14
in
Planned Order Release 8 14
Period 1 2 3 4 5 6
Product Y
n.
Forecast 7 2 10 13 5 5
Projected Available Balance 12 5 3 13 0 5 0
Net Requirements 7 5
MPS 20 10
W2 0 0.70
Y W1 5 0.75
Period 1 2 3 4 5 6
vt
28
Vtusolution.in
Vtusolution.in
Period
Workcentre Part 1 2 3 4 5 6
W1 X 0 18 0 24 0 0
Y 0 20 0 12.5 0 0
Total 0 38 0 36.5 0 0
W2 X 0 5.6 0 9.8 0 0
in
Total 0 43.6 0 46.3 0 0
n.
io
ut
ol
us
vt
29
Vtusolution.in
Vtusolution.in
Master Schedule
o Master schedule: One of three primary inputs in MRP; states which end
in
items are to be produced, when these are needed, and in what quantities.
o Cumulative lead time: The sum of the lead times that sequential
phases of a process require, from ordering of parts or raw materials to
n.
completion of final assembly.
Bill-of-Materials
io
Bill of materials: One of the three primary inputs of MRP; a listing of
all of the raw materials, parts, subassemblies, and assemblies needed to
produce one unit of a product.
ut
• Product structure tree: Visual depiction of the requirements in a bill
of materials, where all components are listed by levels.
• BOM's show how parts are combined to create product
ol
Representation may be graphical or “indented text”
Low-level Coding
us
30
Vtusolution.in
Vtusolution.in
X Y LEVEL 0
A B (2) A LEVEL 1
in
A LEVEL 2
n.
Inventory Records
Inventory Records: One of the three primary inputs of MRP; includes
information on the status of each item by time period
io
Accuracy: is extremely important in that accuracy will determine the
success of the production runs.
MRP Processing
Gross requirements (demand)
vt
31
Vtusolution.in
Vtusolution.in
Planned-order releases
MRP Outputs
Planned orders - schedule indicating the amount and timing of future
orders.
Order releases - Authorization for the execution of planned orders.
in
Changes - revisions of due dates or order quantities, or cancellations of
orders.
n.
io
ut
ol
The MRP Record
Objective is to determine future purchasing or production schedule for
component part Gross Requirements – demand for part
us
32
Vtusolution.in
Vtusolution.in
Planned Order Receipt – planned completion times for batches of parts which
have not yet been ordered Planned Order Release– planned start times for
batches of parts which have not yet been ordered
Period 1 2 3 4 5 6
Gross Requirements 10 0 30 10 20 25
Scheduled Receipts 30
in
Projected Available Balance 15 5 35 5 25 5 10
Net Requirements 0 0 0 5 0 20
Planned Order Receipts 0 0 0 30 0 30
Planned Order Release 0 30 0 0 0 0
n.
• During Period 1:
– 10 units are disbursed
Gross Requirements
30
3
30
4
10
5
20
6
25
7
5
ut
Projected Available Balance 5 35 5 25 5 10 5
Net Requirements 0 0 5 0 20 0
Period 2 3 4 5 6 7
Gross Requirements 0 30 10 20 25 5
Scheduled Receipts
Projected Available Balance 35 35 5 25 5 10 5
Net Requirements 0 0 5 0 20 0
vt
33
Vtusolution.in
Vtusolution.in
Period 2 3 4 5 6 7
Gross Requirements 0 30 10 20 25 5
Scheduled Receipts 30
Projected Available Balance 35 35 5 25 5 10 5
Net Requirements 0 0 5 0 20 0
Planned Order Receipts 0 0 30 0 30 0
in
Planned Order Release 0 0 30 0 0 0
MRP Example
–Start with MPS for products X and Y
n.
Product X: LT=1
Period 1 2 3 4 5 6
Master Production Schedule 8 14
Product Y: LT=1
Period
io
Planned Order Release 0
1
8
2
0
3
14
4
0
5
0
6
ut
Master Production Schedule 20 10
Planned Order Release 0 20 0 10 0 0
Planned order releases for X serve as basis for gross requirements for part B
ol
Product X: LT=1
Period 1 2 3 4 5 6
Master Production Schedule 8 14
us
34
Vtusolution.in
Vtusolution.in
Scheduled Receipts
Projected Available Balance 19 19 3 3 0 0 0
Net Requirements 0 0 0 25 0 0
Planned Order Receipts 0 0 0 25 0 0
Planned Order Releases 0 0 0 0 0 0
Part A’s gross requirements depend on planned order releases for X, Y, and B
in
Product X: LT=1
Period 1 2 3 4 5 6
Planned Order Release 0 8 0 14 0 0
n.
Product Y: LT=1
Period 1 2 3 4 5 6
Planned Order Release 0 20 0 10 0 0
Period 1 2 3 4 5 6
Gross Requirements 0 28 25 24 0 0
Scheduled Receipts 40
Projected Available Balance 16 56 28 3 19 19 19
Net Requirements 0 0 0 21 0 0
vt
35
Vtusolution.in
Vtusolution.in
MRP Planning
in
n.
Benefits of MRP
io
ut
Low levels of in-process inventories
Ability to track material requirements
Ability to evaluate capacity requirements
ol
Means of allocating production time
Requirements of MRP
us
Inventory records
MRP II
Expanded MRP with and emphasis placed on integration
Financial planning
Marketing
36
Vtusolution.in
Vtusolution.in
Engineering
Purchasing
Manufacturing
in
n.
io
ut
Capacity Requirements Planning
ol
• Capacity requirements planning: The process of determining short-
range capacity requirements.
• Load reports: Department or work center reports that compare known and
us
• Should be used as a final check on the MPS More accurate than RCCP
May be too expensive for routine "what-if" analysis
37
Vtusolution.in
Vtusolution.in
• Determine incremental run times and setup times for each part in each
workcenter
• Apply incremental run times and setup times from (1) to planned order
releases to determine capacity requirements per period for each
workcenter
in
The Routing
The routing for a product or part lists
• Where it is processed
n.
• Resources needed
−Per batch or per setup
−Per unit after workcenter is setup
Product
X
io
Workcenter
W1
W2
Operation #
10
20
CLH/Setup
10
0
DLH/Unit
1.0
0.50
ut
Y W1 10 5 0.75
B W2 10 0 0.20
ol
Capacity Requirements Planning
The routing is applied to the planned order releases to obtain the capacity plan
us
Y W1 10 5 0.75
B W2 10 0 0.20
38
Vtusolution.in
Vtusolution.in
Period 1 2 3 4 5 6
Planned Order Release -Product X 0 8 0 14 0 0
Planned Order Release -Product Y 0 20 0 10 0 0
in
Planned Order Release – Part B 0 0 25 0 0 0
W1 Capacity Required – Product X 0 18 0 24 0 0
W1 Capacity Required – Product Y 0 20 0 12.5 0 0
n.
W1 Capacity Required 0 38 0 36.5 0 0
W2 Capacity Required – Product X 0 4 0 7 0 0
W2 Capacity Required – Part B 0 0 5 0 0 0
W2 Capacity Required
io
Total Capacity Required
0
0
4
42
5
5 43.5
7 0
0
0
0
ut
Other Considerations
Safety Stock
ol
Lot sizing
• Lot-for-lot ordering
• Economic order quantity
us
• Fixed-period ordering
• Part-period model
vt
39
Vtusolution.in
Vtusolution.in
in
Enterprise resource planning
n.
io
ut
ol
us
Kanban
Team Exercises
40
Vtusolution.in
Vtusolution.in
The routing is applied to the planned order releases to obtain the capacity plan
in
Y W1 5 0.75
Period 1 2 3 4 5 6
n.
Product X-planned Order Release 0 15 0 46 0 0
Product Y-planned Order Release 0 0 37 0 15 0
Workcentre io Part 1 2 3
Period
4 5 6
ut
W1 X
Y
Total
W2 X
ol
Total
Complete the following MRP Record and indicate in the record that the next
order has been released but not received.
Economic Order Quantity = ???
vt
Period 1 2 3 4 5 6
Gross Requirements 66 58 72 58 60 70
Scheduled Receipts
Projected Available Balance 160
41
Vtusolution.in
Vtusolution.in
Net Requirements
Planned Order Receipts
Planned Order Releases
MRP Exercise
Product X: LT = 3
Product Y: LT = 3
in
Part A: LT = 1; EOQ = 40
Part B: LT = 1; EOQ = 25
n.
Period 1 2 3 4 5 6
Product X 0 10 5
Product Y 0 30 10
Part A 70
Part B
io 40
Beginning
Balance
ut
CRP Exercise
Using your answers form the MRP Exercise determine the CRP using the
figures below.
ol
Y W1 10 5 0.75
B W2 10 0 0.20
Period 1 2 3 4 5 6
Planned Order Release -Product X
vt
Vtusolution.in
Vtusolution.in
in
Overview
n.
• Global Company Profile: Wheeled Coach
• Dependent Demand
• Dependent Inventory Model Requirements Master Production
Schedule Bills of Material Accurate Inventory Records Purchase
•
•
MRP Structure
io
Orders Outstanding Lead Times for Components
Capacity Planning
us
Vtusolution.in
Vtusolution.in
• Lot-Sizing Techniques
• Extensions of MRP oMaterial
Requirements Planning II (MRP
II) Closed-Loop MRP Capacity
Planning
• MRP In Services Distribution
in
Resource Planning (DRP)
• Enterprise Resource Planning
(ERP) Advantages and
n.
Disadvantages of ERP Systems
ERP in the Service Sector
Learning Objectives
io
When you complete this chapter you should be able to:
1. Develop a product structure
ut
2. Build a gross requirements plan
3. Build a net requirements plan
4. Determine lot sizes for lot-for-lot, EOQ, and PPB
5. Describe MRP II
ol
Wheeled Coach
44
Vtusolution.in
Vtusolution.in
Benefits of MRP
1. Better response to customer orders
2. Faster response to market changes
in
3. Improved utilization of facilities and labor
4. Reduced inventory levels
n.
Dependent Demand
1. The demand for one item is related to the demand for another item
2. Given a quantity for the end item, the demand for all parts and
io
components can be calculated
3. In general, used whenever a schedule can be established for an item
4. MRP is the common technique
ut
Effective use of dependent demand inventory models requires the following
1. Master production schedule
2. Specifications or bill of material
ol
3. Inventory availability
4. Purchase orders outstanding
5. Lead times
us
Vtusolution.in
Vtusolution.in
in
The Planning Process
n.
io
ut
ol
46
Vtusolution.in
Vtusolution.in
in
Focus for Different Process Strategies
n.
io
ut
ol
MPS Example
us
47
Vtusolution.in
Vtusolution.in
Bills of Material
• List of components, ingredients, and materials needed to make product
• Provides product structure Items above given level are called parents Items
in
below given level are called children
n.
io
ut
ol
us
vt
48
Vtusolution.in
Vtusolution.in
Bills of Material
• Modular Bills oModules are not final products but components that can be
assembled into multiple end items Can significantly simplify planning and
scheduling
in
• Planning Bills (Pseudo Bills) Created to assign an artificial parent to the BOM
Used to group subassemblies to reduce the number of items planned and
scheduled
n.
o Used to create standard “kits” for production
• Phantom Bills Describe subassemblies that exist only temporarily Are part of
another assembly and never go into inventory
• Low-Level Coding
io
o Item is coded at the lowest level
at which it occurs oBOMs are
ut
processed one level at a time
Accurate Records
ol
• Accurate inventory records are absolutely required for MRP (or any
dependent demand system) to operate correctly
• Generally MRP systems require 99% accuracy
us
Lead Times
49
Vtusolution.in
Vtusolution.in
in
n.
io
ut
ol
MRP Structure
us
vt
50
Vtusolution.in
Vtusolution.in
• Starts with a production schedule for the end item – 50 units of Item A
in week 8
• Using the lead time for the item, determine the week in which the order
in
should be released – a 1 week lead time means the order for 50 units
should be released in week 7
• This step is often called “lead time offset” or “time phasing”
n.
• From the BOM, every Item A requires 2 Item Bs – 100 Item Bs are
required in week 7 to satisfy the order release for Item A
• The lead time for the Item B is 2 weeks – release an order for 100 units
•
of Item B in week 5
io
The timing and quantity for component requirements are determined
by the order release of the parent(s)
ut
• The process continues through the entire BOM one level at a time –
often called “explosion”
• By processing the BOM by level, items with multiple parents are only
processed once, saving time and resources and reducing confusion
ol
• Low-level coding ensures that each item appears at only one level in
the BOM
Gross Requirements Plan
us
vt
51
Vtusolution.in
Vtusolution.in
in
n.
io
ut
ol
us
vt
• Starts with a production schedule for the end item – 50 units of Item A
in week 8
52
Vtusolution.in
Vtusolution.in
in
• There are 15 units of Item B on hand, so the net requirement is 65 units
in week 7
• A planned order receipt of 65 units in week 7 generates a planned
n.
order release of 65 units in week 5
• A planned order receipt of 65 units in week 7 generates a planned
order release of 65 units in week 5
•
• io
The on-hand inventory record for Item B is updated to reflect the use
of the 15 items in inventory and shows no on-hand inventory in week 8
This is referred to as the Gross-to-Net calculation and is the third basic
ut
function of the MRP process
ol
Net Requirements Plan
53
Vtusolution.in
Vtusolution.in
in
n.
MRP Planning Sheet
io
ut
ol
us
Safety Stock
• BOMs, inventory records, purchase and production quantities may not
be perfect
vt
54
Vtusolution.in
Vtusolution.in
MRP Management
• MRP is a dynamic system
• Facilitates replanning when changes occur
• System nervousness can result from too many changes
• Time fences put limits on replanning
• Pegging links each item to its parent allowing effective analysis of
in
changes
n.
• MRP is a planning system that does not do detailed scheduling
• MRP requires fixed lead times which might actually vary with batch
size
•
io
JIT excels at rapidly moving small batches of material through the
system
ut
Finite Capacity Scheduling
• MRP systems do not consider capacity during normal planning cycles
• Finite capacity scheduling (FCS) recognizes actual capacity limits
• By merging MRP and FCS, a finite schedule is created with feasible
ol
55
Vtusolution.in
Vtusolution.in
Balanced Flow
• Used in repetitive operations
• MRP plans are executed using JIT techniques based on “pull”
principles
• Flows are carefully balanced with small lot sizes
in
Supermarket
• Items used by many products are held in a common area often called a
n.
supermarket
• Items are withdrawn as needed
• Inventory is maintained using JIT systems and procedures
•
io
Common items are not planned by the MRP system
ut
Lot-Sizing Techniques
• Lot-for-lot techniques order just what is required for production based
on net requirements May not always be feasible If setup costs are high,
lot-for-lot can be expensive
ol
burdensome
56
Vtusolution.in
Vtusolution.in
Lot-for-Lot Example
1 2 3 4 5 6 7 8 9 10
Gross requirements 35 30 40 0 10 40 30 0 30 55
Scheduled receipts
Projected on hand 35 35 0 0 0 0 0 0 0 0 0
in
Net requirements 0 30 40 0 10 40 30 0 30 55
Planned order receipts 30 40 10 40 30 30 55
Planned order releases 30 40 10 40 30 30 55
n.
Holding cost = $1/week; Setup cost = $100;
Lead time = 1 week
1 2 3 4 5 6 7 8 9 10
Gross requirements 35 30 40 0 10 40 30 0 30 55
us
Scheduled receipts
Projected on hand 35 35 0 43 3 3 66 26 69 69 39
Net requirements 0 30 0 0 7 0 4 0 0 16
Planned order receipts 73 73 73 73
vt
Vtusolution.in
Vtusolution.in
in
PPB Example
n.
1 2 3 4 5 6 7 8 9 10
Gross requirements 35 30 40 0 10 40 30 0 30 55
Scheduled receipts
Projected on hand
Net requirements
Planned order receipts
35
io
ut
Planned order releases
Holding cost = $1/week; Setup cost = $100; Lead time = 1 week EPP = 100 units
ol
us
vt
58
Vtusolution.in
Vtusolution.in
in
n.
PPB Example io
ut
1 2 3 4 5 6 7 8 9 10
Gross requirements 35 30 40 0 10 40 30 0 30 55
Scheduled receipts
Projected on hand 35 35 0 50 10 10 0 60 30 30 0
ol
Net requirements 0 30 0 0 0 40 0 0 0 55
Planned order receipts 80 100 55
us
Holding cost = $1/week; Setup cost = $100; Lead time = 1 week EPP = 100 units
Lot-Sizing Summary
vt
59
Vtusolution.in
Vtusolution.in
in
• Lot sizes can be modified to allow for scrap, process constraints, and
purchase lots
• Use lot-sizing with care as it can cause considerable distortion of
n.
requirements at lower levels of the BOM
• When setup costs are significant and demand is reasonably smooth, PPB,
Wagner-Whitin, or EOQ should give reasonable results
Extensions of MRP
• io
Closed-Loop MRP oMRP system provides input to the
ut
capacity plan, MPS, and production planning process
• Capacity Planning oMRP system generates a load report
which details capacity requirements oThis is used to drive
the capacity planning process oChanges pass back through
ol
60
Vtusolution.in
Vtusolution.in
in
n.
Closed-Loop MRP System
io
ut
ol
us
vt
61
Vtusolution.in
Vtusolution.in
in
n.
io
ut
ol
us
vt
62
Vtusolution.in
Vtusolution.in
in
n.
io
ut
It is also possible to split lots 6 and 11 and move them earlier in the schedule.
This would avoid any potential problems with late orders but would increase
inventory holding cost.
ol
Smoothing Tactics
1. Overlapping Sends part of the work to following operations
us
63
Vtusolution.in
Vtusolution.in
MRP in Services
• Some services or service items are directly linked to demand for other
services
• These can be treated as dependent demand services or items
Restaurants
Hospitals
in
Hotels
Smoothing Tactics
n.
(a) Product Structure Tree
io
ut
ol
us
MRP in Services
64
Vtusolution.in
Vtusolution.in
in
30006 Sauce 1 Serving 0.80
n.
Work Center Operation Labor Type Labor Hours
Setup Time Run Time
1
2
3 io
Assemble dish
Cook linguini
Cook veal & sauce
Chef
Helper one
Assistant Chef
.0069
.0005
.0125
.0041
.0022
.0500
ut
Distribution Resource Planning (DRP)
Using dependent demand techniques through the
ol
supply chain Expected demand or sales
forecasts become gross requirements
Minimum levels of inventory to meet customer service levels
us
suppliers
1. Allows automation and integration of many business processes
2. Shares common data bases and business practices
3. Produces information in real time
65
Vtusolution.in
Vtusolution.in
in
5. Customer relationship management (CRM)
n.
io
ut
ol
us
vt
66
Vtusolution.in
Vtusolution.in
in
n.
io
ut
ol
us
vt
67
Vtusolution.in
Vtusolution.in
in
n.
io
ut
ol
us
vt
68
Vtusolution.in
Vtusolution.in
in
n.
io
ut
Enterprise Resource Planning (ERP)
• ERP can be highly customized to meet specific business requirements
• Enterprise application integration software (EAI) allows ERP systems
ol
Vtusolution.in
Vtusolution.in
in
1. Is very expensive to purchase and even more so to customize
2. Implementation may require major changes in the company and its
processes
n.
3. Is so complex that many companies cannot adjust to it
4. Involves an ongoing, possibly never completed, process for
implementation
io
5. Expertise is limited with ongoing staffing problems
70
Vtusolution.in
Vtusolution.in
ERP systems have been developed for health care, government, retail
stores, hotels, and financial services
Also called efficient consumer response (ECR) systems
Objective is to tie sales to buying, inventory, logistics, and production
in
n.
io
ut
ol
us
vt
71
Vtusolution.in
Vtusolution.in
Chapter 5-
Overview of Operations Planning
Overview
Production-Planning Hierarchy
in
Aggregate Planning
Master Production Scheduling
Types of Production-Planning and Control Systems
n.
Wrap-Up: What World-Class Companies Do
io
ut
ol
us
vt
72
Vtusolution.in
Vtusolution.in
in
n.
io
ut
ol
us
vt
73
Vtusolution.in
Vtusolution.in
in
n.
io
ut
Relationships Between OM Elements
ol
us
vt
74
Vtusolution.in
Vtusolution.in
in
n.
io
ut
ol
us
vt
Vtusolution.in
Vtusolution.in
• Plan for the orderly and systematic change of production capacity to meet the
peaks and valleys of expected customer demand
• Get the most output for the amount of resources available
Inputs
in
A forecast of aggregate demand covering the selected planning horizon (6-18
months)
The alternative means available to adjust short- to medium-term capacity, to
what extent each alternative could impact capacity and the related costs
n.
The current status of the system in terms of workforce level, inventory level and
production rate
Outputs
io
A production plan: aggregate decisions for each period in the planning horizon
ut
about Projected costs if the production plan was implemented
Vtusolution.in
Vtusolution.in
Graphical • Simple, easy to use and understand • Many solutions; solution need not
be optimal
in
Programming •• Popular in many industries linear, and deterministic -- not
• Sensitivity & dual analysis provide useful necessarily a realistic assumption
information
•
n.
Sensitivity & dual analysis provide
Management •• Simple, easy to use and understand •• Solution need not be optimal
us
Coefficients Attempts to duplicate manager’s decision- • Assumes past decisions are good
Model • making process Built on individual’s invalidate
Simplest, least disruptive, easiest to model
implement
vt
77
Vtusolution.in
Vtusolution.in
Matching Demand
Level Capacity
Buffering with inventory
Buffering with backlog
in
Buffering with overtime or subcontracting
n.
Capacity (Production) in each time period is varied to exactly match the
forecasted aggregate demand in that time period
io
Capacity is varied by changing the workforce level
Finished-goods inventories are minimal
Labor and materials costs tend to be high due to the frequent changes
ut
Developing and Evaluating the Matching Production Plan
Capacity (production rate) is held level (constant) over the planning horizon
vt
The difference between the constant production rate and the demand rate is
made up (buffered) by inventory, backlog, overtime, part-time labor and/or
subcontracting
78
Vtusolution.in
Vtusolution.in
Assume that the amount produced each period is constant, no hirings or layoffs
The gap between the amount planned to be produced and the forecasted demand
is filled with either inventory or backorders, i.e., no overtime, no idle time, no
subcontracting
The primary costs of this strategy are inventory carrying and backlogging costs
in
Period-ending inventories or backlogs are determined using the inventory
balance equation:
n.
Aggregate Planning Example
io
A small manufacturing company with 200 employees produces umbrellas. The
company produces the following three product lines: 1) the Executive Line, 2) the
Durable Line and 3) the Compact line, as shown in the below
ut
ol
us
vt
79
Vtusolution.in
Vtusolution.in
10000
10000
8000
8000 7000
5500 6000
6000
4500
in
4000
2000
0
n.
Jan Feb Mar Apr May Jun
Number of working days:
Jan: 22
Feb: 19
Mar: 21
Apr: 21
May: 22
io
ut
Jun: 20
80
Vtusolution.in
Vtusolution.in
in
n.
io
ut
Aggregate Planning Example - Chase Strategy for Executive Umbrellas
ol
• Objective: Adjust workforce level so as to
eliminate the need to carry inventory from
period to period
us
Vtusolution.in
Vtusolution.in
Chase Strategy
Jan Feb Mar Apr May Jun
in
Net requirements 4,250 5,500 7,000 10,000 8,000 6,000
Beginning # of workers 7 4 6 7 10 8
Required workers 4 6 7 10 8 6
n.
Workforce adjustment -3 2 1 3 -2 -1
Ending inventory 0 0 0 0 0 0
io
ut
ol
us
vt
82
Vtusolution.in
Vtusolution.in
The recent globalization of businesses has resulted in highly demanding customers. This
has created intense pressure on companies to meet and exceed customers’ expectations
more effectively and efficiently than their competitors, and still remain profitable to
in
survive and grow. We know that profit is a sales price minus cost. If companies believe
that the sales price of their product/service is broadly determined by the customers (or
market), then the only option to make profit is to reduce costs. However, the key
n.
ingredients of cost such as labour, material, etc are roughly comparable among all the
competitors aiming for a market. Hence, the excess cost that sabotages the prospects of a
company amidst competitors is due to the production method employed.
io
The Two Types of Production Systems:
1. Push production system –The system is based on sales forecasts. It relies upon batch
ut
production and holds finished goods inventory to respond to customers’ needs. This
system consumes a lot of space, involves high costs of overheads and wastes, and
invites risks of obsolescence.
• Demand forecasts are prepared using past data and available information about the
ol
CRP, provide the basis for detailed schedules for all work-stations (to procure raw
materials or make items).
• Each work-station produces as per MPS. Queues and in-process/finished goods
inventory are a part of the system. MPS pushes forward the product through
vt
83
Vtusolution.in
Vtusolution.in
are maintained at all these stages to safeguard against the lapses in coordination
(Just In Case system)
• This approach involves guessing customer demand, duration for completing the
job, etc.
which, if goes wrong, results in excess or shortage of inventory. If the quality of
forecasts is good, Push system produces just right quantities of products at right
in
time
2. Pull production system - produces and moves one piece at a time, with production
volume, pace and mix derived from customer demand. This system aims for total
n.
elimination of different wastes, and full utilization of material, labour and equipment,
thus leading to lower production cost. This system is popular as Toyota Production
System (TPS)
•
io
Pull system works opposite to that of Push system. In Push system, the MPS
pushes the product down the production line (regardless of sales). In Pull system,
the customer demand pulls the product from upstream production line
ut
• It is an attempt to move the discrete units of solid products through the production
line in much the same way as liquid/gas flows in a continuous process industry,
although it is an ideal. The objective here is to achieve a flow of one-piece at a
time from one process to the next, that too when the next process asks for it (Just-
ol
In-Time concept). In effect, the batch quantity to be one. This system effectively
facilitates the journey towards the ultimate goals of a production system namely,
zero waste, lowest possible cost, shortest lead time and defect-free production
us
• This is what the Toyota Production System (TPS) has demonstrated to the world.
The system was earlier referred to as JIT system. Of late, together with many
more improvements, it is known as Lean system
vt
84
Vtusolution.in
Vtusolution.in
in
The primary goal of TPS house is the Simultaneous achievement of Highest quality
(perfection..!), Lowest cost and Shortest lead time. All issues relating to Quality, Cost
and Lead time are addressed through two powerful weapons namely JIT and Jidoka. They
n.
are also called as two pillars of TPS House.
• JIT consists of three main parts. They are known as JIT purchasing, JIT
manufacturing and JIT delivery. The aim of JIT is to produce and deliver finished
io
goods just in time to be sold, subassemblies just in time to be assembled into
finished goods, fabricated parts just in time to go into final assemblies, and
purchase materials just in time to be transformed into fabricated parts.
ut
Each company has its own level of JIT, which also undergoes improvement over time
(monthly, weekly, daily or even hourly). Tighter JIT system spawns plenty of benefits
to the company. JIT approach creates a pull system, and kanban (signboard, card,
ol
chit, e-signal, message, etc.) constitutes an essential element in maintaining this pull
system.
• Jidoka or Autonomation (Intelligent Automation) aims to prevent defective items
us
being passed onto next workstation. Humans make mistakes. But machines can be
designed to eliminate many of them.Devices namely Poka yoke (fool-proofing)
are mounted on machines for automatic shut-off and to notify the supervisor when
either the machine has completed its task or something abnormal (breakdown,
vt
85
Vtusolution.in
Vtusolution.in
In manual assembly (the most common mode) lines, every worker has the right (and
also obligation) to stop the production line when a problem is identified or even
suspected at his workstation. This helps fixing the problem at the source before a
defective is produced. Visual controls aid Jidoka (Target v/s actual production,
Yellow light to call for help, and Red light for line stop)
Foundation of TPS House is built with Heijunka, Standardization of components and
in
work methods, and Kaizen.
• Heijunka - Consistency in volume, variety and sequence of items produced in a
given time period (say, daily). In other words, a leveled production schedule for a
n.
mix of products so that each product is available in some quantity all the time
• Standardization of components and methods - Use of value analysis, method study
and work measurement help to arrive at best design of products and work
• io
procedures which are standardized, so that every workers’ job is done in a
consistent and repeatable manner, and in tune with takt time
Kaizen implies Continuous improvement effort. Everyone in the company
ut
constantly strives to improve the system through his/her effort to eliminate Muri
(anything excess than necessary), Muda (any type of waste) and Mura (any
unevenness).Muda (non-value added) exists everywhere and the customer is not
willing to pay for it. Kaizen aims to eliminate all types of wastes (eg. transport,
ol
Stability - The Philosophy (the Guiding principles) that has provided the much needed
stability to TPS is two pronged.
• Continuous improvement: (i) Being aware of the challenges to realize long-term
vision (ii) Kaizen through constant innovations and (iii) Going to the workplace
vt
(Genchi Genbutsu) to see the facts for oneself and make right decisions and create
consensus
• Respect for people: (i) taking responsibility for other people in reaching their
objectives, and to build mutual trust (ii) Develop individuals through team
approach to problem solving
86
Vtusolution.in
Vtusolution.in
in
rigorously implemented the concepts of JIT and Jidoka. Ohno, having visited the
American supermarkets, observed that shelves are refilled as items are withdrawn
(pulled) by customers. He realized that production scheduling can be better, if done in the
n.
way as the shelves are refilled in the supermarket, especially when overproduction was
not desirable. Thus the concept of Pull came into being in production areas. In a pull
system, a very small amount of inventory buffer is maintained between any two work
io
stations for lead time usage at successor work station, or to cushion against any irregular
supply. The worker at the next work station goes back to the previous station and takes
only that many parts which he needs for then. The worker at the previous station now
ut
produces the exact number of parts for replenishing those that were taken away the next
station’s worker. Thus the previous station’s worker produced almost Just-In-Time when
the part was needed by the next workstation. If the output is not taken, the previous
station’s worker simply stops producing. He does not produce unnecessarily, i.e, neither
ol
over- nor under-production. Necessary quantity’ is not defined by the MPS, but by shop-
floor demands.
Conceptually, customer is linked to assembly to fabrication to suppliers with series of
us
pull loops. As pull signals flow in one direction, product flows in the opposite direction.
Each operation that uses pull within the company becomes customer and supplier
respectively to its previous and next operations.
PUSH system PULL System
vt
Vtusolution.in
Vtusolution.in
in
Toyota) discovered that if they wanted to make their manufacturing system responsive,
they needed to cut lot sizes (relating to both production and procurement)
n.
Small Lot Size
But cutting lot sizes call for frequent change-over of setups (or orders) and result in
higher set-up (or ordering) costs. This conflict between carrying and set-up (or ordering)
io
costs is resolved by classical Economic lot size (or EOQ) approach by the Western
industry.Before Japanese (especially, Toyota) questioned, the set-up time (or ordering
cost) was taken for granted as unalterable. They strived very hard to drive down the
ut
change-over (or purchase order) costs- We will discuss how Japanese did it later. This
enabled a significant reduction in lot sizes, and set the JIT into motion.
ol
us
vt
When lot size drops all the way to one-piece-at-a-time (however, any reduction in lot size
would be helpful) the scrap and quality improvements are maximum. If a worker makes
88
Vtusolution.in
Vtusolution.in
only one part and passes it to the next worker immediately, the first worker soon hears if
the part does not fit in any of the next stations. Thus defects are discovered quickly and
their sources can be attacked before the next part is produced. Greater quality and less
scrap or rework saves material, rework-labour and time, etc. improving productivity. If
parts are made and moved in large lots, by the time the next workstation finds a defective,
several defectives could already be present in the lot. Hence less quality and more scrap.
in
The first worker who quickly learns about the effect of his workmanship will naturally
become motivated to improve. Worker’s awareness of defect causation is heightened.
This awareness of problems and their causes aid the workers, supervisors, engineers to
n.
generate ideas for:
• Controlling defects
• Improving JIT delivery performance (say, handling delays)
•
io
Cutting setup time which helps reduction in lot size further
Often, even when lot size is reduced drastically, still some buffer inventory is maintained
between workstations to cushion the irregularities in the part-feeder processes. Japanese
ut
do not accept the buffer principle as they think buffer inventory hides all flow- and
quality-related problems. Instead of adding it at the point of irregularities, they
deliberately remove it to expose the work force to consequences. In response, workers
and supervisors rally to root out the causes of irregularity at its source so that it won’t
ol
recur. Each time the cause of irregularity is corrected, the Japanese production managers
remove some more buffer stock. Workers are never allowed to settle into a comfortable
pattern. Rather the pattern becomes one of continually perfecting the production process.
us
Reduction in buffer, greater awareness of problem areas and correction lead to smoother
output rates.
The way MURI, MUDA and MURA (very popular in Japan for their significance and
symbolic brevity) are attacked can be seen in the above JIT cause-effect chain. MURI:
vt
Means Excess (Eg. Producing in large lot -EOQ- when it can be reduced to one-piece).
MUDA: Means Waste (Eg. Production of even one defective item is a waste, let alone %
defectives).MURA: Means Unevenness (Eg. Buffer stock implies unevenness in
production flow is accepted. The rational approach is to reduce buffer and expose the
systems to variability, and then deal with it)
89
Vtusolution.in
Vtusolution.in
Quick Setups:
Several processes defy production in small lots. Large setups can be as long as a day or
more. Hence, companies are reluctant to change setup before they produce the part in a
big lot from the setup made. On the other hand, having several dedicated lines for each
part may be expensive. Hence, engineers at Toyota worked to simplify and quicken the
in
die changing process. Shigeo Shingo, a consultant hired by Ohno was able to reduce the
setup time of a 1000-ton press from 6 hours to 3 minutes using the concept of SMED
Seven steps to SMED
n.
1. Observe the current method of changeover
2. Separate the INTERNAL and EXTERNAL activities: Internal activities are those that
can only be performed when the process is stopped, while External activities can be
io
done when the operation is on. For example, fetch tools for next operation before the
machine stops, setup of fixture, centering dies
3. Convert (where possible) Internal activities into External ones : Eg. pre-heating of dies
ut
4. Streamline the remaining internal activities - Simplifying/ eliminating adjustments,
coding settings, standardizing tools and materials, using quick locating and clamping
devices, guides/rails to move heavy dies, simplified tools, etc. Shigeo Shingo rightly
observed that it's only the last turn of a bolt that tightens it - the rest is just movement.
ol
For each iteration of the above process, a 45% improvement in set-up times should be
expected, so it may take several iterations to be less than ten minute time
The aim is for Single digit setuptime (less than 10 minutes), and then One-touch setup.
This can be done through better planning, process redesign, and product redesign.
90
Vtusolution.in
Vtusolution.in
To achieve smooth flow in lean system, many fundamental elements such as small lots,
flexible resources (people, machinery, layout), high quality, Jidoka, kanban, standardized
components and work methods, automated production must be in place.
Further to sustain the pull created in lean system, elements such as leveled production,
kaizen, close supplier ties, lean culture are needed
in
Flexible resources:
Flexible resources allow the system to more readily adapt to unanticipated changes in
demand.Flexibility comes from Cellular layouts, Flexible machinery, and Multifunctional
n.
workers. Equipment and routines are organized to enable each operator to simultaneously
handle multiple machines. Use of limit switches, jigs and fixtures, special tools, fool-
proof devices, quickly changeable tools and dies, etc. with the machines enabled each
io
worker in Toyota to handle as many as 17 machines (on an average of 5-10 machines)
Cellular Layout:The concept was pioneered by an US engineer in 1920s. But Ohno’s
inspired application not only improved flexibility but also greatly improved system
ut
effectiveness. A cell is a group of dissimilar machines arranged to process a family of
parts with similar processing requirements. Work is moved within the cell ideally one
unit at a time from one process to the next by a worker as he or she walks around the cell
in a prescribed path. Cell layouts are usually L or U shaped resembling a mini assembly
ol
line. Cellular layouts, especially U-shaped cells, are commonly used in lean
manufacturing environments to create workplace efficiency and flexibility. These layouts
ensure the shortest part movement distance, allow for sharing of work, provide a
us
foundation for one piece flow, and reduce the amount of floor space required. The teams
in cells are motivated and highly productive. The cycle time in a cell is determined by the
time the worker takes to complete his path through the cell attending to various machines
. Hence, regardless of the variety of parts being produced in a cell the operator cycle time
vt
remains constant (as worker’s path remains the same). The operator cycle time is to be
synchronized with takt time (Takt time is the rate at which the production should take
place, which of course is matched with the rate of customer demand).Changes in takt
time (or production volume) can be affected by adding or subtracting the workers in the
cell or modifying their paths in the cell.
91
Vtusolution.in
Vtusolution.in
Due to similarity of parts produced in a cell, setup changeover requirements are less, and
hence lot sizes that move downstream can be reduced
Flexible machinery: GPMs (rather than commercially available SPMs) are used with
necessary modification to suit the requirement. Often firms use their own tool makers to
build the needed machines. Such machines may be special purpose, light weight, easily
movable and low cost too. Eg. Small presses. The machines built in-house may also be fit
in
with necessary fixtures and dies so that there are no settings or adjustments
Multifunctional Workforce: Pull system runs only the parts that are needed, thus freeing
a good amount of time for constructive activities that will make the job and working
n.
conditions better. The shut down time is be spent on activities such as Preventive
maintenance, Quality improvements, House-keeping, Training, and Continuous
improvement.Job allotment to operators changes frequently (may be every week); so
io
every operator is required to master multiple jobs. The flexibility available with resources
facilitates the Pull system.
ut
Consistent High Quality:
High quality is a must for lean systems to operate, because there is no extra inventory to
buffer against defectives. The system neither has any scope nor provide any room for
scrap or rework.Smaller lot - Increases awareness and early detection of quality
ol
problems. Unquality can be quickly detected when a worker inspects the first and last
pieces of a smaller batch, or makes a piece and uses it too for further operation. The
source of problems can be traced and remedied before producing many defectives.
us
sheets; machines and stock points painted in different colours; clearly marked material
handling routes; demonstration and instructional stands near machines; display of quality
performance and awards; and on-going quality improvement projects.
Jidoka (Work/Line Stop): Jidoka is one of the two pillars of the Toyota Production
System along with just-in-time. Jidoka is enabling machines and authorizing operators to
92
Vtusolution.in
Vtusolution.in
stop work or production line when they detect or suspect any abnormality in the work
centre or system. This enables operations to build-in quality at each process and to
separate men and machines for more efficient work. Ohno believed that ‘Never passing-
on’ a defective part to the next station is the key for ‘zero defects’. For this to happen: (i)
All equipment are fitted with fool-proofing devices called poka-yoke and (ii) workers (i.e
champions of quality) are assigned this responsibility and are given the appropriate
in
authority (Jidoka). Whenever there is abnormality in the functioning of an equipment
such as tool ware, chip clog, etc resulting in unquality product production, the poka yoke
senses it and stops the equipment. It can also stop production when the required quantity
n.
is produced. Flash lights (called Andons) are located at each work station and on Andon
boards that could be viewed from anywhere in the plant. Andon boards display (LED)
the daily target, actual achievement, serial numbers of work stations (yellow and red
io
rows), etc. Whenever, a worker encounters a problem or even suspects one, he acts
(pressing a button/pulling a cord/thread, etc) which cause his workstation’s number to
flash on andon boards. Green light for normal operation, Yellow for calling help and Red
ut
for line stoppage. A flashing andon quickly summons supervisor, maintenance people,
engineers and even co-workers to solve the problem at its root-level.Jidoka is sometimes
called autonomation, meaning “automation with human intelligence” . In fact, the
production system is scheduled for less than its capacity to allow for such stoppages. All
ol
Jidoka drills are recorded and solutions for these problems are deliberated during the time
remaining after production
us
Kanban:
The use of kanbans enable exercising
greater control over the pull process
in the shop floor. Kanban means
vt
Vtusolution.in
Vtusolution.in
they are always filled with the same (ideally, small) quantity. Kanban card contains
information such as
Card number, Part number, Part name, Brief description of the part, Container type and
Capacity, Preceding (where it comes from) and Succeeding stations (where it goes to),
etc.
If the kanban is to move between supplier and customer companies, then additional
in
information such as supplier code, supplier name, number of trips/day, dock where the
goods are to be delivered, Group code, Route detail, etc, is indicated. The information on
kanban does not change. Kanban does not make the schedule of production. They only
n.
authorize the production or withdrawal of goods. Most sophisticated is Dual kanban
system:
Production kanban: authorizes production of goods (container quantity) and
io
Withdrawal kanban: authorizes withdrawal of movement of container full of goods
flashing light, electronic or verbal message are used. Signal Kanbans are used when
inventory between the processes is still necessary.
Supplier kanban: The supplier brings the ordered material directly to the point of use and
then picks up the empty container with kanban (if any) to fill and return later. If there are
94
Vtusolution.in
Vtusolution.in
more suppliers and large number of kanbans, then kanban mailbox can also be used. The
number of kanbans required to control production of an item can be calculated by:
No. of kanbans = (Ave. demand during lead time + safety stock)/ Container size
Problem 1. Masaru fills, caps and labels syrup bottles. He is to process an average of 160
bottles per hour through his cell. Every container attached with a kanban holds 10 bottles.
in
It takes 30 minutes to receive new bottles from the previous cell. The factory uses a
safety stock factor of 10%. How many kanbans should circulate between these cells
Solution: N = [(160 x 0.5) + 8] / 10 = 8.8 Kanbans
n.
Having 8 containers would result in lesser inventory at the cell and exposes problems in
the cell, thus forcing the cell to improve its processes.
io
Standardized Components and Work methods:
Use of standardized component parts and methods of operation are encouraged. They
reduce the non-value adding design elements and process elements to a minimum, and
ut
improve the consistency and efficiency in operations. The applications of value analysis
and work-study techniques are widely seen in this effort.
Standardized Work: The Toyota Production System organizes all jobs around human
motion and creates an efficient production sequence without any "Muda." Work
ol
Automated Production:
Effective lean production systems use both manual and automated processes - the task is
to determine the appropriate type of automation. The process industries are ultimate in
efficiency and productivity due to the: (i) continuous flow of products (gases, liquids,
paint, pallets, powder, petrochemicals, steel, etc) in the system; (ii) high degree of
95
Vtusolution.in
Vtusolution.in
in
efficiency.It is the intention of lean management approach to make discrete unit
production (not only assembly stage but also all fabrication and subassembly stages) into
a continuous flow production system, i.e., much like continuous processing in process
n.
industry. This, often requires the discrete unit production shops to move stage-by-stage
through various plant configurations (before becoming continuous flow/repetitive
production system.) These stages are (stages may also be skipped):
•
•
•
Job-shop fabrication
io
Dedicated production line
Physically merged production processes
ut
• Mixed-model processing
• Automated production lines
Automated dedicated assembly lines may be common (eg. automobile body welding).
But, automated mixed model assembly line, automated subassembly and fabrication
ol
shops/cells are not. Japanese extensively use psuedo-robots (less flexible-pick and place
type) that aid a lot when the buffer between the work stations is being reduced.
When all efficiency improvement aid are provided to the worker, but he still is unable to
us
cope with problems, best option is to automate a part of his work.However, mixed model
production calls for flexible robots which can be programmed to change parameters
depending upon the next model.CAD/CAM compress planning lead time so that the
product quickly gets ready for manufacture. Robots and automated machine tools quickly
vt
make consistently good quality products, with no buffer or waste thus compressing
manufacturing lead time. Automatic quality control (poka yoke) is an aid towards JIT
system
Vtusolution.in
Vtusolution.in
The flow of production created by pull system, kanban, small lots of high quality, flexible
resources and jidoka can be maintained only if the production is relatively steady. Hence,
there is a need to smoothen the production requirement at the final assembly. Otherwise,
kanbans of some parts will circulate very quickly at some times and very slowly at others.
Variations of ± 10% is can be absorbed.
How to reduce variability?
in
1. More accurate forecasts to guard against unexpected demand
• Sales division (eg. Toyota) conducts a survey twice a year
• Monthly production schedules are developed 2 months in advance
n.
• Review plans 1 month in advance and again 10 days in advance
• Daily production are finalized 4 days in advance (Freeze windows) of actual
production(by then orders from dealers are firm)
•
io
Changes in model mix can be communicated to the assembly line just the previous
evening. Kanbans will take care this change in the rest of the system
2. Level the demand across planning horizon:
ut
• Demand is divided into small increments of time and spread out as evenly as
possible so that same amount of each item is produced each day and
• The item production is mixed throughout the day in very small quantities. Produce
roughly the same mix of products each day, using a repeating sequence
ol
• Daily production is arranged in the same ratio as monthly demand and jobs are
distributed as evenly as possible across a day’s schedule
• At least some quantity of every item is produced daily and some quantity is
us
thrice that of vans. Assuming 20 working days in the month, how should the vehicles be
produced to have smoother production?
Solution:
Daily breakdown = 220/20 = 11 vehicles
97
Vtusolution.in
Vtusolution.in
in
- Improve quality of product/service
- Eliminating waste (Muda)
- Improving process efficiency and effectiveness
n.
- Improving morale of employees
Quality is everybody’s responsibility, not just of QC dept. Every employee at every level
participates and contributes ideas to improve the processes and environment. Workers
io
voluntarily spot quality problems, stop operation if needed, trace the source of unquality,
get together to analyze processes and generate ideas for improvement and adjust their
working routines(Upward communication). Kaizen can be better achieved by finding
ut
root causes of problems. To find root cause of a problem – Ask WHYs until the
underlying cause is identified
Anticipate/identify the problem, analyze the root causes, develop alternative solutions,
choose the best one, measure the work content, standardize the method and monitor
ol
to implement, Not a big change for people to resist, People enjoy the implementation as it
is their ideas. Kaizen relies on the human resource rather than capital investments.
Continuous improvement process will make sure the system is always getting updated
vt
Vtusolution.in
Vtusolution.in
in
quality management help
3. Supplier certification: Several stages - Supplier’s products, production facilities,
quality systems, logistic resources are examined by the customer. Statistics of
n.
each shipment are checked. After about 6 months of no problems, the supplier is
certified. Only then the goods from the supplier is considered for exemption from
incoming quality inspection. However, any cost of line stop/product recall due to
io
defective supply may also be recovered from supplier
4. Mixed loads and frequent deliveries: Smaller quantities of variety of goods from
several suppliers makeup a truck load and are delivered directly at the point of use
ut
in customer’s plant, several times a day. Several suppliers share local warehouses.
Precise delivery schedules are drawn and adhered to
5. Standardized, sequenced delivery: Using standardized containers, and exchanging
filled ones with empty ones speeds up the delivery. If deliveries are made directly
ol
may establish small warehouses near to the customer, which they may also share
with other suppliers. These warehouses can also serve as load switching points for
JIT deliveries to different customers
7. Close relationships b/w buyers and suppliers' QC people. Suppliers helped to meet
vt
quality requirement
Suppliers with stringent quality standards could forego incoming inspection and goods
could be delivered right at the assembly line even without being counted, inspected,
tagged or stacked. Suppliers encouraged to package in exact quantities. No overage or
underage is acceptable. Suppliers who try to meet the increasing demands of lean
99
Vtusolution.in
Vtusolution.in
customer without being themselves would have to overrun with inventory, very high
production and distribution costs. Suppliers are encouraged to reduce their production lot
sizes
Lean Purchasing: Japanese JIT buyers rely more on performance specifications and less
on design specifications, giving more room for supplier to innovate. Delay due to spec-
clarification is avoided. Japanese JIT purchase agreements involve minimum paper
in
work, and may specify (in addition to price and specifications) an overall quantity to be
delivered during a period of several months. Purchase agreement specifies that delivery is
to be made either as per the long-term production schedule or release of kanban (which
n.
may be directly from work centre to supplier). Quantities to be delivered may vary from
delivery to delivery, but fixed for whole contract term
io
Machines need maintenance. Maintenance is undertaken,
(i) when a machine breaks down (Breakdown maintenance): Breakdown can be very
ut
expensive due to lost production, idle workers and supervisors, damaged tools and
products, missed deadlines, accidents, etc. Often, cost of up-keeping a broken down
machine is much higher than preventing the breakdown.
(ii) at predetermined times to prevent equipment from breaking down (Preventive
ol
analysis to determine the frequency and schedule of PM, case reports after PM, etc.
But in spite of the PM, breakdown cannot fully prevented. Hence, what Lean system
needs is Total Productive Maintenance (TPM).
TPM is a combination of preventive maintenance and TQC (worker empowerment, zero
vt
defects, QC tools, etc). TPM requires management to take a broader and strategic view of
maintenance activities. Workers take daily care of their machines and the work
environment. They clean, oil and grease their machines, adjust the settings, do minor
repair, collect and interpret the maintenance and operating data, etc.
As a part of TPM, 5–S approach is also widely used.
100
Vtusolution.in
Vtusolution.in
in
everything in its
place
SEISO (Shine Cleaning and looking Floors, walls, stairs, equipment, tool
n.
for ways to keep clean trays, display boards, tools and materials
and organized
SEIKETSU Maintaining and Unavailable information, check-lists,
(Standardize
three
S’s
io
monitoring the first standards, prescribed limits
ut
SHISUKE Sticking to the rules Number of workers without 5-S training,
(Sustain) inability to locate anything within 30
seconds, Number of 5-S inspections not
ol
performed
Vtusolution.in
Vtusolution.in
Limitations of Lean:
in
• Not appropriate for all types of organizations
• Companies with high variability of demand (takt time breaks down), large variety
of lowvolume products (too many kanbans) or custom-engineered products (no
n.
kanbans) find serious deficiencies in this approach.
• Lean gets derailed when unexpected changes in demand or supply occur (eg. Fire,
strike, natural calamities, etc. at supplier’s place)
•
io
Hence, companies should assess risk and uncertainty in their businesses and adapt
lean practices accordingly
ut
\
ol
us
vt
102